ITP s. : HCMC-260-VDGN-CVS-PLN-00002-E Hng Mc Thi cng S: S. 5.2.1.xx Thi cng i cc cu cn STT I 1 Cng Vic Thi Cng/ Hot ng S : E M T Hng Mc Thi Cng:
Ch u T: i Din Ch u T: Nh Thu:
Cng tc chun b
Cc ti liu chun b : Ngy Thng nm 2013 Kim tra B tng ti : Ngy Thng nm 2013 Giao nhn thp/cng tc ly mu thp Ngy Thng nm 2013 Tp kt Thit B thi cng i cc : Ngy Thng nm 2013 < Trnh t cng vic> Kim tra khung vy ca h mng (nu yu cu) Cao , ta h o b tng / th nghim st b tng/ o nhit b tng lt Phiu b tng lt Cao & ta b tng lt Lp t ct thp Ta v cao vn khun/ Tim dc, tim ngang Cng tc chun b b tng b tng / th nghim st b tng/ o nhit b tng i cc
4 II 5
10
11
12
13
14
Phiu b tng i cc Nghim thu kt cu hon thnh (i cc) (Kim tra tim dc, tim ngang, ta , cao , kch thc..) Bin bn kim tra p tr kt cu <Th nghim>
15
16
17
18
Th nghim b tng lt
19
Th nghim b tng
Kim Tra bi Thi Cng Qun L Cht Lng
Xc Nhn
Son Tho bi
Tn v Chc v
Ch u T: i Din Ch u T: Nh Thu:
Ch K Ngy
Ghi Ch
h i cc bao gm o, B tng lt, Cung cp v Lp t ct thp, Vn khun, b tng v bo dng (Khu vc cu cn)
SCC
Ghi nhn S 5.2.1.xx-01 Ghi nhn S 5.2.1.xx-02 Cng tc xy dng S 5.2.1.xx-01 Cng tc xy dng S 5.2.1.xx-02
SCC
NJPT
NJPT
Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ JIS A 1101 hoc AASHTO Phng php th nghim T119 Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ TCVN 4453 : 1995 Cng Tiu Chun K Thut Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ TCVN 4453 : 1995 Cng Tiu Chun K Thut Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ JIS A 1101 hoc AASHTO Phng php th nghim T119 Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng
SCC
SCC
SCC
SCC
Ghi nhn S 5.2.1.xx-06 Ghi nhn S 5.2.1.xx-07 Cng tc xy dng S 5.2.1.xx-03 Cng tc xy dng S 5.2.1.xx-04 Ghi nhn S 5.2.1.xx-08
NJPT
NJPT
NJPT
SCC
SCC
SCC
NJPT
NJPT
Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/JIS G 3112 Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ Phng php JIS A 1108 hay Phng php th nghim AASHTO T22 Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ Phng php JIS A 1108 hay Phng php th nghim AASHTO T22 Kim Tra bi Qun L Cht Lng
n v thc hin th nghim c duyt (TBA) n v thc hin th nghim c duyt (TBA)
Ph Duyt bi
h i cc bao gm o, B tng lt, Cung cp v Lp t ct thp, Vn khun, b tng v bo dng (Khu vc cu cn)
Management Authority for Urban Railways NJPT Association General Contractor, SCC s Representative
Issued Date : 5-Jul-13 Complete Cast-in-situ Pile cap including Excavation, Lean Concrete or Sealing Concrete, Supply and installation of Reinforcement, Form Work, Concrete placing and curing (Viaduc
Every Pile cap Every Delivery and each bottom Every set up of Equipment
Visual
Employer's requirement
Work Spec/OCS
Mill Sheet
Employer's requirement
Work Spec/OCS
Method Statement
Employer's requirement
Work Spec/OCS
Materials type ,Joint, dimensions, stabilizing Not higher than design elevation 125 25 mm, Not more than 35 Employer's requirement
Work spec/OCS
Foundation Hole Elevation, Coordinate Concrete Placing/ Slump Test / Temperature Measurement of lean concrete Concrete Placing Record of lean concrete
Work Spec/OCS Work Spec/OCS/JIS A 1101 or AASHTO Test Method T119 Work Spec/OCS Work Spec/OCS/ TCVN 4453 : 1995 Work Spec/OCS Work Spec/OCS/ TCVN 4453 : 1995 Work Spec/OCS Work Spec/OCS/JIS A 1101 or AASHTO Test Method T119 Work Spec/OCS
Every Truck
Construction Specifications
Delivery Sheet
Construction Drawings
Ele. 20mm
10
Arrangement of Steel Bar Formwork Coordinate & Elevation/ Centerline on longitudinal, transversal direction Preparation work for Concrete Placing Concrete Placing/ Slump Test / Temperature Measurement of Pile cap Concrete Placing Record of Pile cap Structure completed (Pile Cap) (Checking centerline on longitudinal, transversal direction, Coordinate, Elevation, Dimension..) Backfilling Works of Structure
Construction Drawings
Size, Spacing, Splicing +25 mm and -12 mm Coordinate 5 mm Ele. 10 mm Employer's requirement 100 25 mm, Not more than 35 Employer's requirement Construction Joint, Visual shape & Surface Checking k 90%
11
Construction Drawings
12
Method Statement
13
Every Truck
Construction Specifications
14
Method Statement
15
Construction Drawings
Work Spec/OCS
16
Method Statement
Work Spec/OCS
Management Authority for Urban Railways NJPT Association General Contractor, SCC s Representative
Issued Date : 5-Jul-13 Complete Cast-in-situ Pile cap including Excavation, Lean Concrete or Sealing Concrete, Supply and installation of Reinforcement, Form Work, Concrete placing and curing (Viaduc
18
Construction Specifications
Laboratory test
15Mpa
19
Construction Specifications
Laboratory test
35Mpa
Clasification
Prepared by
Approved by
Signature
Date
LEGEND:
n-situ Pile cap including Excavation, Lean Concrete or Sealing Concrete, Supply and installation of Reinforcement, Form Work, Concrete placing and curing (Viaduct Location)
SCC
Record No. 5.2.1.xx-01 Record No. 5.2.1.xx-02 Construction Job No. 5.2.1.xx-01 Construction Job No. 5.2.1.xx-02
