Site Instruction

PROJECT: NGTL, Jetty' 19


SI Serial No Date Received Description Status
HV001-006_MESB_0001 14.05.19 Supply and Provides Office Furnitures. TBA
Removal of P-6088 from the beam and weld to the right position. Applicable
HV001-006_MESB_0002 22.06.19 for Grid 23-24 TBA
Cutting off of F-6016 by 10mm and Re-weld P-6110 to correct dimension.
HV001-006_MESB_0003 24.06.19 TBA
Cutting off of F-6011 by 10mm and 8mm and reweld to P-6107 in correct
HV001-006_MESB_0004 24.06.19 dimension. Applicable to Grid 31-32 and 32-33. Cutting off of F-6007 by 3mm TBA
from both sides.

Modification of F-6079 by drilling of holes 2x d13 holes. Applicable to Grid 37-


HV001-006_MESB_0005 24.06.19 38. TBA
Cutting off the P-6108 and re-weld to the correct position. Applicable to Grid
HV001-006_MESB_0006 24.06.19 31-32. TBA
Modification of F-6069 and Plate P-6085by closing the holes thru welding and
HV001-006_MESB_0007 24.06.19 drilling new holes to correct the dimension. Applicable to Grid 37-38. TBA

Modification of F-6040 by drilling 4nos of holes in correct dimension. Apllicable


HV001-006_MESB_0008 24.06.19 for Grid 32-33. TBA
PROJECT: JETTY MECHANICAL ERECTION WORKS FOR AMMONIA PLANT, BFI
STATUS LOG REQUEST FOR INFORMATION

Date of Response
# RFI Ref No. RFI Description TKIS Response Status
Submission Received

Request for date of Arrival of Structural Material by


1 R-MESB-BRN-0004 20/Jun/19 TKIS will send an update to MESB weekly. 22/Jun/19 Closed
Grid

2 R-MESB-BRN-0005 20/Jun/19 Request for date of Arrival of Conveyor Structural TKIS will revert back soon to MESB for the delivery dates. 22/Jun/19 Open
Material by Grid

3 R-MESB-BRN-0006 20/Jun/19 Request for date of Arrival of Conveyor Materials by TKIS will revert back soon to MESB for the delivery dates. 22/Jun/19 Open
Grid and Quantity of roller in each grid.

4 R-MESB-BRN-0007 20/Jun/19 Request for date of Arrival of cladding per grid. TKIS will revert back soon to MESB for the delivery dates. 22/Jun/19 Open

Request for date of Arrival of Ship loader Materials-


5 R-MESB-BRN-0008 20/Jun/19 TKIS will revert back soon to MESB for the delivery dates. 22/Jun/19 Open
Structural Steel and Equipment.

Request for the Drawings and Details of Non-Standard


6 R-MESB-BRN-0009 20/Jun/19 TKIS will revert back soon to MESB for the delivery dates. 22/Jun/19 Open
Gallery Segments.

Page 3 of 10
PROJECT: JETTY MECHANICAL ERECTION WORKS FOR AMMONIA PLANT, BFI
STATUS LOG REQUEST FOR INFORMATION

Page 4 of 10
PROJECT: JETTY MECHANICAL ERECTION WORKS FOR AMMONIA PLANT, BFI
SITE INSTRUCTION LOG

# Site Instruction Ref No. Date of Receipt Grid Number SI Description Status

1 HV001-006_MESB_0001 14/May/19 N/A Supply and Provides Office Furnitures. TBA

2 HV001-006_MESB_0002 22/Jun/19 Grid 23-24 Removal of P-6088 from the beam and weld to thr right position. Applicable for Grid 23-24 TBA

3 HV001-006_MESB_0003 24/Jun/19 Cutting off of F-6016 by 10mm and Re-weld P-6110 to correct dimension. TBA

4 HV001-006_MESB_0004 24/Jun/19 Grid 31-32 Cutting off of F-6011 by 10mm and 8mm and reweld to P-6107 in correct dimension. Applicable to TBA
32-33 Grid 31-32 and 32-33. Cutting off of F-6007 by 3mm from both sides.

5 HV001-006_MESB_0005 24/Jun/19 Grid 37-38 Modification of F-6079 by drilling of holes 2x Ø13 holes. Applicable to Grid 37-38. TBA

6 HV001-006_MESB_0006 24/Jun/19 Grid 31-32 Cutting off the P-6108 and re-weld to the correct position. Applicable to Grid 31-32. TBA

7 HV001-006_MESB_0007 24/Jun/19 Grid 37-38 Modification of F-6069 and Plate P-6085 by closing the holes thru welding and drilling new holes to TBA
correct the dimension. Applicable to Grid 37-38.

8 HV001-006_MESB_0008 24/Jun/19 Grid 32-33 Modification of F-6040 by drilling 4nos of holes in correct dimension. Apllicable for Grid 32-33. TBA

Fabricate 2nos of each Plate (P-7038, P-7039, P-7047) and Install it by welding to the beam. Applicable
9 HV001-006_MESB_0009 29/Jun/19 Grid 3-4 TBA
for Grid 3-4.

