Project: New Project
Variant: New simulation variant
Tables on a building
System power: 123 kWp
Thiruvananthapuram - India
PVsyst TRIAL
PVsyst TRIAL
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
Project summary
Geographical Site Situation Project settings
Thiruvananthapuram Latitude 8.47 °N Albedo 0.20
India Longitude 76.95 °E
Altitude 17 m
PVsyst TRIAL
Time zone UTC+5
Meteo data
Thiruvananthapuram
MeteoNorm 8.0 station - Synthetic
System summary
Grid-Connected System Tables on a building
PVsyst TRIAL
System information
PV Array Inverters
Nb. of modules 366 units Nb. of units 3.3 units
Pnom total 123 kWp Pnom total 120 kWac
Pnom ratio 1.022
Results summary
Produced Energy 181.4 MWh/year Specific production 1479 kWh/kWp/year Perf. Ratio PR 81.22 %
Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Near shading definition - Iso-shadings diagram 5
PVsyst TRIAL
Main results 6
Loss diagram 7
Special graphs 8
Cost of the system 9
CO₂ Emission Balance 10
PVsyst TRIAL
07/05/21 PVsyst Evaluation mode Page 2/10
Project: New Project
Variant: New simulation variant
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
General parameters
Grid-Connected System Tables on a building
PV Field Orientation
Orientation Sheds configuration Models used
PVsyst TRIAL
Fixed planes 2 orientations Nb. of sheds 366 units Transposition Perez
Tilts/azimuths 8 / 180 ° Sizes Diffuse Perez, Meteonorm
8/0° Sheds spacing 1.02 m Circumsolar separate
Collector width 1.00 m
Ground Cov. Ratio (GCR) 98.3 %
Shading limit angle
Limit profile angle 79.1 °
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
PVsyst TRIAL
Model
(Original PVsyst database)
Unit Nom. Power
Number of PV modules
Nominal (STC)
Array #1 - PV Array
Eldora VSP.72.335.03.04
335 Wp
366 units
123 kWp
Model
(Original PVsyst database)
Unit Nom. Power
Number of inverters
Total power
SG36KTL-M
36.0 kWac
3.3 units
120 kWac
Mixed orient.
#1/2: 13/11 strings
Tilt/Azimuth 8/180 °
8/0 °
Number of PV modules 336 units Number of inverters 3 units
Nominal (STC) 113 kWp Total power 108 kWac
Modules 24 Strings x 14 In series
PVsyst TRIAL
At operating cond. (50°C) Operating voltage 200-950 V
Pmpp 101 kWp Pnom ratio (DC:AC) 1.04
U mpp 475 V
I mpp 213 A
Array #2 - Sub-array #2
Orientation #2
Tilt/Azimuth 8/0 °
Number of PV modules 30 units Number of inverters 1 * MPPT 33% 0.3 units
Nominal (STC) 10.05 kWp Total power 12.0 kWac
Modules 2 Strings x 15 In series
At operating cond. (50°C) Operating voltage 200-950 V
Pmpp 9.02 kWp Pnom ratio (DC:AC) 0.84
U mpp 509 V
I mpp 18 A
PVsyst TRIAL
Total PV power
Nominal (STC)
Total
Module area
123 kWp
366 modules
710 m²
Total inverter power
Total power
Nb. of inverters
Pnom ratio
120 kWac
4 units
0.7 unused
1.02
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
Array losses
Array Soiling Losses Thermal Loss factor Module Quality Loss
Loss Fraction 2.0 % Module temperature according to irradiance Loss Fraction -0.8 %
Uc (const) 29.0 W/m²K
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
Module mismatch losses
Loss Fraction
0° 30°
2.0 % at MPP
50°
Strings Mismatch loss
Loss Fraction
60° 70°
0.1 %
DC wiring losses
Global wiring resistance 10 mΩ
Loss Fraction 1.5 % at STC
PVsyst TRIAL
Array #1 - PV Array
Global array res.
Loss Fraction
38 mΩ
1.5 % at STC
Array #2 - Sub-array #2
Global array res.
