ANNUAL INSPECTION OF BEARING BRIDGES FOR THE YEAR ENDING WITH 31.03.

2018

SECTION : PUTTAPARHTY

Type of Bearing
Sl.No. Name of the Bridges No.of spans Date of inspection Remarks
Bridges

1 3 4 5 9 10

1 Bridges at km 12/6 of Penukonda -Mudigubba road 6VX14.50Mts Neopran 30/1/2018 Neopran


Road Statistics of Puttaparthy Section
Double
Double Four
Lane
Double Lane (C.C) Double Lane B.T Lane Lane
Earthe
WBM C.C
Sl. n Grand
Name of road Startin
No Starting Ending Total Starting Ending Total Starting Ending Total Ending Total Total Starting Ending Total
g
km km km km km km km km km km

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 Kodur - 44.630 44.910 0.28 22.00 34.80 12.80


Dharmavaram road 0.28 35.20 44.63 9.43
Km.22/0 to 47/0 44.91 47.00 2.09
24.32

2 Bukkapatnam
Byepass road from
km.25/0 to 27/2

3 Pamdurthy 7.4 8.00 0.60


Krishnapuram road 0.60
km.0/0 to 13/0
4 Puttaparthy 0.00 1.70 1.70
Diversion road km. 4.10 4.90 0.80
0/0 to 4/9 2.50

5 Kothaacheruvu
Thalamarla road
km.0/0 to 8/0
6 Penukonda 17.00 17.356 0.356 7.00 8.00 1.00 21.387 21.686 0.299
Mudigubba road 21.129 21.387 0.258 17.356 21.129 3.773 0.299
km.7/0 to 55/0 21.686 22.00 0.314 4.773
0.928
7 Mamillakunta 2.10 5.00 2.90
Puttaparthy road 6.60 8.35 1.75
km.0/0 to 8/350 4.65
8 Bukkapatnam
Veldurthy road from
km.0/0 to 10/0
8 Bukkapatnam 3.772 3.929 0.1571 0.000 3.772 3.772
-Nallamada road 8.656 9.750 .0940. 3.929 4.727 4.727
from km.0/0 to 16/0 11.600 11.655 0550. 9.750 11.600 1.850
15.260 15.420 160 11.655 15.260 3.605
1.466 15.420 16.00 0.580
14.534

9 Talamarla
Danthalapalli via
Indlavenkatampalli
km. 0/0 to 4/0
10 Indlavenkatampalli
to Vemuletipalli
km.0/0 to 1/4
Interm Interm
Four
ediate ediate
Lane Four Lane W.B.M Four Lane Total Single Lane C.C Single Lane B.T
Lane Lane
BT
C.C BT
Starti Endin Startin Endin Startin Endin Startin Endin Startin Endin Startin
Total Total Total Total Total Ending Total Starting Ending Total
ng g g g g g g g g g g
km km km km km km km km km km km km km km

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

34.80 35.20 0.40

25 27.2 2.2

7.30 7.40 0.1 0.00 7.300 7.300


8.00 13.00 5.000
12.30
1.70 4.10 2.40
2.40

3.90 4.10 0.20 0.00 3.90 3.90


7.40 8.00 0.60 4.10 7.40 3.30
0.80 7.20
22.00 23.60 1.60 8.00 17.00 9.00
1.60 23.60 55.00 31.40
40.40

0.00 2.10 2.10


5.00 6.60 1.60
3.70
6.05 6.50 0.45 0.00 6.05 6.05
7.50 7.80 0.30 6.50 7.50 1.00
0.75 7.80 10.00 2.2
9.25

2.770 3.110 0.340 0.00 2.770 2.770


3.460 3.540 0.080 3.110 3.460 0.350
0.420 3.540 3.875 0.335
3.455
0.00 1.00 1.000
Single Lane un- Grand
Single Lane WBM Total
metalled Total

Starting Ending Total

km km km km

41 42 43 44 45 46 47 48

25.00

2.20

13

4.90

48

8.35

10

16

4
0.00 0.40 1.40 1.4
1.40
ANNUAL INSPECTION OF BUILDINGS (R&B) SECTION PUTTAPARTHY FOR THE YEAR 2017-18.

SECTION : PUTTAPARHTY

Item & By whom


Capital cost of the
Page No. examined with condition of General Date of
Sl.No. Name of the Building Building as per Condition floor
in building date of Roof and timber condition inspection
building Register
register inspection

1 2 3 4 5 6 7 8 9

1 Section Office 7.00 Lakhs 10/3/2017 Good Good Good 14/3/2018


2017-18.

Remarks

10
STATEMENT SHOWING THE WORK AND OLD BRIDGES REQUIRING IMMEDIATE RECONSTRUCTION

Name of the District : Anantapur

Approx.
Name of the Classifica Vent way Population Cost of
Sl.No Name of the Location of Year of
Division / tion of served in Reconst Remarks
. Road the Bridge Construction
Constituency the road lakhs ruction
Existing Proposal in lakhs
1 2 3 4 5 6 7 8 9 7

2Vx Narrow week cause way, Abutments & piers


Damajipalli - 3Vx
1 Dharmavaram Km. 19/6 SH 40 years 2.50 1.50 25.00 are damaged. Protection works are damaged.
Tadipatri road 4.76 mts
mts Water over flows

Narrow week cause way and damaged


Damajipalli - 2Vx 3Vx approaches, Wing wall is damaged. Abutments
2 Dharmavaram km. 24/2 SH 40 years 1.50 25.00
Tadipatri road 3.6 mts 4.76 mts & piers are damaged. Protection works are
damaged. Water over flows

Narrow week cause way and damaged


2Vx
Damajipalli - 2Vx approaches, Wing wall is damaged. Abutments
3 Dharmavaram Km. 24/4 SH 40 years 1.75 1.50 20.00
Tadipatri road 4.76 mts & piers are damaged. Protection works are
mts
damaged. Water over flows

The existing bridge is 21 V x 4.66 mts. The


21 V x
Kadiri - Hindupur 15 V x centre reinforcement is exposed to slab.
5 Penukonda Km. 48/10 SH 100 years 4.66 0.60 360.00
road 6.76 Requires reconstruction, due to heavy traffic on
mts
the bridge at Gorantla town limits

The Bridge is 12 V x 3.66 mts. 3 years back 5 V


and approaches are washed out and 7 vents
Dharmavaram - 7Vx
10 V x are remaining. C.R.Masonary Abutments &
6 Dharmavaram Anantapur via Km. 22/8 MDR 70 years 3.66 1.37 120.00
5.76 mts Piers are damaged, Reconstruction required.
Chigicherla road mts
Length of the Bridge is 26.00 mts. Approach
length is 75.00 mts.
Dharmavaram - 9Vx 9 vents of 1.20 mts span. Entire cut stone
3Vx
7 Dharmavaram Kalyandurgam Km. 8/6 MDR 50 years 1.20 1.10 40.00 Abutment & piers are damaged and settling.
5.76 mts
road mts Hence required reconstruction.
STATEMENT SHOWING THE PROPOSALS OF BRIDGES IN RIAD AREAS

Vent way
Length of App. Cost
RIAD Proposed LWW of Bridge Population
S.No. DISTRICT DIVISION NAME OF WORK Remarks
MANDAL Bridge in in mts, Rs. In Benefited
Meters Existing Proposal Lakhs

1 2 3 4 5 6 7 8 9 10 11 12

The Bridge is 12 V x 3.66 mts. 3


years back 5 V and approaches
Construction of Bridge at
are washed out and 7 vents are
km. 22/6-8 of
remaining. C.R.Masonary
Dharmavaram - 7 V x 10 V x 5.76
1 Anantapur Dharmavaram Dharmavaram 60.00 50.00 140.00 1.37 lakhs Abutments & Piers are
Anantapur road via 3.66 mts mts
damaged, New construction
chigicherla road in
required. Length of the Bridge is
Anantapur dist.,
26.00 mts. Approach length is
75.00 mts.
ANNUAL INSPECTION OF BRIDGES/CULVERTS
(2017-18)

R&B SECTION, PUTTPARTHY


R&B SUB DIVISION, DHARMAVARAM
R&B DIVISION, DHARMAVARAM
NUMBER OF CULVERTS/BRIDGES
(2016-17)

