DRAINAGE AFFAIRS
PROJECT DEPARTMENT
P.O. BOX 22188
TEL. 44950000 & 44950999 FAX. 44317015
CONSULTANT
CONTRACTOR
COMPANY FORMAT TYPE ZONE NUMBER REV. VERSION DOCUMENT STATUS COMMENTS STATUS
1 DOCUMENT PRESENTATION
1.1 PURPOSE
This form is to be used to ensure, through technical and organizational measures, the control of
risks of accidents and occupational illnesses, according to the Work Permit Procedure. This form is
a copy of the JVT-W-QS-000-031 Work Permit Form with addition of O&M signatures and specific
case of Tie-In activities. This document is only for activities conducted on the O&M site to ensure a
proper coordination between DB and O&M staffs. In case of Tie-In, the two contractors (Marubeni
and Suez) shall sign as Permit Issuers.
1.2 SCOPE
This document applies to all activities under the responsibility of Degrémont Marubeni JV Doha
West Extension 5 Project conducted on Doha West O&M site (Extension 2, 3 and 4). The list of
required activities were a Work Permit is mandatory is detailed in the Work Permit Procedure.
1.4 REFERENCES
1.5 DEFINITIONS
Work permit Safe work permit is a written record that authorizes an employee
with a specific work, at a specific location, for a specific period of
time
Permit requester Person requesting for a Work Permit
Permit holder Person carrying out the intervention
Permit issuer Person issuing the permit and therefore authorizing the start of
the intervention
2 CONTENT
See next page
The 3 first pages of this document must be removed before using the document.
Approved by: Guillaume Peyrissaguet Checked by: Guilhem Joly Drawn up by: Guilhem Joly
Degrémont Marubeni JV Copyright - No reproduction without permission
DOHA WEST - Sewage Treatment Plant Contract N#: B-000874 Doc N#: JVT-W-QS-000-031
Health, Safety & Environment r. B – v. 2 Doc Status: FI
WORK PERMIT Form – on O&M site Page 4 / 4 Date: 26/11/15
Work Permit N#:
DESCRIPTION OF WORK
Name of contractor: Requester Name: Date of request:
Area: Building : Equipment Tag:
Duration of work: Date and starting hour: Date and ending hour (forecast):
Nature of the work:
Approved by: Guillaume Peyrissaguet Checked by: Guilhem Joly Drawn up by: Guilhem Joly
Degrémont Marubeni JV Copyright - No reproduction without permission