You are on page 1of 1

PLUMBING NOTES:

1.) ALL WORKS SHALL CONFORM WITH THE LATEST EDITION


OF NATIONAL PLUMBING CODE, CITY AND MUNICIPAL.

2.) ALL WATERLINES SHALL BE PPR OR G.I SCH. 40.


HYDROSTICALLY TESTED AT LEAST 100 PSI PRIOR
TO TAPPING.

3.) ALL WASTE/SEWER LINES SHALL BE PVC SERIES 1000,


WATER TESTED FOR 1.5 M HEAD PRIOR TO TAPPING.

500MM MAX.
300MM MIN.
4.) ALL SANITARY VENT PIPE SHALL BE PVC SERIES 1000 &
TAPPED TO ROBINSONS EXISTING VENT PIPE.

5.) ALL WASTE AND SEWER LINES SHALL BE PROVIDED WITH


P L U M B I N G I S O M E T R Y FLOOR CLEANOUT.
SCALE: 1:100M
6.) ALL PLUMBING PIPES SHALL BE PROVIDED WITH
ADEQUATE PIPE HANGER.

7.) ALL TESTING SHALL BE CERTIFIED BY RLC ENGINEERING


MALL EXISTING REPRESENTATIVE.
SEWER PIPE

WATER METER CONNECTION DETAIL 8.) ALL LAVATORY & KITCHEN SINK SHALL BE PROVIDED
FD SCALE: NTS WITH STAINLESS STEEL/ CAST IRON GREASE TRAP WITH
C.O
WC
MINIMUM CAPACITY OF 7 GPM METMA OR APPROVED EQUAL.

9.) ALL WET AREA SHALL BE WATERPROOFED WITH HYGARD


THOROSEAL OR APPROVED EQUAL AND SHALL BE FLOOD
TESTED.

19.) SUBMIT AS-BUILT PLAN SIGNED AND SEALED BY


REGISTERED MASTER PLUMBER.
1 to 2% 1 to 2%

300MM (MAX.)
LEGENDS:

WATER SUPPLY LINE

INFORMATION/
WASTE DISPOSAL LINE
COUNTER
C.0 CLEAN OUT
F.D FLOOR DRAIN

WAITING AREA FLOOR CLEAN-OT DETAIL


SCALE: NTS
ENTRANCE

G L A S S

WATER AND SEWER PIPE LAYOUT


SCALE: 1:100M

PROPOSED COMMERCIAL BUILDING JOSE ARCENAS AS SHOWN


(PHILIPPINE AIRLINES)

You might also like