R&B SECTION, GORANTLA


R&B SUB DIVISION, DHARMAVARAM

R&B DIVISION, DHARMAVARAM


T&P REGISTER
(2014-15)

R&B SECTION, PUTTAPARTHY


R&B SUB DIVISION, DHARMAVARAM

R&B DIVISION, DHARMAVARAM


REGISTER OF BUILDINGS
(2017-18)

R&B SECTION, PUTTAPARTHY


R&B SUB DIVISION, DHARMAVARAM

R&B DIVISION, DHARMAVARAM


CONNECTING VILLAGES

(2017-18)

R&B SECTION, PUTTAPARTHY


R&B SUB DIVISION, DHARMAVARAM

R&B DIVISION, DHARMAVARAM


AVS

(2017-18)

R&B SECTION, PUTTAPARTHY


R&B SUB DIVISION, DHARMAVARAM
R&B DIVISION, DHARMAVARAM
SECTION : PUTTAPARTHY

ANNUAL INSPECTION REPORT ON THE CONDITION OF THE BRIDGES/CULVERTS AND CAUSE WAYS (0.600M)
Arrangements of bearings Painting of Steel work
Are there
Name of the If so what
year and any cracks
road and Description of No. of spans and size of steps are taken When Kind of Kind of When
Sl.No. date of or any When last
situation of Type spans or Proposed to Type lubricate painting painting repainting
Inspection defects painted
bridge be taken up d executing executing required
noticed

1 2 3 4 5 6 7 8 9 10 11 12 13
KODUR - DHARMAVARAM ROAD FROM 22/0 TO 47/0

Required white
1 22/4 RCC Road dam 4.00 V x 1.00m Span 9/1/2018 No washing for -- -- -- -- -- --
Parapetwalls
2 22/10 RCC Road dam 1.00 V x 2.95m Span do No do -- -- -- -- -- --
3 23/2 RCC Road dam 2.00 V x 4.00m Span do No do -- -- -- -- -- --
4 23/8 RCC Road dam 1.00 V x 3.90m Span do No do -- -- -- -- -- --
5 24/2 RCC Road dam 1.00 V x 1.95m Span do No do -- -- -- -- -- --
6 24/8 RCC Road dam 1.00 V x 1.50m Span do No do -- -- -- -- -- --
7 24/10 Pipe culvert 1 R x 1.00mts dia do No do -- -- -- -- -- --
8 25/2 Pipe culvert 1 R x 1.00mts dia do No do -- -- -- -- -- --
9 25/8 Pipe culvert 3 R x 0.750mts dia do No do -- -- -- -- -- --
10 25/10 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
11 26/6 RCC Road dam 1.00 V x 3.00m Span do No do -- -- -- -- -- yes
12 26/8 Pipe culvert 3 R x1.00mts dia do No do -- -- -- -- -- --
13 26/8 Pipe culvert 1R x 1.00mts dia do No do -- -- -- -- -- --
14 26/10 Pipe culvert 1R x 0.60mts dia do No do -- -- -- -- -- --
Painting
15 27/8 Pipe culvert 1R x 1.00mts dia do No do -- -- -- -- --
required
16 27/10 Pipe culvert 2R x 1.00mts dia do No do -- -- -- -- -- --
17 28/2 Pipe culvert 1R x 1.00mts dia do No do -- -- -- -- -- --
18 28/6 Pipe culvert 1R x 1.00mts dia do No do -- -- -- -- -- --
19 28/6 Pipe culvert 2R x 1.00mts dia do No do -- -- -- -- -- --
20 29/2 RCC Road dam 2.00 V x 2.00m Span do No do -- -- -- -- -- yes
21 29/4 RCC 2.00 V x 4.00m Span do No do -- -- -- -- -- do
22 29/6 RCC 1.00 V x 1.90m Span do No do -- -- -- -- -- do

23 29/6 RCC 1.00 V x 1.80m Span do No do -- -- -- -- -- do

24 30/4 RCC 1.00 V x 1.95m Span do No do -- -- -- -- -- do

25 30/8 RCC 1.00 V x 3.00m Span do No do -- -- -- -- -- do

26 32/4 RCC 1.00 V x 3.00m Span do No do -- -- -- -- -- do


27 32/10 RCC 1.00 V x 2.95m Span do No do -- -- -- -- -- do
28 33/3 RCC Road dam 1.00 V x 1.50m Span do No do -- -- -- -- -- do
29 33/8 RCC 1.00 V x 2.00m Span do No do -- -- -- -- -- do
30 34/2 Pipe culvert 2.00 x 0.60m dia do No do -- -- -- -- -- do
31 34/8 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- do
32 36/2 Pipe culvert 2.00 x 0.60m dia do No do -- -- -- -- -- do
33 36/4 Pipe culvert 1.00 x 0.60m dia do No do -- -- -- -- -- do
34 36/4 Pipe culvert 3.00 x 0.80m dia do No do -- -- -- -- -- do
35 36/8 RCC+Road dam 1.00 V x 0.90m Span do No do -- -- -- -- -- do
36 37/4 RCC+Road dam 1.00 V x 0.90m Span do No do -- -- -- -- -- do
37 39/6 RCC 1.00 V x 1.45m Span do No do -- -- -- -- -- do
38 39/10 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- do
39 39/10 Pipe culvert 1R x 1.00mts dia do No do -- -- -- -- -- do
40 40/4 Pipe culvert 1R x 1.00mts dia do No do -- -- -- -- -- do
41 42/10 Pipe culvert 1R x 0.90mts dia do No do -- -- -- -- -- --
42 42/10 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
43 43/10 RCC 1.00 V x 1.20m Span do No do -- -- -- -- -- --
44 44/2 RCC 1.00 V x 1.25m Span do No do -- -- -- -- -- --
45 44/4 RCC 1.00 V x 1.20m Span do No do -- -- -- -- -- --
46 44/6 RCC 1.00 V x 1.20m Span do No do -- -- -- -- -- --
47 44/8 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
48 45/8 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
49 46/2 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
50 46/6 Pipe culvert 1R x 0.90mts dia do No do -- -- -- -- -- --
51 46/10 Pipe culvert 1R x 0.90mts dia do No do -- -- -- -- -- --
52 47/0 Pipe culvert 1R x 0.90mts dia do No do -- -- -- -- -- --
PENUKONDA - MUDIGUBBA ROAD FROM KM. 7/0 TO 55/0

1 7/4 Pipe culvert 1R x1.00m dia 11-01-2018. No do -- -- -- -- -- --


2 7/10 RCC 2.00 V x 2.50m Span do No do -- -- -- -- -- --
3 8/2 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
4 8/4 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
5 8/8 Pipe culvert 2R x1.00m dia do No do -- -- -- -- -- New
6 9/2 RCC 1.00 V x 1.20m Span do No do -- -- -- -- -- --
7 9/6 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
8 10/4 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
9 10/6 RCC 1.00 V x 1.60m Span do No do -- -- -- -- -- --
6.00 V x 1.60m Span,
10 11/4 RCC do No do -- -- -- -- -- --
Bearings
11 12/6 RCC 1.00 V x 1.60m Span do No do -- -- -- -- -- --
12 13/4 RCC+Road dam 1.00 V x 1.50m Span do No do -- -- -- -- -- --

13/4 Pipe culvert 1R x1.00m dia do do New


13 13/6 Pipe culvert 2R x1.00m dia do No do -- -- -- -- -- New
14 14/6 RCC 1.00 V x 1.80m Span do No do -- -- -- -- -- --
15 14/10 RCC 2.00 V x 1.50m Span do No do -- -- -- -- -- --
16 15/6 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
17 15/8 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
18 15/10 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
19 16/2 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
20 17/2 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
21 17/4 RCC 1.00 V x 1.20m Span do No do -- -- -- -- -- --
22 17/10 RCC 1.00 V x 1.20m Span do No do -- -- -- -- -- --
23 18/6 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New

24 18/6 RCC+Road dam 1.00 V x 1.50m Span do No do -- -- -- -- -- --

25 18/6 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New


26 19/2 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
27 19/6 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
28 19/6 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
29 19/8 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
30 20/2 RCC 1.00 V x 1.95m Span do No do -- -- -- -- -- --
31 20/6 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
32 20/6 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New
33 20/8 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- New

34 22/2 RCC+Road dam 12 V x 3.05m Span do No do -- -- -- -- -- --

35 22/4 CSS Culvert 1.00 V x 0.60m Span do No do -- -- -- -- -- --

36 22/4 RCC 2.00 V x 0.90m Span do No do -- -- -- -- -- --

37 22/4 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

38 22/8 Pipe culvert 1R x1.00m dia do No do -- -- -- -- -- --

39 25/8 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

40 26/2 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

41 26/8 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

42 26/8 RCC 12 V x 3.05m Span do No do -- -- -- -- -- --

43 27/2 Pipe culvert 3.00R x 1.00m dia do No do -- -- -- -- -- --

44 27/4 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --

45 27/10 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --

46 27/10 Pipe culvert 1.00 R x 0.80m dia do No do -- -- -- -- -- --

47 28/10 RCC 3.00 V x 2.30m Span do No do -- -- -- -- -- --

48 29/10 Pipe culvert 1.00 R x 0.90m dia do No do -- -- -- -- -- --

49 31/8 RCC 1.00 V x 1.55m Span do No do -- -- -- -- -- --

50 32/2 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

51 32/10 Pipe culvert 1.00R x 0.90m dia do No do -- -- -- -- -- --


52 32/10 Pipe culvert 1.00R x 0.90m dia do No do -- -- -- -- -- --

53 33/8 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --


54 33/10 RCC 1.00 V x 1.55m Span do No do -- -- -- -- -- --

55 34/2 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --


56 34/10 Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --
57 34/4 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
58 35/10 Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --
59 36/4 Pipe culvert 2R x 0.90m dia do No do -- -- -- -- -- --
60 36/6 Pipe culvert 1R x 0.90m dia do No do -- -- -- -- -- --
61 36/8 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
62 37/2 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
63 37/4 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
64 37/6 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
65 38/2 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
66 38/2 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
67 38/4 RCC 2.00 V x 1.95m Span do No do -- -- -- -- -- --
68 39/8 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --
69 40/4 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --
70 40/8 Pipe culvert 1R x 0.90m dia do No do -- -- -- -- -- --
71 41/10 RCC 2.00 V x 1.50m Span do No do -- -- -- -- -- --
72 42/4 RCC 1.00 V x 1.95m Span do No do -- -- -- -- -- --
73 43/8 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --
74 43/10 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --
75 43/10 RCC 1.00 V x 4.00m Span do No do -- -- -- -- -- --
76 43/10 Pipe culvert 2R x 0.90m dia do No do -- -- -- -- -- --
77 44/4 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --
78 44/6 Pipe culvert 5R x 0.90m dia do No do -- -- -- -- -- --
79 45/2 Pipe culvert 2R x 0.90m dia do No do -- -- -- -- -- --
80 45/4 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --
81 46/2 Pipe culvert 2R x 0.90m dia do No do -- -- -- -- -- --
82 46/4 RCC 1.00 V x 1.95m Span do No do -- -- -- -- -- --
83 46/6 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --
84 46/8 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --
85 47/2 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
86 47/4 Pipe culvert 1R x 0.75m dia do No do -- -- -- -- -- --
87 50/8 RCC 3.00 V x 1.80m Span do No do -- -- -- -- -- --
88 50/8 RCC+Road dam 3 V x 2.40m Span do No do -- -- -- -- -- --
89 50/8 Pipe culvert 3.00R x 1.20m dia do No do -- -- -- -- -- --
90 52/4 Pipe culvert 1.00R x 1.00m dia do No do -- -- -- -- -- --
91 52/6 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
92 54/4 RCC 4.00 V x 1.50m Span do No do -- -- -- -- -- --
93 54/6 Pipe culvert 1R x 0.90m dia do No do -- -- -- -- -- --
MAMILLAKUNTA - PUTTAPARTHY ROAD FROM KM.0/0- 8/350

1 0/4 RCC+CSSC 1.00 V x 0.85m Span 12/1/2018 No do -- -- -- -- -- --


Pipe culvert
2 0/6 2.00 x 0.60m dia do No do -- -- -- -- -- --
+Road dam
3 0/6 RCC+CSSC 1.00 V x 0.90m Span do No do -- -- -- -- -- --

Pipe culvert
4 0/8 3.00 x 0.90m dia do No do -- -- -- -- -- --
+Road dam

5 1/4 RCC+CSSC 1.00 V x 1.45m Span do No do -- -- -- -- -- --

6 1/10 RCC 3.00 V x 1.50m Span do No do -- -- -- -- -- --


Pipe culvert
7 2/2 7.00 x 1.00m dia do No do -- -- -- -- -- --
+Road dam
8 2/6 RCC 1.00 V x 1.90m Span do No do -- -- -- -- -- --

9 2/10 Pipe culvert 2.00 x 1.00m dia do No do -- -- -- -- -- --

10 3/2 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

11 3/4 Pipe culvert 3.00 x 1.00m dia do No do -- -- -- -- -- --

12 3/6 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

13 3/8 Pipe culvert 3.00 x 0.90m dia do do

14 4/2 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

15 4/2 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

16 4/2 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

17 4/4 Pipe culvert 1.00 x 0.90m dia do No do -- -- -- -- -- --

18 4/6 Pipe culvert 4.00 x 1.00m dia do No do -- -- -- -- -- --

19 4/6 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

20 4/6 Pipe culvert 1.00 x 0.60m dia do No do -- -- -- -- -- --

21 4/6 Pipe culvert 4.00 x 1.00m dia do No do -- -- -- -- -- --

22 4/6 Pipe culvert 2.00 x 1.00m dia do No do -- -- -- -- -- --

23 4/8 Pipe culvert 2.00 x 1.00m dia do No do -- -- -- -- -- --


24 4/10 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

25 5/2 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

26 5/2 Pipe culvert 2.00 x 1.00m dia do No do -- -- -- -- -- --

27 5/4 Pipe culvert 3.00 x 1.00m dia do No do -- -- -- -- -- --

28 5/4 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

29 5/6 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

30 5/6 Pipe culvert 3.00 x 1.00m dia do No do -- -- -- -- -- --

31 5/8 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

32 5/8 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

33 5/8 Pipe culvert 1.00 x 1.00m dia do No do -- -- -- -- -- --

34 7/2 Pipe culvert 1.00 x 0.60m dia do No do -- -- -- -- -- --

35 7/2 Pipe culvert 1.00 x 0.60m dia do No do -- -- -- -- -- --

36 7/4 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

37 8/2 Pipe culvert 1.00 x 0.60m dia do No do -- -- -- -- -- --

RING ROAD ( MAMILLAKUNTA -PUTTAPARTHY ) ROAD FROM KM.2/1- 5/0

1 0/2 Pipe culvert IR x 1.00m dia 12/1/2018 No do -- -- -- -- -- --

2 0/6 Pipe culvert IR x 1.00m dia do No do -- -- -- -- -- --

3 0/8 Pipe culvert IR x 1.00m dia do No do -- -- -- -- -- --

4 1/2. RCC 1.00 V x 6.00m Span do No do -- -- -- -- -- --

5 1/4 Pipe culvert IR x 1.00m dia do No do -- -- -- -- -- --

6 1/6 Pipe culvert 3R x 1.00m dia do No do -- -- -- -- -- --

7 1/8 Pipe culvert IR x 1.00m dia do No do -- -- -- -- -- --


8 2/2 Pipe culvert IR x 1.00m dia do No do -- -- -- -- -- --
9 2/2 Pipe culvert 3R x 1.00m dia do No do -- -- -- -- -- --
10 2/4 Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --
11 2/6 Pipe culvert IR x 1.00m dia do No do -- -- -- -- -- --
PUTTAPARTHY DIVERSION ROAD FROM KM.0/0- 4/9
1 0/6 Pipe culvert 3R x 1.00m dia 12/1/2018 No do -- -- -- -- -- --
2 0/8 Pipe culvert 3R x 1.00m dia do No do -- -- -- -- -- --
3 2/10. RCC 1.00 V x 1.75m Span do No do -- -- -- -- -- --
4 3/4 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --
5 4/4 CSSC 1.00 V x 0.90m Span do No do -- -- -- -- -- --
6 4/4 CSSC 2.00 V x 1.20m Span do No do -- -- -- -- -- --
7 4/8 Pipe culvert 1.00 x 0.60m dia do No do -- -- -- -- -- --

