FOOTING SCHEDULE
1. ALL DIMENSIONS ARE IN METERS
EXCEPT DIA OF BAR.
Footing Size (BxL)
FOUNDATION

1100X1000 1300X1200 1150X1050 1200X1100 1500X1400 1400X1300 1300X1200 1450X1350 1550X1450 1750X1160 1550X1450 1650X1550 2200X2100 1650X1550 2. DIMENSIONS ARE TO BE READ AND
Concrete Depth-D 350 400 350 375 475 500 400 450 500 575 500 525 725 525 NOT MEASURED.
Mix Depth-d 150 200 175 175 200 200 200 200 200 200 200 200 200 200 3. ALL DIMENSIONS ARE TO BE
CHECKED WITH ARCH. DRAWING, ANY
M20 Steel // L 10T-@150MM C/C 12T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 12T-@150MM C/C 10T-@150MM C/C AMBIGUITY FOUND SHALL BE BROUGHT
Steel // b 10T-@150MM C/C 12T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 12T-@150MM C/C 10T-@150MM C/C TO THE NOTICE OF ENGINEER IN
CHARGE.
4. REFER THIS DRAWING ALONG WITH
G-01 & G-02.
FOOTING FC-1 FC-2 FC-3 FC-4 FC-5 FC-6 FC-7 FC-8 FC-9 FC-10 FC-11 FC-12 FC-13 FC-14 5. CONCRETE SHALL BE OF GRADE M2O
UNLESS SPECIFIED OTHERWISE WITH
MARKS
6. T INDICATES STEEL OF HYSD GRADE
Footing Size (BxL)
FOUNDATION

1650X1550 2200X2100 1650X1550 1550X1450 1750X1650 1550X1450 1300X1200 1450X1350 1400X1300 1200X1100 1500X1400 1100X1000 1300X1200 1150X1050 Fe500D CONFIRMING TO IS 2062 LATEST
REV.
Concrete Depth-D 525 725 525 500 575 500 400 450 425 375 475 350 400 350 7. CLEAR COVER TO MAIN
Mix Depth-d 200 200 200 200 200 200 200 200 200 200 200 200 200 175 REINFORCEMENT SHALL BE 7.1.
M20 Steel // L 10T-@150MM C/C 12T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C FOUNDATION = 50mm 7.2. COLUMN =
40mm 7.3. BEAM = 25mm
Steel // b 10T-@150MM C/C 12T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 10T-@150MM C/C 8. CONTRACTOR SHALL BE FULLY
RESPONSIBLE FOR SITE SUPERVISION
AND EXECUTION.
9. DEPTH OF FOUNDATION SHOULD BE
FOOTING FC-15 FC-16 FC-17 FC-18 FC-19 FC-20 FC-21 FC-22 FC-23 FC-24 FC-25 FC-26 FC-27 FC-28 CONSIDER 1650 mm.
MARKS 10. IN ABSENCES OF SOIL REPORTS
SBC CONSIDER 150 KN/M2

COLUMN SCHEDULE

ARRANGEMENTS

4-16T

10-16T 4-12T 6-12T

Columns Size 300X400 230X350 230X350


from Steel 10-16T 4-16T & 4-12T 6-12T
GF LEVEL

basement Stirrup X 8T-@175MM C/C 8T-@175MM C/C 8T-@175MM C/C


slab/footing Stirrup Y 8T-@175MM C/C 8T-@175MM C/C 8T-@175MM C/C
to Concrete M20 M20 M20
GF Slab lvl

COLUMN C-13, C-16 C-10, C-12, C-14, C-1, C-2, C-3,


MARKS C-15, C-17, C-19 C-4, C-5, C-6,
C-7, C-8, C9,
C-11, C-18, C-20,
C-21, C-22, C-23,
C-24, C-25, C-26,
C-27, C-28