Quy tr×nh nµy quy ®Þnh c¸ch thö c¸c thiÕt bÞ phôc vô cña tµu
hµng 8700 T
Ph¹m vi ¸p dông:
¸p dông t¹i Ph©n xëng M¸y tµu, èng tµu, §iÖn Tµu vµ c¸c phßng
ban liªn quan
3. Reference documents:
§Þnh nghÜa:
Relative
Responsibility Contents
documents
Made testing
procedure
Technician Catalogue
for each
Technical dept. equipment.
Classificatio
n rules for
Inspecti steel hull
on vessel.
Tech. dept. Acc.to
Class’s rules
Director Acc.to
Class survey Mooring test equipment’s
catalogue
Production
dept., Q.C dept., Acc.to the
Tech. procedure
dept.,Shipowner Ame
, Service ndm
engineer (if Inspecti
ent
any) on
Engine
workshop
Class survey, Acc. to the
Q.C, Tech. Dept, procedure
Ship owner, Sea trial
Service
engineer (if
any)
Engine
workshop
Inspecti
Production on Acc. to the
dept., Q.C dept., procedure
Tech.
dept.,Shipowner
, Service Delivery
engineer (if
any)
Engine
workshop
Production Acc. to the
dept., Q.C dept., procedure
Tech.
dept.,Shipowner
Tech. dept., Q.C Technical
dept., drawing,
Production Equipment
dept., instruction
Shipowner manual
TANK SS 400
SAFETY Set pressure 0.45 MPa
PRESS. GAUGE 1.0 MPa
ON: 0.25 MPa
PRESS. SWITCH
OFF: 0.35 MPa
CAPACITY 300 L
Test method for fresh water hydrophore tank to be carried
out as follow:
Ph¬ng ph¸p thö b×nh hydrophore níc ngät:
§îc tiÕn hµnh nh sau:
Check all system before testing
KiÓm tra toµn bé hÖ thèng tríc khi thö.
The pump hand wheel should be turned smoothy.
Dïng tay via c¸c b¬m ph¶i nhÑ nhµng.
The relative valves of system are opened.
Më c¸c van cã liªn quan cña hÖ thèng.
Supply power for pump in 5 10 seconds and stop pump
for checking pump rotating direction
CÊp ®iÖn cho b¬m 5 10 gi©y dõng b¬m kiÓm tra chiÒu
quay cña b¬m.
+ No.1 pump:
B¬m sè 1:
Start water feed pump to tank up to moulded water level
by using water pump No.1.
Check automatic pressure off Png¾t = 0.35 MPa.
Khëi ®éng b¬m cÊp níc vµo b×nh ( Giã ¸p lùc ph¶i ®îc n¹p
vµ ®iÒu chØnh mùc níc ) tíi mùc níc thiÕt kÕ b»ng b¬m n-
íc sè 1.
KiÓm tra ¸p lùc ng¾t tù ®éng Png¾t = 0.35 MPa.
X¶ dÇn níc trong b×nh ®Ó gi¶m ¸p lùc trong b×nh, theo
dâi chÕ ®é cÊp níc tù ®éng cña b¬m PcÊp = 0.25 MPa.
Presure reduction to be carried out by discharging water in
tank gradually, the automatic water supply of pump to be
observed with Psupply=0.25 MPa.
KiÓm tra chÕ ®é ®Þnh møc cña c«ng t¾c ¸p lùc theo
®ång hå trong b×nh khi ®ãng, më
The rated mode is checked for pressure switch according
to the tank while opening and closing.
+ B¬m sè 2 : TiÕn hµnh gièng nh b¬m sè 1
+ Pump N0 2: It is carried out similarly as for Pump N 0 1.
