KOLON GLOBAL CORPORATION

LEVEL METER TEST REPORT


LEVEL TRANSMITTER
PROJECT : KARNAPHULI WATER SUPPLY PROJECT C-3 (RESERVOIRS)
SITE
LOCATION DATE
NAME

ITEM TAG NO DESCRIPTION

A. IDENTIFICATION
ORGIN
MAKER SPEC.
COUNTRY

B. INSTALLATION CHECK

1. Check install direction GOOD

2. Install Location ` GOOD

3. Connection status with transmitter GOOD

4. Transmitter Install Status GOOD

5. Check the connection of signal, power cable GOOD

6. Ground Connection GOOD

C. OPERATION TEST GOOD

TESTED BY CHECKED BY APPROVED BY

Gee Hoon Kim Yutaka NIIDA Muhammad Zohurul Hoque


Project Manager OIC, Team Leader/Engr. - KWSP1 Project Director - KWSP1
Kolon Global Corporation NJS Consultants Co. Ltd. CWASA
Date: Date: Date: