Professional Documents
Culture Documents
hEJ扌 ror, 丿盱 use an air vo1ume regu1ating pipe or reduce the blower speed to adjust
`‘
the b1ower’ s airf1ow 。
Jˇ Do not use the discharge side valve to adjust airflow for this wi11
lead to the rise of pressure and damage the blower .
、Maintenance and Inspection
'、
1, Inspection work
(1) Check if the discharge si1ence ,re1ief va1ve, be1t gu。 rd, belt and pressure
gage have any abnorm1t1es .
(2) Check the eccentricity of f1exib1e ;the f1ange space distance; the pipes
(3) Check temperature inside room , Ⅴenti1ator and sOund insu1ation!
2. Inspection standards
Inspection Cycle
d妒ハΦ°∞cH
‘ p¢ °日
宀 H叫∞°
陆∞Φ` ㈧
C←
阳∞Φ宀
阳∞ Φ `
C∩
Remarks
Inspection
¢°
0
∞
-5—
48/233
Vibration | ★ No abnorm1t1es v1brat1on
★ No abnormlty temperature
Temperature rise for motor and b1ower
C1earing of in1et/oudet ★
si1encers ※
★
Rep1acing of bearing and
1ip sea1s ※ ~____ˉ ~
★
C1earing for Housing inside
※
gear ★
Replacing 0f
※
※
★
Rep1acing of Check and f1exib1e
j0nt※ ___
》(。
‘hEr扌 foJ, + Must stop the maChine and check for the items
`
(he1met ;safety
免 Errfm ★ Have the 湎 dress and safety equipment
shoes ;g1oves etc during inspection
3, Inspection Methods
(1) Discharge pressure
COnfirm that the va1ve shown on the pressure gauge is be1ow that noted on the
face p1ate .The cOck on the pressure gauge shou1d be c1osed during norma1 operation
and on1y opened for inspection. The pressure gauge itse1f is easi1y to be damaged
by Ⅴibration or heat from b1ower ,and it shou1d be removed when nit in
-6一
49/233
use ,Alternative1y , a pressure gauge stand could be used and the gauge could be
connected to the b1ower using a rubber hose .Either of these options wi11 prevent
Place an oil receiving dish underneath the gear cover ,remove the drain p1ug
underside and let a11 oil f1ow out ,The Oi1 wi11 flow out quioker if the topˉ
side
oil cap is Opened.Confirm that a11 the oil has been removed and replace the drain
p1ug .Use a funnel when pouring in fresh 0i1 ,and fi11 up oil to a point at the
midd1e of sight g1ass leve1。 (drain plug must be tighten to prevent oil leaking
form the plug ;prevent the gears damage bef0re of the lack 0f oi1!
・If there is toO much 0il -— —
Oi1 1eaking or 0il temperature rise cou1d occur!
・If there is too 1itt1e Oil -ˉ Timing
查
ear sc。 rching ;heating ;or noise emission
cou1d occur !
Use a grease pump to add grease to the rated amount。 (Must stop the maChine )
NOrma11y the grease shou1d fu11 and leaking from the nipp1es !
c. Ⅴ-Belt
A. Loosen the motor side 1iner fixing b01ts and using a metal scale or another tool
to make the pu11eys on the same p1an ! (as the drawing shown)
-7—
50/233
C. Apply a 1oad P (kgf/cm2) as noted be1ow to the center of be1t span in a
perpendicu1ar direction。
5Ⅴ 8Ⅴ ⅩPC
Type of blet 3Ⅴ
12,5
00
9 13,5
Load (kgf)
δ=0,016× L (mm)
rotate operatlon _
-8—
51/233
Attachment of f0reign objects Clean the interna1s
Contacts interna1 compOnents Check inside
Pressure abnorma1ity Remove the sOurce 0f pressure
abnorma1ity
Va1ve at bypass pipe does not Check the cause or rep1ace
work we11
Re1ief va1ve does not work Check and adjust
we11
Looseneζ s from b01ts Tighten the bOlts again
The rlse of discharge pressure Remove the cause of pressure r1se
Insufficient 0f ventilati0n PrOvide better venti1ati0n to reduce
Heat
inside Enclosure temperature in Enc10sure
em1ss10n
Blockage of the fi1ter C1ean the air fi1ter
Too much oil Stop machine ;adjust 0il tO standard
0i1 1eaking Drain p1ug is t0o 1oose Tighten again
Lip seal issues Replace with new 1ip sea1
Pipe air 1eaking Remove the issues,tighten connecting
bolts
Leaking from relief va1ve Adjust again
Airf1ow is Rise frOm pressure Check and remove the 1ssues
not enough Rise from in1et pressure Remove the issues at in1et
S1ip of be1t Retension or replace the belt
Speed is 1ower than standard Check the tension of belt
B1ockage of air filter C1ean the air fi1ter
丿 standard accessorles
Base Frame
`、
1piese
Belt Guard 1piese
Pu11eys 1piece
V-Be1t 1piece
In1et silencer 1piece
Discharge si1encer 1piece
Re1ief valve 1piece
Pressure gauge lpiece
Check valve 1piece
ˉˉ9-—
52/233