NAME OF WORK :
Withdrawing of 15HP and lowering of 7.5HP departmental Submersible pump motor set at site
near PWD elctrical section offic, MPU, Barrackpore during the year 2018-19
Total = 1 No
Rs. 3332.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 3332.00/ No Rs. 3332.00
Total = 1 No
Rs. 6381.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 6381.00/ No Rs. 6381.00
Total = 12 Point
Rs. 83.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) Point
Rate = @ Rs. 83.00/ Point Rs. 996.00
Total = 1 Set
Rs. 12654.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) Set
Rate = @ Rs. 12654.00/ Set Rs. 12654.00
Total = 1 Set
Rs. 1524.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) Set
Rate = @ Rs. 1524.00/ Set Rs. 1524.00
Total = 1 set
Rs. 1948.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) set
Rate = @ Rs. 1948.00/ set Rs. 1948.00
Total = 1 set
Rs. 1467.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) set
Rate = @ Rs. 1467.00/ set Rs. 1467.00
Total = 1 set
Rs. 3332.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) set
Rate = @ Rs. 3332.00/ set Rs. 3332.00
Total = 1 set
Rs. 1693.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) set
Rate = @ Rs. 1693.00/ set Rs. 1693.00
Total = 40.00 m
Rs. 175.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) m
Rate = @ Rs. 175.00/ m Rs. 7000.00
Total = 1 set
Rs. 733.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) set
Rate = @ Rs. 733.00/ set Rs. 733.00
Total = 1 No.s
Rs. 4179.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No.s
Rate = @ Rs. 4179.00/ No.s Rs. 4179.00
Total = 2 sets
Rs. 1467.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) sets
Rate = @ Rs. 1467.00/ sets Rs. 2934.00
TOTAL = 1 Set
Analysis Rate @ Rs. 3451.60/ Set Rs. 3452.00
TOTAL = 1 Set
Analysis Rate @ Rs. 87529.55/ Set Rs. 87530.00
TOTAL = 38.00 m
Analysis Rate @ Rs. 1552.56/ m Rs. 58997.00
TOTAL = 3 Set
Analysis Rate @ Rs. 11390.87/ Set Rs. 34173.00
Total = 1 Set
Rs. 1524.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) Set
Rate = @ Rs. 1524.00/ Set Rs. 1524.00
Total = 2 sets
Rs. 1467.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) sets
Rate = @ Rs. 1467.00/ sets Rs. 2934.00
a) Pakur Variety
around the tube well 1 x 1.800 x 1.800 x 0.200 = 0.648 m3
column footings 6 x 0.900 x 0.900 x 0.200 = 0.972 m3
columns 6 x 0.250 x 0.250 x 2.450 = 0.919 m3
Total = 2.539 m3 `
ITEM Rate add GST Add Labour Cess Final Rate
@ 12 % of Colm @ 1% of Colm [C] + [D]
[A] [B]rate
Item [A][C]
+ [B] [D][C]
Colm [E]
Rs.5783.43 Rs.694.01 Rs.6477.44 Rs.64.77 Rs.6542.21
Rs. 6542.21 + ( Rs. 95.00 x 0 floor + Rs. 116.00 x 0 floor ) m3
Rate = @ Rs. 6542.21/ m3 Rs. 16611.00
RATE ANALYSIS
Installation of the 15 HP Pump motor with allied works, for drawing water from the tube well, in
location near PWD Electrical Section Office by the SSF battalion Field - Mangal Pandey Uddyan,
Barrackpore during the year 2018 - 19"
ITEM No. 1
Supplying, fitting and fixing starter L&T make
(model no ML3FASD Fully automatic Star-Delta Starter CAT No. SS90730
ITEM No. 2
Supplying, fitting and fixing single phase preventor relay L&T make SPPR TYPE SDz5 (for MU-
G30/40/50/75) CAT No. XM818070000
ITEM No. 3
Page 14
Supplying, fitting and fixing 3 core flat submersible cable of 4.0 sq. mm.
Finolex make IS 694 1100V.
OR
ITEM No. 3
S & F 3 core flat submersible cable of 4.0 sq. mm. Finolex make IS 694 1100V.
Ref: N.I.T. no. 07/ KWSD-III of 2018-19.