Loss Fraction
485 mΩ
1.5 % at STC
PVsyst TRIAL
PVsyst TRIAL
07/05/21 PVsyst Evaluation mode Page 4/10
Project: New Project
Variant: New simulation variant
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
07/05/21 PVsyst Evaluation mode Page 5/10
Project: New Project
Variant: New simulation variant
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
Main results
System Production
Produced Energy 181.4 MWh/year Specific production 1479 kWh/kWp/year
Performance Ratio PR 81.22 %
PVsyst TRIAL
Normalized productions (per installed kWp) Performance Ratio PR
PVsyst TRIAL
January
GlobHor
kWh/m²
164.3
DiffHor
kWh/m²
73.60
Balances and main results
T_Amb
°C
28.00
GlobInc
kWh/m²
163.9
GlobEff
kWh/m²
149.2
EArray
MWh
16.26
E_Grid
MWh
16.03
PR
ratio
0.798
February 159.7 70.40 28.00 159.2 147.1 15.97 15.74 0.806
March 181.8 82.60 28.90 181.2 168.8 18.20 17.95 0.808
April 161.7 83.60 28.70 161.1 150.1 16.31 16.08 0.814
May 155.1 88.90 28.60 154.3 143.2 15.63 15.41 0.815
June 144.0 76.80 26.80 143.4 133.1 14.67 14.46 0.822
July 142.7 80.10 26.90 142.1 131.7 14.54 14.33 0.823
August 155.6 88.20 26.90 154.9 143.8 15.84 15.61 0.822
PVsyst TRIAL
September 156.5 76.30 26.60 155.9 144.9 15.89 15.66 0.820
October 147.3 83.60 27.00 146.5 134.6 14.81 14.60 0.813
November 126.7 66.70 26.70 126.2 114.6 12.65 12.47 0.806
December 133.1 71.10 26.39 132.6 119.5 13.22 13.03 0.801
Year 1828.5 941.90 27.46 1821.5 1680.7 183.98 181.39 0.812
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
07/05/21 PVsyst Evaluation mode Page 6/10
Project: New Project
Variant: New simulation variant
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
Loss diagram
1829 kWh/m² Global horizontal irradiation
PVsyst TRIAL
-3.24% Near Shadings: irradiance loss
PVsyst TRIAL
-2.10% Mismatch loss, modules and strings
-0.96% Ohmic wiring loss
-0.01% Mixed orientation mismatch loss
184.0 MWh Array virtual energy at MPP
-1.40% Inverter Loss during operation (efficiency)
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
-0.01% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
181.4 MWh Available Energy at Inverter Output
PVsyst TRIAL
181.4 MWh Energy injected into grid
PVsyst TRIAL
07/05/21 PVsyst Evaluation mode Page 7/10
Project: New Project
Variant: New simulation variant
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
Special graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
System Output Power Distribution
PVsyst TRIAL
PVsyst TRIAL
07/05/21 PVsyst Evaluation mode Page 8/10
Project: New Project
Variant: New simulation variant
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
PVsyst TRIAL
Total 0.00
Depreciable asset 0.00
Operating costs
Item Total
INR/year
Total (OPEX) 0.00
System summary
Total installation cost 0.00 INR
Operating costs 0.00 INR/year
PVsyst TRIAL
Produced Energy 181 MWh/year
Cost of produced energy (LCOE) 0.000 INR/kWh
PVsyst TRIAL
PVsyst TRIAL
07/05/21 PVsyst Evaluation mode Page 9/10
Project: New Project
Variant: New simulation variant
PVsyst V7.2.1
VC0, Simulation date:
07/05/21 10:38
with v7.2.1
PVsyst TRIAL
Replaced Emissions
Total: 5093.5 tCO₂
System production: 181.39 MWh/yr
Grid Lifecycle Emissions: 936 gCO₂/kWh
Source: IEA List
Country: India
Lifetime: 30 years
Annual degradation: 1.0 %
PVsyst TRIAL
Item
Modules
Supports
LCE
1713 kgCO2/kWp
6.24 kgCO2/kg
System Lifecycle Emissions Details
Quantity
123 kWp
3660 kg
Subtotal
[kgCO₂]
209997
22850
Inverters 619 kgCO2/units 3.00 units 1856
PVsyst TRIAL
PVsyst TRIAL
07/05/21 PVsyst Evaluation mode Page 10/10