SCC
NJPT
NJPT
SCC
Record No. 5.2.1.xx-03 Record No. 5.2.1.xx-04 Record No. 5.2.1.xx-05 Record No. 5.2.1.xx-06 Record No. 5.2.1.xx-07 Construction Job No. 5.2.1.xx-03 Construction Job No. 5.2.1.xx-04 Record No. 5.2.1.xx-08 Record No. 5.2.1.xx-09 Record No. 5.2.1.xx-10 Construction Job No. 5.2.1.xx-05 Construction Job No. 5.2.1.xx-06
SCC
SCC
SCC
NJPT
NJPT
NJPT
SCC
SCC
SCC
NJPT
NJPT
n-situ Pile cap including Excavation, Lean Concrete or Sealing Concrete, Supply and installation of Reinforcement, Form Work, Concrete placing and curing (Viaduct Location)
Approved by
Ch u T: i Din Ch u T: Nh Thu:
Ngy lp : 7/5/2013 Cng tc ti ch i cc bao gm o, B tng lt, Cung cp v Lp t ct thp, Vn khun, b tng v bo dng (Khu vc cu cn)
Quan St
Yu cu ca Ch u T
SCC
Yu cu ca Ch u T
NJPT
Quan St v o c
Yu cu ca Ch u T
NJPT
Mi i cc
Cao , ta h o
Mi i cc
Mi xe b tng
Phiu b tng lt
Mi i cc
Mi i cc
Bn v thi cng
Tiu chun thi cng/ Loi vt liu, cc lin kt, Cng Tiu Chun K Thut cc kch thc, n nh Thi Cng Tiu chun thi cng/ Khng cao hn cao thit Quan St v o c Cng Tiu Chun K Thut k Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut o st b tng 125 25 mm, Thi Cng/ Kim tra nhit Khng ln hn 35 JIS A 1101 hoc AASHTO Phng php th nghim T119 Tiu chun thi cng/ Thi Gian v Khi Lng b Yu cu ca Ch u T Cng Tiu Chun K Thut tng Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Quan St v o c Cao . 20mm Thi Cng/ TCVN 4453 : 1995 Quan St v o c Quan St v o c Kch Thc, Khong cch, Mi ni +25 mm v-12 mm ta 5mm cao 10mm Yu cu ca Ch u T Cng Tiu Chun K Thut Thi Cng Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ TCVN 4453 : 1995 Cng Tiu Chun K Thut Thi Cng
SCC
SCC
SCC
SCC
NJPT
10
Lp t ct thp
Mi i cc
Bn v thi cng
NJPT
11
Mi i cc
Bn v thi cng
Quan St v o c
NJPT
12
Mi i cc
o c
SCC
Ch u T: i Din Ch u T: Nh Thu:
Ngy lp : 7/5/2013 Cng tc ti ch i cc bao gm o, B tng lt, Cung cp v Lp t ct thp, Vn khun, b tng v bo dng (Khu vc cu cn)
13
Mi xe b tng
SCC
14
Phiu b tng i cc
Mi i cc
Yu cu ca Ch u T
SCC
15
Nghim thu kt cu hon thnh (i cc) (Kim tra tim dc, tim ngang, ta , cao , kch thc..)
Mi i cc
Bn v thi cng
Quan St v o c
Tiu chun thi cng/ Mi ni thi cng, b mt v Cng Tiu Chun K Thut hnh dng Thi Cng k 90% Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng
NJPT
16
Mi i cc
Quan St v o c
NJPT
17
Th Nghim ti phng
Tiu chun thi cng/ Cng thp theo bn v Cng Tiu Chun K Thut thit k Thi Cng/JIS G 3112 Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ Phng php JIS A 1108 hay Phng php th nghim AASHTO T22 Tiu chun thi cng/ Cng Tiu Chun K Thut Thi Cng/ Phng php JIS A 1108 hay Phng php th nghim AASHTO T22
n v thc hin th nghim c duyt (TBA) n v thc hin th nghim c duyt (TBA)
18
Th nghim b tng lt
Th Nghim ti phng
15Mpa
19
Th nghim b tng
Th Nghim ti phng
35Mpa
Xc Nhn
Son Tho bi
Ph Duyt bi
Tn v Chc v
Ch K Ngy
Ghi Ch
Ghi nhn S 5.2.1.xx-01 Ghi nhn S 5.2.1.xx-02 Cng tc xy dng S 5.2.1.xx-01 Cng tc xy dng S 5.2.1.xx-02
Ghi nhn S 5.2.1.xx-06 Ghi nhn S 5.2.1.xx-07 Cng tc xy dng S 5.2.1.xx-03 Cng tc xy dng S 5.2.1.xx-04 Ghi nhn S 5.2.1.xx-08
Ph Duyt bi
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERTIFICATE FOR ACCEPTANCE OF CONSTRUCTION PARTS BIN BN NGHIM THU CC PHN VIC XY DNG
Form (5a)
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Parts have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked and accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant). Consequently in accordance with Decree 48/2010/ND-CP dated 7 May 2010 this Certificate shall be the supporting document for Application of Interim Payment by SumitomoCIENCO6 Consortium. Cn c Ngh nh 15/2013/ND-CP, ngy 6 thng 2 nm 2013, cc phn vic xy dng sau y c thc hin bi nh thu ph ca Lin danh SumitomoCIENCO6 (SCC) v c kim tra v chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). Theo , cn c theo Ngh nh 48/2010/ND-CP ngy 7 thng 5 nm 2010, Bin bn ny s l Ti liu h tr cho Yu cu thanh ton tm bi Lin danh Sumitomo-CIENCO 6.
Object of Acceptance Inspection and Certificate i tng nghim thu No. of Construction Part: S ca Phn vic xy dng Description of Construction Part: M t ca Phn vic xy dng Achievement of Construction Part: Phn vic xy dng hon thnh : No. 5.2.1.xx S 5.2.1.xx Complete all pile caps including Structural Excavation, Form work, Re-bar installation and concrete placing at each pier Hon thnh ton b i cc bao gm o, vn khun, lp t ct thp v b tng ti mi ct Complete Cast-in-situ Pile cap including Excavation, Lean Concrete or Sealing Concrete, Supply and installation of Reinforcement, Form Work, Concrete placing and curing Cng tc ti ch i cc bao gm o, B tng lt, Cung cp v Lp t ct thp, Vn khun, b tng v bo dng
Participants to Acceptance Inspection Thnh phn tham gia nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT) Sumitomo-CIENCO6 Consortium Lin danh Sumitomo-CIENCO 6
Name of Person in charge Tn ngi ph trch Signature: Ch k: Date of Acceptance Inspection Ngy nghim thu Date:. Ngy:
Place: . a im:.
Assessment of Completed Construction Part / nh gi cng vic xy dng hon thnh Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn: a) Documents as basis for Inspection / Ti liu dng lm cn c nghim thu Base on Contract No.61/H-BQLST Cn c Hp ng s 61/H-BQLST Decision of Approval for Subcontractor : Ref No Date . Quyt nh ph duyt nh thu ph: S .. Ngy Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Request for Acceptance for Pile cap of General Contractor SCC: As Attached Phiu yu cu nghim thu cng tc i cc ca tng thu SCC : nh km
Page 13 of 70
Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n b) Quality of Inspected Work / nh gi cht lng cng vic c nghim thu
c) Inspection of Work on site including measurements / Nghim thu thc t ti hin trng bao gm kt qu o kim tra - Test result of material and equipment: As Attached Kt qu kim tra th nghim vt liu v thit b: nh km - Site construction Inspection sheets: As Attached Cc bin bn kim tra hin trng: nh km - Construction diary and other related documents Nht k thi cng v cc ti liu khc lin quan - Internal Acceptance for General Contractor Bin bn nghim thu ni b tng thu d) Comments of Employer's Representative (NJPT) if any / Nhn xt ca i din Ch u t (NJPT) nu c
Conclusion Kt lun
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu
Employer's Representative (NJPT) i din Ch u t (NJPT) Project Manager: (Full Name and Signature) Gim c d n (K, h tn)
Sumitomo-CIENCO6 Consortium Lin danh Sumitomo-CIENCO 6 Project Manager: (Full Name and Signature) Gim c d n (K, h tn)
Shigeki IHARA
Page 14 of 70
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CHECK LIST FOR CERTIFICATE FOR ACCEPTANCE OF CONSTRUCTION PARTS BIN BN KIM TRA H S NGHIM THU CNG VIC XY DNG
Object of Acceptance Inspection and Certificate i tng nghim thu No. of Construction Part: S ca Phn vic xy dng Description of Construction Part: M t ca Phn vic xy dng Achievement of Construction Part: Phn vic xy dng hon thnh : Comply with: Tun theo: CERTIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG Ref. No. S Not required Khng yu cu Not required Khng yu cu Certificate of Job / BB Nghim thu No. 5.2.1.xx-01 Certificate of Job / BB Nghim thu No. 5.2.1.xx-02 Not required Khng yu cu Not required Khng yu cu Not required Khng yu cu Not required Khng yu cu Not required Khng yu cu Certificate of Job / BB Nghim thu No. 5.2.1.xx-03 Certificate of Job / BB Nghim thu No. 5.2.1.xx-04 Not required Khng yu cu Not required Khng yu cu Not required Khng yu cu Signiture Ch k SCC NJPT No. 5.2.1.xx S 5.2.1.xx Complete all pile caps including Structural Excavation, Form work, Re-bar installation and concrete placing at each pier Hon thnh ton b i cc bao gm o, vn khun, lp t ct thp v b tng ti mi ct Complete Cast-in-situ Pile cap including Excavation, Lean Concrete or Sealing Concrete, Supply and installation of Reinforcement, Form Work, Concrete placing and curing Cng tc ti ch i cc bao gm o, B tng lt, Cung cp v Lp t ct thp, Vn khun, b tng v bo dng
Work Item based on the Contractor's Inspection & Testing Plan Cng vic da trn K hoch Nghim thu & Kim tra ca Nh thu
INSPECTION SHEETS BY THE CONTRACTOR PHIU NGHIM THU BI NH THU Signiture Ch k SCC NJPT
Ref. No. S Record No. 5.2.1.xx-01 Record No. 5.2.1.xx-02 Certificate of Job / BB Nghim thu No. 5.2.1.xx-01 Certificate of Job / BB Nghim thu No. 5.2.1.xx-02 Record No. 5.2.1.xx-03 Record No. 5.2.1.xx-04 Record No. 5.2.1.xx-05 Record No. 5.2.1.xx-06 Record No. 5.2.1.xx-07 Certificate of Job / BB Nghim thu No. 5.2.1.xx-03 Certificate of Job / BB Nghim thu No. 5.2.1.xx-04 Record No. 5.2.1.xx-08 Record No. 5.2.1.xx-09 Record No. 5.2.1.xx-10
N/A
Preparation Documents Cc ti liu chun b Checking of Ready Mix Concrete Kim tra B tng ti Delivery of Reinforcing Steel Bar/Sampling for testing Giao nhn thp/cng tc ly mu thp Mobilization Equipment of Pile cap Tp kt Thit B thi cng i cc Checking cofferdam of foundation hole(if required) Kim tra khung vy ca h mng (nu yu cu) Foundation Hole Elevation, Coordinate Cao , ta h o Concrete Placing/ Slump Test / Temperature Measurement of lean concrete b tng / th nghim st b tng/ o nhit b tng lt Concrete Placing Record of lean concrete Phiu b tng lt Lean Concrete Ele.& Coordinate Cao & ta b tng lt Arrangement of Steel Bar Lp t ct thp Formwork Coordinate & Elevation/ Centerline on longitudinal, transversal direction Ta v cao vn khun/ Tim dc, tim ngang Preparation work for Concrete Placing Cng tc chun b b tng Concrete Placing/ Slump Test / Temperature Measurement of Pile cap b tng / th nghim st b tng/ o nhit b tng i cc Concrete Placing Record of Pile cap Phiu b tng i cc
10
11
12
13
14
15 of 70
15
Structure completed (Pile Cap) (Checking centerline on longitudinal, transversal direction, Coordinate, Elevation, Dimension..) Nghim thu kt cu hon thnh (i cc) (Kim tra tim dc, tim ngang, ta , cao , kch thc..) Backfilling Works of Structure Bin bn kim tra p tr kt cu Reinforcing steel bar testing Bin bn kim tra Th nghim thp Concrete / Compressive Strength of lean concrete Th nghim b tng lt Concrete / Compressive Strength Th nghim b tng Internal Acceptance Nghim thu ni b
16
Certificate of Job / BB Nghim thu No. 5.2.1.xx-06 Certificate of Job / BB Nghim thu No. 5.2.1.xx-07 Not required Khng yu cu Certificate of Job / BB Nghim thu No. 5.2.1.xx-08
Certificate of Job / BB Nghim thu No. 5.2.1.xx-06 Certificate of Job / BB Nghim thu No. 5.2.1.xx-07 Record No. 5.2.1.xx-11 Certificate of Job / BB Nghim thu No. 5.2.1.xx-08
17
18
19
20
Signature: Ch k:
Signature: Ch k:
Date: Ngy:
Date: Ngy:
16 of 70
THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness CNG HA X HI CH NGHA VIT NAM c lp - T do - Hnh phc ------------------------Place (a im):. Date (Thi gian):/../ MINUTES NUMBER/ BIN BN S: . INTERNAL ACCEPTANCE FOR PILE CAP OF VIADUCT NGHIM THU NI B CNG TC I CC CU CN PROJECT: Ho Chi Minh City Urban Railway Construction Project Ben Thanh - Suoi Tien Section (Line 1) CNG TRNH: D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) 1. Object of acceptance: i tng nghim thu: Piles Cap No. .. At Pier Location. Thi cng i cc s . Ti v tr Tr .
