Form Monitoring
Form Monitoring
-
-
-
-
- 12/31/1899 2/14/1900 45
- 2/15/1900 3/17/1900 30
-
- 3/18/1900 4/1/1900 14
- 4/2/1900 7/1/1900 90
- 7/2/1900 8/16/1900 45
- 8/17/1900 9/16/1900 30
MONITORING PEKERJAAN JEMBATAN ATASANG
VOLUME RENCANA REALISASI
NO ITEM PEKERJAAN SAT
TOTAL S/D 13 DES S/D 13 DES
I ACCESS ROAD m3 7,000.00
II ABUTMENT & PIER WORK
Galian m3 3,300.00
Pengecoran m3 319.74
IV SUPER STRUCTURE
Erection s/d Cor Slab ls 1.00
V RETAINING WALL
Pengecoran m3 442.00
VI EMBANKMENT WORK m3 20,214.00
VII GABION m3 265.00
VIII ROAD WORK m2
JEMBATAN ATASANGIN
- 1/5/2021 1/14/2021 9
- 1/15/2021 2/11/2021 27
- 2/12/2021 3/10/2021 26
- 3/11/2021 3/26/2021 15
- 3/11/2021 4/10/2021 30
- 4/11/2021 4/20/2021 9
- 4/21/2021 5/5/2021 14
MONITORING PEKERJAAN HEADPON
VOLUME RENCANA
NO ITEM PEKERJAAN SAT
TOTAL S/D 13 DES
I GALIAN
A Headpond Wall and Slab M3 5,347.00
IV HEADPOND
A Wall HW 37, 38,39,40
PENGECORAN m3 266.59
B Slab ( HS 9, HS 16, HS 17, HS 8, HS 14, HS 15, HS 20)
PENGECORAN m3 427.00
Wall ( HW 17, HW 18, HW 19, HW 20, HW 21, HW 22,
C
HW 33, HW 34, HW 35, HW 36)
PENGECORAN m3 680.35
EKERJAAN HEADPOND
REALISASI TARGET PEKAN DURASI
DEVIASI DEPAN START FINISH
S/D 13 DES (HARI)
-
- 11/8/2020 12/2/2020 24
-
-
1,000.00 1,000.00 12/5/2020 1/13/2021 39
-
- 12/11/2020 12/25/2020 14
-
- 4/11/2021 5/26/2021 45
MONITORING PEKERJAAN INLET
VOLUME RENCANA REALISASI
NO ITEM PEKERJAAN SAT
TOTAL S/D 13 DES S/D 13 DES
I INLET BLOCK 1
PENGECORAN m3 750
II INLET BLOCK 2
PENGECORAN m3 3431
III INLET BLOCK 3
PENGECORAN m3 3073
IV INLET BLOCK 4
PENGECORAN m3 3804
V INLET BLOCK 5
PENGECORAN m3 674
KERJAAN INLET
Note:
Pekerjaan Tailrace Conduit bergantung pada pekerjaan galian Powerhouse
N TAILRACE CONDUIT