Assistant Engineer, P.W.D. Kolkata West Sub-Division-III, Govt. of West Bengal
ITEM No. 4
Supplying and installation of 440 volts 2900 R.P.M. , 15HP Submersible Pump motor set (make KSB
model No. BPD 302/7, UMAI/H150-13/22(S.D.) into the tube well incl., erection of tripod stand by
co's own tools & tackles.
ITEM No. 5
Supplying, fitting and fixing of G. I. pipes of TATA make (h) 80 mm dia. Heavy quality
ITEM No. 6
Supplying, fitting and fixing Wheel valve of approved brand and make tested to 21 Kg per Sq. cm.
(for water lines only) 80 mm dia.
ITEM No. 7
Laying out the cable within the cable protection pipe from Pump Motor set to the stator
Ref: N.I.T. no. 07/ KWSD-III of 2018-19.
Assistant Engineer, P.W.D. Kolkata West Sub-Division-III, Govt. of West Bengal
ITEM No. 8
Supplying, fitting and fixing 80 mm M.S. housing clamp of approved quality.
ITEM No. 9
Supplying, fitting and fixing 80 mm dia flange with washer heavy type ISI marked.
ITEM No. 10
Supplying, fitting and fixing 80 mm dia galvanised iron socket heavy type with I.S.I. mark.
Labour charges for fitting & fixing with tools and 1 Set @ Rs. 50.00 /set = Rs. 50.00
tackles Sum = Rs. 352.80 + Rs. 5.00 + Rs. 50.00 = Rs. 407.80
Sundries @1% + water charges @1% = @ 2 % of Rs. 407.80 = Rs. 8.16
Sum = Rs. 407.80 + Rs. 8.16 = Rs. 415.96
OverHead Charges @ 5% = @ 5 % of Rs. 415.96 = Rs. 20.80
Sum = Rs. 415.96 + Rs. 20.80 = Rs. 436.76
Contractors Profit @10% = @ 10 % of Rs. 436.76 = Rs. 43.68
Sum = Rs. 436.76 + Rs. 43.68 = Rs. 480.44
GST @12% = @ 12 % of Rs. 480.44 = Rs. 57.65
Sum = Rs. 480.44 + Rs. 57.65 = Rs. 538.09
Labour Cess @1% = @ 1 % of Rs. 538.09 = Rs. 5.38
Sum = Rs. 538.09 + Rs. 5.38 = Rs. 543.47
ITEM No. 11
Supplying, fitting and fixing 80 mm dia galvanised iron plain equal elbow heavy type.
ITEM No. 12
Supplying, fitting and fixing 80 mm dia galvanised iron plain Tee heavy type.
ITEM No. 13
Supplying, fitting and fixing 80 mm dia galvanised iron Nipple heavy type.
ITEM No. 14
Supplying, fitting and fixing 80 mm dia galvanised iron Short Piece heavy type.
Tube Well boring & lowering of necessary pipes in location near PWD Electrical Section Office by
the SSF battalion Field - Mangal Pandey Uddyan, Barrackpore during the year 2018 - 19"
REPORT:
This estimate has been prepared to meet up the cost of the above mentioned work. In order to cater the
increasing demand during summer and hot season, the higher authority has been decided to provide a
new tube well for the housing.
MODE OF EXECUTION:
The work will be executed through the agency to be selected by inviting Tender as per Government norms
after obtaining fund from the competent authority and will be executed by P.W.D.
Junior Engineer, P.W.D. Assistant Engineer, P.W.D.
Barrackpore Sub Division-II Barrackpore Sub Division-II
Page 21
NAME OF WORK :
Tube Well boring & lowering of necessary pipes in location near PWD Electrical Section Office by
the SSF battalion Field - Mangal Pandey Uddyan, Barrackpore during the year 2018 - 19"
(c) For depth upto 250 metre for 150 mm dia. Tube well with top
enlargement of 300 mm dia.(upto 50 metre.)
Supplying, fitting and fixing 300 mm M.S. housing clamp of approved quality.
Total = 2 No
Rs. 2235.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 2235.00/ No Rs. 4470.00
Total = 1 No
Rs. 8247.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 8247.00/ No Rs. 8247.00
Total = 1 No
Rs. 916.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 916.00/ No Rs. 916.00
Packing the annular space between the outside of the tube well pipes & strainers and the bore with pea
size washed gravel of approved quality having size from 2 mm to 5 mm or the size approved by the
Engineer-in- charge including cost of all materials labour and equipment complete.