B¬m níc ngät sinh ho¹t
Service fresh water feed pump:
h¹ng môc ®¬n vÞ thiÕt kÕ KÕt qu¶ b¬m 1 KÕt qu¶ b¬m 2
Items Unit design Result of Result of Pump
0
Pump N 1 N0 2
tæng cét ¸p MPa 0.5
Total pressure level
¸p lùc hót MPa
Suction presure
¸p lùc x¶ MPa
Discharge pressure
dßng ®iÖn a
Current
k.®éng b¬m MPa 0.25
Pump start
dõng b¬m MPa 0.35
pump stop
QUANTITY : 01 SET
TYPE : VERTI. CENTRISELF. PRIM. SYS.
MODEL : FE2V – 150E with VK-20NB
CAPACITY : 55/200 m3/ h , 55/20 m
MOTOR : 37 kw - 440 V - 3Ph – 60 Hz – 1750 r.p.m
MANUFACTURER : NANIWA.
Diesel Pump
MODEL 3JHLP MODEL TY - 30
C«ng suÊt (Capacity ) 22 KW( 30 Capacity 55m3/ h
PS)
Vßng quay (Revolution ) 3200 min -1 Total head 0.64
MPa(65m )
Sè xi lanh 4 suction -5m
Number of cylinders
Vßng quay 3200 min -1
Revolution
c) TiÕn hµnh:
c) Performance:
Thang thö 0 – 1.0 MPa 1.0 – 2.0 MPa 2.0 – 3.0 MPa
Test range
Thêi gian Phót Gi©y Phót Gi©y Phót Gi©y
Interval Minuets Minuets Minuets
Seconds Seconds Seconds
¸p lùc giã
Compressed air
pressure
Ampe kÕ A A A
Ameter
N¹p khÝ tõ m¸y nÐn khÝ chÝnh sè 2 vµo chai giã chÝnh sè
2
Main air receiver N0 2 is charged from Main air compressor
N0 2
Thang thö 0 – 1.0 MPa 1.0 – 2.0 MPa 2.0 – 3.0 MPa
Test range
Thêi gian Phót Gi©y Phót Gi©y Phót Gi©y
Interval Minuets Minuets Minuets
Seconds Seconds Seconds
¸p lùc giã
Air pressure
Ampe kÕ A A A
Ameter
Thang thö 0 – 1.0 MPa 1.0 – 2.0 MPa 2.0 – 3.0 MPa
Test range
Thêi gian Phót Gi©y Phót Gi©y Phót Gi©y
Interval Minuets Minuets Minuets
Seconds Seconds Seconds
¸p lùc giã
Air pressure
Ampe kÕ A A A
Ameter
Thö chÕ ®é tù ®éng khëi ®éng & dõng cña m¸y nÐn khÝ
Auto start/stop test for air compressor:
DÇu nhên: SHELL GADINIA OIL 30 ®îc n¹p ®ñ vµo C¸t te m¸y
LO: SHELL GADINIA OIL 30 to be filled sufficiently into
crankcase
Kh«ng ®îc hµn c¾t trong khu vùc buång m¸y.
Welding and cutting works are not allowed in E/R area.
Ngêi kh«ng cã nhiÖm vô kh«ng ®îc tham gia vµo qu¸
tr×nh thö, kh«ng ®îc tù tiÖn thay ®æi chÕ ®é thö mµ cha ®îc
phÐp cña héi ®ång thö
Unauthororied people are imposible to participate in the
test process; test mode changing is prohibited without test
group’s allowance.
KiÓm tra l¹i toµn bé c¸c chi tiÕt, c¸c côm chi tiÕt, c¸c liªn
kÕt ®îc l¾p r¸p trªn m¸y nhÊt lµ c¸c chi tiÕt truyÒn chuyÓn
®éng
Rechecking all the elements, element units, members
assembled on engine especially for movable driving elements.
§o co bãp trôc c¬ tríc khi thö vµ sau khi thö råi ghi l¹i kÕt
qu¶
Crankshaft deflection should be measured before and after
test, and then the result to be reported.
§iÒu chØnh van cöa ra cña m¸y läc sao cho ¸p kÕ b¸o ¸p
lùc P ~ 0.15 MPa
Purifier outlet inddne valve to be so adjusted that the
pressure gauge indicates pressure= 0.15 MPa
Thêi gian chê x¶ 10 phót.
Dicharge waiting interval in 10 minutes
KiÓm tra ®Æc ®iÓm vËn hµnh ®o vßng quay.
Operational characteristics of revolution measurement are
checked.
Trong qu¸ tr×nh thö tiÕn hµnh x¶ cÆn b»ng tay
Sludge is drained manually during test process.
+ Thö hÖ thèng b¸o ®éng ®Ó kiÓm tra trong qu¸ tr×nh vËn
hµnh
+ Alarm system is tested and checked during operation
process.
Thö chÕ ®é ho¹t ®éng tù ®éng.
Auto operation is tested.
Khëi ®éng m¸y läc ly t©m.
Centrifugal purifier shoul be started.
BËt c«ng t¾c b¶ng tù ®éng ®iÒu khiÓn vÒ ON ®Ìn CON.
SOURCE s¸ng.
Auto panel switch to be turned On and CON. SOURCE lamp
shall flash.
Sau khi kiÓm tra m¸y läc ®· ®¹t ®îc tèc ®é ®Þnh møc Ên
c«ng t¾c nót tù ®éng AUTO. START . trªn b¶ng ®iÒu khiÓn
Van ®iÖn tõ 2 sÏ ho¹t ®éng níc sÏ ®îc cÊp vµo.
After checking the purifier when it reach rated speed,
AUTO START push button to be pushed activated on solenoid
valve panel 2, and then water shall be supplied.
Cho m¸y ch¹y ë chÕ ®é hoµn toµn tù ®éng ®Ó kiÓm tra
hÖ thèng ®iÒu khiÓn tù ®éng
Purifier is operated in completely automatic mode to check
auto controle system.
+ Thö thiÕt bÞ b¶o vÖ.
+ Protection devices are tested.
* KiÓm tra b¸o ®éng ng¾t. khi rß rØ dÇu, hoÆc ¸p lùc cöa ra
thÊp.
* Shut-down alarm is tested when oil leakage occurs or outlet
port pressure is low.
Më van ®¸y kÐt, x¶ níc díi ®¸y b×nh xuèng sµn la canh,
khi xuÊt hiÖn dÇu th× dõng l¹i .
Tank bottom drain valve to discharge water to bilge tank.
This shall be stopped until oil occurs.
Khëi ®éng qu¹t khÝ th¶i, kiÓm tra chiÒu quay.
Exhaust gas blower is started to check its rotary direction.
Khëi ®éng bé ®èt dÇu diezel, b¬m tuÇn hoµn dÇu cÆn díi
kÐt, kiÓm tra chiÒu quay vµ chØ thÞ ¸p lùc theo thiÕt kÕ .
DO firing unit, sludge oil circulating pump of tank bottom
are started to check the rotary direction and pressure indication
according to the design.
KiÓm tra b¶ng ®iÒu khiÓn ho¹t ®éng vµ thiÕt bÞ chØ b¸o
b×nh thêng
Common indication devices and operation controle panel
should be checked.
§èt nåi h¬i, ®a h¬i vµo sÊy kÐt dÇu cÆn trùc nhËt ®Õn
nhiÖt ®é 80oC
Boiler should be operated to heat service sludge oil tank
up to 800 C.
b) TiÕn hµnh :
b) Performance:
*. Thö ®èt dÇu cÆn :
* Sludge oil consumption test.
§ãng chÆt cöa th¶i , Ên nót “ WASTE OIL “ .
Drain port is closed tightly and press “WASTE OIL “button.
TiÕn hµnh thö ho¹t ®éng cña c¸c van ®iÒu tiÕt
Regulating valve is test for opearation.
KiÓm tra chøc n¨ng thiÕt bÞ an toµn vµ thiÕt bÞ b¸o ®éng
Funtions of safety and alarm devices are checked.