PAMUDURTHY - KRISHNAPURAM ROAD FROM KM.0/0- 13/0

1 0/4 RCC+Road dam 3.00 x 2.80m dia 13/1/2018 No do -- -- -- -- -- --

2 0/4 Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --

3 0/6 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --

4 1/2 Pipe culvert 4R x 0.80m dia do No do -- -- -- -- -- --

5 1/8 Pipe culvert 3R x 0.80m dia do No do -- -- -- -- -- --

6 2/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

7 2/10 Pipe culvert 1.00 V x 1.95m Span do No do -- -- -- -- -- --

8 3/6 Pipe culvert 2R x 1.20m dia do No do -- -- -- -- -- --

9 3/6 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --

10 4/4 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

11 4/8 RCC 1.00 V x 1.00m Span do No do -- -- -- -- -- --

12 5/2 Pipe culvert 1R x 1.20m dia do No do -- -- -- -- -- --

13 5/10 Pipe culvert 1R x 1.20m dia do No do -- -- -- -- -- --

14 7/4 CSSC 1.00 V x 0.60m Span do No do -- -- -- -- -- --

15 7/4 RCC+Road dam 4.00 x 1.20m dia do No do -- -- -- -- -- --

16 8/8 CSS+Road dam 2.00 x 1.20m dia do No do -- -- -- -- -- --


17 8/8 CSSC 1.00 V x 0.60m Span do No do -- -- -- -- -- --

18 9/6 Pipe culvert 3R x 0.60m dia do No do -- -- -- -- -- --

19 9/10 Pipe culvert 3R x 0.60m dia do No do -- -- -- -- -- --

20 9/10 Pipe culvert 1R x 1.20m dia do No do -- -- -- -- -- --

21 10/10 Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --

22 11/6 CSSC 1.00 V x 1.05m Span do No do -- -- -- -- -- --

23 12/2 CSSC 1.00 V x 0.50m Span do No do -- -- -- -- -- --

24 12/2 Pipe culvert 3R x 1.00m dia do No do -- -- -- -- -- --

25 12/10 RCC 4.00 V x 1.65m Span do No do -- -- -- -- -- --


ANNUAL INSPECTION REPORT ON THE CONDITION OF THE BRIDGES/CULVERTS AND CAUSE WAYS (0.600M)
Arrangements of bearings Painting of Steel work
Are there
Name of the If so what
year and any cracks
road and Description of No. of spans and size of steps are taken When Kind of Kind of When
Sl.No. date of or any When last
situation of Type spans or Proposed to Type lubricate painting painting repainting
Inspection defects painted
bridge be taken up d executing executing required
noticed

1 2 3 4 5 6 7 8 9 10 11 12 13
BUKKAPATNAM - NALLAMADA ROAD FROM KM.0/0- 16/0
1 0/2 RCC 1.00 V x 1.80m Span 13/1/2018 No do -- -- -- -- -- --

2 0/6 RCC 2.00 V x 3.15m Span do No do -- -- -- -- -- --

3 1/6 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --

4 1/8 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --

5 2/2 RCC 2.00 V x 4.00m Span do No do -- -- -- -- -- --

6 2/4 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

7 2/4 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

8 2/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

9 2/10 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

10 3/6 RCC 1.00 V x 2.90m Span do No do -- -- -- -- -- --

11 4/4 Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --

12 4/8 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

13 4/8 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

14 4/10 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

15 5/2 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

16 5/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

17 5/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

18 5/8 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --


19 6/2 Pipe culvert 3R x 0.80m dia do No do -- -- -- -- -- --

20 6/4 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

21 6/6 RCC 1.00 V x 4.00m Span do No do -- -- -- -- -- --

22 6/8 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

23 6/8 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --

24 6/10 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

25 7/2 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

26 7/2 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

27 7/4 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

28 7/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

29 7/10 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

30 7/10 RCC 1.00 V x 1.60m Span do No do -- -- -- -- -- --

31 8/6 RCC 2.00 V x 3.95m Span do No do -- -- -- -- -- --

32 9/6 RCC 1.00 V x 1.10m Span do No do -- -- -- -- -- --


33 9/6 RCC 1.00 V x 1.10m Span do No do -- -- -- -- -- --

34 9/8 RCC 1.00 V x 1.40m Span do No do -- -- -- -- -- --

35 10/2 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

36 10/4 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

37 10/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

38 10/10 RCC 2.00 V x 1.60m Span do No do -- -- -- -- -- --

39 11/4 RCC 1.00 V x 1.50m Span do No do -- -- -- -- -- --

40 11/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

41 11/10 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

42 12/4 RCC+Road dam 2.00 V x 3.00m Span do No do -- -- -- -- -- --

43 12/8 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

44 12/8 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

45 12/10 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

46 13/2 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

47 13/6 Road dam 2R x 0.80m dia do No do -- -- -- -- -- --

48 13/10 RCC 1.00 V x 2.00m Span do No do -- -- -- -- -- --

49 14/2 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

50 14/4 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

51 14/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

52 14/8 RCC 2.00 V x 1.50m Span do No do -- -- -- -- -- --

53 15/10 RCC 2.00 V x 1.80m Span do No do -- -- -- -- -- --

54 15/10 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

55 15/10 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --


BUKKAPATNAM -VELDURTHY ROAD FROM KM.0/0- 10/0
1 0/4 RCC 2.00 V x 1.00m Span 13/1/2018 No do -- -- -- -- -- --
2 3/6 RCC 1.00 V x 5.30m Span do No do -- -- -- -- -- --
3 5/6 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
4 5/6 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
5 5/10 Pipe culvert 1R x 0.60m dia do No do -- -- -- -- -- --
6 9/8 RCC 3.00 V x 1.00m Span do No do -- -- -- -- -- --
KOTHACHERUVU - TALAMARLA ROAD FROM KM.0/0- 8/0
1 0/2 Pipe culvert 1R x 0.90m dia 14/1/2018 No do -- -- -- -- -- --
2 0/4 RCC 1.00 V x 1.20m Span do No do -- -- -- -- -- --

3 0/8 Pipe culvert 1R x 0.90m dia do No do -- -- -- -- -- --

4 1/8 RCC 1.00 V x 2.10m Span do No do -- -- -- -- -- --

5 2/8 Pipe culvert 1R x 0.90m dia do No do -- -- -- -- -- --

6 2/10 RCC 3.00 V x 2.10m Span do No do -- -- -- -- -- --

7 3/2 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

8 3/2 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

9 3/6 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

10 3/8 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

11 4/2 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

12 4/10 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

13 4/10 RCC 3.00 V x 2.10m Span do No do -- -- -- -- -- --

14 5/2 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

15 5/4 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

16 5/8 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

17 6/2 RCC 2R x 0.80m dia do No do -- -- -- -- -- --

Pipe culvert 4R x 0.80m dia do No do -- -- -- -- -- --


18 6/4 RCC 2.00 V x 1.35m Span do No do -- -- -- -- -- --

19 7/2 Pipe culvert 2R x 0.80m dia do No do -- -- -- -- -- --

20 7/4 Pipe culvert 1R x 0.80m dia do No do -- -- -- -- -- --

21 7/4 Pipe culvert 2R x 1.10m dia do No do -- -- -- -- -- --

BUKKAPATNAM -BY PASS ROAD FROM KM.25/0- 27/2


1 25/8 Pipe culvert 2R x 1.00m dia 14/1/2018 No do -- -- -- -- -- --

2 26/4 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --

3 26/6 CSSC 2.00 V x 1.10m Span do No do -- -- -- -- -- --

TALAMARLA -DANTHALAPALLI (VIA) INDLAVENKATAMPALLI ROAD FROM KM.0/0- 4/0


1 0/8 Pipe culvert 1R x 1.00m dia 14/1/2018 No do -- -- -- -- -- --
2 1/4 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --
3 1/8 Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --
1 1/10. Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --
2 2/8 Pipe culvert 1R x 1.00m dia do No do -- -- -- -- -- --
3 3/8 Pipe culvert 2R x 1.00m dia do No do -- -- -- -- -- --
Road Renewal charts
Carriage
Year of way Type of
SI.No KM Renewal width Surface Nature of soils Villages

