a. Construction sequence
Stage 1: Construction of diaphragm wall, bored piles, Kingpost
Stage 2: Excavation to Ground floor (-3000)
Stage 3: Construction of Ground floor
Stage 4: Excavation to B1 floor (-2550)
Stage 5: Construction of B1 floor, install bracing system
Stage 6: Excavation to B2 floor (-3000)
Stage 7: Construction of B2 floor, install bracing system
Stage 8: Excavation to B3 floor (-2000)
Stage 9: Construction of B3 basement
Stage 10: Construction of the remaining basement
Stage 11: Construction of podiums
b. Calculation data
No Thickness c' ' Average E50 Eur
(m) (kN/m3) (kPa) (Degree) SPT (kPa) (kPa)
index
o
Layer 1 1.5 19.1 13 26 31' 6.67 3157 9471 0.35
Layer 2 6.0 19.1 13 26o31' 6.67 3157 9471 0.35
Layer 7 17.0 18 - 30o 16.44 11850 - 0.3
Layer 8 8.4 18.2 - 32o 26 18400 - 0.3
Layer 10 7 18.5 - 35o 37.67 19280 - 0.3
Layer 11 10 20 - - > 100 - 0.2
Chart 1
Sum-Msf
2
Curve 1
1.8
1.6
1.4
1.2
1
0 40 80 120 160 200