Title موضوع
Introduction تشریح باز دید از ساحه
Finding/Observation مشاهدات
1- Tools and equipment’s (bulldozer, shovel, وسایل و ماشنری در ساحه
2- Construction material and its condition:
3- Quality assurance check: چک نمودن کیفیت کار و مواد
- % of work is done / what is operation / no operational/ فیصدی کار انجام شده
- % of remaining work/ fault in progress work ( concrete mix design, shuttering, plaster, mosaic, tiles, ………….,
trees, landscape slope, top view , other views, فیصدی کار باقی مانده
Recommendation (Reward/ warning) نتیجه و هدایات
Conclusion: (focus on the alarming issue put your recommendation any) نتیجه نهایی
Technical/site inspection reports are used for controlling, checking construction process of a project or
inspecting the condition of a construction site/ landscape of what is being done so far. Technical report
is also evaluating the percentage of project items being completed.
راپور تخنیکی انجنیری یا راپور باز دید از ساحه پروژه ساختمانی عبارت از راپور است که در آن کنترول ،چک نمودن پروسه
ساخت و ساز و یا تفتیش و بازدید از حالت پروژه ساختمانی ویا هر ساحه محیط زیستی باشد که تا فعال کدام کار در آن انجام داده
شده .راپور تخنیکی انجنیری برای ارزیابی فیصدی کار انجام شده پروژه ساختمانی نیز استفاده میشود.
Finding/Observation موندنی/ یافته ها/ باز دید از ساحه یا مشاهدات
Observing the existing work (completed, Continued and Not started yet) مشاهدات در ساحه
1- Check the bill of quantity (BoQ) of the project بل ارقام و مواد را چک کردن
2- Based on site take not of what item is completed کدام کارها انجام شده مطابق بل کارهای پروژه
3- Do some small tests ( Test of breaks, Steel, plaster, slump test etc) یگان تست های ساده ساحوی را برای چک مواد انجام دهید
4- Check the material on site! Are they on a good/usable condition) for example cement must be protected with plastic
sheets and must be positioned above the ground, steel must be clean with no corroded spots or dirt,
مواد های موجوده در ساحه ساختمانی باید چک شود که و باید در بهترین وضعیت مکانی و محیطی قرار داشته باشد
5- Check the technology of pouring concrete as check the portion of water in concrete چک کردن مواد کانکریت کا باید شکل
.خمیر باشد یعنی کار آیی کانکریت چک شود
6- Take photos تصاویر هر قسمت از کار پروژه را بگیرید
Item Actual Quantity
Description Of item Unit Quantity in BoQ
No Previous Payable To date
Mobilization at site is for the cost of establishing plant equipment facilities and
0.1 personnel upon the site. Lump sum 1.00 1.000 - 1.00
Demobilization from site is shall be compensation in full for the costs of removing
0.4 plant, equipment, facilities and personnel from the site . Lump sum 1.00 0.000 1.000 1.00
Filling of foundation of building by boulder thickness 20cm based on the design and
2.1 specification with all required activities: Cum 159.00 159.000 58.000 217.00
Filling by compacted Gravel as per drawing based on design and Specification with
2.3 Cum 197.00 195.000 2.000 197.00
all required activities
Sand for filling around the pit based on the design and specification with all required
2.7 Cum 8.00 0.000 - -
activities.
Stone masonry in foundation and above foundation, with morter 1:4 (cement-sand)
3.6 based on the design and specification with all required activities. Cum 370.00 355.260 14.740 370.00
Supply and installation of wooden doors and windows with steel grille and ironware
3.9 Sqm 24.00 0.000 64.220 64.22
Based on the design and specification with all required activities.
Pointing with morter 1:3(cement-sand) Based on the design and specification with all
3.6 required activities. Sqm 490.00 484.760 (484.76) -
Supply and installation of 4mm mesh according to drawing and specification with all
3.8 Sqm 56.00 56.000 - 56.00
required activities.
Supply and installation of stair from 18mm dia steel bar as per drawing and
3.8 specification with all required activities. No 1.00 0.000 - -
Dry Stone masonry in foundation based on the design and specification with all
3.6 required activities. Cum 11.00 0.000 - -
لست احجام کاری پروژه
برای تست ساحوی خشت میتوانید یک خشت را بشکل افقی و یک خشت را در زیر آن بشکل
عمودی قرار دهید و به زمین از فاصله یک متری رها کنید و این کار را باالی سه جوره خشت
جداگانه که از قسمت های مختلف انبار خشت گرفته ایید انجام دهید .در سه بار انجام این کار باید
دو تست جواب مثب بدهد یعنی خشت ها میده نشود و اگر از یک بار زیاد میده میشد بداند که
کیفیت خشت مشکل دارد اینکه
شاید خشت از قسمت های سر کوره خشتی بوده که بخار خشت های دیگر آنرا ضعیف الکیفیت
کرده.
ساحه کشی موجوده وسایل لکه ماشنری او نوری وسایل ) 1- Tools and equipment’s (bulldozer, shovel,
دست کش ندارد
مواد ساختمانی و حالت شان 2- Construction material and its condition:
مواد های موجوده در ساحه ساختمانی باید چک شود و باید در بهترین وضعیت مکانی و محیطی قرار داشته باشد از
قبیل ریگ ،جغل ،سمنت ،سنگ ،سیخ ،خشت و تمامی مواد ساختمانی
Site Engineer of the project
?
1- Electricity
Fixtures for bath room and kitchen are not completely done!
3- Hand railing for Stairs
1- Construction work slow, stopped, on planed so the work must be started as soon as possible
کار ساختمانی به شکل بطی روان است /یا کار مطلقا توقف است و باید کارها در اسرع وقت شروع شود
)2- The ratio of the concrete was not correct so that ratio of concerted for mark 200M must be ( 1:1.4:2
نسبت مواد ریگ جغل و سمنت درست نبود فلهذا برای مارک 200باید نسبت مواد جغل ریگ و سمنت 1:1.5:2باشد
3- Gravel has dirt , so it must be washed before use in concrete
ریگ در بین خود الی و خاک داشت فلهذا باید ریگ و جغل قبل از استفاده خوب شتسته شود و بعد استفاده
آب موجود آب سیالب بود که قابل استفاده نمی باشد
خشت کاری به شکل منظم انجام شده بود 4- Break
سنگ کاری در بعضی قسمت ها مواد کانکریت اصال استفاده نشده بود که باید سنگ کاری تخریب شده و دوباره از سر با مواد که نسبت 5- Stone
های آن دیزاین شده اجرا شود
رنگ در قرارداد نوع برایتو است لیکن در ساحه از رنگ های گینت و محلی استفاده شده فلهذا باید رنگ از نوع برایتو استفاده شود 6- Paint
To conclude
1- Construction work of this project going smoothly, fairly, very good , not bad, in a best condition, bad,
so bad, on satisfactory.
This company should be given appreciation award or execute their payment as best implementer
2- Based on low quality and less technical education and the existing evidence, this company must be
fined/ introduced to responsibility authorities to take its construction working permit and should be
blacklisted.
نتیجه
غیر مسلکی) جیریان داشت که باید این، بد، قابل قبول، مناسب، در آخر کار ساخت و ساز این پروژه به شکل (خوب
کمپنی به شکل عالی تمجید شود و مستحق تصدیق نامه ( این کمپنی نظر به بی کیفایتی و غیر مسلکی مطابق به این اسناد
) موجود به ثارنوالی معرفی شود و کمنی مذکور را در لست سیاه پشنهاد میکنم