KODURU-DHARMAVARAM ROAD IN KM.0/0 TO 63/905


22/0-8 2014-15 7.00 B.T RED SOILS Pedaballi

22/8-10 2014-15 7.00 B.T RED SOILS

23/0-10 2014-15 7.00 B.T RED SOILS

24/0-100 2012-13 7.00 B.T RED SOILS K.M 24/8 Bathalapalli

24/100-25/0 2012-13 7.00 B.T RED SOILS


25/0-10 2012-13 7.00 B.T RED SOILS
25/0-540 2012-13 7.00 B.T RED SOILS
25/540-26/0 2014-15 7.00 B.T RED SOILS

26/0-500 2014-15 7.00 B.T RED SOILS

26/5-10 2013-14 7.00 B.T RED SOILS


27/0-10 2013-14 7.00 B.T RED SOILS
28/0-850 2013-14 7.00 B.T RED SOILS
28/850-29/0 2013-14 7.00 B.T RED SOILS
29/0-10 2013-14 7.00 B.T RED SOILS
30/0-2 2013-14 7.00 B.T RED SOILS
30/2-10 2013-14 7.00 B.T RED SOILS
31/0-10 2013-14 7.00 B.T RED SOILS
32/0-10 2013-14 7.00 B.T RED SOILS
33/0-10 2013-14 7.00 B.T RED SOILS Kappalabanda
34/0-2 2005-06 7.00 B.T RED SOILS
34/200-670 2010-11 7.00 B.T RED SOILS
K.M34/6 -8
34/670-35/0 2005-06 7.00 B.T RED SOILS Mamillakunta,35/0
Ptp railway station
35/0-10 2005-06 7.00 B.T RED SOILS
36/0-4 2005-06 7.00 B.T RED SOILS
36/4-37/2 2010-11 7.00 B.T RED SOILS
37/2-38/0 2014-15 7.00 B.T RED SOILS
38/0-38/4 2014-15 7.00 B.T RED SOILS
38/4-530 2005-06 7.00 B.T RED SOILS Kothacheruvu
38/530-39/900 2010-11 7.00 B.T RED SOILS
39/900-40/0 2014-15 7.00 B.T RED SOILS
40/0-10 2014-15 7.00 B.T RED SOILS
41/0-100 2014-15 7.00 B.T RED SOILS
41/100-42/4 2007-08 7.00 B.T RED SOILS
42/4-10 2014-15 7.00 B.T RED SOILS
43/0-10 2014-15 7.00 B.T RED SOILS 43/2 mailepalli
44/0-44/630 2014-15 7.00 B.T RED SOILS 44/6 Kodapaganipalli
44/630-910 2007-08 7.00 C.C RED SOILS
44/910-45/0 2014-15 7.00 B.T RED SOILS
45/0-200 2014-15 7.00 B.T RED SOILS
45/2-10 2008-09 7.00 B.T RED SOILS
46/0-10 2007-08 7.00 B.T RED SOILS
MAMILLAKUNTA-PUTTAPARTHY ROAD 0/0 to 8/350 (MDR)

0/0 0/10 2015-16 2X7.50 BT RED SOILS Mamillakunta

1/0. 2/0. 2015-16 2X7.50 BT RED SOILS

2/0. 2/1. 2015-16 2x7.50 BT RED SOILS SSS.HOSPITAL


Prasanthi gram& Air
2/1. 2/6. 2010-11 7.00 BT CHWODY SOIL
port
2/6 . 3/0. 2010-11 7.00 BT CHWODY SOIL

3/0. 4/0. 2010-11 7.00 BT RED SOILS

4/0. 4/6. 2010-11 7.00 BT RED SOILS

4/6. 6/0. 2015-16 2X7.50 BT RED SOILS

6/0. 6/6. 2015-16 2X7.50 BT RED SOILS

6/6. 7/2. 2015-16 7.00 BT RED SOILS

7/2. 7/6. 2015-16 7.00 BT RED SOILS

7/6. 8/350 2005-06 7.00 C.C RED SOILS

Puttaparthy Diversion road K.M 0/0 to 4/9 (M.D.R)

0/0 0/275 2013-14 7.00 BT RED SOILS Prasanthi gram

0/275 1/700 2013-14 7.00 BT RED SOILS

1/700 4/1. 2013-14 5.50 BT RED SOILS 2/6 Brahmanapalli

4/1. 4/9. 2013-14 7.00 BT RED SOILS 4/7-9 Yenumalapalli

Penukonda-Mudigubba road K.M 7/0 to 55/0 (M.D.R)

7/0. 8/0. 2017-18 6.70 BT

8/0. 9/0. 2017-18 7.00 BT

9/0. 10/0. 2017-18 7.00 BT


11/940
10/0. 2017-18 7.00 BT 11/2-4 Bandlapalli
.
11/940
10/0. 2017-18 7.00 BT
.
12/136 11/940-12/200
11/940. 2017-18 7.00 CC
. Appalavandla Palli

12/136. 12/6. 2017-18 7.00 BT

12/6. 13/0. 2017-18 7.00 BT

13/0. 14/0. 2017-18 7.00 B.T 13/2 Byrapuram

14/0. 15/0. 2017-18 7.00 B.T

15/0. 16/0. 2017-18 7.00 B.T

16/0 17/0 2017-18 7.00 B.T 16/0-17/4 Locherla

17/0 17/356 2009-10 7.00 C.C


17/356 17/8 2017-18 6.7 B.T

17/8 19/0 2017-18 6.7 B.T

19/0 20/0 2017-18 6.7 B.T

20/0 20/062 2017-18 6.7 B.T

20/062 20/152 2017-18 6.7 B.T

20/152 20/400 2017-18 6.7 B.T Kotchacheruvu

20/400 20/700 2017-18 6.7 B.T

20/700 21/0 2009-10 7.00 CC

21/0 21/129 2009-10 7.00 CC

21/129 21/387 2009-10 7.00 C.C


P.M ROAD &K.D
21/387 21/473 2009-10 10.00 C.C
ROAD Junction piont
21/473 21/686 2009-10 14.00 C.C

21/686 22/0 2009-10 7.00 C.C

22/0 22/6 2004-05 5.5 B.T

22/6 23/2. 2011-12 5.5 B.T

23/2 25/300 2015-16 7.00 B.T

25/300 26/0 2015-16 7.00 CC

25/600 26/0 2015-16 7.00 B.T Bukkapatnam

26/0 28/0 2015-16 7.00 B.T


28/10&29/2
28/0 29/0 2015-16 3.66 B.T
Buchaiahgaripalli
29/10 =0/0 of
29/0 30/0 2015-16 3.66 B.T Bukkapatnam-
Veldurthi Road

30/0 31/0 2015-16 3.66 B.T

31/0 32/0 2015-16 3.66 B.T

32/0 33/0 2015-16 3.66 B.T

33/0 33/6 2015-16 3.66 B.T

33/6 35/0 2015-16 3.66 B.T

35/0 36/0 2015-16 3.66 B.T

36/0 37/0 2013-14 3.66 B.T


37/0-6
37/0 38/0 2013-14 3.66 B.T
Chandrayunipalli
38/0 38/5 2013-14 3.66 B.T
38/8 to 39/2
38/5 39/0 2013-14 3.66 B.T
Siddarampuram
39/0 40/0 2015-16 3.66 B.T B.C.Soils

40/0 40/370 2013-14 3.66 B.T B.C.Soils

40/370 41/0 2013-14 3.66 B.T B.C.Soils 40/8 to 41/2 Gunipalli

41/0 41/550 2013-14 3.66 B.T B.C.Soils

41/550 42/0 2013-14 3.66 B.T B.C.Soils

42/0 43/0 2015-16 3.66 B.T B.C.Soils

43/0 44/0 2015-16 3.66 B.T Gravelly Soils

44/0 45/0 2015-16 3.66 B.T Gravelly Soils 44/4-8 Rasimpalli

45/0 46/0 2015-16 3.66 B.T Gravelly Soils

46/0 47/0 2015-16 3.66 B.T Gravelly Soils

47/0 48/0 2015-16 3.66 B.T Gravelly Soils

48/2 Guruguthanda
48/0 48/8 2015-16 3.66 B.T Gravelly Soils
Km.2/0 of P-K Road

48/8 49/0 2015-16 3.66 B.T Gravelly Soils

49/0 50/0 2015-16 3.66 B.T Gravelly Soils

50/0 51/0 2015-16 3.66 B.T Gravelly Soils

51/0 52/0 2015-16 3.66 B.T Red Earth

52/0 53/0 2013-14 3.66 B.T Red Earth

53/0 54/0 2013-14 3.66 B.T Red Earth

54/0 54/10 2013-14 3.66 B.T Red Earth

Bukkapatnam By-pass road K.M 25/2 to 27/2

25/2. 25/6. 2016-17 7.00 B.T Bukkapatnam.

