1.2.1 Excavate the layer of the soil next to 1.5.1) Spread to level compact 10cm ,(02-03)
the top 30-70cm where the soil layer is silt course aggeregate from stone crush site.
or black -cotton soil or humus and not
accepted as a sub-grade
250 250
10 10
0.4 2500 m2
2500 m2 total volume of work
1000.0 m2
1000.0 m2 total volume of work
1500 250
1500.00 m3 10
1500.00 m3 Total Volume of Work 2500 m
2500 m total volume of work
400 450.7
800 160
400 0.07512 1.3 0.5 0.2
2
16 16 0.666667
0.096 2400
0.106667
441
436.46
400
437
394.6
445.4
414.28
2968.74
TAKE OFF SHEET SUMMERY
PROJECT:- Kidus Yared Church
Contractor : Misganaw Adela
1) Earth Work
1.1 Top Soil Excavation site clear m2 260 393.8816 20.00 7877.63
2) Bulk Excavation
Contractor