Location : Coordinate/Ta X= . V tr xy dng: Y= 2. Acceptance participants/ Thnh phn trc tip nghim thu: a) SCCs Supervision Representative (Sumitomo - Cienco6 Consortium): i din Gim st ca Tng thu SCC (Lin Danh Sumitomo - Cienco6) : - Mr. . - Mr. . b) Sub-Contractor s Representative: i din nh thu ph: - Mr. . - Mr. . 3. Time of Acceptance/ Thi gian nghim thu: From/ T: .. (Date/ ngy . month/ thng ... year/nm ..) To/ n:.. At/ Ti:. Construction Site/ Hin trng 4. Evaluation for implemented work item/ nh gi cng vic c thc hin: a) Related documents used for acceptance/ V cc ti liu lm cn c nghim thu: Decision of Approval for Subcontractor : Ref No Date . Quyt nh ph duyt nh thu ph: S .. Ngy Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Technical standard, norm applied: Quy chun, tiu chun c p dng: (Date/ ngy . month/ thng ... year/nm ..) : Site Manager/ Ch huy cng trng : Engineer in charge/ K s ph trch trc tip : Supervision Manager / Qun l Gim st : Supervision Engineer / K s Gim st
- Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n Test result of material and equipment: Kt qu kim tra th nghim vt liu v thit b: - Test result of material and equipment: As Attached Kt qu kim tra th nghim vt liu v thit b: nh km - Construction diary and other related documents Nht k thi cng v cc ti liu khc lin quan - Site construction Inspection sheets: As Attached Cc bin bn kim tra hin trng: nh km Quantity Complete/ Khi lng thi cng: - Piles Cap No. .. Type . i cc s . Loi . b) Construction quality (Comparison with design, standard and technical requirement)/ V cht lng cng vic xy dng (i chiu vi thit k, tiu chun xy dng v yu cu k thut): Met requirement/ t yu cu c) Other comments, (if any)/ Cc kin khc (nu c): .. .. 5. Conclusion/ Kt lun: - Acceptance agreed, Agreed for Sub-Contractor to carry out next construction works. Kt lun: ng nghim thu, ng cho Nh Thu ph trin khai cc cng vic xy dng tip theo. SCC'S SUPERVISION REPRESENTATIVE GIM ST CA TNG THU SCC SUB-CONTRACTOR'S REPRESENTATIVE I DIN NH THU PH
Records of Acceptance For Construction Job/ H s nghim thu cng vic xy dng gm: - Inspection sheets of construction jobs and document attached above Clause 4.a / Bin bn nghim thu cng vic xy dng v cc ti liu nh km theo mc 4.a bn trn; - Related documents used for acceptance/ Cc ti liu lm cn c nghim thu
THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness CNG HA X HI CH NGHA VIT NAM c lp - T do - Hnh phc -------------------------Place (a im):. Date (Thi gian):/../ REQUEST FOR ACCEPTANCE/ PHIU YU CU NGHIM THU: ACCEPTANCE FOR PILE CAP WORKS OF VIADUCT NGHIM THU CNG TC I CC CU CN PROJECT: Ho Chi Minh City Urban Railway Construction Project Ben Thanh - Suoi Tien Section (Line 1) CNG TRNH: D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) 1. Object of acceptance: i tng nghim thu: Piles Cap No. .. At Pier Location. Thi cng i cc s . Ti v tr Tr .
Location : Coordinate/Ta X= . V tr xy dng: Y= 2. Time of Acceptance/ Thi gian mi nghim thu: From/ T: .. (Date/ ngy . month/ thng ... year/nm ..) To/ n:.. At/ Ti:. Construction Site/ Hin trng 3. Bases for acceptance/ Ti liu chun b nghim thu: Decision of Approval for Subcontractor : Ref No Date . Quyt nh ph duyt nh thu ph: S .. Ngy Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t Project Outline Construction Specification - Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n Test result of material and equipment: Kt qu kim tra th nghim vt liu v thit b: - Test result of material and equipment: As Attached Kt qu kim tra th nghim vt liu v thit b: nh km (Date/ ngy . month/ thng ... year/nm ..)
- Site construction Inspection sheets: As Attached Cc bin bn kim tra hin trng: nh km - Construction diary and other related documents Nht k thi cng v cc ti liu khc lin quan - Internal Acceptance for General Contractor Bin bn nghim thu ni b tng thu Requested by / ngh bi : .. Position / Chc v : . Received by / Tip nhn bi : Position / Chc v : . Date/ ngy dd/mm/yy NJPT comments / kin ca NJPT : Signature / K tn : Signature / K tn :
THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness CNG HA X HI CH NGHA VIT NAM c lp - T do - Hnh phc
a im):. Date (Thi gian):/../ ACCEPTANCE FOR PILE CAP WORKS OF VIADUCT NGHIM THU CNG TC I CC CU CN
ECT: Ho Chi Minh City Urban Railway Construction Project Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot)
lithic concrete and reinforced concrete structures Codes for construction, check
HCMC-260-VDGN-CVS-PLN-00002-E-01
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET PREPARATION DOCUMENTS PHIU KIM TRA CC TI LIU CHUN B
Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn:
5.2.1.xx-01
Description (Ni dung) I. Preparation Documents (Ti liu chun b) - Working Drawing Approved and Design changes Approved/ Bn v thi cng c duyt v nhng thay i thit k c chp thun
OK
NG
- Approved Method Statement for Construction/ Bin php Thi cng c duyt
- Inspection and Testing Plan(ITP) Approved/ K hoch kim tra v nghim thu (ITP) c duyt - Related documents of Construction area plan, Existing Utility Plan (If any)/ Ti liu v a hnh ni thi cng, cc cng trnh tin ch hin hu (nu c). - Approved Design of form-work, of scaffolding, bracing (if any) and temporary work needed for pile cap construction/ Thit k c duyt ca vn khun, dn gio, thanh ging (nu c) v cc cng tc tm cn thit cho thi cng i cc - Source of Material Supply, Location of disposal soil/ Ngun vt liu cung cp cho cng trnh, v tr t thi. II. Another ( Cc vn khc )
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM Supervision / QC Engineer (Gim st/ k s cht lng)
HCMC-260-VDGN-CVS-PLN-00002-E-02 Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot)
INSPECTION SHEET READY MIX CONRETE (BIN BN KIM TRA B TNG TI)
Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn: OK NG Remark (Ghi nhn)
5.2.1.xx-02
Description (Ni dung) I. Checking item (Cng tc) - Concrete grade (Cp b tng) - Concrete supplier (Nh cung cp b tng)
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM Supervision / QC Engineer (Gim st/ k s cht lng)
HCMC-260-VDGN-CVS-PLN-00002-E-03
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked and accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant). Cn c Ngh nh 15/2013/ND-CP ngy 6 thng 2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh SumitomoCIENCO6 (SCC) v c kim tra v chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung).