25/6. 26/7. 2016-17 7.00 C.C Bukkapatnam.

26/7. 27/0. 2016-17 7.00 B.T


Pamudurthy-Krishnapuram Road Km. 0/0 to 13/0

0/0 1/0. 2013-14 3.66 B.T B.C.Soils 0/0-6 Pamuduthy.

1/0. 2/0. 2013-14 3.66 B.T B.C.Soils

2/0. 2/2. 2013-14 3.66 B.T Red Earth

2/2. 2/4. 2013-14 3.66 B.T Red Earth 2/2. Arunagiri.

2/4. 2/10. 2013-14 3.66 B.T Red Earth

3/0. 4/0. 2013-14 3.66 B.T Red Earth

4/0. 5/0. 2013-14 3.66 B.T Red Earth

5/0. 6/0. 2013-14 3.66 B.T Red Earth

6/0. 7/0. 2013-14 3.66 B.T Red Earth

7/0. 7/4. 2013-14 3.66 B.T Red Earth

7/4. 8/0. 2013-14 3.66 B.T Red Earth Marala.

8/0. 9/0. 2013-14 3.66 B.T Red Earth

9/0. 10/0. 2013-14 3.66 B.T Red Earth

10/0. 10/4. 2013-14 3.66 B.T Red Earth

10/4. 11/0. 2013-14 3.66 B.T Red Earth

11/0. 12/0. 2013-14 3.66 B.T Red Earth

12/0. 12/10. 2013-14 3.66 B.T Red Earth Krishnapuram.

Kotchacheruvu-Talamarla Road Km.0/0 to 8/0

0/0. 1/0. 2013-14 3.66 B.T Red Earth

1/0. 2/0. 2013-14 3.66 B.T Red Earth

2/0. 2/8. 2013-14 3.66 B.T Red Earth

2/8. 3/0. 2013-14 3.66 B.T Red Earth

3/0. 3/9. 2013-14 3.66 B.T Red Earth

3/9. 4/0. 2003-04 3.75 C.C.Road Red Earth marakuntapalli

4/0. 4/100 2003-04 3.75 C.C.Road Red Earth

4/100 5/0. 2013-14 3.66 B.T Red Earth

5/0. 6/0. 2013-14 3.66 B.T Chowdy Soil

6/0. 7/0. 2013-14 3.66 B.T Red Earth

7/0. 7/4. 2013-14 3.66 B.T B.C.Soils

7/4. 7/10. 2003-04 3.75 C.C.Road B.C.Soils Talamarla


Bukkapatnam-Nallamada Road Km.0/0 to 16/0

0/0. 1/0. 2012-13 7.00 B.T 0/10. Janakampalli.

1/0. 2/0. 2012-13 7.00 B.T

2/0. 3/0. 2012-13 7.00 B.T

3/0. 3/772. 2012-13 7.00 B.T

3/772. 3/929. 2012-14 7.00 C.C


3/10. Karnataka
3/929. 4/0. 2012-13 7.00 B.T
Nagepalli
4/0. 5/0. 2012-13 7.00 B.T
5/0. 6/0. 2012-13 7.00 B.T
6/0. 7/0. 2012-13 7.00 B.T
7/0. 8/0. 2012-13 7.00 B.T
8/0. 8/656. 2012-13 7.00 B.T Ghat Road
8/656 9/750. 2012-14 7.00 C.C

9/750. 10/0. 2012-13 7.00 B.T Vengalammacheruvu

10/0. 11/0. 2012-13 7.00 B.T


11/0. 12/0. 2012-13 7.00 B.T
12/0. 13/0. 2012-13 7.00 B.T
13/0 14/0. 2012-13 7.00 B.T
15/260
14/0. 2012-13 7.00 B.T
.
15/420
15/260. 2012-13 7.00 C.C
.
15/0-4
15/420. 16/0. 2012-13 7.00 B.T
Kambalaparthi.

Bukkapatnam-Veldurthy road Km.0/0 to 11/340.

0/0. 1/0. 2013-14 3.66 B.T


1/0. 2/0. 2013-14 3.75 B.T
2/0. 3/0. 2013-14 3.75 B.T
3/0. 4/0. 2013-14 3.75 B.T
4/0. 5/0. 2013-14 3.75 B.T
5/0. 6/0. 2013-14 3.75 B.T
6/0. 6/050 2013-14 3.75 B.T
6/050 6/500 2004-05 3.75 C.C.Road Mylasamudram
6/500 7/0. 2013-14 3.75 B.T
7/0. 7/500 2004-05 3.75 C.C.Road Kesapuram
7/500 7/800 2013-14 3.75 B.T
7/800 8/0. 2013-14 3.75 B.T
8/0. 9/0. 2013-14 3.75 B.T
9/0. 10/0. 2013-14 3.75 B.T
10/0. 11/340 2013-14 3.75 B.T
Talamarla -Dantlapalli (via) Indlavenkatampalli Road Km.0/0 to 4/0

0/0 2/770. 2014-15 3.75 BT Red Earth

2/770. 3/110. 2014-15 3.75 CC Red Earth Dantlapalli

3/110. 3/460. 2014-15 3.75 BT Red Earth

3/460. 3/540. 2014-15 3.75 CC Red Earth Indlavenkatampalli

3/540. 3/875. 2014-15 3.75 BT Red Earth

Indlavenkatampalli -Vemuletipalli Road Km.0/0 to 1/4

0/0 1/0. 2007-08 3.75 BT Red Earth Indlavenkatampalli

1/0. 1/4. -- 3.75 Earthen Red Earth Vemulatipalli


1

1
S.NO.
Particulars of Property Description

2
Section office
which det every detailed structure

Year of construction purcheses or

3
trafer to and from the Dept
Station of locality :-

Cost of the site (site plan indicating

4
Govrnment land
the area of the site appended)

Original cost of the

5
7.00 Lakhs
building

Subsequent additions

_
6
or reductions with
PUTTAPARTHY

amount & year


Record value

7
Progressive Total

Constructed or
8
Constructed
purched
witch
Mandal :-

Roads & Buildings Constructed or


9

Department purched
Founds from
Name of the Department Holding Administrative charge of Building :-

10

Section office Maintained


11

Section office Original


Objective of
construction
REGISTER OF BUILDINGS
PUTTAPARTHY

How used From time


12

to time
rent
Assed

13

Under F. R. 45 B,
standerd

R.R.Masonary
14

Foundations

Brick Masnary in CM
15

walls

R.C.C.(1:2:4)
16

Roof
ROADS & BUILDINGS.

Palished vetrified tiles over


17

Floor
c.c.bed
Division : Dharmavaram

Nature of building

18

one Number of stores

Superfical plinth area including


19

65.90 Sqm
varandas
20

709.08 sqm Cubical contents


21

Remarks

Signature &designation of the


22

officer
ANNUAL T&P ACCOUNT AS ON 31/09/2014 (R&B) PUTTAPARTHY SECTION
Closin
Balance Reciepts
Item g Remar
Name of Article Brought
No. Balanc ks
over Oct-13 ### Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Total Oct-13 ### Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14
e
Scientific & Mathematical Instruments.
Sokkia - C - 410 -
1 Automatic Levelling 2 -- -- -- -- -- -- -- -- -- -- -- -- 2 -- -- -- -- -- -- -- -- -- -- -- -- 2
Instrument & Tripod

Levelling Staff
2 2, (1 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 2, (1 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 2, (1 U/S)
(Alluminium) 6.0 metres.
Prismatic compass with
3 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1
stand
4 Depth Guage 1(u/s) -- -- -- -- -- -- -- -- -- -- -- -- 1(u/s) -- -- -- -- -- -- -- -- -- -- -- -- 1(u/s)
Bitumen Extractor (Hand
5 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1
Operator)
12 mm dia Alluminium sieves

6 90 mm Sieves 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1

7 45 mm Sieves 2 -- -- -- -- -- -- -- -- -- -- -- -- 2 -- -- -- -- -- -- -- -- -- -- -- -- 2

8 26.50 mm Sieves 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1

9 22.40 mm Sieves 2 -- -- -- -- -- -- -- -- -- -- -- -- 2 -- -- -- -- -- -- -- -- -- -- -- -- 2

10 13.20 mm Sieves 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1

11 11.20 mm Sieves 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1

12 12.50 mm Sieves 2 -- -- -- -- -- -- -- -- -- -- -- -- 2 -- -- -- -- -- -- -- -- -- -- -- -- 2

Electronic Weighing
13 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1
Balance .

