DESIGN OF U/S ABUTMENT

(WITH WATER IN TROUGH)

DATA :
ABUTMENT LENGTH : 8.900 m 744 756
TROUGH BED LEVEL : 265.101 m
BOX DEPTH (INTERNAL) : 2.400 m
BOX WIDTH (INTERNAL) : 3.100 m
BOX TOP MEMBER THICKNESS : 0.000 m
BOX BOTTOM MEMBER THICKNESS : 0.300 m
BOX sealing coat THICKNESS : 0.075 m
PEDESTAL+BEARING THICKNESS : 0.150 m
W12 R2 R1
SLAB BOTTOM LEVEL : 265.026 m
BED BLOCK BOTTOM LEVEL : 264.276 m W7 W8 +264.576
+264.276
TOP OF FOUDATION : 260.100 m W1
FOUNDATION (1st step) DEPTH : 0.000 m
FOUNDATION (2nd step) DEPTH : 0.600 m
BOT. OF FOUNDATION(1st step) : 260.100 m
BOT. OF FOUNDATION(2nd step) : 259.500 m W6
BED BLOCK THICKNESS : 0.300 m 4.926
TOP WIDTH : 0.756 m W11A W11 W4 W3
DWARF WALL WIDTH : 0.744 m W5 W2
REAR BATTER : 0.600 m 0 600 600 0 +260.100
FRONT BATTER : 0.600 m 0.000 A W13
BOTTOM WIDTH : 2.700 m 600 1st step +260.100
LIVE LOAD SURCHARGE : 3.340 m
0.600 W14 2nd step +259.500
2700
B
1st OFFSET ON EITHER SIDE : 0.000 m 3900
2nd OFFSET ON EITHER SIDE : 0.600 m

R1= At base of pier:(from pier design calculations)


( 0.000 + ( 288.00 / 2 ) )/ 8.900 ) = 16.18 t

R2= (trough rests on soil)


At base of pier:(from pier design calculations)
232.33 x( 0.600 + 0.756 ) = 3.54 t 0
10.00 x 8.90

R1= At base of Footing:(from pier design calculations)


( 0.000 + ( 288.00 / 2 ) )/ 8.900 ) = 16.18 t

R2= (trough rests on soil)


At base of Footing:(from pier design calculations)
288.00 x( 0.600 + 0.600 + 0.756 ) = 6.33 t 0
10.00 x 8.90

UNIT WT. OF CONC. : 2.400


UNIT WT. OF SOIL : 2.100
UNIT WT. OF WATER : 1.000

HOR. COEFFT. OF SOIL : 0.1584 ( considering O value as 28o )


VER. COEFFT. OF SOIL : 0.0395
STRESS IN CONCRETE : Taking Moments of all forces about 'A'

FORCE PARTICULARS MAG. L.A. MOMENT


TONS. MTS TON.MT.

R1 AS CALCULATED ABOVE 16.18 1.722 27.862

R2 AS CALCULATED ABOVE 0.00 0.678 0.000

W1 0.756 * 0.300 * 2.500 0.567 1.722 0.976

W2 0.500 * 0.600 * 4.176 * 2.400 3.007 2.300 6.915

W3 0.756 * 4.176 * 2.400 7.577 1.722 13.047

W4 0.744 * 4.476 * 2.400 7.992 0.972 7.769

W5 0.500 * 0.600 * 4.176 * 2.400 3.007 0.400 1.203

W6 0.500 * 0.600 * 4.176 * 2.100 2.631 0.200 0.526

W7 0.600 * 0.750 * 2.100 0.945 0.300 0.284

W12 0.600 * 3.340 * 1.000 2.004 0.300 0.601

PV 0.0395 * 4.926 * 4.926 * 2.100 2.013 - -

45.922

PH 0.1584 * 4.926 * 4.926 * 2.100 8.072 1.970 15.904

Braking Force 20/100 * 43.200 0.971 4.476 4.345


8.900

9.042 79.433

LEVER ARM = 1.730 mts.


ECCENTRICITY = 0.380 mts.
ALLOWABLE LIMIT = 0.450 mts. NO TENSION

MAX. STRESS = 31.360 t/sq.mt.


MIN. STRESS = 2.656 t/sq.mt.
STRESS ON SOIL : Taking Moments of all forces about 'B'

FORCE PARTICULARS MAG. L.A. MOMENT


TONS. MTS TON.MT.

R1 AS CALCULATED ABOVE 16.18 2.322 37.569

R2 AS CALCULATED ABOVE 0.00 1.278 0.000

W1 As already calculated 0.567 2.322 1.317

W2 As already calculated 3.007 2.900 8.719

W3 As already calculated 7.577 2.322 17.594

W4 As already calculated 7.992 1.572 12.564

W5 As already calculated 3.007 1.000 3.007

W6 As already calculated 2.631 0.800 2.105

W7 As already calculated 0.945 0.900 0.851

W11A 0.600 * 4.926 * 2.100 6.207 0.300 1.862

W12 1.344 * 3.340 * 1.000 4.489 0.672 3.017

W14 3.900 * 0.600 * 2.400 5.616 1.950 10.951

PV 0.0395 * 5.526 * 5.526 * 2.100 2.533 - -

60.750 99.555

PH 0.1584 * 5.526 * 5.526 * 2.100 10.158 2.210 22.453

Braking Force 20/100 * 43.200 0.971 5.076 4.928


8.900
11.129 126.935

LEVER ARM = 2.089 mts.


ECCENTRICITY = 0.139 mts.
ALLOWABLE LIMIT = 0.650 mts. NO TENSION

MAX. STRESS = 18.919 t/sq.mt.


MIN. STRESS = 12.235 t/sq.mt.

FACTOR OF SAFETY
OVER_T 3.636 > 2
SLIDING 2.729 > 1.5