Construction Job No. Cng vic xy dng s Description of Construction Job M t cng vic xy dng Item No. of ITP S ITP Description of Work M t cng vic Date: Ngy:
No. [ ] 5.2.1.xx-01 S 5.2.1.xx-01 Delivery of reinforcing steel bar/sampling for testing Kim tra giao nhn thp/cng tc ly mu thp cho th nghim HCMC-260-VDGN-CVS-PLN-00002Chainage / L trnh: Pier No. / S hiu tr: Place: a im:
Subject i tng
Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn:
a) Documents as basis for Inspection / Cc t i liu dng lm cn c nghim thu Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n
Item / Hng mc
Conclusion Kt lun
Not OK
Mill Certificate (Lot/heat No./batch/size etc) Chng ch cht lng xut xng (bao gm:l hng, m xut xng, kch c) Sample quantities + Signature Parties S lng mu + ch k cc bn tham gia
Attachment nh km
Record only Lu tr
OK
Not OK
Attachment nh km
Record only Lu tr
OK
Not OK
Attachment nh km
Record only Lu tr
OK
Not OK
Attachment nh km
Record only Lu tr
OK
Not OK
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT)
Signature: Ch k:
Signature: Ch k:
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-03
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot)
IFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
ed 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 C and overseen by the Employer and/or the Employer's Representative (General Consultant).
nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomon bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung).
5.2.1.xx-01 5.2.1.xx-01 Delivery of reinforcing steel bar/sampling for testing Kim tra giao nhn thp/cng tc ly mu thp cho th nghim
: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance
Conclusion Kt lun
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
Rectification of Comments Noted (Note: Punch List is attached) a cha nh phn Nhn xt (Ghi ch: Danh sch nh km)
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-04
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Jobs have been done by subcontractor of SumitomoCIENCO6 Consoritum (SCC) and checked and accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant). Cn c Ngh nh 15/2013/ND-CP ngy 6 thng 2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh SumitomoCIENCO6 (SCC) v c kim tra v chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung).
Construction Job No. Cng vic xy dng s Description of Construction Job M t cng vic xy dng Item No. of ITP S ITP Description of Work M t cng vic Date: Ngy:
No. [ ] 5.2.1.xx-02 S 5.2.1.xx-02 Mobilization Equipment of Pile Cap Kim tra cng tc kim tra thit b thi cng i cc HCMC-260-VDGN-CVS-PLN-00002Chainage / L trnh: Pier No. / S hiu tr: Place: a im:
Subject i tng
Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn:
a) Documents as basis for Inspection / Cc t i liu dng lm cn c nghim thu Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n
Description (Ni dung) I. Equipment (Thit b) - Service crane (Cn cu cng v) - Excavator (Xe cuc) - Steel plate (Tm tn) - Electricity (Cp in) - Formwork (Vn khun) - Tamper (m cc) - Vibrator (My m rung) - Cutting machine (My ct thp) - Bar bender (my un thp) - Welding machine (My hn) - Water pump (My bm nc) II. Another (Cc vn khc)
OK
NG
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT)
Signature: Ch k:
Signature: Ch k:
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-05
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET CHECKING COFFERDAM OF FOUNDATION HOLE (IF REQUIRED) BIN BN KIM TRA KHUNG VY H MNG (NU YU CU) Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn: Description (Ni dung) - Sheet piles of cofferdam (cc vn ca khung vy) - Joints of cofferdam (cc lin kt ca khung vy) - Supporting frame of cofferdam (Khung chng ca khung vy) - Stabilizing of cofferdam ( n nh ca khung vy) - Dimensions of cofferdam (Cc kch thc ca khung vy) - Coordinate of corners of cofferdam (Ta cc gc ca khung vy) - Straight of cofferdam ( thng ca khung vy) Conclusion (Kt lun) Remark (Ghi nhn)
OK OK OK OK OK OK OK
Note /Ghi ch : All checking description will be observed Design drawing of cofferdam which is approved by Employer's Representative. Tt c cc ni dung kim tra s tin hnh theo bn v thit k khung vy c chp thun bi i din Ch u t II. Another (Cc vn khc):
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM
-VDGN-CVS-PLN-00002-E-05
tion (Line 1)
nh - Sui Tin
o v Depot)
5.2.1.xx-03
Representative. n Ch u t
s cng trng)
HCMC-260-VDGN-CVS-PLN-00002-E- 06
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET FOUNDATION HOLE ELEVATION, COORDINATE BIN BN NGHIM THU CAO , TA H MNG
Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn:
5.2.1.xx-04
1. Plan (Hnh v)
ID No S hiu X 1 2 .. ..
Coordinate (Ta ) Design (Thit k) Y X Actual (Thc t) Y Tolerance (Sai lch) X2+Y2
20mm
Levelling and compaction/ Lm phng v m cht: Hole dewatering/ Bm nc h mng: Remark: (Nhn xt)
OK OK
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM
HCMC-260-VDGN-CVS-PLN-00002-E-07
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET CONCRETE PLACING/ SLUMP TEST / TEMPERATURE MEASUREMENT OF LEAN CONCRETE B TNG / TH NGHIM ST B TNG/ O NHIT B TNG LT
Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn: Vehicle No. Volume (m3) Bin s xe Khi lng (m 3 ) Number of Samples S lng mu th Name of Sample Tn mu
5.2.1.xx-05
No. S
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM Supervision / QC Engineer (Gim st/ k s cht lng)
HCMC-260-VDGN-CVS-PLN-00002-E-08 Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot)
INSPECTION SHEET CONCRETE PLACING RECORD OF LEAN CONCRETE PHIU B TNG LT Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn:
5.2.1.xx-06
General Information (Thng tin chung): Concrete Grade (Cp b tng) Design Conc. Vol. (Kh/lg BT thit k) Concrete supply & transport method (Cung cp & vn chuyn b tng): No. (STT) Truck No. Arrival (S xe) (n) Time (Thi gian) Wait (i) Start () Finish (Kt.thc) ; Actual Conc. Vol. (Kh/lg BT thc t) By agitator truck (bng xe ch b tng) Slump ( st) 12525 (mm) Volume (Th tch BT) (m3)
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM Supervision / QC Engineer(Gim st/ k s cht lng)
HCMC-260-VDGN-CVS-PLN-00002-E-08
City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) ng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin age 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot)
5.2.1.xx-06
HCMC-260-VDGN-CVS-PLN-00002-E-09
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET LEAN CONCRETE ELE.& COORDINATE BIN BN NGHIM THU CAO & TA B TNG LT
Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn:
5.2.1.xx-07
1. Plan (Hnh v)
Elevation (Cao ) Tolerance Tolerance (Sai lch) Design Actual (Sai lch) X2+Y2 (Thit k) (Thc t) 2.0 (cm)
20mm
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM
HCMC-260-VDGN-CVS-PLN-00002-E-10 Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant).