14 Concrete Moulds 4 -- -- -- -- -- -- -- -- -- -- -- -- 4 -- -- -- -- -- -- -- -- -- -- -- -- 4

15 AI Value testing machine 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1

16 Slump cone 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1

17 TW Dinning table 2, (1 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 2, (1 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 2, (1 U/S)

TW modern size table


18 4, (2 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 4, (2 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 4, (2 U/S)
top with decolom

19 Small table 1 -- -- -- -- -- -- -- -- -- -- -- -- 1 -- -- -- -- -- -- -- -- -- -- -- -- 1

20 Plastic chairs 10 (4 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 10 (4 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 10 (4 U/S)

21 Tea pai(wooden) 4, (2 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 4, (2 U/S) -- -- -- -- -- -- -- -- -- -- -- -- 4, (2 U/S)


ANNUAL T&P ACCOUNT AS ON 30/09/2017 (R&B) PUTTAPARTHY SECTION Closin
Balance Reciepts
Item g Remar
Name of Article Brought
No. Apr-17 ### Jun-17 Jul-17 Aug-17 Sep-17 Total ### ### July-17 Aug-17 Sep-17 Total Balanc ks
over
Scientific & Mathematical Instruments. e

Sokkia - C - 410 -
1 Automatic Levelling 2 -- -- -- -- -- -- 2 -- -- -- -- -- 2
Instrument & Tripod
Levelling Staff
2 2, (1 U/S) -- -- -- -- -- -- 2, (1 U/S) -- -- -- -- -- 2, (1 U/S)
(Alluminium) 6.0 metres.
Prismatic compass with
3 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1
stand
4 Depth Guage 1(u/s) -- -- -- -- -- -- 1(u/s) -- -- -- -- -- 1(u/s)
Bitumen Extractor (Hand
5 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1
Operator)
12 mm dia Alluminium sieves
6 90 mm Sieves 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1

7 45 mm Sieves 2 -- -- -- -- -- -- 2 -- -- -- -- -- 2

8 26.50 mm Sieves 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1

9 22.40 mm Sieves 2 -- -- -- -- -- -- 2 -- -- -- -- -- 2

10 13.20 mm Sieves 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1

11 11.20 mm Sieves 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1

12 12.50 mm Sieves 2 -- -- -- -- -- -- 2 -- -- -- -- -- 2
Electronic Weighing
13 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1
Balance .
14 Concrete Moulds 4 -- -- -- -- -- -- 4 -- -- -- -- -- 4

15 AI Value testing machine 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1

16 Slump cone 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1

17 TW Dinning table 2, (1 U/S) -- -- -- -- -- -- 2, (1 U/S) -- -- -- -- -- 2, (1 U/S)

TW modern size table


18 4, (2 U/S) -- -- -- -- -- -- 4, (2 U/S) -- -- -- -- -- 4, (2 U/S)
top with decolom

19 Small table 1 -- -- -- -- -- -- 1 -- -- -- -- -- 1

20 Plastic chairs 10 (4 U/S) -- -- -- -- -- -- 10 (4 U/S) -- -- -- -- -- 10 (4 U/S)

21 Tea pai(wooden) 4, (2 U/S) -- -- -- -- -- -- 4, (2 U/S) -- -- -- -- -- 4, (2 U/S)


MINOR 7F ACCOUNT
Division Dharmavaram Month : April 2016
Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil

MINOR 7F ACCOUNT
Division Dharmavaram Month : May 2016
Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Issues
Name of Opening Closing
S.No. Remarks
Article Balance Total Balance
Qty Ref Qty Ref Total

Transaction - Nil
MINOR 7F ACCOUNT

Division Dharmavaram Month : June 2016


Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil

MINOR 7F ACCOUNT

Division Dharmavaram Month : July 2016


Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil
Transaction - Nil

MINOR 7F ACCOUNT
Division Dharmavaram Month : August 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

MINOR 7F ACCOUNT

Division Dharmavaram Month : Sept 2016


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

MINOR 7F ACCOUNT
Division Dharmavaram Month : Oct 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

MINOR 7F ACCOUNT

Division Dharmavaram Month : Nov 2016


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

MINOR 7F ACCOUNT
Division Dharmavaram Month : Dec 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

MINOR 7F ACCOUNT

Division Dharmavaram Month : Jan 2017


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

MINOR 7F ACCOUNT
Division Dharmavaram Month : Feb 2017

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

MINOR 7F ACCOUNT

Division Dharmavaram Month : Mar 2017


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil
MAJOR 7F ACCOUNT
Division Dharmavaram Month : April 2016
Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil

MAJOR 7F ACCOUNT
Division Dharmavaram Month : May 2016
Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Issues
Name of Opening Closing
S.No. Remarks
Article Balance Total Balance
Qty Ref Qty Ref Total

Transaction - Nil
MAJOR 7F ACCOUNT

Division Dharmavaram Month : June 2016


Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil

MAJOR 7F ACCOUNT

Division Dharmavaram Month : July 2016


Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil
Transaction - Nil

MAJOR 7F ACCOUNT
Division Dharmavaram Month : August 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

MAJOR 7F ACCOUNT

Division Dharmavaram Month : Sept 2016


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

MAJOR 7F ACCOUNT
Division Dharmavaram Month : Oct 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

MAJOR 7F ACCOUNT

Division Dharmavaram Month : Nov 2016


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

MAJOR 7F ACCOUNT
Division Dharmavaram Month : Dec 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

MAJOR 7F ACCOUNT

Division Dharmavaram Month : Jan 2017


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

MAJOR 7F ACCOUNT
Division Dharmavaram Month : Feb 2017

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

MAJOR 7F ACCOUNT

Division Dharmavaram Month : Mar 2017


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil
ROAD METAL ACCOUNTT
Division Dharmavaram Month : April 2016
Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil

ROAD METAL ACCOUNTT


Division Dharmavaram Month : May 2016
Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Issues
Name of Opening Closing
S.No. Remarks
Article Balance Total Balance
Qty Ref Qty Ref Total

Transaction - Nil
ROAD METAL ACCOUNTT

Division Dharmavaram Month : June 2016


Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil

ROAD METAL ACCOUNTT

Division Dharmavaram Month : July 2016


Sub - Division Dharmavaram
Section Puttaparthy
Reciepts Total Issues
Name of Opening Closing
S.No. Remarks
Article Balance Balance
Qty Ref Qty Ref Total

Transaction - Nil
Transaction - Nil

ROAD METAL ACCOUNTT


Division Dharmavaram Month : August 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

ROAD METAL ACCOUNTT

Division Dharmavaram Month : Sept 2016


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

ROAD METAL ACCOUNTT


Division Dharmavaram Month : Oct 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

ROAD METAL ACCOUNTT

Division Dharmavaram Month : Nov 2016


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

ROAD METAL ACCOUNTT


Division Dharmavaram Month : Dec 2016

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

ROAD METAL ACCOUNTT

Division Dharmavaram Month : Jan 2017


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil

ROAD METAL ACCOUNTT


Division Dharmavaram Month : Feb 2017

Sub - Division Dharmavaram

Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil

ROAD METAL ACCOUNTT

Division Dharmavaram Month : Mar 2017


Sub - Division Dharmavaram
Section Puttaparthy
Name of Opening Reciepts Total Issues Closing
S.No. Remarks
Article Balance Qty Ref Qty Ref Total Balance

Transaction - Nil
Transaction - Nil
SECTION OFFICE MEASUREMENTS
HALL 8.750 3.450 30.188
OFFICE ROOM1 4.600 3.250 14.950
OFFICE ROOM2 4.600 3.250 14.950
BATH ROOM 2.500 1.600 4.000
BATH ROOM 2.650 2.200 5.830
69.918 752.3123
Minor Bridges span 6mt to 30v mt s Major Bridges span 30mts and above Culverts span upto 6mts

S.No Classification Below Below


of road Below standard standard standard standard standard
standard standard standard standard standard
standard single Double single single lane Double lane
Multilane single Double lane Multilane single lane <
single lane lane lane lane 3.75 mts 7.50 mts
lane 3.75 mts
1 2 3 4 5 6 7 8 9 10

State Highways (R&B) Section, Puttaparthy

Koduru
-Dharmavaram
1 road 0/0 to
63/905
Total 1 0
Major District roads

Penukonda 1No (6
-Mudigubba Vents of
1 road from km
68
14.50 mt.
7/0 to 55/0 Span)
Puttaparthy
Diversion road
2 from km 0/0 to
3
4/9
Pamdurthy -
Krishnapuram
3 road from km.
25
0/0 - 13/0

Mamillakunta
-Puttaparthy
4 road from km.
0/0 - 8/350
Bukkapatnam
Bypass road
5 from km. 25/0 -
3
27/2
Total 1 99
Z.P Taken over roads
Bukkapatnam
-Nallamada
1 road from km.
50
0/0 - 16/0
Bukkapatnam
-Veldurthy
2 road from km.
7
0/0 - 11/340
Kothacheruvu
-Talamarla
3 road from km.
21
0/0 - 8/0
Total 1 78
6mts

standard
Multilane >
7.50 mts

11

106

106

19

37

60
0
Statement Showing the names of villages/Towns connected by each road

Section : Puttaparthy
Chainag
S.No. Name of the Road Location of villages
e
From To
km. 22/0-4 Pedaballi
km. 24/8 Bathalapalli
km. 33/2-4 Kappalabanda

Kodur - Dharmavaram km. 34/6-8 Mamillakunta


1 22.00 47.00
Road km. 35/0 Puttaparthy Railway station
km.38/0-10 Kothacheruvu
km. 43/2 mailepalli
km. 44/6 Kadapaganlapalli
km. 0/0 Mamillakunta

Mamillakunta - km. 2/0-1 SSS Hospital


2 0.00 8.350
Puttaparthy road km.2/2-6 Prasanthi gram & Airport

km. 6/6-8/305 Puttaparthy Town

km.0/0 Prasanthi gram


Puttaparthy Diversion
3 0.00 4.900 km. 2/6 Brahmanapalli
road
km. 4/7-9 Yenumulapalli

km. 11/2-4 Bandlapalli

km.12/4 Appalavandla Palli

km.13/2 Byrapuram

km. 16/4-17/2 Lotcherla

km.20/0-22/2 Kothacheruvu

Penukonda - Mudigubba km.25/2 - 27/0 Bukkapatnam


4 7.00 55.00
road km. 29/0-2 Buchaiahgaripalli

km.37/0-6 Chandrayunipalli

km. 38/8-39/2 Siddarampuram

km. 40/8-41/2 Gunipalli

km. 44/4-8 Rasimpalli

km. 48/2 Guruguthanda


Bukkapatnam By-pass
5 25.00 27.000 km. 25/0-27/0 Bukkapatnam
road
km.0/0-6 Pamudurthy

Pamudurthy - km. 2/2 Arunagiri


6 0.00 13.000
Krishnapuram road km.7/4-6 Marala

km.12/2-10 Krishnapuram

Kothacheruvu - km. 3/9-4/1 Maralakuntapalli


7 0.00 8.000
Talamarla road km. 7/4-7/10 Talamarla

km. 0/2-10 Janakampalli

km. 3/10 Karnataka Nagepalli


Bukkapatnam -
8 0.00 16.000 km.9/6-10 Vengalammacheruvu
Nallamada road
km. 11/6-12/2 Cherlopalli

km. 15/0-4 Kambalaparthi

km. 6/0-5 Mylasamudram


Bukkapatnam - Veldurthy
9 0.00 10.000 km.7/0-5 Kesapuram
road
km.10/0 Veldurthy

km.0/0 - Talamarla,

Talamarla Danthalapalli km. 0/8 Narayanareddypalli


10 (via) Indlavenkatampalli 0.00 4.000
road km. 2/100 - Indlavakitampalli

km. 4/0-Danthalapalli

km. 0/0 - Indlavenkatampalli


Indlavenkatampalli -
11 0.00 1.400
Vemuletipalli
km.- 1/4 Vemuletipalli

km 6/0 settipalli

km 9/8-10 Kotlapalli
Kondampalli - Pedaballi
12 6.00 16.000
(via) Settipalli
km 13/0-2 Marlapalli

km 15/8-16/8 Marlapalli
Remarks
Road Statistics of Puttaparthy Section
Interm Interm
Four Four
ediate ediate Single Lane un- Grand
Double Lane (C.C) Double Lane B.T Lane Lane Single Lane C.C Single Lane B.T Total
Lane Lane metalled Total
C.C BT
Sl. C.C BT
Name of road Starti Endin Startin Endin Startin Endin Startin
No Starting Ending Total Starting Ending Total Starting Ending Total Total Total Total Ending Total Starting Ending Total
ng g g g g g g

km km km km km km km km km km km km km km km km km km

1 2 3 4 5 6 7 8 16 17 18 19 20 21 29 30 31 32 33 34 35 36 37 38 39 40 44 45 46 47 48
1 Kodur - 44.630 44.910 0.28 22.00 34.80 12.80 34.80 35.20 0.40 25.00
Dharmavaram road 0.28 35.20 44.63 9.43
Km.22/0 to 47/0 44.91 47.00 2.09
24.32

2 Bukkapatnam 25 27.2 2.2 2.20


Byepass road from
km.25/0 to 27/2

3 Pamdurthy 7.4 8.00 0.60 7.30 7.40 0.1 0.00 7.300 7.300 13
Krishnapuram road 0.60 8.00 13.00 5.000
km.0/0 to 13/0 12.30
4 Puttaparthy 0.00 1.70 1.70 1.70 4.10 2.40 4.90
Diversion road km. 4.10 4.90 0.80 2.40
0/0 to 4/9 2.50

5 Kothaacheruvu 3.90 4.10 0.20 0.00 3.90 3.90 8


Thalamarla road 7.40 8.00 0.60 4.10 7.40 3.30
km.0/0 to 8/0 0.80 7.20
6 Penukonda 17.00 17.356 0.356 7.00 8.00 1.00 21.387 21.686 0.299 22.00 23.60 1.60 8.00 17.00 9.00 48
Mudigubba road 21.129 21.387 0.258 17.356 21.129 3.773 0.299 1.60 28.00 55.00 27.00
km.7/0 to 55/0 21.686 22.000 0.314 4.773 36.00
25.300 26.000 0.700
1.628
7 Mamillakunta 2.10 5.00 2.90 0.00 2.10 2.10 8.35
Puttaparthy road 6.60 8.35 1.75 5.00 6.60 1.60
km.0/0 to 8/350 4.65 3.70
8 Bukkapatnam 6.05 6.50 0.45 0.00 6.05 6.05 10
Veldurthy road from 7.50 7.80 0.30 6.50 7.50 1.00
km.0/0 to 10/0 0.75 7.80 10.00 2.2
8 Bukkapatnam 3.772 3.929 0.157 0.000 3.772 9.25
3.772 16
-Nallamada road 8.656 9.750 1.094 3.929 4.727 4.727
from km.0/0 to 16/0 11.600 11.655 0.055 9.750 11.600 1.850
15.260 15.420 0.160 11.655 15.260 3.605
1.466 15.420 16.00 0.580
14.534

9 Talamarla 2.770 3.110 0.340 0.00 2.770 2.770 4


Danthalapalli via 3.460 3.540 0.080 3.110 3.460 0.350
Indlavenkatampalli 0.420 3.540 3.875 0.335
km. 0/0 to 4/0 3.455
10 Indlavenkatampalli 0.00 1.00 1.000 0.00 0.40 1.40 1.4
to Vemuletipalli 1.40
km.0/0 to 1/4

140.85