You are on page 1of 20

ACTIVITY NO.

10 CEILING AND TIME TO CLIMB

HOLY ANGEL UNIVERSITY


ADDRESS

AE 111
APPLIED SUBSONIC AERODYNAMICS

ACTIVITY NO. 10
CEILING AND TIME TO CLIMB

SUBMITTED BY: AAAAAA


SECTION: AAAAAA
SEMESTER: AAAA
SCHOOL YEAR: AAAAA

AAAAAAAAAAAAAAAAAA
INSTRUCTOR

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

NAME : SUBMISSION DATE :

INSTRUCTOR: GRADE :

Given:

Airplane Weight, = 1,667 lbs

From Activity No. 8:

BHP= 116 hp

N = 2,800 rpm

P = 78% (assumed)

V
= ????
ND

Propeller Diameter, D = ??? ft.

From Activity No. 9:

R.C. at Sea Level = ????? fpm

R.C. at 5,000 ft Altitude = ?????? fpm

R.C. at 10,000 ft Altitude = ????? fpm

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

ALTITUDE , h (ft)

RATE OF CLIMB , R.C. (ft / min)

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

Computation for Absolute Ceiling, H:

By Ratio and Proportion:


H h
=
R.C.0 R.C.0 − R.C.h

h R.C.0
H=
R.C.0 − R.C.h

Where: H = Absolute Ceiling in ft


h = Any Altitude in ft
R.C.0 = Rate of Climb at Sea Level
R.C.h = Rate of Climb at any Altitude

????
H =
????

H = ????? ft

Computation for Density Ratio, σ Above Sea Level up to Tropopause ( 36,080 ft ):

4.26
  aH 
 = = 1 + 
H   T 
0  0 

Where: H =
0
= Density Ratio

a = Lapse Rate ( -0.003566 OR / ft )


H = Absolute Ceiling in ft
=???????
T0 = Temperature at sea level ( 519 OR )

4.26
  − 0.003566 O R / ft (???????? )
   
 =  1+  

H 519 O R
 
 

 = ??????
H

ALTITUDE , h ALTITUDE FACTOR


ft Fig. 44b Fig. 55b
H ???? ?????

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

Explanation of Table
Column No.:

1 , V0 = Taken From Activity No. 7

THPREQ’D
2 , o= Taken From Activity No. 7

3 , N = Taken From Activity No. 8

1
4 , V =

@ H = ????????? ft

2
5 , THP =
REQD 
@ H = ????????? ft

6 , N = 3 x Altitude Factor ( Fig. 55b )

7 , BHP at Reduced N = ( Design BHP x 6 ) ÷ Design N

8 , BHP = 7 x Altitude Factor ( Fig. 44b )

9 , V/ND = ( 1 x 88 ) ÷ ( 6 x D )

10 , % Design V/ND = ( 9 ÷ Design V/ND )

11 , % Design P = Obtained From Fig. 55a

12 , P = 11 x Design P

13 , THPAV = 8 x 12

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

2 3 4 5 6
1

SEA LEVEL ?????? FT ALTITUDE

Vo THPREQDO N V THPREQ’D N

mph hp rpm mph hp rpm

7 8 9 10 11 12 13
7 8 9 10 11 12 13

SEA LEVEL ?????? FT ALTITUDE

BHP at reduced N BHP V/ND % Design V/ND % Design ηp ηp THPAV

hp hp - % % % hp

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

70

H = ?????? FT
60
THRUST HORSEPOWER,THP

50

40

30

20

10

0
0 20 40 60 80 100 120 140 160

FLIGHT SPEED,V(mph)

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

RATE OF CLIMB , R.C. (ft / min)

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

Computation For Service Ceiling , HS:

By Ratio and Proportion:

H HS
=
R.C.0 R.C.0 − 100 fpm

H  R.C.0 − 100 fpm


HS =  
R.C.0

Where: H = Absolute Ceiling in ft


HS = Service Ceiling in ft
R.C.0 = Rate of Climb at Sea Level in fpm
R.C.H = Rate of Climb at Service Ceiling in fpm (= 100 fpm)
S

????
H =
S ?????

H = ????? ft
S

Computation For Density Ratio, σ Above Sea Level up to Tropopause ( 36,080 ft ):

4.26
  aH s 
 = = 1 + 
H   T 
s 0  0 

Where:  = = Density Ratio
H
s
0
a = Lapse Rate (-0.003566 OR / ft)
Hs = Service Ceiling in ft
= 13,161.85 ft
T0 = Temperature at Sea Level ( 519 OR )

4.26
  − 0.003566 O R / ft (???????t )
   
 =  1+ 
HS O
 519 R 
 

 = ????
H
S

ALTITUDE , h ALTITUDE FACTOR


ft Fig. 44b Fig. 55b
Hs ???? ?????

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

Explanation of Table
Column No.:

14 , V0 = Taken From Activity No. 7

15 , THPREQ’Do = Taken From Activity No. 7

16 , N = Taken From Activity No. 8

14
17 , V =

@H = ???????? ft
S

15
18 , THP =
REQD 
@H = ?????????? ft
S

19 , N = 16 x Altitude Factor ( Fig. 55b )

20 , BHP at Reduced N = ( Design BHP x 19 ) ÷ Design N

21 , BHP = 20 x Altitude Factor ( Fig. 44b )

22 , V/ND = ( 14 x 88 ) ÷ ( 19 x D )

23 , % Design V/ND = ( 22 ÷ Design V/ND )

24 , % Design P = Obtained From Fig. 55a

25 , P = 24 x Design P

26 , THPAV = 21 x 25

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

14 15 16 17 18 19

SEA LEVEL ????? FT ALTITUDE

Vo THPREQDO N V THPREQ’D N

mph hp rpm mph hp rpm

20 21 22 23 24 25 26

SEA LEVEL ??????? FT ALTITUDE

BHP at reduced N BHP V/ND % Design V/ND % Design ηp ηp THPAV

hp hp - % % % hp

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

100

90

80
Hs =????? FT

70
THRUST HORSEPOWER,THP

60

50

40
THPREQD
30

20

10

0
0 20 40 60 80 100 120 140 160 180
VMAX=????
FLIGHT SPEED,V(mph)

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

h= ???? ft
V THPAV THPREQ'D EHP=THP AV - THP REQ'D R.C.= (EHP/W) x 33,000
mph hp hp hp ft/min

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

Computation For Maximum Climb Angle ,  max :


Formula:

 max = SIN
−1 R.C .
V
max

Where:  max = Maximum Climb Angle


R.C. = Rate of Climb (Read From Graph)
V = Flight Speed (Read From Graph)

At Service Ceiling, HS = 10,604.49 ft:


@ R.C. = ???? fpm and V = ????? mph

 max = SIN
−1 ??? fpm
88 fpm
????? mph 
1 mph
max

 max = ????

MAX SPEED FOR MAX. MAX. CLIMB ANGLE, SPEED FOR MAX. CLIMB
ALTITUDE VMAX
R.C. R.C. max ANGLE
ft mph fpm mph Deg. mph
Hs
H

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

Explanation of Table

Column No.:
1 , Altitude, h = Assigned

2 , R.C. = From Activity No. 9

h  1
3 , =
R.C. 2

4 , t =  3

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB
Computation:
Time to climb from 12,000 ft altitude to Absolute Ceiling, AT H=????? FT.:

By Ratio and Proportion:

H h
=
R.C.0 R.C.0 − R.C.h

h R.C.0
R.C.h = R.C.0 −
H

  ???? ft 
 ???? fpm 

  
R.C . = ???? fpm −  
h ???? ft
 
 

R.C. = ???? fpm


h

H H
t = ln
R.C . H −h
h

t = ?????? min .

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

Interpolation for Rate of Climb:

ALTITUDE R.C.

ft fpm
Sea Level ???
1000 X
5000 ????

𝑚𝑖𝑑𝑑𝑙𝑒 − 𝑢𝑝𝑝𝑒𝑟 𝑚𝑖𝑑𝑑𝑙𝑒 − 𝑢𝑝𝑝𝑒𝑟


=
𝑙𝑜𝑤𝑒𝑟 − 𝑢𝑝𝑝𝑒𝑟 𝑙𝑜𝑤𝑒𝑟 − 𝑢𝑝𝑝𝑒𝑟
X = ???? fpm

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB

1 2 3 4

h
Altitude, h R.C. t=  3 3
R.C.
ft fpm min. min.
Sea Level
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Hs
11000
12000
H

Time to Climb to Service Ceiling, HS:

H H
t = ln
H R.C . H −H
S 0 S

 ????    ????? ft 


=
 ft  ln  
fpm   ft 
t
H  ??????  ??????????
S     

t = ?????? min .
H
S

PAGE _ OF _ PAGES
ACTIVITY NO. 10 CEILING AND TIME TO CLIMB
CONCLUSION :

PAGE _ OF _ PAGES

You might also like