Foundation forces

Down Thrust
Uplift
Side Thrust (T)
SideThrust (L)

TRUE LENGTH FACTOR

soil/rock/concrete data
unit weight of soil (top layer) Wtdrysoil
unit weight of soil (bottom layer) Wtwetsoil
unit weight of concrete (top layer) wtdryconc
unit weight of concrete(bottom layer) wtwetconc
bearing capacity BC
DEPTH OF WATER TABLE BELOW GROUND LINE Hw
ANGLE OF REPOSE OF SOIL (TOIP LAYER) Atop
ANGLE OF REPOSE OF SOIL (BOTTOM LAYER) Abtm
(1+SIN )/(1-SIN A)

FOUNDATION GEOMETRY
HEIGHT OF CHIMNEY ABOVE GL H1C
HEIGHT OF CHIMNEY UP TO WATER TABLE H2C=Hw
HEIGHT OF CHIMNEY BELOW WATER TABLE H3c=H-H2c-H4p-H5p-H6p-H7p
HEIGHT OF PAD 1 H4p
HEIGHT OF SLOPED PAD 2 H5p
HEIGHT OF BOTTOM PAD 3 H6p
HEIGHT OF LEAN CONCRETE PAD 4 H7p
HEIGHT OF EXCAVATION H
WIDTH OF CHIMNEY B1c
WIDTH OF PAD 1 B2p
WIDTH AT TOP OF PAD 2 B3p=B4p-2*H5p
WIDTH AT BOTTOM OF PAD 2, PAD3, PAD 4 B4p
HEIGHT OF CHIMNEY H10c=H2c+H3c

VOLUME OF CONCRETE
HEIGHT OF CHIMNEY ABOVE GROUND LEVEL V1c
VOLUME OF CHIMNEY IN SOIL(TOP LAYER) V2c
VOLUME OF CONCRETE (TOP LAYER) V3c
VOLUME OF CHIMNEY IN SOIL (BOTTOM LAYER) V4c
VOLUME OF PAD 1 IN SOIL (BOTTOM LAYER) V5p
VOLUME OF PAD 2 IN SOIL (BOTTOM LAYER) V6p
VOLUME OF PAD 3 IN SOIL (BOTTOM LAYER) V7p
VOLUME OF CONCRETE (TOP LAYER) V8p
VOLUME OF FOUNDATION PER LEG V9p
VOLUME OF LEAN CONCRETE PAD 4 LEG V10p

VOLUME OF SOIL
HEIGHT OF SOIL TOP LAYER H8s
HEIGHT OF SOIL BOTTOM LAYER H9s
tan ANGLE OF REPOSE FOR TOP LAYER B5s
tan ANGLE OF REPOSE FOR BOTTOM LAYER B6s
A1
A2
VOLUME OF SOIL (TOP FRUSTUM) V11s
VOLUME OF SOIL (BOTTOM FRUSTUM) V12s

CHECK FOR UPLIFT

WEIGHT OF SOIL TOP LAYER WT1s


WEIGHT OF SOIL BOTTOM LAYER WT2s
WEIGHT OF CHIMNEY ABOVE GROUND WT3s
WEIGHT OF CONCRETE DUE TO OVERLOAD(TOP LAYER) WT4s
WEIGHT OF CONCRETE DUE TO OVERLOAD(BOTTOM LAYER) WT5s
RESISTANCE AGAINST UPLIFT WT6r
FOS (NC) 1
FOS(BWC) 1

MOMENT DUE TO SIDE THRUST AT FOUNDATION TOE (NORMAL CONDITION) TRANSVERSE SHEAR
PASSIVE EARTH PRESSURE(F) F
UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1
SHEAR F
FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S
If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised

Resisting soil force


moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNDATION TOE (NORMAL CONDITION) longitudnal shear

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1
SHEAR F
FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S
If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNADATION TOE(BROKEN WIRE CONDITION TRANSVERSE SHEAR) TRANSVERSE SHEAR

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1

FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S


If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNADATION TOE(BROKEN WIRE CONDITION LONGITUDNAL SHEAR SHEAR) LONGITUD

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1

FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S


If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

CHECK FOR BEARING CAPACITY : NORMAL CONDITION

Bearing pressure due to direct compression BR1nc


Bearing pressure due to eccentricity BR2nc
Bearing pressure due to transverse shear BR3nc
Bearing pressure due to longitudinal shear BR4nc
Total Bearing Pressure
Factor Of Safety NC 1
CHECK FOR BEARING CAPACITY : BROKEN WIRE CONDITION

Bearing pressure due to direct compression BR1bwc


Bearing pressure due to eccentricity BR2bwc
Bearing pressure due to transverse shear BR3bwc
Bearing pressure due to longitudinal shear BR4bwc
Total Bearing Pressure
Factor Of Safety NC 1

DESIGN OF CHIMNEY

CHECK FOR COMPRESSION WITH BENDING PREFER DRAWING OF FOOTING AND CHIMNEY FOR DI
CASE:1 NORMAL CONDITION
PU
GRADE OF REINFORCEMENT STEEL
STERENGTH OF STEEL
DIAMETER OF BAR IN CHIMNEY Mid -
NO OF BARS IN CHIMANEY
AREA OF STEEL Asc
AREA OF CHIMNEY Ac
% OF STEEL P
As per IS 456-2000 Longitudinal Reinforcement shall n
less than 0.8 % of the grosscross sectional area of colu
GRADE OF CONCRETE
STRENGTH OF CONCRETE
P/Fck
Pu/Fck
CONCRETE COVER IN CHIMNEY
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 44/45/46 of sp 16)
Mux1/Muy1
Puz=0.45*Fck*Ac+0..75Fy*Asc
Pu/Puz
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CASE:2 BROKENWIRE CONDITION

PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 44/45/46 of sp 16)
Mux1/Muy1
Puz=0.45*Fck*Ac+0..75Fy*Asc
Pu/Puz
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CHECK FOR TENSION WITH BENDING


CASE:1 NORMAL CONDITION

PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 79/80/81 of sp 16)
Mux1/Muy1
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CASE:2 BROKENWIRE CONDITION


PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 79/80/81 of sp 16)
Mux1/Muy1
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CHECK FOR BASE SLAB

COMPRESSION REINFORCEMENT AT SECTION X-X


DIMENSION OF SECTION AT X-X
PROVIDE BAR "A" AT BOTTOM OF PAD

AT TOP OF PAD

EFFECTIVE DEPTH
NORMAL CONDITION DIRECT COMPRESSION (P/A)
DUE TO ECCENTRICITY (P.ex/Z)/2
MAX ( TRAN MOMENT OR LONG MOMENT)
TOTAL

BROKENWIRE CONDITION DIRECT COMPRESSION (P/A)


DUE TO ECCENTRICITY (P.ex/Z)/2
MAX ( TRAN MOMENT OR LONG MOMENT)
TOTAL
MAXIMUM BEARING PRESSURE

MAX BEARING PRESSURE


BENDING MOMENT AT SECTION X-X
Mux1=bearing pressure*(B4P-B1c)^2/8*B4p
Mux1/bd^2
Mulim/bd^2 for fck 20 n/mm^2 & Fy=415 n/mm^2 refer page 10, tab
DESIGN METHOD
refer table 2 of SP 16
Pt tension reinforcement
Pc (=0 for singly reinforced slab) compression reinforcement
Ast required
Ast provided

Asc required
Asc provided

COMPRESSION REINFORCEMENT AT SECTION Y-Y


DIMENSION OF SECTION Y-Y FROM TOE
EFFECTIVE DEPTH
BENDING MOMENT AT SECTION Y-Y
Muy1=bearing pressure*(B4p-B2p)^2/8*B4p
Mux1/bd^2
DESIGN METHOD
REFER TABLE 2 OF SP16
Pt tension reinforcement
Pc (=0 for singly reinforced slab) compression reinforcement
Ast required
Ast provided

Asc required
Asc provided (12 mm 10 bars) 12

As per IS 456-2000 Minimum Reinforcement in either direction in slabs shall not be less than 0.15 percent
5 of the gross cross sectional area and 0.12 percent for high strength deformed bars

Area of slab
Area of steel reinforcement required

UPLIFT REINFORCEMENT AT SECTION X-X


Provide bar 'C' at top of pad

Ast provided
EFFECTIVE DEPTH
Bearing pressure P = Uplift / (B4p - B1c)^2
Muxrequired = P x (B4p - B1c)^2 / 8 x 1000
Muxprovided = 0.87 . Fy . Ast . d { 1 - Fy . Ast /( 1000 . Fck . d) }

UPLIFT REINFORCEMENT AT SECTION Y-Y

Ast provided
EFFECTIVE DEPTH
Muxrequired = P x (B4p - B1c)^2 / 8 x 1000
Muxprovided = 0.87 . Fy . Ast . d { 1 - Fy . Ast /( 1000 . Fck . d) }

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: DOWN THRUST CONDITION

ONE WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

ONE WAY SHEAR AT SECTION Y-Y


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: UPLIFT CONDITION

ONE WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

ONE WAY SHEAR AT SECTION Y-Y


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B2p) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000
CHECK FOR TWO WAY SHEAR FOR BASE SLAB: DOWNTHRUST CONDITION
TWO WAY SHEAR AT SECTION X-X
Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B1c + d)^2 )
Shear Stress = Shear Force / 4 x d x (B1c + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

TWO WAY SHEAR AT SECTION Y-Y

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B2p + d)^2 )
Shear Stress = Shear Force / 4 x d x (B2p + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: UPLIFT CONDITION

TWO WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B1c + d)^2 )
Shear Stress = Shear Force / 4 x d x (B1c + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

TWO WAY SHEAR AT SECTION Y-Y

Design bearing pressure


FULL WIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B2p + d)^2 )
Shear Stress = Shear Force / 4 x d x (B2p + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

