You are on page 1of 4

SITE TEST REPORT

Description: Contractor.: Record No.:

Accuracy Testing of Ibn Omairah Co. STR-4619-20


Energy Meter – Elster Contract No.: Sheet:
4400007162 1 of 4
-
A. General Data and Information

SITE CT RATIO 3600/1 A

MAKE PT RATIO 13.8/0.120 KV

MODEL ACCURACY CLASS 0.2

SERIAL NO. FEEDER GT2

B. Function Test
NO FUNCTIONS
1 Physical /Visual Inspection.
2 Electrical check.
3 Metering Minimum Current
4 Current Measurement
5 Voltage Measurement
6 POWER(MW-MVAR) Measurement
7 Accuracy Test
8 Maximum Demand

1. Mechanical Check and Visual Inspection


Item Description Remark

1 Inspect for physical damage and defects. 

2 All connection check according to the wiring diagram. 

3 Verify tightness for external wiring. 

2. Electrical Checks:
Item Description Remark

1 Wiring check as per Ref (approved) Drawing 

2 Auxiliary power supply checked for rating and polarity 

3 Test Switch checked for correct function 

3. Metering
TEST PERFORMED BY TEST WITNESSED BY DATE
NAME
SIGNATURE
TEST EQUIPMENT Calibration Due:10 MAY, Serial No:
File : 505771613.doc
SITE TEST REPORT

Description: Contractor.: Record No.:

Accuracy Testing of Ibn Omairah Co. STR-4619-20


Energy Meter – Elster Contract No.: Sheet:
4400007162 2 of 4
-
CREEP TEST

APPLIED
APPLIED VOLTAGE REMARKS
CURRENT
69.28 0.0 A No Increment In Energy Values

69.28 0.001A Minimum current value.

4- Current Measurements:

Current (A) measurement Current (A) measurement


3 ph Secondary Expected Actual
Current injected (A)
A B C A B C

0.00 0.00 0.00 0.00 0.002 K 0.002 K 0.002 K

0.25 0.9 K 0.9 K 0.9 K 0.900 K 0.900 K 0.900 K

0.50 1.8 K 1.8 K 1.8 K 1.799 K 1.800 K 1.799K

1.00 3.6 K 3.6 K 3.6 K 3.599 K 3.600 K 3.598 K

5- Voltage Measurements:

3Ph Phase Voltage (KV) meas. Phase Voltage (KV) meas


Secondary Expected Actual
Voltage applied
(V) PH-N VA VB VC VA VB VC

0.00 0.00 0.00 0.00 0.002 0.002 0.002

90%
7.17 7.17 7.17 7.169 7.167 7.167
62.355 V
100%
7.967 7.967 7.967 7.965 7.963 7.964
69.28 V
110%
8.764 8.764 8.764 8.760 8.759 8.758
76.212 V

TEST PERFORMED BY TEST WITNESSED BY DATE


NAME
SIGNATURE
TEST EQUIPMENT Calibration Due:10 MAY, Serial No:
File : 505771613.doc
SITE TEST REPORT

Description: Contractor.: Record No.:

Accuracy Testing of Ibn Omairah Co. STR-4619-20


Energy Meter – Elster Contract No.: Sheet:
4400007162 3 of 4
6- Power Measurements: (+VE IMPORT & -VE EXPORT) -

3 Ph Power factor MW meas. MVAR meas.


3 ph
Voltag Phase
current
e Angle
injected
applie set @ Actual Exp Actual Exp Actual
(A) Exp
d (V)

69.28 1.00 0.0 1 1 86.045 86.003 0 0

69.28 1.00 45 0.707 0.707 60.834 60.827 60.834 60.827

69.28 1.00 90 0 0 0 0 86.045 86.000

69.28 1.00 180 -1 -1 -86.045 -86.011 0 0

69.28 1.00 270 0 0 0 0 -86.045 -86.007

69.28 1.00 315 0.707 0.707 60.834 60.794 -60.834 -60.825

7. Accuracy Test

Accuracy Test of Meter (Active Energy)


Result Result
Test # Test Description IEC 62053-22 Import Export
Limitations (Error %) (Error %)
1 10% In, 100%Vn UPF ± 0.2 -0.0600 -0.0585
2 100% In, 100%Vn UPF ± 0.2 -0.0547 -0.0689
3 300% In, 100%Vn UPF ± 0.2 -0.0570 -0.1322
4 600% In, 100%Vn UPF ± 0.2 -0.0570 -0.1495
5 10% In, 100%Vn 0.5Lag ± 0.3 -0.0150 -0.0175
6 100% In, 100%Vn 0.5Lag ± 0.3 -0.0201 -0.0112
7 300% In, 100%Vn 0.5Lag ± 0.3 -0.0224 -0.0458
8 600% In, 100%Vn 0.5Lag ± 0.3 0.0191 0.0408
9 10% In, 100%Vn 0.8Lead ± 0.3 -0.0829 -0.0904
10 100% In, 100%Vn 0.8Lead ± 0.3 -0.0726 -0.1056
11 300% In, 100%Vn 0.8Lead ± 0.3 -0.0541 -0.0595
12 600% In, 100%Vn 0.8Lead ± 0.3 -0.1095 -0.0733

Accuracy Test of Meter (Reactive Energy).


TEST PERFORMED BY TEST WITNESSED BY DATE
NAME
SIGNATURE
TEST EQUIPMENT Calibration Due:10 MAY, Serial No:
File : 505771613.doc
SITE TEST REPORT

Description: Contractor.: Record No.:

Accuracy Testing of Ibn Omairah Co. STR-4619-20


Energy Meter – Elster Contract No.: Sheet:
4400007162 4 of 4
Result Result
-
Test # Test Description IEC 62053-23 Import Export
Limitations (Error %) (Error %)

1 10% In, 100%Vn UPF ± 2% -0.0623 -0.0416


2 100% In, 100%Vn UPF ± 2% -0.0570 -0.0547
3 300% In, 100%Vn UPF ± 2% -0.0501 -0.0570
4 600% In, 100%Vn UPF ± 2% -0.0570 -0.0570
5 10% In, 100%Vn 0.5Lag ± 2% -0.1303 -0.0854
6 100% In, 100%Vn 0.5Lag ± 2% -0.1020 -0.1020
7 300% In, 100%Vn 0.5Lag ± 2% -0.0916 -0.0916
8 600% In, 100%Vn 0.5Lag ± 2% -0.0501 -0.0570
9 10% In, 100%Vn 0.8Lead ± 2% -0.0534 -0.0589
10 100% In, 100%Vn 0.8Lead ± 2% -0.0357 -0.0689
11 300% In, 100%Vn 0.8Lead ± 2% -0.0541 -0.0541
12 600% In, 100%Vn 0.8Lead ± 2% 0.0013 -0.1095

8.Maximum Demand Test:

3 Ph Phase MW meas. MVAR meas.


3 ph current
Voltage Angle
injected (A)
applied (V) set @
Exp Actual Exp Actual

69.284 0.5 60 21.511 21.486 37.257 37.260

69.284 1.00 60 43.022 43.014 74.515 74.478

TEST PERFORMED BY TEST WITNESSED BY DATE


NAME
SIGNATURE
TEST EQUIPMENT Calibration Due:10 MAY, Serial No:
File : 505771613.doc