- C¸c thiÕt bÞ kiÓm so¸t an toµn.
4. - The safety controle devices:
B¶ng ®iÒu
FO khiÓn §iÓm
N0 Tªn(Discription)
Shut off B¸o ChØ ®Æt
®éng b¸o
Kh«ng cã löa 0 0 0
1 Miss Fire / Flame
Failure
Qu¹t lß ®èt b×nh th- 0 0 0
2 êng
Burner Fan Abnormal
Qu¹t lµm m¸t b×nh th- 0 0 0
3 êng
Cooling Fan Abnormal
NhiÖt ®é cao cña 0 0 0 11000C
buång ®èt
4
Furnace temperature
high
¸p suÊt buång ®èt 0 0 0 -0.1KPa
5 cao
Furnace pressure high
H¹ ¸p suÊt dÇu th¶i 0 0 0 0.1MPa
6 Waste oil pressure
drop
NhiÖt ®é khÝ x¶ cao 0 0 0 3200C
7 Exhaust gas high
temperature
H¹ ¸p suÊt buång ®èt 0 0 0 0.5MPa
8 Aux. Burner oil
pressure
H¹ ¸p suÊt khÝ 0 0 0 40kPa
9 Atomize Pressure Air
drop
1 Bé s¾p xÐp bÊt thêng 0 X 0
0 BCU abnormal
1 MÊt ®iÖn ( nguån lçi ) 0 X X
1 Control Source Failuce
Cöa më trong khi m¸y 0 X X
1
ch¹y
1
Door Lock Abnormal
5.2.12) ThiÕt bÞ xö lý níc th¶i: ( 01 tæ )
5.2.12) Sewage treatment unit:
1 - C¸c th«ng sè c¬ b¶n.
1 – Principle parameters:
Type: SBT – 25
Nguån: AC 440 V x 60 Hz x 3
Power: AC 440 V x 60 Hz x 3
Max = 25 ngêi/ ngµy.
Max = 25 people/day.
B¬m th¶i: ( 01 tæ )
Discharge pump: 1 unit
Type: CR – 50 S , 4 m3/ h x 20 m x 1,5 Kw x 2p.
Qu¹t giã: ( 01 tæ )
Blower : 1 unit.
Type: TSS – 32, 370 l/ min x 0.02 MPa x 0.45 Kw x 4p
2 - Ph¬ng ph¸p thö:
2- Test method
C¸c hÖ thèng liªn quan ®· ®îc kiÓm tra, ch¹y thö.
Correspoding systems have been check and
performed for running test.
Via b¬m ph¶i nhÑ nhµng.
Turn the pump smoothly.
Thêng xuyªn më van 1. 3. 7. 9. vµ ®ãng c¸c van 2. 4. 5. 6.
8.
Ussually open valves 1, 3, 7, 9 and close valves 2, 4, 5, 6,
8.
Trong lóc vÖ sinh läc ®ãng van 3. 5. 7. 8. më van 6.
Close valves 3, 5, 7, 8 and open valve 6 during cleaning
time.
Khi x¶ cÆn ®ãng van 3. 6. 8 vµ më van 4. 5. 7. 9.
Close valves 3. 6. 8 and open valves 4. 5. 7. 9 during
discharging the sludge.
Khi lµm s¹ch, hoÆc kiÓm tra Toilet vµ èng dÉn chÊt th¶i
®ãng van 1 vµ më van 2.
Close valve 1 and open valve 2 during cleaning or checking
Toilet and sewage pipeline.
5.2.13) M¸y ®iÒu hßa trung t©m.( 01 tæ )
5.2.13) Air Conditioning Plant (01 Unit)
1 - C¸c th«ng sè c¬ b¶n.
1- Principle parameters:
Type: UAP – 15 HS4DD.
Nguån : AC 440 V x 60 Hz x 3P.
Power: AC 440 V x 60 Hz x 3P.