1 x 6.930 x 3.75 x 1.050 = 27.29 m3
Gross Vol = 27.29 m3
Deduct 1/9 th = -3.03 m3
Net Vol = 24.257 m3
Rs. 2029.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) m3
Rate = @ Rs. 2029.00/ m3 Rs. 49217.00
Total = 3 day
Rs. 7538.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) day
Rate = @ Rs. 7538.00/ day Rs. 22614.00
Total = 1 No
Rs. 1231.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 1231.00/ No Rs. 1231.00
Rs. 753459.00
SL-0 page-43 Item- 40
Reinforcement for reinforced concrete work in all sorts of structures including
distribution bars, stirrups, binders etc initial straightening and removal of loose
rust (if necessary), cutting to requisite length, hooking and bending to correct
(i) Tor steel/Mild
shape, placing in Steel
proper position and binding with 16 gauge-black annealed wire
at every intersection, complete as per drawing
for TATAand direction.
/ RINL
STEP - 1
Item Rate Page - 43 Item No. 40
STEP - 2
Deduct issue rate Page - 304 Table - 1.1
STEP - 3
Add Basic price Page - 304 Table - 1.1
STEP - 4
Add Contractor profit @ 10 % of Basic Price
STEP - 5
Add Cost of carriage from outlet to site with Charge for 1.05 MT steel
necessary loading, unloading and stacking
STEP - 6
Add Cost of carriage of steel Charge for 1.05 MT steel
Road & Bridge Schedule 2015
(ii) for other than TATA / RINL Rs. 55776.00/ MT = Rs. 55776.00/ MT
STEP - 2
Deduct issue rate Page - 304 Table - 1.1
(ii) for other than TATA / RINL Rs. 39300.00/ MT x 1.05 = -Rs. 41265.00/ MT
STEP - 3
Add Basic price Page - 304 Table - 1.1
(ii) for other than TATA / RINL Rs. 34630.00/ MT x 1.05 = Rs. 36361.50/ MT
STEP - 4
Add Contractor profit @ 10 % of Basic Price
(ii) for other than TATA / RINL Rs. 34630.00/ MT x 0.10 = Rs. 3463.00/ MT
STEP - 5
Add Cost of carriage from outlet to site with Charge for 1.05 MT steel
necessary loading, unloading and stacking
Road & Bridge Schedule 2015
(ii) for other than TATA / RINL Rs. 96.00/ MT x 0.75 x 1.05 = Rs. 75.60/ MT
STEP - 6
Add Cost of carriage of steel Charge for 1.05 MT steel
Road & Bridge Schedule 2015
STEP - 1
Ref. Page : 14 item no : 07 Mark (A) = Rs. 4482.00
per Cum
STEP - 2
Ref. Page : B-61 Table No. 01
Quantity of stone aggregate to be considered per Cu.m. of Concrete
STEP - 3
Ref. Page : Table No. 02
Cost of carriage of stone aggregate from Barrckpur railway yard
Distance = 1.10 km
Distance up to 5 km = L.S. =Rs.124.00 = Rs. 124.00 (C1)
Distance from 5 km to 10 km 0.00 @ Rs.10.90/km = Rs. 0.00 (C2)
Distance from10 km to 20 km 0 @ Rs.10.10/km = Rs. 0.00 (C3)
(C1) + (C2) + (C3) = Rs. 124.00 per Cu.m.
for 0.860 Cu.m. @ Rs. 124.00 per Cu.m. Mark (C) = Rs. 106.64
STEP - 4
Ref. Page : Table No. 03
Cost of loading and unloading
(a) Stone aggregate below 40 mm nominal size
20 mm Nominal size = 0.573 Cum@Rs. 58.00 Per Cu.m. (D1) = Rs. 33.23
10 mm Nominal size = 0.287 Cum@Rs. 58.00 Per Cu.m. (D2) = Rs. 16.65
(D1) + (D2) = Mark (D) = Rs. 49.88
RATE ANALYSIS
Page : 24 item no : 04 Bldg Schdl 2017
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size)
excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes
(i) Pakur Variety
STEP - 1
Ref. Page : 11 item no : 05 Mark (A) = Rs. 3886.00
per Cum
STEP - 2
Ref. Page : B-61 Table No. 01
Quantity of stone aggregate to be considered per Cu.m. of Concrete
Railway Stackyard = Barrckpur
20 mm Nominal size = 0.660Cu.m @ Rs.1375.00 Per Cu.m. (B1) = Rs. 907.50
10 mm Nominal size = 0.220Cu.m @ Rs.1244.00 Per Cu.m. (B2) = Rs. 273.68
TOTAL = 0.880Cu.m (B1) + (B2) = Mark (B) = Rs. 1181.18
STEP - 3
Ref. Page : Table No. 02
Cost of carriage of stone aggregate from Barrckpur railway yard
and upto Dr. B.N. BOSE Sub-Divisional HOSPITAL
Distance = 1.10 km
Distance up to 5 km = L.S. =Rs.124.00 = Rs. 124.00 (C1)
Distance from 5 km to 10 km 0.00 @ Rs.10.90/km = Rs. 0.00 (C2)
Distance from10 km to 20 km @ Rs.10.10/km = Rs. 0.00 (C3)
(C1) + (C2) + (C3) = Rs. 124.00 per Cu.m.
for 0.880 Cu.m. @ Rs. 124.00 per Cu.m. Mark (C) = Rs. 109.12
STEP - 4
Ref. Page : Table No. 03
Cost of loading and unloading
(a) Stone aggregate below 40 mm nominal size
20 mm Nominal size = 0.66 Cum@Rs. 58.00 Per Cu.m. (D1) = Rs. 38.28
10 mm Nominal size = 0.22 Cum@Rs. 58.00 Per Cu.m. (D2) = Rs. 12.76
(D1) + (D2) = Mark (D) = Rs. 51.04
RATE ANALYSIS
Page : 25 item no : 06 Bldg Schdl 2017
Controlled cement concrete with well graded stone chips ( 20mm nominal size) Controlled cement con
[ using concrete mixture ] (i) Pakur Variety (b) M25 grade [ using concrete mixtur
STEP - 1 STEP - 1
Ref. Page : 25 item no : 06 (b) Mark (A) = Rs. 4918.00 Ref.
per Cum
STEP - 2 STEP - 2
Ref. Page : B-59 Table No. 01 Ref.
Quantity of stone aggregate to be considered per Cu.m. of Concrete Quantity of stone aggr
Railway Stackyard = Barrckpur Railway Sta
20 mm Nominal size = 0.540Cu.m Cum@Rs. Rs.1375.00 Per Cu.m. (B1) = Rs. 742.50 20 mm Nomin
10 mm Nominal size = 0.360Cu.m Cum@Rs. Rs.1244.00 Per Cu.m. (B2) = Rs. 447.84 10 mm Nomin
TOTAL = 0.900Cu.m (B1) + (B2) = Mark (B) = Rs. 1190.34
STEP - 3 STEP - 3
Ref. Page : Table No. 02 Ref.
Cost of carriage of stone aggregate from Barrckpur railway yard Cost of c
and upto Dr. B.N. BOSE Sub-Divisional HOSPITAL and upto
Distance = 1.10 km Di
Distance up to 5 km = L.S. =Rs.124.00 = Rs. 124.00 (C1) Distance up
Distance from 5 km to 10 km 0.00 @ Rs.10.90/km = Rs. 0.00 (C2) Distance
Distance from10 km to 20 km @ Rs.10.10/km = Rs. 0.00 (C3) Distance
(C1) + (C2) + (C3) = Rs. 124.00 per Cu.m.
for 0.900 Cu.m. @ Rs. 124.00 per Cu.m. Mark (C) = Rs. 111.60 for
STEP - 4 STEP - 4
Ref. Page : Table No. 03 Ref.
Cost of loading and unloading Cost of loading and un
(a) Stone aggregate below 40 mm nominal size (a) Stone aggregate be
20 mm Nominal size = 0.54 Cum@Rs. 58.00 Per Cu.m. (D1) = Rs. 31.32 20 mm Nomin
10 mm Nominal size = 0.36 Cum@Rs. 58.00 Per Cu.m. (D2) = Rs. 20.88 10 mm Nomin
(D1) + (D2) = Mark (D) = Rs. 52.20
RMC M25
RATE ANALYSIS
Page : 32 item no : 18 Bldg Schdl 2017
supplying Ready Mixed cement concrete with well graded stone chips ( 20mm nominal supplying Ready Mixed
size) (ii) with approved concrete pump (i) Pakur Variety b) M25 grade size) (ii) with approve
STEP - 1 STEP - 1
Ref. Page : 32 item no : 09 (B) Mark (A) = Rs. 5868.00 Ref.
per Cum
STEP - 2 STEP - 2
Ref. Page : B-59 Table No. 01 Ref.
Quantity of stone aggregate to be considered per Cu.m. of Concrete Quantity of stone aggr
Railway Stackyard = Barrckpur Railway Sta
20 mm Nominal size = 0.540Cu.m @ Rs.1375.00 Per Cu.m. (B1) = Rs. 742.50 20 mm Nomin
10 mm Nominal size = 0.360Cu.m @ Rs.1244.00 Per Cu.m. (B2) = Rs. 447.84 10 mm Nomin
TOTAL = 0.900Cu.m (B1) + (B2) = Mark (B) = Rs. 1190.34
STEP - 3 STEP - 3
Ref. Page : Table No. 02 Ref.
Cost of carriage of stone aggregate from Barrckpur railway yard Cost of c
and upto Dr. B.N. BOSE Sub-Divisional HOSPITAL and upto
Distance = 1.10 km Di
Distance up to 5 km = L.S. =Rs.124.00 = Rs. 124.00 (C1) Distance up
Distance from 5 km to 10 km 0.00 @ Rs.10.90/km = Rs. 0.00 (C2) Distance
Distance from10 km to 20 km @ Rs.10.10/km = Rs. 0.00 (C3) Distance
(C1) + (C2) + (C3) = Rs. 124.00 per Cu.m.
for 0.900 Cu.m. @ Rs. 124.00 per Cu.m. Mark (C) = Rs. 111.60 for
STEP - 4 STEP - 4
Ref. Page : Table No. 03 Ref.
Cost of loading and unloading Cost of loading and un
(a) Stone aggregate below 40 mm nominal size (a) Stone aggregate be
20 mm Nominal size = 0.54 Cum@Rs. 58.00 Per Cu.m. (D1) = Rs. 31.32 20 mm Nomin
10 mm Nominal size = 0.36 Cum@Rs. 58.00 Per Cu.m. (D2) = Rs. 20.88 10 mm Nomin
(D1) + (D2) = Mark (D) = Rs. 52.20
RMC M25
RATE ANALYSIS
Page : 32 item no : 18 Bldg Schdl 2017
supplying Ready Mixed cement concrete with well graded stone chips ( 20mm nominal supplying Ready Mixed
size) (ii) without approved concrete pump (i) Pakur Variety b) M25 grade size) (ii) without app
STEP - 1 STEP - 1
Ref. Page : 32 item no : 09 (B) Mark (A) = Rs. 5685.00 Ref.
per Cum
STEP - 2 STEP - 2
Ref. Page : B-59 Table No. 01 Ref.
Quantity of stone aggregate to be considered per Cu.m. of Concrete Quantity of stone aggr
Railway Stackyard = Barrckpur Railway Sta
20 mm Nominal size = 0.540Cu.m @ Rs.1375.00 Per Cu.m. (B1) = Rs. 742.50 20 mm Nomin
10 mm Nominal size = 0.360Cu.m @ Rs.1244.00 Per Cu.m. (B2) = Rs. 447.84 10 mm Nomin
TOTAL = 0.900Cu.m (B1) + (B2) = Mark (B) = Rs. 1190.34
STEP - 3 STEP - 3
Ref. Page : Table No. 02 Ref.
Cost of carriage of stone aggregate from Barrckpur railway yard Cost of c
and upto Dr. B.N. BOSE Sub-Divisional HOSPITAL and upto
Distance = 1.10 km Di
Distance up to 5 km = L.S. =Rs.124.00 = Rs. 124.00 (C1) Distance up
Distance from 5 km to 10 km 0.00 @ Rs.10.90/km = Rs. 0.00 (C2) Distance
Distance from10 km to 20 km @ Rs.10.10/km = Rs. 0.00 (C3) Distance
(C1) + (C2) + (C3) = Rs. 124.00 per Cu.m.
for 0.900 Cu.m. @ Rs. 124.00 per Cu.m. Mark (C) = Rs. 111.60 for
STEP - 4 STEP - 4
Ref. Page : Table No. 03 Ref.
Cost of loading and unloading Cost of loading and un
(a) Stone aggregate below 40 mm nominal size (a) Stone aggregate be
20 mm Nominal size = 0.54 Cum@Rs. 58.00 Per Cu.m. (D1) = Rs. 31.32 20 mm Nomin
10 mm Nominal size = 0.36 Cum@Rs. 58.00 Per Cu.m. (D2) = Rs. 20.88 10 mm Nomin
(D1) + (D2) = Mark (D) = Rs. 52.20
RMC M30
RATE ANALYSIS
Page : 33 item no : 19 Bldg Schdl 2017
supplying Ready Mixed cement concrete with well graded stone chips ( 20mm nominal supplying Ready Mixed
size) (ii) with approved concrete pump (i) Pakur Variety b) M30 grade size) (ii) with approve
STEP - 1 STEP - 1
Ref. Page : 33 item no : 09 (B) Mark (A) = Rs. 6088.00 Ref.
per Cum
STEP - 2 STEP - 2
Ref. Page : B-59 Table No. 01 Ref.
Quantity of stone aggregate to be considered per Cu.m. of Concrete Quantity of stone aggr
Railway Stackyard = Barrckpur Railway Sta
20 mm Nominal size = 0.540Cu.m @ Rs.1375.00 Per Cu.m. (B1) = Rs. 742.50 20 mm Nomin
10 mm Nominal size = 0.360Cu.m @ Rs.1244.00 Per Cu.m. (B2) = Rs. 447.84 10 mm Nomin
TOTAL = 0.900Cu.m (B1) + (B2) = Mark (B) = Rs. 1190.34
STEP - 3 STEP - 3
Ref. Page : Table No. 02 Ref.
Cost of carriage of stone aggregate from Barrckpur railway yard Cost of c
and upto Dr. B.N. BOSE Sub-Divisional HOSPITAL and upto
Distance = 1.10 km Di
Distance up to 5 km = L.S. =Rs.124.00 = Rs. 124.00 (C1) Distance up
Distance from 5 km to 10 km 0.00 @ Rs.10.90/km = Rs. 0.00 (C2) Distance
Distance from10 km to 20 km @ Rs.10.10/km = Rs. 0.00 (C3) Distance
(C1) + (C2) + (C3) = Rs. 124.00 per Cu.m.
for 0.900 Cu.m. @ Rs. 124.00 per Cu.m. Mark (C) = Rs. 111.60 for
STEP - 4 STEP - 4
Ref. Page : Table No. 03 Ref.
Cost of loading and unloading Cost of loading and un
(a) Stone aggregate below 40 mm nominal size (a) Stone aggregate be
20 mm Nominal size = 0.54 Cum@Rs. 58.00 Per Cu.m. (D1) = Rs. 31.32 20 mm Nomin
10 mm Nominal size = 0.36 Cum@Rs. 58.00 Per Cu.m. (D2) = Rs. 20.88 10 mm Nomin
(D1) + (D2) = Mark (D) = Rs. 52.20
RMC M30
RATE ANALYSIS
Page : 33 item no : 19 Bldg Schdl 2017
supplying Ready Mixed cement concrete with well graded stone chips ( 20mm nominal supplying Ready Mixed
size) (ii) without approved concrete pump (i) Pakur Variety b) M30 grade size) (ii) without app
STEP - 1 STEP - 1
Ref. Page : 33 item no : 09 (B) Mark (A) = Rs. 5855.00 Ref.
per Cum
STEP - 2 STEP - 2
Ref. Page : B-59 Table No. 01 Ref.
Quantity of stone aggregate to be considered per Cu.m. of Concrete Quantity of stone aggr
Railway Stackyard = Barrckpur Railway Sta
20 mm Nominal size = 0.540Cu.m @ Rs.1375.00 Per Cu.m. (B1) = Rs. 742.50 20 mm Nomin
10 mm Nominal size = 0.360Cu.m @ Rs.1244.00 Per Cu.m. (B2) = Rs. 447.84 10 mm Nomin
TOTAL = 0.900Cu.m (B1) + (B2) = Mark (B) = Rs. 1190.34
STEP - 3 STEP - 3
Ref. Page : Table No. 02 Ref.
Cost of carriage of stone aggregate from Barrckpur railway yard Cost of c
and upto Dr. B.N. BOSE Sub-Divisional HOSPITAL and upto
Distance = 1.10 km Di
Distance up to 5 km = L.S. =Rs.124.00 = Rs. 124.00 (C1) Distance up
Distance from 5 km to 10 km 0.00 @ Rs.10.90/km = Rs. 0.00 (C2) Distance
Distance from10 km to 20 km @ Rs.10.10/km = Rs. 0.00 (C3) Distance
(C1) + (C2) + (C3) = Rs. 124.00 per Cu.m.
for 0.900 Cu.m. @ Rs. 124.00 per Cu.m. Mark (C) = Rs. 111.60 for
STEP - 4 STEP - 4
Ref. Page : Table No. 03 Ref.
Cost of loading and unloading Cost of loading and un
(a) Stone aggregate below 40 mm nominal size (a) Stone aggregate be
20 mm Nominal size = 0.54 Cum@Rs. 58.00 Per Cu.m. (D1) = Rs. 31.32 20 mm Nomin
10 mm Nominal size = 0.36 Cum@Rs. 58.00 Per Cu.m. (D2) = Rs. 20.88 10 mm Nomin
(D1) + (D2) = Mark (D) = Rs. 52.20
Page : 25 item no : 11
for additional floor
Extra above the rate of ground floor,up to 4th floor @ Rs.95/Cu.m./ floor
Extra above the rate of ground floor,above 4th floor@ Rs.116/Cu.m./floor
RMC M40
RATE ANALYSIS
Page : 34 item no : 21 Bldg Schdl 2017
supplying Ready Mixed cement concrete with well graded stone chips ( 20mm nominal
size) (ii) with approved concrete pump (i) Pakur Variety b) M40 grade
Page : 25 item no : 11
for additional floor
Extra above the rate of ground floor,up to 4th floor @ Rs.95/Cu.m./ floor
Extra above the rate of ground floor,above 4th floor@ Rs.116/Cu.m./floor
Extra for lifting charge for approved concrete pump@ Rs.20 /Cu.m./floor
RMC M40
RATE ANALYSIS
Page : 25 item no : 09 (B)(e) Bldg Schdl 2017
supplying Ready Mixed cement concrete with well graded stone chips ( 20mm nominal
size) (ii) without approved concrete pump (i) Pakur Variety b) M40 grade
Page : 25 item no : 11
for additional floor
Extra above the rate of ground floor,up to 4th floor @ Rs.95/Cu.m./ floor
Extra above the rate of ground floor,above 4th floor@ Rs.116/Cu.m./floor
RMC M20
RATE ANALYSIS
Page : 32 item no : 17 Bldg Schdl 2017
supplying Ready Mixed cement concrete with well graded stone chips ( 20mm nominal
size) (ii) with approved concrete pump (i) Pakur Variety b) M30 grade
RMC M20
RATE ANALYSIS
Page : 32 item no : 17 Bldg Schdl 2017
supplying Ready Mixed cement concrete with well graded stone chips ( 20mm nominal
size) (ii) without approved concrete pump (i) Pakur Variety b) M30 grade
Page : 25 item no : 11
for additional floor
Extra above the rate of ground floor,up to 4th floor @ Rs.95/Cu.m./ floor
Extra above the rate of ground floor,above 4th floor@ Rs.116/Cu.m./floor
Page 43
NAME OF WORK :
Tube Well boring & lowering of necessary pipes in location near PWD Electrical Section Office by
the SSF battalion Field - Mangal Pandey Uddyan, Barrackpore during the year 2018 - 19"
(viii) 80 mm dia.
1 x 18.00 x 9.50 = 171.00 m
1 x 12.00 x 7.50 = 90.00 m
TOTAL = 261.00 m
Rs. 94.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) m
Rate = @ Rs. 94.00/ m Rs. 24534.00
Labour for fitting and fixing G.I. specials including cost of jointing materials.
Page 44
(a) Plug.
(iii) Above 50 mm upto 80 mm dia.
TOTAL = 0 No
Rs. 11.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 11.00/ No Rs. 0.00
(b) Socket, Reducing socket, Bend, Plain equal elbow, Reducing elbow,
Nipple, Short piece.
(iii) Above 50 mm upto 80 mm dia.
TOTAL = 0 No
Rs. 11.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 11.00/ No Rs. 0.00
(c) Plain tee, Reducing tee, Pendent tee, Jamnut, Socket and Nipple
(iii) Above 50 mm upto 80 mm dia.
TOTAL = 0 No
Rs. 11.00 + ( Rs. 0.00 x 0 floor + Rs. 0.00 x 0 floor ) No
Rate = @ Rs. 11.00/ No Rs. 0.00
RATE ANALYSIS
ITEM No. 1
Supplying, fitting and fixing starter
(model no MU-G20H Fully automatic Star-Delta Starter SS95975