Cutting off of Beams T-7033 and T-7032 by 15mm. Install by welding plates P-7009 to Beams and do
10 HV001-006_MESB_0010 29/Jun/19 Grid 2-3 TBA
the touch painting. Applicable for Grid 2-3.

Fabricate 1no of Beam B-6004 by drilling 4 by Ø14 holes and do touch-up painting. Applicable for Grid
11 HV001-006_MESB_0011 29/Jun/19 Grid 23-24 TBA
23-24

12 HV001-006_MESB_0012 1/Jul/19 Grid 2-3 Modification of P-7068 by closing the holes by welding and drilling new holes to correct the dimension. TBA
Applicable for Grid 2-3.

Page 5 of 10
PROJECT: JETTY MECHANICAL ERECTION WORKS FOR AMMONIA PLANT, BFI
SITE INSTRUCTION LOG

23-24
Modification of 8nos of SP-6002 and 20nos of SP-6007 by increasing the hole size from Ø11 to Ø13 and
13 HV001-006_MESB_0013 1/Jul/19 Grid 24-25 TBA
do touch-up painting. Applicable for Grid 23-24, 24-25, and 26-27.
26-27

2-3 Modification of 14nos of F-7040 by cutting off and adjust the dimension and do touch-up painting.
14 HV001-006_MESB_0014 1/Jul/19 Grid TBA
3-4 Applicable for Grid 2-3 and 3-4.

Page 6 of 10
Action By

MESB

MESB

MESB

MESB

MESB

MESB

MESB

MESB

MESB

MESB

MESB

MESB

Page 7 of 10
MESB

MESB

Page 8 of 10
PROJECT: JETTY MECHANICAL ERECTION WORKS FOR AMMONIA PLANT, BFI
SITE INSTRUCTION LOG

Date of
# Site Instruction Ref No. Grid Number SI Description Status Action By Location
Receipt

1 HV001-006_MESB_0001 14/May/19 N/A Supply and Provides Office Furnitures. TBA MESB

2 HV001-006_MESB_0002 22/Jun/19 Grid 23-24 Removal of P-6088 from the beam and weld to the right position and do touch-up painting. Applicable TBA MESB BFI
for Grid 23-24

3 HV001-006_MESB_0003 24/Jun/19 Grid Cutting off of F-6016 by 10mm and Re-weld P-6110 to correct dimension. TBA MESB

31-32 Cutting off of F-6011 by 10mm and 8mm and reweld to P-6107 in correct dimension. Applicable to
4 HV001-006_MESB_0004 24/Jun/19 Grid TBA MESB Muara
32-33 Grid 31-32 and 32-33. Cutting off of F-6007 by 3mm from both sides.

5 HV001-006_MESB_0005 24/Jun/19 Grid 37-38 Modification of F-6079 by drilling of holes 2x Ø13 holes. Applicable to Grid 37-38. TBA MESB Muara

6 HV001-006_MESB_0006 24/Jun/19 Grid 31-32 Cutting off the P-6108 and re-weld to the correct position. Applicable to Grid 31-32. TBA MESB Muara

7 HV001-006_MESB_0007 24/Jun/19 Grid 37-38 Modification of F-6069 and Plate P-6085 by closing the holes thru welding and drilling new holes to TBA MESB Muara
correct the dimension. Applicable to Grid 37-38.

8 HV001-006_MESB_0008 24/Jun/19 Grid 32-33 Modification of F-6040 by drilling 4nos of holes in correct dimension. Applicable for Grid 32-33. TBA MESB Muara

Fabricate 2nos of each Plate (P-7038, P-7039, P-7047) and Install it by welding to the beam and to do
9 HV001-006_MESB_0009 29/Jun/19 Grid 3-4 TBA MESB BFI
touch-up painting. Applicable for Grid 3-4.

Cutting off of Beams T-7033 and T-7032 by 15mm. Install by welding plates P-7009 to Beams and do
10 HV001-006_MESB_0010 29/Jun/19 Grid 2-3 TBA MESB BFI
the touch painting. Applicable for Grid 2-3.

11 HV001-006_MESB_0011 29/Jun/19 Grid 23-24 Fabricate 1no of Beam B-6004 by drilling 4 by Ø14 holes and do touch-up painting. Applicable for Grid TBA MESB BFI
23-24

Page 9 of 10
PROJECT: JETTY MECHANICAL ERECTION WORKS FOR AMMONIA PLANT, BFI
SITE INSTRUCTION LOG

Modification of P-7068 by closing the holes by welding and drilling new holes to correct the dimension.
12 HV001-006_MESB_0012 1/Jul/19 Grid 2-3 Applicable for Grid 2-3. TBA MESB BFI

23-24 Modification of 8nos of SP-6002 and 20nos of SP-6007 by increasing the hole size from Ø11 to Ø13 and
13 HV001-006_MESB_0013 1/Jul/19 Grid 24-25 TBA MESB BFI
do touch-up painting. Applicable for Grid 23-24, 24-25, and 26-27.
26-27

2-3 Modification of 14nos of F-7040 by cutting off and adjust the dimension and do touch-up painting.
14 HV001-006_MESB_0014 1/Jul/19 Grid TBA MESB BFI
3-4 Applicable for Grid 2-3 and 3-4.

Page 10 of 10