CHECK FOR BOND

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Maximum shear force = { (B4p - B1c) / 2 - d } x B4p x Bearing Pressure
Ast
Factor Xu/d = ( 0.87 x fy x Ast ) / (0.36 x fck x B4p x d)
j = 1 - ( Xu/d ) x 1/3
No of Bars in Compression
Bond stress = shear / j x d x (no of bars : compression ) x Pi x dia
Permissible Bond Stress Refer IS 456 : 2000 Clause 26.2.1.1 (Page 43)

CHECK AGAINST OVER TURNING


Normal Condition
Resultant Side Thrust under Normal Condition
Overturning due to eccentricity of Uplift load
Overturning due to resultant side thrust
Overturning due to overload of concrete (-ve)
Total Overturning Moment
Resisting Moment

Broken wire Condition


Resultant Side Thrust under Normal Condition
Overturning due to eccentricity of Uplift load
Overturning due to resultant side thrust
Overturning due to overload of concrete (-ve)
Total Overturning Moment
Resisting Moment

Check for sliding (M = Wsd*h*[(1+SINq)/(1-SINq)])


CHECK AGAINST UPROOTING OF STUB

Design Uplift
Total Depth of Pad (H4p + H5p + H6p)
Clearance of stub from the bottom of bottom pad
Depth of Stub embedment (H4p+H5p+H6p-H8p)
Stub Section
Use Outer Cleat 3 nos
Use Inner Cleat 3 nos
Bolts for each cleat 16 mm dia
16
Load resisted by stub
Permissible Bond Stress
Bond Stress x (Stub surface - Stub covered by cleat) US
Load resisted by cleat
Bearing Stress of concrete 0.45 x Fck
(1) due to concrete Bearing stress x (inner cleat width + outer cleat width) x
(2) due to strength of bolt Double shear of bolt
(3) due to bearing of stub
(4) due to bearing of cleat
min ( 1,2,3,4)
Us + min load resisted by cleat
Design Uplift
Normal Condition Broken Wire Condition
(Reliability) in Kgs (Security) in Kgs
Equal Unequal Critical Equal
Cnc 68583 72012 72012 51192
Tnc 61042 64094 64094 43706
TSnc 3538 4599 4599 2345
LSnc 3919 5095 5095 3246

TRUE LENGTH FACTOR 1.055401946


TAN THEETA 0.23861

1440 kg/m3
1440 kg/m3
2400 kg/m3
2400 kg/m3
10000 kg/m3
3000 mm
30 deg 0.5235
30 deg 0.5235
3.00

225 mm
3000 mm
-570 mm
250 mm
120 mm
150 mm
50 mm
3000 mm
540 mm
1800 mm
3660 mm
3900 mm
2430 mm

0.066 M3
0.875 M3
0.940 M3
-0.166 M3
0.810 M3
1.715 M3
2.282 M3
4.640 M3
5.581 M3
0.761 M3

3000 mm
-200 mm
1732 mm
-115 mm
13.451 M2
48.636 M2
87.664 M3
-0.583 M3

126236.3 Kg
-840 Kg
157 Kg
840 Kg
2995 Kg
129388.5 Kg
2.02 OK
2.82 OK

1440 kg/m3
30 deg
0.54 m
4599.0 kg
1986 mm

1930 mm
4344 kg
9548 kg.M

5095.00 kg
1440 kg/m3
30 DEG
0.54 m
5095.00 kg
2090 mm

1930 mm
4344.1 kg
11123.0 kg.M

SVERSE SHEAR) TRANSVERSE SHEAR

3049.0 kg
1440 kg/m3
30 mm
0.54 m
kg
1617 mm

1617 mm
3049 kg
6451.8 kg.M

TUDNAL SHEAR SHEAR) LONGITUDINAL SHEAR

4220.0 kg
1440 kg/m3
30 mm
0.54 m

1902 mm

1902 mm
4220.0 kg
8528.3 kg.M

4892.4 Kg/m2
1877.3 Kg/m2
965.8 Kg/m2
1125.1 Kg/m2
8860.6 Kg/m2
1.13 OK
3755 Kg/m2
1401 Kg/m2
653 Kg/m2
863 Kg/m2
6671 Kg/m2
1.50 OK

OF FOOTING AND CHIMNEY FOR DIMENSIONS

72012 kg 706437.72 N
Fe415
415 N/mm2
16mm corner - 20 mm
8 No. 8 No.
4122 4122 mm^2
291600 mm^2
1.414 %
Longitudinal Reinforcement shall not be
he grosscross sectional area of column
M20
20 N/mm2
0.071
0.121
50 mm
0.111
0.11
35349 kg.M
3907373 N
0.181
α 0.968
9416 kg.M
0.266
10733 kg.M
0.304
0.593
OK

53752 526770 N
0.071
0.090
0.111
0.101
32456.87 kg.M
3907373 N
0.135
α 0.891
6452 kg.M
0.199
8528 kg.M
0.263
0.541
0K

64094 628121 N
0.071
0.108
0.111
0.07
22471.9 kg.M
α 1
9416 kg.M
0.419
10733 kg.M
0.478
0.897
OK

45891 449732 N
0.071
0.077
0.111
0.06
19261.7 kg.M
α 1
6452 kg.M
0.335
8528 kg.M
0.443
0.778
OK

T BOTTOM OF PAD DIA 12 mm


NO 22
DIA 12 mm
NO 12
ED1 452 mm
4892 Kg/m2
TY (P.ex/Z)/2 939 Kg/m2
NT OR LONG MOMENT) 1125 Kg/m2
6956 Kg/m2

3755 kg/m^2 botom width for


section=1500 mm
TY (P.ex/Z)/2 701 kg/m^2
NT OR LONG MOMENT) 863 kg/m^2 for section x-x
0.0532 N/mm2 bottom width=
0.0696 N/mm 2

382.85 KN.M
1.041
Fy=415 n/mm^2 refer page 10, table D of SP16 2.76
SINGLY REINFORCED
d'/d 0.14
0.3012 %
0 %
2451 mm2
2488 mm2
OK
0 mm2
1357 mm2
OK
DIA 12 mm
NO 12

1050 mm
ED2 202 mm
149.55 KN.M
1.041
SINGLY REINFORCED
d'/d 0.354
0.2888 %
0 %
2135 mm2
2488 mm2
OK
0
10 1131 mm2
OK
han 0.15 percent

451800 mm2
ement required 542 mm2
OK

DIA 12 mm
NO 12
1357 mm2
452 mm
0.0406 N/mm2
57239842 N.mm/M
207646756 N.mm/M
OK

DIA 12 mm
NO 10
1131 mm2
202 mm
22359313.211 N.mm/M
72889565.7157835 N.mm/M
ok

0.0696 N/mm2
3900 mm
540 mm
452 mm
85422 N/meter width
0.1890 N/mm2
2488 mm2
0.141
73, IS 456 : 2000 0.2832 N/mm2
OK

0.0696 N/mm2
3900 mm
1800 mm
202 mm
58988 N/meter width
0.292 N/mm2
2488 N/mm2
0.316
73, IS 456 : 2000 0.39072 N/mm2
OK

0.0406 N/mm2
3900 mm
540 mm
452 mm
49809 N/meter width
0.1102
1357 mm2
0.077
73, IS 456 : 2000 0.2832 N/mm2
OK

0.0406 N/mm2
3900 mm
1800 mm
202 mm
34396 N/meter width
0.1703
1131 mm2
0.144
73, IS 456 : 2000 0.28 N/mm2
OK

0.069562 N/mm2
3900 mm
540 mm
452 mm
989581 N
0.5517 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.069562 N/mm2
3900 mm
1800 mm
202 mm
779230 N
0.482 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.0406 N/mm2
3900 mm
540 mm
452 mm
577020 N
0.322 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.0406 N/mm2
3900 mm
1800 mm
202 mm
454365.419 N
0.281 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.069562 N/mm2
3900 mm
540 mm
452 mm
333145 N
2488 mm2
0.071
1.000
22
0.889 N/mm2
lause 26.2.1.1 (Page 43) 1.2 N/mm2
OK

6864 Kg
78948 Kg.M
21792 Kg.M
-5190 Kg.M
95551 Kg.M
203769 Kg.M
2.13 OK

5206 Kg
56527 Kg.M
16530 Kg.M
-5190 Kg.M
67867 Kg.M
203769 Kg.M
3.00 OK

q)/(1-SINq)])
H
M1 0 0 Kg/M2
M2 2.42 10448 Kg/M2 (1+SINq)/(1-SINq)
M3 0.25 11527 Kg/M 2
M4 0.13 12089 Kg/M2
M5 0.15 12736 Kg/M2
M6 0.05 12952 Kg/M2

F1 6827 Kg
F2 3214 Kg
F3 5802 Kg
F4 7261 Kg

F 23104 Kg

Max (Tsnc or Tsbwc 0r LSnc or LSbwc) 5095 Kg


F.O.Sor Tsbwc 0r LSnc or LSbwc) 4.53

OK

64094 628121.2
520
150
370
L120*120*10 120 10 6320
L90*90*6 300 mm long 90 6 5200
L90*90*6 300 mm long 90 6 5200
4 5.6 grade 310
nos area of one bolt 200.96

1.2 N/mm2
129720 N

9 N/mm2
er cleat width + outer cleat width) x flange x Nos 1166400 N
1495142.4 N
979031 N
1174837 N
979031 N
1108751 N
628121 N
OK
Broken Wire Condition
(Security) in Kgs
Unequal Critical
53752 53752
45891 45891
3049 3049
4220 4220
DATA FROM DRAWINGS
CHIMNEY CROSS SECTION 600 600 360000 mm^2
cover 50 mm
effective depth 600-50 550 mm
om width for
tion=1500 mm

for section x-x


bottom width= 1800 mm
for section y-y slab width is 3660 mm
q 30 0.52
3
no of cleatno of cleat pair
6 3
12
Foundation forces
Down Thrust
Uplift
Side Thrust (T)
SideThrust (L)

TRUE LENGTH FACTOR

soil/rock/concrete data
unit weight of soil (top layer) Wtdrysoil
unit weight of soil (bottom layer) Wtwetsoil
unit weight of concrete (top layer) wtdryconc
unit weight of concrete(bottom layer) wtwetconc
bearing capacity BC
DEPTH OF WATER TABLE BELOW GROUND LINE Hw
ANGLE OF REPOSE OF SOIL (TOIP LAYER) Atop
ANGLE OF REPOSE OF SOIL (BOTTOM LAYER) Abtm
(1+SIN )/(1-SIN A)

FOUNDATION GEOMETRY
HEIGHT OF CHIMNEY ABOVE GL H1C
HEIGHT OF CHIMNEY UP TO WATER TABLE H2C=Hw
HEIGHT OF CHIMNEY BELOW WATER TABLE H3c=H-H2c-H4p-H5p-H6p-H7p
HEIGHT OF PAD 1 H4p
HEIGHT OF SLOPED PAD 2 H5p
HEIGHT OF BOTTOM PAD 3 H6p
HEIGHT OF LEAN CONCRETE PAD 4 H7p
HEIGHT OF EXCAVATION H
WIDTH OF CHIMNEY B1c
WIDTH OF PAD 1 B2p
WIDTH AT TOP OF PAD 2 B3p=B4p-2*H5p
WIDTH AT BOTTOM OF PAD 2, PAD3, PAD 4 B4p
HEIGHT OF CHIMNEY H10c=H2c+H3c

VOLUME OF CONCRETE
HEIGHT OF CHIMNEY ABOVE GROUND LEVEL V1c
VOLUME OF CHIMNEY IN SOIL(TOP LAYER) V2c
VOLUME OF CONCRETE (TOP LAYER) V3c
VOLUME OF CHIMNEY IN SOIL (BOTTOM LAYER) V4c
VOLUME OF PAD 1 IN SOIL (BOTTOM LAYER) V5p
VOLUME OF PAD 2 IN SOIL (BOTTOM LAYER) V6p
VOLUME OF PAD 3 IN SOIL (BOTTOM LAYER) V7p
VOLUME OF CONCRETE (TOP LAYER) V8p
VOLUME OF FOUNDATION PER LEG V9p
VOLUME OF LEAN CONCRETE PAD 4 LEG V10p

VOLUME OF SOIL
HEIGHT OF SOIL TOP LAYER H8s
HEIGHT OF SOIL BOTTOM LAYER H9s
tan ANGLE OF REPOSE FOR TOP LAYER B5s
tan ANGLE OF REPOSE FOR BOTTOM LAYER B6s
A1
A2
VOLUME OF SOIL (TOP FRUSTUM) V11s
VOLUME OF SOIL (BOTTOM FRUSTUM) V12s

CHECK FOR UPLIFT

WEIGHT OF SOIL TOP LAYER WT1s


WEIGHT OF SOIL BOTTOM LAYER WT2s
WEIGHT OF CHIMNEY ABOVE GROUND WT3s
WEIGHT OF CONCRETE DUE TO OVERLOAD(TOP LAYER) WT4s
WEIGHT OF CONCRETE DUE TO OVERLOAD(BOTTOM LAYER) WT5s
RESISTANCE AGAINST UPLIFT WT6r
FOS (NC) 1
FOS(BWC) 1

MOMENT DUE TO SIDE THRUST AT FOUNDATION TOE (NORMAL CONDITION) TRANSVERSE SHEAR
PASSIVE EARTH PRESSURE(F) F
UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1
SHEAR F
FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S
If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised

Resisting soil force


moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNDATION TOE (NORMAL CONDITION) longitudnal shear

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1
SHEAR F
FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S
If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNADATION TOE(BROKEN WIRE CONDITION TRANSVERSE SHEAR) TRANSVERSE SHEAR

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1

FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S


If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNADATION TOE(BROKEN WIRE CONDITION LONGITUDNAL SHEAR SHEAR) LONGITUD

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1

FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S


If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

CHECK FOR BEARING CAPACITY : NORMAL CONDITION

Bearing pressure due to direct compression BR1nc


Bearing pressure due to eccentricity BR2nc
Bearing pressure due to transverse shear BR3nc
Bearing pressure due to longitudinal shear BR4nc
Total Bearing Pressure
Factor Of Safety NC 1
CHECK FOR BEARING CAPACITY : BROKEN WIRE CONDITION

Bearing pressure due to direct compression BR1bwc


Bearing pressure due to eccentricity BR2bwc
Bearing pressure due to transverse shear BR3bwc
Bearing pressure due to longitudinal shear BR4bwc
Total Bearing Pressure
Factor Of Safety NC 1

DESIGN OF CHIMNEY

CHECK FOR COMPRESSION WITH BENDING PREFER DRAWING OF FOOTING AND CHIMNEY FOR DI
CASE:1 NORMAL CONDITION
PU
GRADE OF REINFORCEMENT STEEL
STERENGTH OF STEEL
DIAMETER OF BAR IN CHIMNEY Mid -
NO OF BARS IN CHIMANEY
AREA OF STEEL Asc
AREA OF CHIMNEY Ac
% OF STEEL P As per IS 456-2000 Longitudinal Reinforcement shall n
less than 0.8 % of the grosscross sectional area of colu
GRADE OF CONCRETE
STRENGTH OF CONCRETE
P/Fck
Pu/Fck
CONCRETE COVER IN CHIMNEY
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 44/45/46 of sp 16)
Mux1/Muy1
Puz=0.45*Fck*Ac+0..75Fy*Asc
Pu/Puz
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CASE:2 BROKENWIRE CONDITION

PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 44/45/46 of sp 16)
Mux1/Muy1
Puz=0.45*Fck*Ac+0..75Fy*Asc
Pu/Puz
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CHECK FOR TENSION WITH BENDING


CASE:1 NORMAL CONDITION

PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 79/80/81 of sp 16)
Mux1/Muy1
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CASE:2 BROKENWIRE CONDITION


PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 79/80/81 of sp 16)
Mux1/Muy1
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CHECK FOR BASE SLAB

COMPRESSION REINFORCEMENT AT SECTION X-X


DIMENSION OF SECTION AT X-X
PROVIDE BAR "A" AT BOTTOM OF PAD

AT TOP OF PAD

EFFECTIVE DEPTH
NORMAL CONDITION DIRECT COMPRESSION (P/A)
DUE TO ECCENTRICITY (P.ex/Z)/2
MAX ( TRAN MOMENT OR LONG MOMENT)
TOTAL

BROKENWIRE CONDITION DIRECT COMPRESSION (P/A)


DUE TO ECCENTRICITY (P.ex/Z)/2
MAX ( TRAN MOMENT OR LONG MOMENT)
TOTAL
MAXIMUM BEARING PRESSURE

MAX BEARING PRESSURE


BENDING MOMENT AT SECTION X-X
Mux1=bearing pressure*(B4P-B1c)^2/8*B4p
Mux1/bd^2
Mulim/bd^2 for fck 20 n/mm^2 & Fy=415 n/mm^2 refer page 10, tab
DESIGN METHOD
refer table 2 of SP 16
Pt tension reinforcement
Pc (=0 for singly reinforced slab) compression reinforcement
Ast required
Ast provided

Asc required
Asc provided

COMPRESSION REINFORCEMENT AT SECTION Y-Y


DIMENSION OF SECTION Y-Y FROM TOE
EFFECTIVE DEPTH
BENDING MOMENT AT SECTION Y-Y
Muy1=bearing pressure*(B4p-B2p)^2/8*B4p
Mux1/bd^2
DESIGN METHOD
REFER TABLE 2 OF SP16
Pt tension reinforcement
Pc (=0 for singly reinforced slab) compression reinforcement
Ast required
Ast provided

Asc required
Asc provided (12 mm 10 bars) 12

As per IS 456-2000 Minimum Reinforcement in either direction in slabs shall not be less than 0.15 percent
5 of the gross cross sectional area and 0.12 percent for high strength deformed bars

Area of slab
Area of steel reinforcement required

UPLIFT REINFORCEMENT AT SECTION X-X


Provide bar 'C' at top of pad

Ast provided
EFFECTIVE DEPTH
Bearing pressure P = Uplift / (B4p - B1c)^2
Muxrequired = P x (B4p - B1c)^2 / 8 x 1000
Muxprovided = 0.87 . Fy . Ast . d { 1 - Fy . Ast /( 1000 . Fck . d) }

UPLIFT REINFORCEMENT AT SECTION Y-Y

Ast provided
EFFECTIVE DEPTH
Muxrequired = P x (B4p - B1c)^2 / 8 x 1000
Muxprovided = 0.87 . Fy . Ast . d { 1 - Fy . Ast /( 1000 . Fck . d) }

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: DOWN THRUST CONDITION

ONE WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

ONE WAY SHEAR AT SECTION Y-Y


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: UPLIFT CONDITION

ONE WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

ONE WAY SHEAR AT SECTION Y-Y


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B2p) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000
CHECK FOR TWO WAY SHEAR FOR BASE SLAB: DOWNTHRUST CONDITION
TWO WAY SHEAR AT SECTION X-X
Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B1c + d)^2 )
Shear Stress = Shear Force / 4 x d x (B1c + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

TWO WAY SHEAR AT SECTION Y-Y

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B2p + d)^2 )
Shear Stress = Shear Force / 4 x d x (B2p + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: UPLIFT CONDITION

TWO WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B1c + d)^2 )
Shear Stress = Shear Force / 4 x d x (B1c + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

TWO WAY SHEAR AT SECTION Y-Y

Design bearing pressure


FULL WIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B2p + d)^2 )
Shear Stress = Shear Force / 4 x d x (B2p + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

CHECK FOR BOND

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Maximum shear force = { (B4p - B1c) / 2 - d } x B4p x Bearing Pressure
Ast
Factor Xu/d = ( 0.87 x fy x Ast ) / (0.36 x fck x B4p x d)
j = 1 - ( Xu/d ) x 1/3
No of Bars in Compression
Bond stress = shear / j x d x (no of bars : compression ) x Pi x dia
Permissible Bond Stress Refer IS 456 : 2000 Clause 26.2.1.1 (Page 43)