Cn c Ngh nh 15/2013/ND-CP ngy 6 thng 2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) v c kim tra chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). Construction Jobs Construction Job No. Cng vic xy dng s Cng vic xy dng Description of Construction Job M t cng vic xy dng Subject i tng Item No. of ITP S ITP Description of Work M t cng vic Date: Ngy: No. [ ] S 5.2.1.xx-03 5.2.1. xx -03
Arrangement of steel bars Lp t ct thp HCMC-260-VDGN-CVS-PLN-00002Chainage / L trnh: Pier No. / S hiu tr: Place: a im:
Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn: a) Documents as basis for Inspection / Cc ti liu dng lm cn c nghim thu Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n b) Quality of Inspected Work / nh gi cht lng cng vic c nghim thu
c) Inspection of Work on site / Nghim thu thc t ti him trng Plan (Hnh v)
ID No S hiu
Length Chiu di (mm) Design Thit k 12997 12972 12947 12921 12897 12872 12848 12821 12797 12772 12749 12722 12698 13011 7939 7917 7892 7869 7846 7821 7798 7776 7751 7728 7705 7680 7658 7635 7610 7587 Actual Thc t
Total Volume Tng khi lng (m) Design Thit k 25.994 25.944 25.894 25.842 25.794 25.744 25.696 25.642 25.594 25.544 25.498 25.444 25.396 260.220 15.878 15.834 15.784 15.738 15.692 15.642 15.596 15.552 15.502 15.456 15.410 15.360 15.316 15.270 15.220 15.174
1a-1 1a-2 1a-3 1a-4 1a-5 1a-6 1a-7 1a-8 1a-9 1a-10 1b-1 1b-2 1b-3 2 3a-1 3a-2 3a-3 3a-4 3a-5 3a-6 3a-7 3a-8 3a-9 3a-10 3a-11 3a-12 3a-13 3a-14 3a-15 3a-16
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
3a-17 3a-18 3a-19 3a-20 3a-21 3a-22 3a-23 3a-24 3a-25 3a-26 3b
20 20 20 20 20 20 20 20 20 20 20
2 2 2 2 2 2 2 2 2 2 4
7564 7539 7517 7494 7469 7446 7423 7398 7376 7353 7330
15.128 15.078 15.034 14.988 14.938 14.892 14.846 14.796 14.752 14.706 29.320
4 5 6 7 9
20 20 20 32 32
20 22 40 24 24
11 8 10
32 28 25
24 36 36
20 16 16 16 16 16 32 32 32
16 4 10 6 6 12 30 30 4
011
32
3814
15.256
006
16
11
7705
84.755
007
12
22
7130
156.860
008 Concrete Cover Space/ Khong cch bo v b tng Splicing length/Chiu di mi ni: Cleaning/V sinh ct thp: Welding & fastening/Hn buc ct thp: Others/Nhng vn khc: d) Comments of NJPT if any / Nhn xt ca NJPT nu c
12
22 OK OK OK OK None
5150
113.300
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT)
Signature: Ch k:
Signature: Ch k:
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-10
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot)
n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot)
ICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS N BN NGHIM THU CC CNG VIC XY DNG
3, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked and Representative (General Consultant).
g vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) v c kim tra v i din Ch u T (T Vn Chung). 5.2.1.xx-03 5.2.1. xx -03 Arrangement of steel bars Lp t ct thp
and reinforced concrete structures Codes for construction, check and acceptance
t ti him trng
Remark Ghi ch
ments Noted (Note: Punch List is attached) n xt (Ghi ch: Danh sch nh km)
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-11
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked and accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant). Cn c Ngh nh 15/2013/ND-CP ngy 6 thng 2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) v c kim tra v chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). Construction Jobs Cng vic xy dng Construction Job No. Cng vic xy dng s Description of Construction Job M t cng vic xy dng Item No. of ITP S ITP Description of Work M t cng vic Date: Ngy: No. [ ] 5.2.1.xx-04 S 5.2.1.xx-04 Formwork Coordinate & Elevation/ Centerline on longitudinal, transversal direction Ta v cao vn khun/ Tim dc, tim ngang HCMC-260-VDGN-CVS-PLN-00002Chainage / L trnh: Pier No. / S hiu tr: Place: a im:
Subject i tng
Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn: a) Documents as basis for Inspection / Cc ti liu dng lm cn c nghim thu Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n b) Quality of Inspected Work / nh gi cht lng cng vic c nghim thu
c) Inspection of Work on site / Nghim thu thc t ti him trng Plan (Hnh v)
I BN THNH
I SUI TIN
Coordinate (Ta ) ID No S hiu Design (Thit k) X 1 2 .. .. Formwork Dimensions (Kch thc vn khun) (m) ID No S hiu 1 2 3 Diemension (Kch thc) H W L Ok Ok Ok Ok Stablility/ n nh: Design (Thit k) Actual (Thc t) Tolerance (Sai lch) +25 mm; -12 mm Y Actual (Thc t) X Y Tolerance (Sai lch) X2+Y2 5mm
Elevation (Cao ) Design (Thit k) Actual (Thc t) Tolerance (Sai lch) 10 (mm)
Remark (Ghi ch )
Flatness/ bng phng: Surface condition/B mt vn khun: Cleaning up/V sinh khun: Spacer Concrete/ Cc k b tng
Lubrication of formwork/Bi trn khun: Hermetic of formwork/ kn kht ca khun: Slant of surfaces of form-work/ nghing mt vn khun None
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT)
Signature: Ch k:
Signature: Ch k:
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-11
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot)
n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot)
IFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
bruary 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum he Employer and/or the Employer's Representative (General Consultant).
13, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) m xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). 5.2.1.xx-04 5.2.1.xx-04 Formwork Coordinate & Elevation/ Centerline on longitudinal, transversal direction Ta v cao vn khun/ Tim dc, tim ngang
hic concrete and reinforced concrete structures Codes for construction, check and acceptance
I SUI TIN
Ok Ok Ok Ok
tion of Comments Noted (Note: Punch List is attached) nh phn Nhn xt (Ghi ch: Danh sch nh km)
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-12
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET PREPARATION WORK FOR CONRETE PLACING (BIN BN KIM TRA CNG TC CHUN B B TNG )
Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn: Description (Ni dung) I. Equipment (Thit b) - Concrete batching plant (Trm trn b tng) - Concrete transport (Vn chuyn b tng) - Concrete Grade (Cp b tng) - Concrete vibrating tamper (m rung) - Concrete penetrating vibrator (m di) - Electricity (Cp in) - Equipment for concreting (Thit b b tng): + Concrete pump (xe bm b tng) + Concrete mixer truck (Xe ch hn hp BT) + Others/ Khc II.Material (Vt liu) - Cement (Xi-mng) - Sand (Ct) - Aggregate (Cp phi) - Water (Nc) - Additive (Ph gia) III. Weather (Thi tit) - Rain (Ma): - Sunshine (Nng) : - Wind (gi) : IV. Another (Cc vn khc) Remark (Nhn xt): Grade 35 OK NG Remark (Ghi nhn)
5.2.1.xx-08
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM Supervision / QC Engineer (Gim st/ k s cht lng)
HCMC-260-VDGN-CVS-PLN-00002-E-13
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET CONCRETE PLACING/ SLUMP TEST / TEMPERATURE MEASUREMENT OF PILE CAP B TNG / TH NGHIM ST B TNG/ O NHIT B TNG I CC
Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn: Finishing Time Vehicle No. Volume 3 (m ) Number of Samples Name of Sample Tn mu Slump (mm) st 100 25 (mm) Concrete Temp. Nhit BT 35C
Air temperature
5.2.1.xx-09
No.
