Professional Documents
Culture Documents
Prepared by:
A. PRE IMPLEMENTATION
The School Deworming Coordinator:
1. Attend the Division Deworming Orientation
2. Checked and Received deworming tablets
3. Coordinated with the school principal as to
the re orientation to all teacher’s
concerned
4. Re-orient all teachers and other school
personnel, PTA, stakeholders on the
implementation of school Mass
Deworming
5. Distributed to all teacher advisers the
deworming tablet equal to the number of
pupils enrolled per class
6. Teacher advisers prepared deworming
folders which include all the deworming
forms required (eg. DF-1-CHECKLIST,
DF-2 SUMMARY, DF-3 for 4PS’s
Beneficiaries; Parents’ consent and
DepEd Memorandum
B. IMPLEMENTATION
The Class Adviser
1. Checked the health status of each
pupil/student prior to deworming
2. Ensured the pupils/ students have
eaten their full meal before deworming
3. Conducted hand washing and tooth
brushing activity
4. Distributed one tablet of
Albendazole /Mebendazole per
pupils/students
5. Ensured that all pupils/students
observed the proper intake of the
deworming tablet
C. POST IMPLEMENTATION
1. School QATAME coordinator had
answered the monitoring tool
2. Submitted hard or soft copy of mass
deworming report with the signature of
persons concerned on time
Prepared by: