5X800MW YADADRI TPS

BTG Works:
 Boiler, Turbine and Generator along with associated equipment viz., ESP, Ducts etc.
System Stage Sub system/Equipment Quantity Remarks
Generator Transformer 3 Nos/Unit
GCB 1 No/Unit
Stage-I Unit Transformer
UAT 2 Nos/Unit
Busduct A/R Unitized
Transformer Generator Transformer 3 Nos/Unit
Yard GCB 1 No/Unit
Stage-II Unit Transformer
UAT
Busduct A/R Unitized
Station Transformer 3 Nos Common for plant
Common
Station Aux. Transformer
 GTs, STs Auxiliaries Transformers, Bus Ducts and GCB.
 Fans and Mill Foundations.
 Fuel Oil Forwarding
 SCR
 EOT Cranes

System Stage Sub system/Equipment Quantity Remarks


Stage-I TG Hall EOT crane above 100T 2 Nos Common for Unit-1 & 2
EOT Cranes
Stage-II TG Hall EOT crane above 100T 2 Nos Common for Unit-3,4&5
 Elevators and Handling Equipment in Main Plant Area and Boiler.
 Simulators.

BOP Works:

 Coal Handling Plant along with LOCOs and Bull Dozers

System Stage Sub system/Equipment Quantity Remarks


Transfer Points 15 Nos
Raw coal Transfer Points 2 Nos
Pent House 3 Nos
Crusher House 1 No
Dual paths (A & B)
Stage - I Conveyor system 15 Nos
CHP Machine package
ERH 1 No
RCERH 1 No
Wagon Tippler 2 Nos Machine package
Track Hopper 1 No Machine package
Stage - II Transfer Points 17 Nos
5X800MW YADADRI TPS

Raw coal Transfer Points 2 Nos


Pent House 3 Nos
Crusher House 1 No
Dual paths (A & B)
Conveyor system 19 Nos
Machine package
ERH 1 No
RCERH 1 No
Wagon Tippler 2 Nos Machine package
Track Hopper 1 No Machine package
Stackers 3 Nos Common for plant
Reclaimers 3 Nos Machine package
Common systems Dust suppression pump house 3 Nos Common for plant
Stock pile 6 Nos Common for plant
MCC 5 Nos

System Stage Sub system Quantity Remarks


ESP Hoppers 4 Passes Unitized
FAE Towers 3 Nos Unitized
Compressor House 1 No Common building for Unit-1 & 2
Stage - I Vacuum Pump House 2 Nos Unitized
Ash slurry pump house 1 No Common building for Unit-1 & 2
Silo utility building with HCSD 1 No Common building for Unit-1 & 2
Fly ash silos 2 nos Common Unit-1 & 2
ESP Hoppers 4 Passes Unitized
FAE Towers 3 Nos Unitized
AHP Compressor House 1 No Common building for Unit-3, 4 & 5
Vacuum Pump House 3 Nos Unitized
Stage - II
One for building for Unit-3 & 4
Ash slurry pump house 2 Nos
Second for Unit-5
Silo utility building with HCSD 1 No Common building for Unit-1 & 2
Fly ash silos 3 nos Common Unit-3,4&5
Ash water pump house 1 No Common for plant
Clarifiers 4 Nos Common for plant
Common systems Chemical House 2 Nos Common for plant
MCC 6 Nos
Recovery pump house 1 No Common for plant
 Ash Handling Plant along with Ash Water Recovery System and HCSD System

 Lime handling and Gypsum Handling System for FGD


 Mill Reject System
5X800MW YADADRI TPS

 Raw Water System from Raw Water Reservoir, PTP, DM, Chlorination, CW treatment, Side Stream
Filtration, ETP, STP, Service Water and Potable Water.
 Compressed Air System
 NDCT
 Chimney
 Fire Alarm, Fire Protection, Fire Tenders
 Chemical Lab, Environmental Lab
 Bunker Structures, bunker and their foundations
 Switchyard
 Fuel Oil Unloading, Fuel Oil Tanks
 All Pipe Racks
 Cable Tray System for BOP areas
 Cable for BOP areas
 DG sets
 AC & ventilation
 CPU & CPU regeneration
 Miscellaneous Cranes
 Weighbridges
 H2 Generation Plants
 Miscellaneous Tanks, DM CST etc.,
 Elevators other than Main Plant and boiler
 Roof Top Solar Plant
 E-BOP (Batteries, Battery Charges, MV/LV Switchgears, Service Transformers, Instrumentation etc.)