Weather
Remark
Nhit khng kh
(Thi tit)
Ghi nhn
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM
HCMC-260-VDGN-CVS-PLN-00002-E-14
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET CONCRETE PLACING RECORD OF PILE CAP PHIU B TNG I CC
Chainage / L trnh: Pier No. / S hiu tr: Date / Ngy: Time / Gi: Record No.: S ghi nhn:
5.2.1.xx-10
General Information (Thng tin chung) Concrete Grade (Cp b tng) Design Conc. Vol. (Kh/lg BT thit k) Curing method (Phng php bo dng) Concrete supply & transport method (Cung cp & vn chuyn b tng): Time (Thi gian) No. Truck No. Arrival (STT) (S xe) (n) Wait (i) Start () Finish (Kt.thc) By agitator truck (bng xe ch b tng) Slump ( st) 100 25 (mm) Conc. Temp. (Nhit BT) 35(C) Volume (Th tch BT) (m3) ; Actual Conc. Vol. (Kh/lg BT thc t)
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM Supervision / QC Engineer (Gim st/ k s cht lng)
HCMC-260-VDGN-CVS-PLN-00002-E-14
ban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) yn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET CONCRETE PLACING RECORD OF PILE CAP PHIU B TNG I CC
5.2.1.xx-10
HCMC-260-VDGN-CVS-PLN-00002-E-15
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked and accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant).
Cn c Ngh nh 15/2013/ND-CP ngy 6 thng 2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) c kim tra v chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). Construction Jobs Cng vic xy dng Construction Job No. Cng vic xy dng s Description of Construction Job M t cng vic xy dng
No. [ ] 5.2.1.xx-05 S 5.2.1.xx-05 Structure completed (Pile Cap) (Checking centerline on longitudinal, transversal direction, Coordinate, Elevation, Dimension..) Nghim thu kt cu hon thnh (i cc) (Kim tra tim dc, tim ngang, ta , cao , kch th HCMC-260-VDGN-CVS-PLN-00002Chainage / L trnh: Pier No. / S hiu tr: Place: a im:
Subject i tng
Item No. of ITP S ITP Description of Work M t cng vic Date: Ngy:
Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn: a) Documents as basis for Inspection / Cc ti liu dng lm cn c nghim thu Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n b) Quality of Inspected Work / nh gi cht lng cng vic c nghim thu
c) Inspection of Work on site / Nghim thu thc t ti him trng Plan (Hnh v)
I BN THNH
I SUI TIN
Coordinate (Ta ) ID No S hiu Design (Thit k) X 1 2 .. .. Formwork Dimensions (Kch thc vn khun) (m) ID No S hiu 1 2 3 Diemension (Kch thc) H W L Design (Thit k) Actual (Thc t) Tolerance (Sai lch) +25 mm; -12 mm Y Actual (Thc t) X Y Tolerance (Sai lch) X2+Y2 5mm
Remark (Ghi ch )
Construction Joint between Column & Pile Cap (Mi ni thi cng gia Ct v B mng) Roughening the Construction Joint between Column & Pile Cap/ To nhm mi ni gia ct v b mng Visual shape & Surface Checking (Kim tra hnh dang & b mt) Tolerance/Description (Dung sai/Ni dung) Abrupt irregularitie 5mm; Gradual irregularities<10mm in 2m Straightness/Curvedness ( thng/ cong) Thay i t ngt 5mm Thay i dn u 10mm mi 2m Flatness of horizontal/vertical surface ( phng mt ng/ mt ngang) Repair of visual surface defects (cracks, honeycombs, spalls) (Sa cha cc khuyt tt b mt (nt, r, bc v ..)) Slant of completed surfaces of pile cap ( nghing b mt hon thin ca i cc) d) Comments of NJPT if any / Nhn xt ca NJPT nu c
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT)
Signature: Ch k:
Signature: Ch k:
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-15
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum erseen by the Employer and/or the Employer's Representative (General Consultant).
2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). 5.2.1.xx-05 5.2.1.xx-05 Structure completed (Pile Cap) (Checking centerline on longitudinal, transversal direction, Coordinate, Elevation, Dimension..) Nghim thu kt cu hon thnh (i cc) (Kim tra tim dc, tim ngang, ta , cao , kch thc..)
ected by parties / Cc ti liu sau c nghim thu bi cc bn: Inspection / Cc ti liu dng lm cn c nghim thu
5: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance
Remark (Ghi ch )
OK
NG
OK
NG
Rectification of Comments Noted (Note: Punch List is attached) sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km)
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-16
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked and accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant). Cn c Ngh nh 15/2013/ND-CP ngy 6 thng 2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) v c kim tra v chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). Construction Jobs Cng vic xy dng Construction Job No. Cng vic xy dng s Description of Construction Job M t cng vic xy dng Item No. of ITP S ITP Description of Work M t cng vic Date: Ngy: No. [ ] 5.2.1.xx-06 S 5.2.1.xx-06 Backfilling works of structures Kim tra p tr kt cu HCMC-260-VDGN-CVS-PLN-00002Chainage / L trnh: Pier No. / S hiu tr: Place: a im:
Subject i tng
Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn: a) Documents as basis for Inspection / Cc ti liu dng lm cn c nghim thu Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n b) Quality of Inspected Work / nh gi cht lng cng vic c nghim thu
c) Inspection of Work on site / Nghim thu thc t ti him trng Plan (Hnh v)
BEN THANH E2
(In accordance with working drawing and method statement which approved by Employer's Representative)
SUOI TIEN E2 E1
E1: Elevation at bottom of excavation E2: Elevation at top of final layer
Foundation
No. Lp
Right side (front)/ Bn phi (trc) Different Density Dung sai T.t (m) cht (mm) Actual
Comment Nhn xt
Left side (behind)/ Bn tri (sau) Different Density Dung sai T.t (m) cht (mm) Actual
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT)
Signature: Ch k:
Signature: Ch k:
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-16
Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot)
n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot)
IFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
ruary 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum he Employer and/or the Employer's Representative (General Consultant).
3, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) v t bi Ch u T v/hoc i din Ch u T (T Vn Chung). 5.2.1.xx-06 5.2.1.xx-06
arties / Cc ti liu sau c nghim thu bi cc bn: n / Cc ti liu dng lm cn c nghim thu
hic concrete and reinforced concrete structures Codes for construction, check and acceptance
on of Comments Noted (Note: Punch List is attached) h phn Nhn xt (Ghi ch: Danh sch nh km)
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-17 Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked and accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant). Cn c Ngh nh 15/2013/ND-CP ngy 6 thng 2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) v c kim tra v chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung).