CHECK AGAINST OVER TURNING


Normal Condition
Resultant Side Thrust under Normal Condition
Overturning due to eccentricity of Uplift load
Overturning due to resultant side thrust
Overturning due to overload of concrete (-ve)
Total Overturning Moment
Resisting Moment

Broken wire Condition


Resultant Side Thrust under Normal Condition
Overturning due to eccentricity of Uplift load
Overturning due to resultant side thrust
Overturning due to overload of concrete (-ve)
Total Overturning Moment
Resisting Moment

Check for sliding (M = Wsd*h*[(1+SINq)/(1-SINq)])


CHECK AGAINST UPROOTING OF STUB

Design Uplift
Total Depth of Pad (H4p + H5p + H6p)
Clearance of stub from the bottom of bottom pad
Depth of Stub embedment (H4p+H5p+H6p-H8p)
Stub Section
Use Outer Cleat 3 nos
Use Inner Cleat 3 nos
Bolts for each cleat 16 mm dia

Load resisted by stub


Permissible Bond Stress
Bond Stress x (Stub surface - Stub covered by cleat) US
Load resisted by cleat
Bearing Stress of concrete 0.45 x Fck
(1) due to concrete Bearing stress x (inner cleat width + outer cleat width) x
(2) due to strength of bolt Double shear of bolt
(3) due to bearing of stub
(4) due to bearing of cleat
min ( 1,2,3,4)
Us + min load resisted by cleat
Design Uplift
Normal Condition Broken Wire Condition
(Reliability) in Kgs (Security) in Kgs
Equal Unequal Critical Equal
Cnc 68583 72012 72012 51192
Tnc 61042 64094 64094 43706
TSnc 3538 4599 4599 2345
LSnc 3919 5095 5095 3246

TRUE LENGTH FACTOR 1.055401946


TAN THEETA 0.23861

1440 kg/m3
1440 kg/m3
2400 kg/m3
2400 kg/m3
20000 kg/m3
3000 mm
30 deg 0.5235
30 deg 0.5235
3.00

225 mm
3000 mm
-580 mm
250 mm
130 mm
150 mm
50 mm
3000 mm
540 mm
1500 mm
2640 mm
2900 mm
2420 mm

0.06561 M3
0.8748 M3
0.94041 M3
-0.169 M3
0.563 M3
0.998 M3
1.262 M3
2.653 M3
3.593 M3
0.421 M3

3000 mm
-200 mm
1732 mm
-115 mm
7.113 M2
35.371 M2
58.345 M3
-0.289 M3

84016 Kg
-417 Kg
157 Kg
840 Kg
1740 Kg
86336 Kg
1.35 OK
1.88 OK

1440 kg/m3
30 deg
0.54 m
4599 kg
1986 mm

1920 mm
4299 kg
9572 kg.M

5095 kg
1440 kg/m3
30 DEG
0.54 m
5095 kg
2090 mm

1920 mm
4299 kg
11147 kg.M

SVERSE SHEAR) TRANSVERSE SHEAR

3049 kg
1440 kg/m3
30 mm
0.54 m
kg
1617 mm

1617 mm
3049 kg
6421 kg.M

TUDNAL SHEAR SHEAR) LONGITUDINAL SHEAR

4220 kg
1440 kg/m3
30 mm
0.54 m

1902 mm

1902 mm
4220 kg
8486 kg.M

8583 Kg/m2
4646 Kg/m2
2355 Kg/m2
2742 Kg/m2
18326 Kg/m2
1.09 OK
6525 Kg/m2
3468 Kg/m2
1580 Kg/m2
2088 Kg/m2
13661 Kg/m2
1.46 OK

OF FOOTING AND CHIMNEY FOR DIMENSIONS

72012 kg 706437.72 N
Fe415
415 N/mm2
16mm corner - 20 mm
8 No. 8 No.
4122 4122 mm^2
291600 mm^2
Longitudinal Reinforcement shall not be 1.4135802469 %
he grosscross sectional area of column
M20
20 N/mm2
0.071
0.121
50 mm
0.111
0.11
35349 kg.M
3907373 N
0.181
α 0.968
9413 kg.M
0.266
10725 kg.M
0.303
0.593
OK

53752 526770 N
0.071
0.0903
0.111
0.101
32423.8 kg.M
3907373 N
0.135
α 0.891
6421 kg.M
0.198
8486 kg.M
0.262
0.539
0K

64094 628121 N
0.071
0.108
0.111
0.07
22471.9 kg.M
α 1
9413 kg.M
0.419
10725 kg.M
0.477
0.896
OK

45891 449732 N
0.071
0.077
0.111
0.06
19261.6513761468 kg.M
α 1
6421 kg.M
0.333
8486 kg.M
0.441
0.774
OK

T BOTTOM OF PAD DIA 12 mm


NO 16
DIA 12 mm
NO 12
ED1 462 mm
8583 Kg/m2
TY (P.ex/Z)/2 2323 Kg/m2
NT OR LONG MOMENT) 2742 Kg/m2
13648 Kg/m2
botom width for
6525 kg/m^2 section=1500 mm
TY (P.ex/Z)/2 1734 kg/m^2
NT OR LONG MOMENT) 2088 kg/m^2 for section x-x
0.1035 N/mm2 bottom width=
0.1365 N/mm 2

275.55 KN.M
0.861
Fy=415 n/mm^2 refer page 10, table D of SP16 2.76
SINGLY REINFORCED
d'/d 0.14
0.245 %
0 %
1698 mm2
1809 mm2
OK
0 mm2
1357 mm2
OK
DIA 12 mm
NO 12

700 mm
ED2 212 mm
96.97 KN.M
0.86
SINGLY REINFORCED
d'/d 0.366
0.233 %
0 %
1304 mm2
1809 mm2
OK
0
10 1131 mm2
OK
han 0.15 percent

384000 mm2
ement required 461 mm2
OK

DIA 12 mm
NO 12
1357 mm2
462 mm
0.0723 N/mm2
50306174 N.mm/M
212545886 N.mm/M
OK

DIA 12 mm
NO 10
1131 mm2
212 mm
17703264.262 N.mm/M
76972174.6957835 N.mm/M
ok

0.1365 N/mm2
2900 mm
540 mm
462 mm
97992 N/meter width
0.2121 N/mm2
1809 mm2
0.135
73, IS 456 : 2000 0.2832 N/mm2
OK

0.1365 N/mm2
2900 mm
1500 mm
212 mm
66602 N/meter width
0.314 N/mm2
1809 N/mm2
0.294
73, IS 456 : 2000 0.38112 N/mm2
OK

0.0723 N/mm2
2900 mm
540 mm
462 mm
51881 N/meter width
0.1123
1357 mm2
0.101
73, IS 456 : 2000 0.2832 N/mm2
OK

0.0723 N/mm2
2900 mm
1500 mm
212 mm
35262 N/meter width
0.1663
1131 mm2
0.184
73, IS 456 : 2000 0.3056 N/mm2
OK

0.136479 N/mm2
2900 mm
540 mm
462 mm
1010761 N
0.5459 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.136479 N/mm2
2900 mm
1500 mm
212 mm
747775 N
0.5150757752 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.0723 N/mm2
2900 mm
540 mm
462 mm
535144 N
0.289 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.0723 N/mm2
2900 mm
1500 mm
212 mm
395906.842 N
0.273 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.136479 N/mm2
2900 mm
540 mm
462 mm
284176 N
1809 mm^2
0.068
1.000
16
1.020 N/mm2
lause 26.2.1.1 (Page 43) 1.2 N/mm2
OK

6864 Kg
58705 Kg.M
21792 Kg.M
-2646 Kg.M
77852 Kg.M
101016 Kg.M
1.30 OK

5206 Kg
42033 Kg.M
16530 Kg.M
-2646 Kg.M
55917 Kg.M
101016 Kg.M
1.81 OK

q)/(1-SINq)])
H
M1 0 0 Kg/M2
M2 2.42 10448 Kg/M2 (1+SINq)/(1-SINq)
M3 0.25 11527 Kg/M2
M4 0.13 12089 Kg/M2
M5 0.15 12736 Kg/M2
M6 0.05 12952 Kg/M2

F1 6827 Kg
F2 2802 Kg
F3 4252 Kg
F4 5399 Kg
Kg
F 19280 Kg

Max (Tsnc or Tsbwc 0r LSnc or LSbwc) 5095 Kg


F.O.Sor Tsbwc 0r LSnc or LSbwc) 3.78

OK

64094 628121.2
530
150
380
L120*120*10 120 10 6320
L90*90*6 300 mm long 90 6 5200
L90*90*6 300 mm long 90 6 5200
4 5.6 grade 310
nos

1.2 N/mm2
135240 N

9 N/mm2
er cleat width + outer cleat width) x flange x Nos 1166400 N
1496184 N
979031 N
1174837 N
979031 N
1114271 N
628121 N
OK
Broken Wire Condition
(Security) in Kgs
Unequal Critical
53752 53752
45891 45891
3049 3049
4220 4220
DATA FROM DRAWINGS
CHIMNEY CROSS SECTION 600 600 360000 mm^2
cover 50 mm
effective depth 600-50 550 mm
botom width for
ection=1500 mm

for section x-x


bottom width= 1500 mm
for section y-y slab width is 2640 mm
q 30 0.52
3
no of cleatno of cleat pair
6 3
12
Foundation forces
Down Thrust
Uplift
Side Thrust (T)
SideThrust (L)

TRUE LENGTH FACTOR

soil/rock/concrete data
unit weight of soil (top layer) Wtdrysoil
unit weight of soil (bottom layer) Wtwetsoil
unit weight of concrete (top layer) wtdryconc
unit weight of concrete(bottom layer) wtwetconc
bearing capacity BC
DEPTH OF WATER TABLE BELOW GROUND LINE Hw
ANGLE OF REPOSE OF SOIL (TOIP LAYER) Atop
ANGLE OF REPOSE OF SOIL (BOTTOM LAYER) Abtm
(1+SIN )/(1-SIN A)

FOUNDATION GEOMETRY
HEIGHT OF CHIMNEY ABOVE GL H1C
HEIGHT OF CHIMNEY UP TO WATER TABLE H2C=Hw
HEIGHT OF CHIMNEY BELOW WATER TABLE H3c=H-H2c-H4p-H5p-H6p-H7p
HEIGHT OF PAD 1 H4p
HEIGHT OF SLOPED PAD 2 H5p
HEIGHT OF BOTTOM PAD 3 H6p
HEIGHT OF LEAN CONCRETE PAD 4 H7p
HEIGHT OF EXCAVATION H
WIDTH OF CHIMNEY B1c
WIDTH OF PAD 1 B2p
WIDTH AT TOP OF PAD 2 B3p=B4p-2*H5p
WIDTH AT BOTTOM OF PAD 2, PAD3, PAD 4 B4p
HEIGHT OF CHIMNEY H10c=H2c+H3c

VOLUME OF CONCRETE
HEIGHT OF CHIMNEY ABOVE GROUND LEVEL V1c
VOLUME OF CHIMNEY IN SOIL(TOP LAYER) V2c
VOLUME OF CONCRETE (TOP LAYER) V3c
VOLUME OF CHIMNEY IN SOIL (BOTTOM LAYER) V4c
VOLUME OF PAD 1 IN SOIL (BOTTOM LAYER) V5p
VOLUME OF PAD 2 IN SOIL (BOTTOM LAYER) V6p
VOLUME OF PAD 3 IN SOIL (BOTTOM LAYER) V7p
VOLUME OF CONCRETE (TOP LAYER) V8p
VOLUME OF FOUNDATION PER LEG V9p
VOLUME OF LEAN CONCRETE PAD 4 LEG V10p

VOLUME OF SOIL
HEIGHT OF SOIL TOP LAYER H8s
HEIGHT OF SOIL BOTTOM LAYER H9s
tan ANGLE OF REPOSE FOR TOP LAYER B5s
tan ANGLE OF REPOSE FOR BOTTOM LAYER B6s
A1
A2
VOLUME OF SOIL (TOP FRUSTUM) V11s
VOLUME OF SOIL (BOTTOM FRUSTUM) V12s

CHECK FOR UPLIFT

WEIGHT OF SOIL TOP LAYER WT1s


WEIGHT OF SOIL BOTTOM LAYER WT2s
WEIGHT OF CHIMNEY ABOVE GROUND WT3s
WEIGHT OF CONCRETE DUE TO OVERLOAD(TOP LAYER) WT4s
WEIGHT OF CONCRETE DUE TO OVERLOAD(BOTTOM LAYER) WT5s
RESISTANCE AGAINST UPLIFT WT6r
FOS (NC) 1
FOS(BWC) 1

MOMENT DUE TO SIDE THRUST AT FOUNDATION TOE (NORMAL CONDITION) TRANSVERSE SHEAR
PASSIVE EARTH PRESSURE(F) F
UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1
SHEAR F
FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S
If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised

Resisting soil force


moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNDATION TOE (NORMAL CONDITION) longitudnal shear

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1
SHEAR F
FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S
If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNADATION TOE(BROKEN WIRE CONDITION TRANSVERSE SHEAR) TRANSVERSE SHEAR

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1

FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S


If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNADATION TOE(BROKEN WIRE CONDITION LONGITUDNAL SHEAR SHEAR) LONGITUD

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1

FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S


If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

CHECK FOR BEARING CAPACITY : NORMAL CONDITION

Bearing pressure due to direct compression BR1nc


Bearing pressure due to eccentricity BR2nc
Bearing pressure due to transverse shear BR3nc
Bearing pressure due to longitudinal shear BR4nc
Total Bearing Pressure
Factor Of Safety NC 1
CHECK FOR BEARING CAPACITY : BROKEN WIRE CONDITION

Bearing pressure due to direct compression BR1bwc


Bearing pressure due to eccentricity BR2bwc
Bearing pressure due to transverse shear BR3bwc
Bearing pressure due to longitudinal shear BR4bwc
Total Bearing Pressure
Factor Of Safety NC 1

DESIGN OF CHIMNEY

CHECK FOR COMPRESSION WITH BENDING PREFER DRAWING OF FOOTING AND CHIMNEY FOR D
CASE:1 NORMAL CONDITION
PU
GRADE OF REINFORCEMENT STEEL
STERENGTH OF STEEL
DIAMETER OF BAR IN CHIMNEY Mid -
NO OF BARS IN CHIMANEY
AREA OF STEEL Asc
AREA OF CHIMNEY Ac
% OF STEEL P As per IS 456-2000 Longitudinal Reinforcement shall n
less than 0.8 % of the grosscross sectional area of colu
GRADE OF CONCRETE
STRENGTH OF CONCRETE
P/Fck
Pu/Fck
CONCRETE COVER IN CHIMNEY
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 44/45/46 of sp 16)
Mux1/Muy1
Puz=0.45*Fck*Ac+0..75Fy*Asc
Pu/Puz
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CASE:2 BROKENWIRE CONDITION

PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 44/45/46 of sp 16)
Mux1/Muy1
Puz=0.45*Fck*Ac+0..75Fy*Asc
Pu/Puz
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CHECK FOR TENSION WITH BENDING


CASE:1 NORMAL CONDITION

PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 79/80/81 of sp 16)
Mux1/Muy1
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CASE:2 BROKENWIRE CONDITION


PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 79/80/81 of sp 16)
Mux1/Muy1
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CHECK FOR BASE SLAB

COMPRESSION REINFORCEMENT AT SECTION X-X


DIMENSION OF SECTION AT X-X
PROVIDE BAR "A" AT BOTTOM OF PAD

AT TOP OF PAD

EFFECTIVE DEPTH
NORMAL CONDITION DIRECT COMPRESSION (P/A)
DUE TO ECCENTRICITY (P.ex/Z)/2
MAX ( TRAN MOMENT OR LONG MOMENT)
TOTAL

BROKENWIRE CONDITION DIRECT COMPRESSION (P/A)


DUE TO ECCENTRICITY (P.ex/Z)/2
MAX ( TRAN MOMENT OR LONG MOMENT)
TOTAL
MAXIMUM BEARING PRESSURE

MAX BEARING PRESSURE


BENDING MOMENT AT SECTION X-X
Mux1=bearing pressure*(B4P-B1c)^2/8*B4p
Mux1/bd^2
Mulim/bd^2 for fck 20 n/mm^2 & Fy=415 n/mm^2 refer page 10, tab
DESIGN METHOD
refer table 2 of SP 16
Pt tension reinforcement
Pc (=0 for singly reinforced slab) compression reinforcement
Ast required
Ast provided

Asc required
Asc provided

COMPRESSION REINFORCEMENT AT SECTION Y-Y


DIMENSION OF SECTION Y-Y FROM TOE
EFFECTIVE DEPTH
BENDING MOMENT AT SECTION Y-Y
Muy1=bearing pressure*(B4p-B2p)^2/8*B4p
Mux1/bd^2
DESIGN METHOD
REFER TABLE 2 OF SP16
Pt tension reinforcement
Pc (=0 for singly reinforced slab) compression reinforcement
Ast required
Ast provided

Asc required
Asc provided

As per IS 456-2000 Minimum Reinforcement in either direction in slabs shall not be less than 0.15 percent
5 of the gross cross sectional area and 0.12 percent for high strength deformed bars

Area of slab
Area of steel reinforcement required

UPLIFT REINFORCEMENT AT SECTION X-X


Provide bar 'C' at top of pad

Ast provided
EFFECTIVE DEPTH
Bearing pressure P = Uplift / (B4p - B1c)^2
Muxrequired = P x (B4p - B1c)^2 / 8 x 1000
Muxprovided = 0.87 . Fy . Ast . d { 1 - Fy . Ast /( 1000 . Fck . d) }

UPLIFT REINFORCEMENT AT SECTION Y-Y

Ast provided
EFFECTIVE DEPTH
Muxrequired = P x (B4p - B1c)^2 / 8 x 1000
Muxprovided = 0.87 . Fy . Ast . d { 1 - Fy . Ast /( 1000 . Fck . d) }

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: DOWN THRUST CONDITION

ONE WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

ONE WAY SHEAR AT SECTION Y-Y


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: UPLIFT CONDITION

ONE WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

ONE WAY SHEAR AT SECTION Y-Y


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B2p) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

CHECK FOR TWO WAY SHEAR FOR BASE SLAB: DOWNTHRUST CONDITION
TWO WAY SHEAR AT SECTION X-X
Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B1c + d)^2 )
Shear Stress = Shear Force / 4 x d x (B1c + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

TWO WAY SHEAR AT SECTION Y-Y

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B2p + d)^2 )
Shear Stress = Shear Force / 4 x d x (B2p + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: UPLIFT CONDITION

TWO WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B1c + d)^2 )
Shear Stress = Shear Force / 4 x d x (B1c + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

TWO WAY SHEAR AT SECTION Y-Y

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B2p + d)^2 )
Shear Stress = Shear Force / 4 x d x (B2p + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

CHECK FOR BOND

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Maximum shear force = { (B4p - B1c) / 2 - d } x B4p x Bearing Pressure
Ast
Factor Xu/d = ( 0.87 x fy x Ast ) / (0.36 x fck x B4p x d)
j = 1 - ( Xu/d ) x 1/3
No of Bars in Compression
Bond stress = shear / j x d x (no of bars : compression ) x Pi x dia
Permissible Bond Stress Refer IS 456 : 2000 Clause 26.2.1.1 (Page 43)

CHECK AGAINST OVER TURNING


Normal Condition
Resultant Side Thrust under Normal Condition
Overturning due to eccentricity of Uplift load
Overturning due to resultant side thrust
Overturning due to overload of concrete (-ve)
Total Overturning Moment
Resisting Moment

Broken wire Condition


Resultant Side Thrust under Normal Condition
Overturning due to eccentricity of Uplift load
Overturning due to resultant side thrust
Overturning due to overload of concrete (-ve)
Total Overturning Moment
Resisting Moment

Check for sliding (M = Wsd*h*[(1+SINq)/(1-SINq)])


CHECK AGAINST UPROOTING OF STUB

Design Uplift
Total Depth of Pad (H4p + H5p + H6p)
Clearance of stub from the bottom of bottom pad
Depth of Stub embedment (H4p+H5p+H6p-H8p)
Stub Section
Use Outer Cleat 3 nos
Use Inner Cleat 3 nos
Bolts for each cleat 16 mm dia

Load resisted by stub


Permissible Bond Stress
Bond Stress x (Stub surface - Stub covered by cleat)
Load resisted by cleat
Bearing Stress of concrete 0.45 x Fck
(1) due to concrete Bearing stress x (inner cleat width + outer cleat width) x
(2) due to strength of bolt Double shear of bolt
(3) due to bearing of stub
(4) due to bearing of cleat
min ( 1,2,3,4) US
Us + min load resisted by cleat
Design Uplift
Normal Condition Broken Wire Condition
(Reliability) in Kgs (Security) in Kgs
Equal Unequal Critical Equal Unequal
Cnc 68583 72012 72012 51192 53752
Tnc 61042 64094 64094 43706 45891
TSnc 3538 4599 4599 2345 3049
LSnc 3919 5095 5095 3246 4220

TRUE LENGTH FACTOR 1.055401946


TAN THEETA 0.23861

1440 kg/m3
1440 kg/m3
2400 kg/m3
2400 kg/m3
45000 kg/m3
3000 mm
20 deg 0.3490
20 deg 0.3490
2.04

225 mm
3000 mm
-590 mm
270 mm
120 mm
150 mm
50 mm
3000 mm
540 mm
1700 mm
2860 mm
3100 mm
2410 mm

0.06561 M3
0.8748 M3
0.94041 M3
-0.172 M3
0.780 M3
1.066 M3
1.442 M3
3.116 M3
4.056 M3
0.481 M3

3000 mm
-200 mm
1092 mm
-73 mm
8.724 M2
25.509 M2
49.151 M3
-0.391 M3

70777 Kg
-564 Kg
157 Kg
840 Kg
2069 Kg
73280 Kg
1.14 OK
1.60 OK

1440 kg/m3
20 deg
0.54 m
4599 kg
2408 mm

1910 mm
2893 kg
11198 kg.M

5095 kg
1440 KG/M3
20 DEG
0.54 m
5095 kg
2535 mm

1910 mm
2893 kg
12773 kg.M

SVERSE SHEAR) TRANSVERSE SHEAR

3049 kg
1440 KG/M3
20 mm
0.54 m
kg
1961 mm

1910 mm
2893 kg
6277 kg.M

TUDNAL SHEAR SHEAR) LONGITUDINAL SHEAR

4220 kg
1440 KG/M3
20 mm
0.54 m

2307 mm

1910 mm
2893 kg
9995 kg.M

7563 Kg/m2
3869 Kg/m2
2255 Kg/m2
2573 Kg/m2
16260 Kg/m2
2.77 OK
5763 Kg/m2
2888 Kg/m2
1264 Kg/m2
2013 Kg/m2
11928 Kg/m2
3.77 OK

OF FOOTING AND CHIMNEY FOR DIMENSIONS


CHIMNEY CROSS SECTI
72012 kg 706437.72 N cover
Fe415 effective depth
415 N/mm2
16mm corner - 20 mm
8 No. 8 No.
4122 4122 mm2
291600 mm2
Longitudinal Reinforcement shall not be 1.4135802469 %
he grosscross sectional area of column
M20
20 N/mm2
0.071
0.121
50 mm
0.111
0.11
35349 kg.M
3907373 kg
0.181
α 0.968
10277 kg.M
0.291
11584 kg.M
0.328
0.642
OK

53752 526770 N
0.071
0.0903
0.111
0.101
32434.97639616 KG. M
3907373 N
0.135
α 0.891
6192 KG. M
0.191
9278 KG. M
0.286
0.557
0K

64094 628121 N
0.071
0.108
0.111
0.07
22479.69 KG. M
α 1
10277 KG. M
0.457
11584 KG. M
0.515
0.972
OK

45891 449732 N
0.071
0.077
0.111
0.06
19268.303 KG. M
α 1.000
6192 KG. M
0.321
9278 KG. M
0.482
0.803
OK

T BOTTOM OF PAD DIA 12 mm


NO 20
DIA 12 mm
NO 12
ED1 472 mm
7563 Kg/m2
TY (P.ex/Z)/2 1935 Kg/m2
NT OR LONG MOMENT) 2573 Kg/m2
12070 Kg/m2
botom width for
5763 Kg/m2 section=1500 mm
TY (P.ex/Z)/2 1444 Kg/m2
NT OR LONG MOMENT) 2013 Kg/m2 for section x-x
0.0922 N/mm 2
bottom width=
0.1207 N/mm2

306.53 KN.M
0.809
Fy=415 n/mm^2 refer page 10, table D of SP16 2.76
SINGLY REINFORCED
d'/d 0.146
0.230 %
0 %
1846 mm2
2262 mm2
OK
0 mm2
1357 mm2
OK
DIA 12 mm
NO 12

700 mm
ED2 202 mm
91.67 KN.M
0.81 for section y-y slab wid
SINGLY REINFORCED
d'/d 0.342
0.23 %
0 %
1329 mm2
2262 mm2
OK
0
1357 mm2
OK
han 0.15 percent

443700 mm2
ement required 532 mm2
OK

DIA 12 mm
NO 12
1357 mm2
472 mm
0.0635 N/mm2
52020072 N.mm/M
217445017 N.mm/M
OK

DIA 12 mm
NO 12
1357 mm2
202 mm
15557760.796 N.mm/M
85168486.2956883 N.mm/M
ok

0.1207 N/mm2
3100 mm
540 mm
472 mm
97528 N/meter width
0.2066 N/mm2
2262 mm2
0.155
73, IS 456 : 2000 0.2832 N/mm2
OK

0.1207 N/mm2
3100 mm
1700 mm
202 mm
60110 N/meter width
0.298 N/mm2
2262 N/mm2
0.361
73, IS 456 : 2000 0.4128 N/mm2
OK

0.0635 N/mm2
3100 mm
540 mm
472 mm
51309 N/meter width
0.1087 N/mm2
1357 mm2
0.093
73, IS 456 : 2000 0.2832 N/mm2
OK

0.0635 N/mm2
3100 mm
1700 mm
202 mm
31624 N/meter width
0.1566
1357 mm2
0.217
73, IS 456 : 2000 0.3328 N/mm2
OK

0.120703 N/mm2
3100 mm
540 mm
472 mm
1036334 N
0.5424 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.120703 N/mm2
3100 mm
1700 mm
202 mm
723297 N
0.4706 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.0635 N/mm2
3100 mm
540 mm
472 mm
545211 N
0.285 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.0635 N/mm2
3100 mm
1700 mm
202 mm
380523.525 N
0.248 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.120703 N/mm2
3100 mm
540 mm
472 mm
302336 N
2262 mm2
0.078
1.000
20
0.850 N/mm2
lause 26.2.1.1 (Page 43) 1.118 N/mm2
OK

6864 Kg
62754 Kg.M
21792 Kg.M
-3168 Kg.M
81378 Kg.M
90692 Kg.M
1.11 OK

5206 Kg
44932 Kg.M
16530 Kg.M
-3168 Kg.M
58293 Kg.M
90692 Kg.M
1.56 OK

q)/(1-SINq)])
H
M1 0 0 Kg/M2 q (deg)
M2 2.41 7076 Kg/M2 (1+SINq)/(1-SINq)
M3 0.27 7868 Kg/M2
M4 0.12 8221 Kg/M2
M5 0.15 8661 Kg/M2
M6 0.05 8808 Kg/M2

F1 4604 Kg
F2 2260 Kg
F3 2877 Kg
F4 3925 Kg
F5 1354 Kg
F 15019 Kg

Max (Tsnc or Tsbwc 0r LSnc or LSbwc) 5095 Kg


F.O.STsbwc 0r LSnc or LSbwc) 2.95

OK

64094 628121.2
540
150
390
L120*120*10 120 10 6320 no of cleat
L90*90*6 300 mm long 90 6 5200 6
L90*90*6 300 mm long 90 6 5200
4 5.6 grade 310
nos

1.2 N/mm2
140760 N

9 N/mm2
er cleat width + outer cleat width) x flange x Nos 1166400 N
1496184 N
979031 N
1174837 N
979031 N
1119791 N
628121 N
Wire Condition

Critical
53752
45891
3049
4220
DATA FROM DRAWINGS
CHIMNEY CROSS SECTION 600 600 360000 mm^2
50 mm
effective depth 600-50 550 mm
dth for
500 mm

1700 mm
for section y-y slab width is 2860 mm
20 0.35
2
no of cleat pair
3
12
Foundation forces
Down Thrust
Uplift
Side Thrust (T)
SideThrust (L)

TRUE LENGTH FACTOR

soil/rock/concrete data
unit weight of soil (top layer) Wtdrysoil
unit weight of soil (bottom layer) Wtwetsoil
unit weight of concrete (top layer) wtdryconc
unit weight of concrete(bottom layer) wtwetconc
bearing capacity BC
DEPTH OF WATER TABLE BELOW GROUND LINE Hw
ANGLE OF REPOSE OF SOIL (TOIP LAYER) Atop
ANGLE OF REPOSE OF SOIL (BOTTOM LAYER) Abtm
(1+SIN )/(1-SIN A)

FOUNDATION GEOMETRY
HEIGHT OF CHIMNEY ABOVE GL H1C
HEIGHT OF CHIMNEY UP TO WATER TABLE H2C=Hw
HEIGHT OF CHIMNEY BELOW WATER TABLE H3c=H-H2c-H4p-H5p-H6p-H7p
HEIGHT OF PAD 1 H4p
HEIGHT OF SLOPED PAD 2 H5p
HEIGHT OF BOTTOM PAD 3 H6p
HEIGHT OF LEAN CONCRETE PAD 4 H7p
HEIGHT OF EXCAVATION H
WIDTH OF CHIMNEY B1c
WIDTH OF PAD 1 B2p
WIDTH AT TOP OF PAD 2 B3p=B4p-2*H5p
WIDTH AT BOTTOM OF PAD 2, PAD3, PAD 4 B4p
HEIGHT OF CHIMNEY H10c=H2c+H3c

VOLUME OF CONCRETE
HEIGHT OF CHIMNEY ABOVE GROUND LEVEL V1c
VOLUME OF CHIMNEY IN SOIL(TOP LAYER) V2c
VOLUME OF CONCRETE (TOP LAYER) V3c
VOLUME OF CHIMNEY IN SOIL (BOTTOM LAYER) V4c
VOLUME OF PAD 1 IN SOIL (BOTTOM LAYER) V5p
VOLUME OF PAD 2 IN SOIL (BOTTOM LAYER) V6p
VOLUME OF PAD 3 IN SOIL (BOTTOM LAYER) V7p
VOLUME OF CONCRETE (TOP LAYER) V8p
VOLUME OF FOUNDATION PER LEG V9p
VOLUME OF LEAN CONCRETE PAD 4 LEG V10p

VOLUME OF SOIL
HEIGHT OF SOIL TOP LAYER H8s
HEIGHT OF SOIL BOTTOM LAYER H9s
tan ANGLE OF REPOSE FOR TOP LAYER B5s
tan ANGLE OF REPOSE FOR BOTTOM LAYER B6s
A1
A2
VOLUME OF SOIL (TOP FRUSTUM) V11s
VOLUME OF SOIL (BOTTOM FRUSTUM) V12s

CHECK FOR UPLIFT

WEIGHT OF SOIL TOP LAYER WT1s


WEIGHT OF SOIL BOTTOM LAYER WT2s
WEIGHT OF CHIMNEY ABOVE GROUND WT3s
WEIGHT OF CONCRETE DUE TO OVERLOAD(TOP LAYER) WT4s
WEIGHT OF CONCRETE DUE TO OVERLOAD(BOTTOM LAYER) WT5s
RESISTANCE AGAINST UPLIFT WT6r
FOS (NC) 1
FOS(BWC) 1

MOMENT DUE TO SIDE THRUST AT FOUNDATION TOE (NORMAL CONDITION) TRANSVERSE SHEAR
PASSIVE EARTH PRESSURE(F) F
UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1
SHEAR F
FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S
If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised

Resisting soil force


moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNDATION TOE (NORMAL CONDITION) longitudnal shear

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1
SHEAR F
FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S
If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNADATION TOE(BROKEN WIRE CONDITION TRANSVERSE SHEAR) TRANSVERSE SHEAR

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1

FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S


If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

MOMENT DUE TO SIDE THRUST AT FOUNADATION TOE(BROKEN WIRE CONDITION LONGITUDNAL SHEAR SHEAR) LONGITUD

PASSIVE EARTH PRESSURE(F) F


UNIT WEIGHT OF SOIL W
ANGLE OF REPOSE
CHIMNEY WIDTH B1

FROM FORMULA h=[2*F/(W*B1*((1-SIN PHY)/(1+S


If h > H10c - 500 mm (height of chimney - 500 mm loose soil) then H mobilised = H10c - 500 mm
If h<= H10c - 500 mm then H mobilised = h Hence H mobilised Hence H mobalised
Resisting soil force
moment due to side thrust at the base of footing

CHECK FOR BEARING CAPACITY : NORMAL CONDITION

Bearing pressure due to direct compression BR1nc


Bearing pressure due to eccentricity BR2nc
Bearing pressure due to transverse shear BR3nc
Bearing pressure due to longitudinal shear BR4nc
Total Bearing Pressure
Factor Of Safety NC 1
CHECK FOR BEARING CAPACITY : BROKEN WIRE CONDITION

Bearing pressure due to direct compression BR1bwc


Bearing pressure due to eccentricity BR2bwc
Bearing pressure due to transverse shear BR3bwc
Bearing pressure due to longitudinal shear BR4bwc
Total Bearing Pressure
Factor Of Safety NC 1

DESIGN OF CHIMNEY

CHECK FOR COMPRESSION WITH BENDING PREFER DRAWING OF FOOTING AND CHIMNEY FOR D
CASE:1 NORMAL CONDITION
PU
GRADE OF REINFORCEMENT STEEL
STERENGTH OF STEEL
DIAMETER OF BAR IN CHIMNEY Mid -
NO OF BARS IN CHIMANEY
AREA OF STEEL Asc
AREA OF CHIMNEY Ac
% OF STEEL P As per IS 456-2000 Longitudinal Reinforcement shall n
less than 0.8 % of the grosscross sectional area of colu
GRADE OF CONCRETE
STRENGTH OF CONCRETE
P/Fck
Pu/Fck
CONCRETE COVER IN CHIMNEY
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 44/45/46 of sp 16)
Mux1/Muy1
Puz=0.45*Fck*Ac+0..75Fy*Asc
Pu/Puz
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CASE:2 BROKENWIRE CONDITION

PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 44/45/46 of sp 16)
Mux1/Muy1
Puz=0.45*Fck*Ac+0..75Fy*Asc
Pu/Puz
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CHECK FOR TENSION WITH BENDING


CASE:1 NORMAL CONDITION

PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 79/80/81 of sp 16)
Mux1/Muy1
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CASE:2 BROKENWIRE CONDITION


PU
P/Fck
Pu/FckBD
d'/d=(cover + bar dia/2)/d
Mu/FckBD^2 (refer chart 79/80/81 of sp 16)
Mux1/Muy1
refer page no 249 of CBIP manual
Mux due to tran shear soil pressure
Mux/Mux1
Muy due to long shear soil pressure
Muy/Muy1
[Mux/Mux1]^αn+[Muy/Muy1]^αn
FACTOR Nc

CHECK FOR BASE SLAB

COMPRESSION REINFORCEMENT AT SECTION X-X


DIMENSION OF SECTION AT X-X
PROVIDE BAR "A" AT BOTTOM OF PAD

AT TOP OF PAD

EFFECTIVE DEPTH
NORMAL CONDITION DIRECT COMPRESSION (P/A)
DUE TO ECCENTRICITY (P.ex/Z)/2
MAX ( TRAN MOMENT OR LONG MOMENT)
TOTAL

BROKENWIRE CONDITION DIRECT COMPRESSION (P/A)


DUE TO ECCENTRICITY (P.ex/Z)/2
MAX ( TRAN MOMENT OR LONG MOMENT)
TOTAL
MAXIMUM BEARING PRESSURE

MAX BEARING PRESSURE


BENDING MOMENT AT SECTION X-X
Mux1=bearing pressure*(B4P-B1c)^2/8*B4p
Mux1/bd^2
Mulim/bd^2 for fck 20 n/mm^2 & Fy=415 n/mm^2 refer page 10, tab
DESIGN METHOD
refer table 2 of SP 16
Pt tension reinforcement
Pc (=0 for singly reinforced slab) compression reinforcement
Ast required
Ast provided

Asc required
Asc provided

COMPRESSION REINFORCEMENT AT SECTION Y-Y


DIMENSION OF SECTION Y-Y FROM TOE
EFFECTIVE DEPTH
BENDING MOMENT AT SECTION Y-Y
Muy1=bearing pressure*(B4p-B2p)^2/8*B4p
Mux1/bd^2
DESIGN METHOD
REFER TABLE 2 OF SP16
Pt tension reinforcement
Pc (=0 for singly reinforced slab) compression reinforcement
Ast required
Ast provided

Asc required
Asc provided

As per IS 456-2000 Minimum Reinforcement in either direction in slabs shall not be less than 0.15 percent
5 of the gross cross sectional area and 0.12 percent for high strength deformed bars

Area of slab
Area of steel reinforcement required

UPLIFT REINFORCEMENT AT SECTION X-X


Provide bar 'C' at top of pad

Ast provided
EFFECTIVE DEPTH
Bearing pressure P = Uplift / (B4p - B1c)^2
Muxrequired = P x (B4p - B1c)^2 / 8 x 1000
Muxprovided = 0.87 . Fy . Ast . d { 1 - Fy . Ast /( 1000 . Fck . d) }

UPLIFT REINFORCEMENT AT SECTION Y-Y

Ast provided
EFFECTIVE DEPTH
Muxrequired = P x (B4p - B1c)^2 / 8 x 1000
Muxprovided = 0.87 . Fy . Ast . d { 1 - Fy . Ast /( 1000 . Fck . d) }

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: DOWN THRUST CONDITION

ONE WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

ONE WAY SHEAR AT SECTION Y-Y


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: UPLIFT CONDITION

ONE WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B1c) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

ONE WAY SHEAR AT SECTION Y-Y


Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear force V1 = { (B4p-B2p) / 2 - d } x pressure * 1000
Shear stress = V1 / (d x 1000)
Ast provided (compression reinforcement)
100 x Ast (provided) / (B4p x d)
Permissible Shear Stress Refer table 1a, page 73, IS 456 : 2000

CHECK FOR TWO WAY SHEAR FOR BASE SLAB: DOWNTHRUST CONDITION
TWO WAY SHEAR AT SECTION X-X
Design bearing pressure
FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B1c + d)^2 )
Shear Stress = Shear Force / 4 x d x (B1c + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

TWO WAY SHEAR AT SECTION Y-Y

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B2p + d)^2 )
Shear Stress = Shear Force / 4 x d x (B2p + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

CHECK FOR ONE WAY SHEAR FOR BASE SLAB: UPLIFT CONDITION

TWO WAY SHEAR AT SECTION X-X


Design bearing pressure
FULL WIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B1c + d)^2 )
Shear Stress = Shear Force / 4 x d x (B1c + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

TWO WAY SHEAR AT SECTION Y-Y

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Shear Force = bearing pressure x ( B4p^2 - (B2p + d)^2 )
Shear Stress = Shear Force / 4 x d x (B2p + d)
Allowable shear stress = 0.25 x Sqrt (Fck) (refer 31.6.3.1, page 59 of IS 456 : 2000)

CHECK FOR BOND

Design bearing pressure


FULL WAIDTH AT SLAB
CHIMNEY WIDTH
EFFECTIVE DEPTH
Maximum shear force = { (B4p - B1c) / 2 - d } x B4p x Bearing Pressure
Ast
Factor Xu/d = ( 0.87 x fy x Ast ) / (0.36 x fck x B4p x d)
j = 1 - ( Xu/d ) x 1/3
No of Bars in Compression
Bond stress = shear / j x d x (no of bars : compression ) x Pi x dia
Permissible Bond Stress Refer IS 456 : 2000 Clause 26.2.1.1 (Page 43)

CHECK AGAINST OVER TURNING


Normal Condition
Resultant Side Thrust under Normal Condition
Overturning due to eccentricity of Uplift load
Overturning due to resultant side thrust
Overturning due to overload of concrete (-ve)
Total Overturning Moment
Resisting Moment

Broken wire Condition


Resultant Side Thrust under Normal Condition
Overturning due to eccentricity of Uplift load
Overturning due to resultant side thrust
Overturning due to overload of concrete (-ve)
Total Overturning Moment
Resisting Moment

Check for sliding (M = Wsd*h*[(1+SINq)/(1-SINq)])


CHECK AGAINST UPROOTING OF STUB

Design Uplift
Total Depth of Pad (H4p + H5p + H6p)
Clearance of stub from the bottom of bottom pad
Depth of Stub embedment (H4p+H5p+H6p-H8p)
Stub Section
Use Outer Cleat 3 nos
Use Inner Cleat 3 nos
Bolts for each cleat 16 mm dia

Load resisted by stub


Permissible Bond Stress
Bond Stress x (Stub surface - Stub covered by cleat)
Load resisted by cleat
Bearing Stress of concrete 0.45 x Fck
(1) due to concrete Bearing stress x (inner cleat width + outer cleat width) x
(2) due to strength of bolt Double shear of bolt
(3) due to bearing of stub
(4) due to bearing of cleat
min ( 1,2,3,4) US
Us + min load resisted by cleat
Design Uplift
Normal Condition Broken Wire Condition
(Reliability) in Kgs (Security) in Kgs
Equal Unequal Critical Equal Unequal
Cnc 68583 72012 72012 51192 53752
Tnc 61042 64094 64094 43706 45891
TSnc 3538 4599 4599 2345 3049
LSnc 3919 5095 5095 3246 4220

TRUE LENGTH FACTOR 1.055401946


TAN THEETA 0.23861

1440 kg/m3
1440 kg/m3
2400 kg/m3
2400 kg/m3
30000 kg/m3
3000 mm
20 deg 0.3490
20 deg 0.3490
2.04

225 mm
3000 mm
-590 mm
270 mm
120 mm
150 mm
50 mm
3000 mm
540 mm
1700 mm
3060 mm
3300 mm
2410 mm

0.06561 M3
0.8748 M3
0.94041 M3
-0.172 M3
0.780 M3
1.214 M3
1.634 M3
3.456 M3
4.396 M3
0.545 M3

3000 mm
-200 mm
1092 mm
-73 mm
9.946 M2
27.604 M2
54.119 M3
-0.450 M3

77932 Kg
-647 Kg
157 Kg
840 Kg
2272 Kg
80554 Kg
1.26 OK
1.76 OK

1440 kg/m3
20 deg
0.54 m
4599.0 kg
2408 mm

1910 mm
2893 kg
11198 kg.M

5095 kg
1440 KG/M3
20 DEG
0.54 m
5095 kg
2535 mm

1910 mm
2893 kg
12773 kg.M

SVERSE SHEAR) TRANSVERSE SHEAR

3049 kg
1440 KG/M3
20 mm
0.54 m
kg
1961 mm

1910 mm
2893 kg
6277 kg.M

TUDNAL SHEAR SHEAR) LONGITUDINAL SHEAR

4220 kg
1440 KG/M3
20 mm
0.54 m

2307 mm

1910 mm
2893 kg
9995 kg.M

6710 Kg/m2
3208 Kg/m2
1870 Kg/m2
2133 Kg/m2
13919 Kg/m2
2.16 OK
5121 Kg/m2
2394 Kg/m2
1048 Kg/m2
1669 Kg/m2
10232 Kg/m2
2.93 OK

OF FOOTING AND CHIMNEY FOR DIMENSIONS


CHIMNEY CROSS SECTI
72012 kg 706437.72 N cover
Fe415 effective depth
415 N/mm2
16mm corner - 20 mm
8 No. 8 No.
4122 4122 mm2
291600 mm2
Longitudinal Reinforcement shall not be 1.4135802469 %
he grosscross sectional area of column
M20
20 N/mm2
0.071
0.121
50 mm
0.111
0.11
35349 kg.M
3907373 N
0.181
α 0.968
10277 kg.M
0.291
11584 kg.M
0.328
0.642
OK

53752 526770 N
0.071
0.0903
0.111
0.101
32423.8 kg.M
3907373 N
0.135
α 0.891
6192 kg.M
0.191
9278 kg.M
0.286
0.557
0K

64094 628121 N
0.071
0.108
0.111
0.07
22472 kg.M
α 1
10277 kg.M
0.457
11584 kg.M
0.515
0.973
OK

45891 449732 N
0.071
0.077
0.111
0.06
19261.6513761468 KN.M
α 1
6192 N
0.321
9278 N
0.482
0.803
OK

T BOTTOM OF PAD DIA 12 mm


NO 20
DIA 12 mm
NO 12
ED1 472 mm
6710 Kg/m2
TY (P.ex/Z)/2 1604 Kg/m2
NT OR LONG MOMENT) 2133 Kg/m2
10446 Kg/m2
botom width for
5121 Kg/m2 section=1500 mm
TY (P.ex/Z)/2 1197 Kg/m2
NT OR LONG MOMENT) 1669 Kg/m2 for section x-x
0.0799 N/mm 2
bottom width=
0.1045 N/mm2

328.24 KN.M
0.867
Fy=415 n/mm^2 refer page 10, table D of SP16 2.76
SINGLY REINFORCED
d'/d 0.146
0.245 %
0 %
1966 mm2
2262 mm2
OK
0 mm2
1357 mm2
OK
DIA 12 mm
NO 12

800 mm
ED2 202 mm
110.31 KN.M
0.87 for section y-y slab wid
SINGLY REINFORCED
d'/d 0.342
0.245 %
0 %
1514 mm2
2262 mm2
OK
0
1357 mm2
OK
han 0.15 percent

443700 mm2
ement required 532 mm2
OK

DIA 12 mm
NO 12
1357 mm2
472 mm
0.0562 N/mm2
53543975 N.mm/M
217445017 N.mm/M
OK

DIA 12 mm
NO 12
1357 mm2
202 mm
17994194.462 N.mm/M
85168486.2956883 N.mm/M
ok

0.1045 N/mm2
3300 mm
540 mm
472 mm
94850 N/meter width
0.2010 N/mm2
2262 mm2
0.145
73, IS 456 : 2000 0.2832 N/mm2
OK

0.1045 N/mm2
3300 mm
1700 mm
202 mm
62468 N/meter width
0.309 N/mm2
2262 N/mm2
0.339
73, IS 456 : 2000 0.40224 N/mm2
OK

0.0562 N/mm2
3300 mm
540 mm
472 mm
51059 N/meter width
0.1082 N/mm2
1357 mm2
0.087
73, IS 456 : 2000 0.2832 N/mm2
OK

0.0562 N/mm2
3300 mm
1700 mm
202 mm
33627 N/meter width
0.1665
1357 mm2
0.204
73, IS 456 : 2000 0.3328 N/mm2
OK

0.104461 N/mm2
3300 mm
540 mm
472 mm
1030595 N
0.5394 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.104461 N/mm2
3300 mm
1700 mm
202 mm
759680 N
0.4943 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.0562 N/mm2
3300 mm
540 mm
472 mm
554775 N
0.290 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.0562 N/mm2
3300 mm
1700 mm
202 mm
408940.337 N
0.266 N/mm2
59 of IS 456 : 2000) 1.118 N/mm2
OK

0.104461 N/mm2
3300 mm
540 mm
472 mm
313006 N
2262 mm2
0.073
1.000
20
0.880 N/mm2
lause 26.2.1.1 (Page 43) 1.2 N/mm2
OK

6864 Kg
66802 Kg.M
21792 Kg.M
-3596 Kg.M
84998 Kg.M
106266 Kg.M
1.25 OK

5206 Kg
47831 Kg.M
16530 Kg.M
-3596 Kg.M
60764 Kg.M
106266 Kg.M
1.75 OK

q)/(1-SINq)])
H
M1 0 0 Kg/M2 q (deg)
M2 2.41 7076 Kg/M2 (1+SINq)/(1-SINq)
M3 0.27 7868 Kg/M2
M4 0.12 8221 Kg/M2
M5 0.15 8661 Kg/M2
M6 0.05 8808 Kg/M2

F1 4604 Kg
F2 2260 Kg
F3 3070 Kg
F4 4178 Kg
F5 1441 Kg
F 15553 Kg

Max (Tsnc or Tsbwc 0r LSnc or LSbwc) 5095 Kg


F.O.STsbwc 0r LSnc or LSbwc) 3.05

OK

64094 628121.2
540
150
390
L120*120*10 120 10 6320 no of cleat
L90*90*6 300 mm long 90 6 5200 6
L90*90*6 300 mm long 90 6 5200
4 5.6 grade 310
nos

1.2 N/mm2
140760 N

9 N/mm2
er cleat width + outer cleat width) x flange x Nos 1166400 N
1496184 N
979031 N
1174837 N
979031 N
1119791 N
628121 N
Wire Condition

Critical
53752
45891
3049
4220
DATA FROM DRAWINGS
CHIMNEY CROSS SECTION 600 600 360000 mm^2
50 mm
effective depth 600-50 550 mm
dth for
500 mm

1700 mm
for section y-y slab width is 3060 mm
20 0.35
2
no of cleat pair
3
12