You are on page 1of 8

Version 7.3.

PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System

Project: 50KW solar Power Plant at Nagpur


Variant: New simulation variant
Tables on a building
System power: 50.9 kWp

PVsyst TRIAL Nagpur - India

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: 50KW solar Power Plant at Nagpur
Variant: New simulation variant

PVsyst V7.3.2
VC0, Simulation date:
27/03/23 09:47

PVsyst TRIAL
with v7.3.2

Project summary
Geographical Site Situation Project settings
Nagpur Latitude 21.14 °N Albedo 0.20
India Longitude 79.09 °E
Altitude 300 m
Time zone UTC+5.5

Meteo data
Nagpur
Meteonorm 8.1 (1996-2015) - Synthetic

System summary

PVsyst TRIAL
Grid-Connected System Tables on a building

PV Field Orientation Near Shadings User's needs


Fixed plane Linear shadings Unlimited load (grid)
Tilt/Azimuth 30 / 0 °

System information
PV Array Inverters
Nb. of modules 152 units Nb. of units 1 unit
Pnom total 50.9 kWp Pnom total 50.0 kWac
Pnom ratio 1.018

Results summary
Produced Energy 71773 kWh/year Specific production 1410 kWh/kWp/year Perf. Ratio PR 74.96 %

PVsyst TRIAL
Project and results summary

Near shading definition - Iso-shadings diagram


Main results
Loss diagram
Table of contents

General parameters, PV Array Characteristics, System losses


2
3
5
6
7
Predef. graphs 8

PVsyst TRIAL

PVsyst TRIAL
27/03/23 PVsyst Evaluation mode Page 2/8
Project: 50KW solar Power Plant at Nagpur
Variant: New simulation variant

PVsyst V7.3.2
VC0, Simulation date:
27/03/23 09:47

PVsyst TRIAL
with v7.3.2

General parameters
Grid-Connected System Tables on a building

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Nb. of sheds 72 units Transposition Perez
Tilt/Azimuth 30 / 0 ° Sizes Diffuse Perez, Meteonorm
Sheds spacing 3.10 m Circumsolar separate
Collector width 1.70 m
Ground Cov. Ratio (GCR) 55.0 %
Shading limit angle
Limit profile angle 27.7 °

PVsyst TRIAL
Horizon Near Shadings User's needs
Free Horizon Linear shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model AXIprotect X HC MT BLK AC-335MG/120V Model PVS-50-TL
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 335 Wp Unit Nom. Power 50.0 kWac
Number of PV modules 152 units Number of inverters 3 * MPPT 33% 1 unit
Nominal (STC) 50.9 kWp Total power 50.0 kWac
Modules 8 Strings x 19 In series Operating voltage 300-950 V
At operating cond. (50°C) Max. power (=>30°C) 55.0 kWac

PVsyst TRIAL
Pmpp 46.0 kWp Pnom ratio (DC:AC) 1.02
U mpp 582 V No power sharing between MPPTs
I mpp 79 A

Total PV power Total inverter power


Nominal (STC) 51 kWp Total power 50 kWac
Total 152 modules Number of inverters 1 unit
Module area 261 m² Pnom ratio 1.02
Cell area 231 m²

Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 3.0 % Module temperature according to irradiance Global array res. 123 mΩ
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC

PVsyst TRIAL
Uv (wind) 0.0 W/m²K/m/s

Serie Diode Loss LID - Light Induced Degradation Module Quality Loss
Voltage drop 0.7 V Loss Fraction 2.0 % Loss Fraction -0.4 %
Loss Fraction 0.1 % at STC

Module mismatch losses Strings Mismatch loss


Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

IAM loss factor


Incidence effect (IAM): Fresnel smooth glass, n = 1.526

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 0.998 0.981 0.948 0.862 0.776 0.636 0.403 0.000

PVsyst TRIAL
27/03/23 PVsyst Evaluation mode Page 3/8
Project: 50KW solar Power Plant at Nagpur
Variant: New simulation variant