C«ng chÊt l¹nh: R22.
Freezing liquid: R22.
C«ng suÊt lµm m¸t : 67.4 Kw
Cooling liquid: 67.4 Kw
C«ng suÊt sÊy : 83.7 Kw
Heating capacity: 83.7 Kw
M¸y nÐn: 02 Tæ.
Air compressor: 2 groups.
Type: JH527YEB.
§êng kÝnh xy lanh x hµnh tr×nh x sè xy lanh: 44.45mm x
25.9 mm x 5
Cylinder x stroke x numbers of cylinder: 44.45mm x 25.9
mm x 5
§éng c¬ ®iÖn lai m¸y nÐn: 7.5 Kw x 22A x 02 chiÕc.
Compressor eclectro-driving motor: 7.5 Kw x 22A x 02
units.
B×nh ngng:
Condensor:
Model: UWC.
DiÖn tÝch 18.4 m2.
Area: 18.4 m2.
Qu¹t: 160 m3/min x 685 Pa
Blower: 160 m3/min x 685 Pa
§éng c¬ lai qu¹t: 5.5 Kw x 440V x 60 Hz
Blower driving motor: 5.5 Kw x 440V x 60 Hz
Träng lîng: 940 Kg.
Weight: 940 Kg.
2 - Ph¬ng ph¸p thö:
2-Test method:
* Thö ®iÒu hoµ l¹nh.
* Test for cold air conditioner
KiÓm tra hÖ thèng níc biÓn lµm m¸t bÇu ngng tr¹m ®iÒu
hßa.
Cooling sea water for condenser of A/C station needed to
be checked.
Ch¹y b¬m níc biÓn lµm m¸t bÇu ngng tr¹m ®iÒu hßa.
Cooling sea water pump of A/C station condenser is
operated.
NhiÖt ®é níc lµm m¸t ≤ 36 0C
Cooling water temperature ≤ 36 0C.
Khëi ®éng qu¹t giã vµ m¸y nÐn m¸y ®iÒu hßa trung t©m.
Ventilation fan and compressor of central air conditioner to
be started.
NhiÖt ®é trong phßng sÏ ®îc ®iÒu khiÓn bëi van ®iÒu
chØnh nhiÖt ®é.
Room temperature shall be controlled by temperature
regulating valve.
Khi ¸p suÊt hót thÊp c«ng t¾c ¸p lùc ng¾t m¸y nÐn (Tù
®éng khëi ®éng l¹i)
The pressure switch shall stop R22 compressor when
suction pressure is low (Auto restart).
Khi ¸p suÊt khÝ x¶ ra cao c«ng t¾c ¸p lùc ng¾t m¸y
nÐn(Khëi ®éng l¹i b»ng tay)
The pressure switch shall stop R22 compressor when
discharge pressure is high (Manual restart).
NÕu trong trêng hîp trªn c«ng t¾c ¸p lùc kh«ng ho¹t ®éng
¸p suÊt khÝ ra cao sÏ ®îc x¶ ra ngoµi bëi van an toµn.
If pressure switch is failed as above mentioned, the high
outlet gas pressure shall be discharged out from safety
valve.
Thö ®iÒu hoµ nãng.
Heating air conditioning test.
Khëi ®éng qu¹t giã 7,5 Kw.
Ventilation fan is started at 7,5 Kw.
M¸y nÐn c«ng chÊt l¹nh ë tr¹ng th¸i dõng.
R22 compressor is in stop condition.
Van x¶ cña b¶ng bÉy h¬i níc ph¶i ®îc më.
Drain valve of steam trap panel to be opened.
Më van h¬i nãng sè ST24V ( B¶n vÏ 14 tËp MP-1 ), më
tiÕp van h¬i sè 5 t¹i b¶ng van ( REGULATOR VALVE PANEL ),
h¬i nãng ®i vµo bé sÊy, sÊy nãng luång kh«ng khÝ s¹ch ®îc
qu¹t giã thæi vµo c¸c buång ( NhiÖt ®é ®îc ®iÒu chØnh bëi
van sè 1 nhê bé tù ®éng 2 ).
