This report details concrete temperature and strength test results for the foundation of the administration building at the King Salman Energy Park project in SPARK. It shows that the maximum temperature recorded by sensor point 2 at the top of the foundation was 44.9°C on February 29, 2020, with a minimum of 16.7°C, though maturity and strength were not available. The concrete was poured on February 21, 2020.
This report details concrete temperature and strength test results for the foundation of the administration building at the King Salman Energy Park project in SPARK. It shows that the maximum temperature recorded by sensor point 2 at the top of the foundation was 44.9°C on February 29, 2020, with a minimum of 16.7°C, though maturity and strength were not available. The concrete was poured on February 21, 2020.
This report details concrete temperature and strength test results for the foundation of the administration building at the King Salman Energy Park project in SPARK. It shows that the maximum temperature recorded by sensor point 2 at the top of the foundation was 44.9°C on February 29, 2020, with a minimum of 16.7°C, though maturity and strength were not available. The concrete was poured on February 21, 2020.