BR.16B BR.16C BR.22 BR.23 BR.24 BR.25 BR.

26
Item No. Description Unit BF-21 BF-22 BF-23 BF-24 BF-25 BF-26 BF-27 TOTAL
2.7(1) a Removal of Existing Pipe Culvert, Nominal Bore < 300mm m - - - - - - - 30.0

Removal of Existing Pipe Culvert, Nominal Bore 300mm-


2.7(1) b m - - - - - - - 570.0
500mm
2.7(1) c Removal of Existing Pipe Culvert, Nominal Bore > 500mm m - - - - - - - 3,040.0
2.7(2) a Removal of Existing Box Culvert, < 50cu.m cu.m - - - - - - - 450.0
2.7(3) a Removal of Existing Headwall of Pipe Culvert, < 50cu.m cu.m - - - - - - - 420.0

2.7(4) a Removal of Existing Headwall of Box Culvert, < 50cu.m cu.m - - - - - - - 560.0

Removal of Steel Handrail, Replacement of Existing


2.7(5) a m 25.0 - 184.0 - - - 144.0 353.0
Bridge
Removal of Concrete - Deck Slab, Replacement of
2.7(5) b1 cu.m 23.0 - 203.0 - - - 159.0 385.0
Existing Bridge
Removal of Concrete - Abutment and Pier, Replacement
2.7(5) b2 cu.m 35.0 - 129.0 73.0 - - 126.0 363.0
of Existing Bridge
Removal of Wearing Course, Replacement of Existing
2.7(5) c sq.m 193.0 - - 280.0 - - 504.0 977.0
Bridge 16B
2.7(5) d Removal of Steel Girder, Replacement of Existing Bridge ton - - 175.0 - - - 73.0 248.0

2.7(5) e Removal of Deck Beam, Replacement of Existing Bridge no. 8.0 - - 17.0 - - - 25.0

Chipping of Existing Pile Head up to River Bed,


2.7(5) f no. - - - 18.0 - - 52.0 70.0
Replacement of Existing Bridge
Chipping of Existing Column up to River Bed,
2.7(5) g no. - - 24.0 - - - - 24.0
Replacement of Existing Bridge
Removal of Existing Abutment Railing, Widening of
2.7(6) a m - - - - 13.0 16.0 - 29.0
Existing Bridge
Removal of Existing Deck Railing, Widening of Existing
2.7(6) b m - - - - 30.0 24.0 - 54.0
Bridge
2.7(6) c Removal of Wearing Course, Widening of Existing Bridge sq.m - - - - 229.0 200.0 - 429.0

Removal of Existing Grouted Riprap, Widening of Existing


2.7(6) d sq.m - - - - 180.0 126.0 - 306.0