Main Pilot
Capa 136 ( at 1.8 40 ( at l/h
city MPa ) 0.8 MPa)
0.4 ( 085 A) 0.09 kW
Moto
2 2 Pole
r
3510 3200 r.p.m
2 - Thö tÝch tô
2- Accumulation test.
Thö tÝch tô ®Çy ®ñ ®Ó ng¨n ngõa ¸p suÊt h¬i t¨ng qu¸
100% ¸p suÊt lµm viÖc
Full accumulation test is performed to avoid increasing
steam pressure over 100%
3 - §Æt van an toµn
3- Sefety valve setting:
C¸c van an toµn më víi ¸p suÊt 0.69 MPa.
Relief valve shall be opned by pressure =0.69 MPa.
§iÒu chØnh: §iÒu chØnh vÝt cña van an toµn
Adjudting: Screw of safety valve.
4- Dõng qu¹t
4- Stop the fan
Trong qu¸ tr×nh qu¹t ch¹y, Ên bé tiÕp ®iÓm ®Ó kiÓm tra
qu¸ t¶i
During fan is operating, contacting unit is pressed to check
the over load mode.
- Thö c¸c thiÕt bÞ b¶o vÖ vµ thiÕt bÞ b¸o ®éng
5 – Protection and alarm equipments:
C¸c thiÕt bÞ díi ®©y ®îc x¸c ®Þnh:
The following equipment should be determined:
a. Dõng sù cè b»ng tay
a. Em’cy stop by hand.
b. Ng¾t tù ®éng
b. Auto-stop
c. Chu«ng b¸o ®éng
c. Alarm bell
TÊt c¶ c¸c thiÕt bÞ b¶o vÖ vµ c¸c thiÕt bÞ b¸o ®éng l¾p
trªn nåi h¬i ®Òu thö tríc khi vËn hµnh nåi h¬i ®Ó tr¸nh sù cè
kh«ng ®¸ng cã
All the protection and alarm equipments built-in boiler
should be tested before it is operated to avoid unrespected
problems.
Biªn b¶n thö
Test report:
1 .Thö ®iÒu khiÓn møc níc nåi h¬i
1. Test to control the boiler water level.
2. Thö tÝch tô
2. Accumulation test:
INDEK
No. ITEM (Sè ®Ò môc)
1. GENERAL
(giíi thiÖu chung)
2. MAIN GENERATOR TEST
(Thö m¸y ph¸t chÝnh)
3. MAIN SWITCHBOARD TEST
(thö b¶ng ®iÖn chÝnh)
4. EMERGENCY GENERATOR TEST
(thö m¸y ph¸t sù cè)
5. EMERGENCY SWITCHBOARD TEST
(thö b¶ng ®iÖn sù cè)
6. CONFIRMATION TEST OF CHARGE DISCHARGING BOARD
AND DISTRIBUTION BOARD
(x¸c nhËn thö cho hÖ n¹p vµ b¶ng n¹p, b¶ng ph©n phèi)
7. CONFIRMATION TEST FOR TRANSFORMERS, MOTORS AND
STARTERS
(x¸c nhËn thö cho c¸c m¸y biÕn ¸p, ®éng c¬ vµ c¸c bé khëi
®éng)
8. CONFIRMATION TEST FOR LIGHTING
(x¸c nhËn thö cho chiÕu s¸ng)
9. OPERATION TEST FOR INTERIOR COMMUNICATION AND
NAUTICAL EQUIPMENT
(thö ho¹t ®éng cho hÖ thèng th«ng tin liªn l¹c néi bé vµ c¸c
thiÕt bÞ hµng h¶i)
10. OPERATION TEST FOR RADIO EQUIPMENT
(thö ho¹t ®éng cho c¸c thiÕt bÞ radio)
11. INSULATION RESISTANCE TEST
(thö ®iÖn trë c¸ch ®iÖn)
12. EMERGENCY STOP TEST FOR MOTORS
(thö dõng sù cè cho c¸c ®éng c¬)
1. GENERAL
This test record was carried out to follow “METHOD OF ON-
BOARD TEST FOR ELECTRICAL INSTALLATION” in presence of
the owner’s representatives, the surveyors of the
Classification society and the persons of the Yard who are in
charge of.