PVsyst V7.3.2
VC0, Simulation date:
27/03/23 09:47

PVsyst TRIAL
with v7.3.2

System losses
Unavailability of the system Auxiliaries loss
Time fraction 2.0 %
7.3 days,
3 periods

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL
27/03/23 PVsyst Evaluation mode Page 4/8
Project: 50KW solar Power Plant at Nagpur
Variant: New simulation variant

PVsyst V7.3.2
VC0, Simulation date:
27/03/23 09:47

PVsyst TRIAL
with v7.3.2

Near shadings parameter


Perspective of the PV-field and surrounding shading scene

PVsyst TRIAL
Iso-shadings diagram

PVsyst TRIAL
Orientation #1

PVsyst TRIAL

PVsyst TRIAL
27/03/23 PVsyst Evaluation mode Page 5/8
Project: 50KW solar Power Plant at Nagpur
Variant: New simulation variant

PVsyst V7.3.2
VC0, Simulation date:
27/03/23 09:47

PVsyst TRIAL
with v7.3.2

Main results
System Production
Produced Energy 71773 kWh/year Specific production 1410 kWh/kWp/year
Performance Ratio PR 74.96 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 131.4 52.41 21.49 173.9 161.5 7014 6425 0.726

PVsyst TRIAL
February 139.0 60.09 24.99 167.7 156.1 6664 6525 0.764
March 178.4 74.14 29.26 192.4 178.8 7448 7286 0.744
April 190.0 82.21 32.19 184.2 170.1 7033 6875 0.733
May 197.8 90.10 35.59 174.5 159.7 6565 6413 0.722
June 147.7 89.85 31.27 127.9 115.7 4937 4823 0.741
July 113.9 80.28 28.10 100.2 89.5 3933 3837 0.752
August 119.5 80.84 27.22 110.9 100.3 4386 4283 0.758
September 137.7 79.28 27.36 139.1 127.4 5510 5389 0.761
October 148.5 71.60 27.04 169.7 157.7 6717 6567 0.760
November 130.8 53.63 23.94 166.0 154.3 6620 6483 0.767
December 127.8 49.85 21.50 174.0 161.2 7007 6867 0.775
Year 1762.4 864.28 27.50 1880.4 1732.2 73835 71773 0.750

PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
27/03/23 PVsyst Evaluation mode Page 6/8
Project: 50KW solar Power Plant at Nagpur
Variant: New simulation variant

PVsyst V7.3.2
VC0, Simulation date:
27/03/23 09:47

PVsyst TRIAL
with v7.3.2

Loss diagram
1762 kWh/m² Global horizontal irradiation
+6.7% Global incident in coll. plane

-2.65% Near Shadings: irradiance loss

-2.45% IAM factor on global

-3.00% Soiling loss factor

1732 kWh/m² * 261 m² coll. Effective irradiation on collectors

PVsyst TRIAL
efficiency at STC = 19.53% PV conversion

88319 kWh Array nominal energy (at STC effic.)


-0.72% PV loss due to irradiance level

-11.53% PV loss due to temperature

+0.36% Module quality loss

-2.00% LID - Light induced degradation

-2.10% Mismatch loss, modules and strings


-1.16% Ohmic wiring loss
73835 kWh Array virtual energy at MPP

PVsyst TRIAL
-2.18% Inverter Loss during operation (efficiency)
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
-0.01% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
72214 kWh Available Energy at Inverter Output

0.00% Auxiliaries (fans, other)


-0.61% System unavailability
71773 kWh Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
27/03/23 PVsyst Evaluation mode Page 7/8
Project: 50KW solar Power Plant at Nagpur
Variant: New simulation variant

PVsyst V7.3.2
VC0, Simulation date:
27/03/23 09:47

PVsyst TRIAL
with v7.3.2

Predef. graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
27/03/23 PVsyst Evaluation mode Page 8/8

You might also like