Professional Documents
Culture Documents
Agenda Coordination Meeting No.02 Between Royal Commission (RC) and China Harbour Engineeing Arabia Co. Ltd. (Chec)
Agenda Coordination Meeting No.02 Between Royal Commission (RC) and China Harbour Engineeing Arabia Co. Ltd. (Chec)
Contract Title: Construction of Interchange Bridges at Shareh Al-Mina & By-pass (Phase-1)
Contract No.: PIC R-7507
NTP Date: 05 Jan 2015
EOC Date: 04 Feb 2017
Date: 4 Feb 2015 Time: 1:30 Page: 1 of 3
.
Place: Jabriah 8 Site Office - Conference Room File No.
_____________________________________________________________________________________
CHEC shall provide all contractual requirement and deliverables as shown in specification
During specific date. Next meeting contractor should have a plan for all submittal.
The next Coordination Meeting to be held at RC residential section conference room as determined
during this meeting.
PREPARED BY : _________________
Engr. Yasser AL-BOGAMI
Coordinator