2. MAIN GENERATOR TEST
2.1 Specifications of main generator(c¸c th«ng sè kü thuËt
cña m¸y ph¸t chÝnh)
Quantity ............................2 sets (sè lîng)
Type ...........................Dripproof, brushless, F-insul.
(lo¹i)
Output ...........................AC 450V, 60Hz, 3, 350KVA
(280KW).
(®Çu ra)
Revolution.......................... 1200 min -1.
(tèc ®é vßng quay)
Rated current......................513 A
(dßng ®Þnh møc)
Maker................................. TAIYO ELECTRIC CO., LTD.
Prime mover ...................... YANMAR DIESEL ENGINE CO.,
LTD 6NY16L-UN, 320KW x 1200 min-1.
2.2 Kind of load
(lo¹i t¶i)
Water (power factor 1.0)
(níc)(hÖ sè c«ng suÊt)
2.3 Meters
(c¸c dông cô ®o)
Meters on the main switchboard .
(c¸c ®ång hå ®o ë trªn b¶ng ®iÖn chÝnh)
2.4 Test items and procedures
(thö c¸c th«ng sè vµ c¸c qui tr×nh thö)
2.4.1Insulation resistance measurement.
(tiÕn hµnh ®o ®iÖn trë c¸ch ®iÖn)
No.1 Generator
Befo
re
~ 1/2 160 450 60
~ 3/4 240 450 60
~ 4/4 320 450 60
~ 4/4 320 450 60
After
No.2 Generator
Befo
re
~ 1/2 160 450 60
~ 3/4 240 450 60
~ 4/4 320 450 60
~ 4/4 320 450 60
After
2.4.4 Load Characteristic Test.
(thö ®Æc tÝnh t¶i)
Load Output Voltag Curren Frequen
(KW) e t cy
(V) (A) (Hz)
No.1 Generator
4/4 320 450
3/4 240 450
2/4 160 450
1/4 80 450 -
0 0 450 0
1/4 80 450 -
2/4 160 450
3/4 240 450
4/4 320 450
No.2 Generator
ACB ON
Auto
starting sig.
(tÝn hiÖu tù No.1 No..2
®éng khëi
®éng)
ACB abnormal sec sec
trip(ng¾t
kh«ng b×nh
thêng
¸ptomat)
3. MAIN SWITCHBOARD TEST
3.1 Switching ON/OFF test of feeder breaker ....................................
3.2 Confirmation test of alarms
(x¸c nhËn thö c¸c th«ng sè b¸o ®éng)
after
Prime mover
time load Revoluti L.O. Temperature (oC) Room
on press. Cylinde Exhaus Cool Cool temp
(min-1) (MPa) r t air air (oC)
hesd gas out in
before - -
1/2 1800
3/4 1800
4/4 1800
4/4 1800
after
4.4.4 Load Characteristic Test
(thö ®Æc tÝnh t¶i)
Load Output Voltage Current Frequenc
(KW) (V) (A) y
(Hz)
4/4 24 450
3/4 18 450
2/4 12 450 -
1/4 6 450 -
0 0 450 0
1/4 6 450 -
2/4 12 450 -
3/4 18 450
4/4 24 450
6. Hå s¬.
6. Documents:
C¸c b¶n vÏ kü thuËt.
Technical drawings.
Catalog ®i kÌm thiÕt bÞ.
Catalogues attached with delivered equipments.
7. Phô lôc.
7. Appendix
Kh«ng.
Non.
1
page: