PROJECT : PROPOSED GROUTED BOULDERS RETAINING WALL

LOCATION : Barangay Bubug, Silay City, Neg. Occ.

DATE : November 8, 2016

SUBJECT : Bill Of Quantities

OWNER : KOOL INDUSTRIAL CORP.

 
ITEM NO. WORK DESCRIPTION UNIT
 
A GENERAL REQUIREMENTS
MOBILIZATION/DEMOBILIZATION
1  
& TEMFACIL
2   TEMPORARY FENCE ENCLOSURE
Provision of Personal Protective
3  
equipment & safety measure
    Total of A
 
B CIVIL WORKS

  TEMPORARY ENVIRONMENTAL
1
CONTROLS
a   Equipment and Tools, etc. lumpsum
b   Mixing Sand cu. Meter
c   Bamboo Poles length
d   Labor lumpsum
    Sub-total
2   DEMOLITION WORKS
a   Equipment and Tools, etc. lumpsum
b   Labor lumpsum
    Sub-total
3   EXCAVATION WORKS
a   Manpower lumpsum
b   Equipment & Tools, etc. lumpsum
    Sub-total

 
4 FORM WORKS
a   Site preparation & layout
BURGOS ST., CAMINGAWAN, BRGY. ESTEFANIA
BACOLOD CITY, NEG. OCC., PHILIPPINES
TEL. NO.: (034) 7098266
EMAIL: bacolodcatbuilders_c@yahoo.com

b   2x2x12 Coco Lumber


c   Concrete Nails 1"
d   Concrete Nails 4"
e   C.W. Nails 4"
f   C.W. Nails 2 1/2"
g   C.W. Nails 1"
h   Nylon
i   Ordinary Plywood sheets
j   Labor
    Sub-total
5   CONCRETE WORKS and P. FENCE
a   Portland Cement
b   Mixing Sand cu. Meter
c   G-3/8" Crushed Gravel cu. Meter
d   Curing Compound drums
e   DSB 10mm Ø length
f   DSB 12mm Ø length
g   Labor
    Sub-total
STONE WORKS (ARMOURED
6  
STONE)
a   Armoured Stone cu. Meter
    Labor
    Sub-total
FILTER, BACKFILLING AND
7  
GRAVEL BEDDING
a   G-1" Crushed Gravel cu. Meter
b   G-3/4" Crushed Gravel cu. Meter
c   Mixing Sand cu. Meter
d   Weepholes, PVC pipe 2"Ø length
e   Filling Materials cu. Meter
f   Labor
    Sub-total

 
8 CONSUMABLES (OTHERS)
a   Electricity and Water, etc. lumpsum
    Sub-total
     
    Total of B
BURGOS ST., CAMINGAWAN, BRGY. ESTEFANIA
BACOLOD CITY, NEG. OCC., PHILIPPINES
TEL. NO.: (034) 7098266
EMAIL: bacolodcatbuilders_c@yahoo.com

     
    Total of A & B
     
GEN. REQUIREMENT & WORK
   
COST
     
    CONTINGENCIES 5%
    RETENTION 10%
    TAX 2%
 CONTRACTOR'S PROFIT + SUPERVISION 15%
    GRAND TOTAL

Prepared by:

Jon Rodney Nolido


General Manager
Bacolod Cat Builders & Contractors, inc.