Construction Job No. Cng vic xy dng s Description of Construction Job M t cng vic xy dng Item No. of ITP S ITP Description of Work M t cng vic Date: Ngy:
No. [ ] S Reinforcing steel bar testing Kt qu th nghim thp HCMC-260-VDGN-CVS-PLN-00002Chainage / L trnh: Pier No. / S hiu tr: Place: a im:
5.2.1.xx-07 5.2.1.xx-07
Subject i tng
Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn: a) Documents as basis for Inspection / Cc ti liu dng lm cn c nghim thu Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n b) Quality of Inspected Work / nh gi cht lng cng vic c nghim thu
No. STT
Grade/ Cng
Evaluation Result/ Kt qu nh gi
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
Not OK
OK
Not OK
OK
Not OK
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT)
Signature: Ch k:
Signature: Ch k:
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-17 Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot)
Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot)
CATE FOR ACCEPTANCE OF CONSTRUCTION JOBS N BN NGHIM THU CC CNG VIC XY DNG
ebruary 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum the Employer and/or the Employer's Representative (General Consultant).
13, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomo-CIENCO6 (SCC) v xt bi Ch u T v/hoc i din Ch u T (T Vn Chung).
5.2.1.xx-07 5.2.1.xx-07
d by parties / Cc ti liu sau c nghim thu bi cc bn: pection / Cc ti liu dng lm cn c nghim thu
onolithic concrete and reinforced concrete structures Codes for construction, check and acceptance
Evaluation Result/ Kt qu nh gi
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
OK
Not OK
tification of Comments Noted (Note: Punch List is attached) cha nh phn Nhn xt (Ghi ch: Danh sch nh km)
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-18
Ho Chi Minh City Urban Railway Construction Project, Ben Thanh - Suoi Tien Section (Line 1) D n u t xy dng tuyn ng st th s 1 thnh ph H Ch Minh, tuyn Bn Thnh - Sui Tin Contract Package 2: Civil (Elevated & Depot) / Gi thu s 2: Xy dng (on trn cao v Depot) INSPECTION SHEET CONCRETE COMPRESSIVE STRENGTH OF LEAN CONCRETE KT QU TH NGHIM B TNG LT
Chainage / L trnh: Pier No. / S hiu tr:
Date / Ngy: Time / Gi: Record No.: S ghi nhn: Strength Cng ( Mpa ) 7 days 7 ngy 28 days 28 ngy
Average of 28 days ( trung bnh 28 ngy)
5.2.1.xx-11
No TT
Sample No. Mu s
Remark Ghi ch
GENERAL CONTRACTOR, SCC S REPRESENTATIVE I DIN TNG THU SCC SUMITOMO - CIENCO6 CONSORTIUM
HCMC-260-VDGN-CVS-PLN-00002-E-19 Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot) D n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot) CERIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
In accordance with Decree No. 15/2013/ND-CP dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 Consoritum (SCC) and checked and accepted by SCC and overseen by the Employer and/or the Employer's Representative (General Consultant). Cn c Ngh nh 15/2013/ND-CP ngy 6 thng 2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh SumitomoCIENCO6 (SCC) v c kim tra v chp thun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). Construction Jobs Cng vic xy dng Construction Job No. Cng vic xy dng s Description of Construction Job M t cng vic xy dng Item No. of ITP S ITP Description of Work M t cng vic Date: Ngy: No. [ ] 5.2.1.xx-08 S 5.2.1.xx-08 Concrete compressive strength of pile cap Kt qu th nghim b tng i cc HCMC-260-VDGN-CVS-PLN-00002Chainage / L trnh: Pier No. / S hiu tr: Place: a im:
Subject i tng
Following have been inspected by parties / Cc ti liu sau c nghim thu bi cc bn: a) Documents as basis for Inspection / Cc t i liu dng lm cn c nghim thu Working Drawing Approved and Design changes Approved :Ref No Date . Bn v thi cng c duyt v nhng thay i thit k c chp thun: S ... Ngy . Method Statement for Construction Approved:Ref No Date . Bin php thi cng c duyt: S Ngy .. Inspection and Testing Plan(ITP) Approved: Ref No.. Date. K hoch kim tra v nghim thu (ITP) c duyt: S ... Ngy . Request for Inspections of General Contractor SCC: As Attached Phiu yu cu kim tra ca tng thu SCC : nh km Technical standard, norm applied: Quy chun, tiu chun c p dng: - Project Employer's Requirement - General Yu cu chung d n ca Ch u t - Project Outline Construction Specification Tiu chun xy dng chung ca d n - TCVN 4453 : 1995: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance TCVN 4453 : 1995: Kt cu btng v btng ct thp ton khi - Quy phm thi cng v nghim thu - Other standards for Material Testing shown in the Project Outline Construction Specification Cc tiu chun th nghim vt liu khc c th hin trong Tiu chun xy dng chung ca d n b) Quality of Inspected Work / nh gi cht lng cng vic c nghim thu
No TT
Sample No. Mu s
Accepted ng nghim thu Accepted Subject to Rectification of Comments Noted (Note: Punch List is attached) ng nghim thu vi sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km) Not Accepted Khng ng nghim thu Employer's Representative (NJPT) i din Ch u t (NJPT)
Signature: Ch k:
Signature: Ch k:
Signature: Ch k:
HCMC-260-VDGN-CVS-PLN-00002-E-19 Ho Chi Minh City Urban Railway Construction Project Ben Thanh Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot)
n Xy dng Tuyn ng st th s 1 TP. H Ch Minh Tuyn Bn Thnh - Sui Tin Gi thu s 2: Xy dng (on trn cao v Depot)
RIFICATE FOR ACCEPTANCE OF CONSTRUCTION JOBS BIN BN NGHIM THU CC CNG VIC XY DNG
dated 6 February 2013, following Construction Jobs have been done by subcontractor of Sumitomo-CIENCO6 SCC and overseen by the Employer and/or the Employer's Representative (General Consultant).
2 nm 2013, cc cng vic xy dng sau y c thc hin bi nh thu ph ca Lin danh Sumitomohun bi SCC v c xem xt bi Ch u T v/hoc i din Ch u T (T Vn Chung). 5.2.1.xx-08 5.2.1.xx-08
pected by parties / Cc ti liu sau c nghim thu bi cc bn: r Inspection / Cc t i liu dng lm cn c nghim thu
5: Monolithic concrete and reinforced concrete structures Codes for construction, check and acceptance
Remark Ghi ch
o Rectification of Comments Noted (Note: Punch List is attached) sa cha nh phn Nhn xt (Ghi ch: Danh sch nh km)