PVsyst - Simulation report
Grid-Connected System
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: New Project
Variant: New simulation variant
PVsyst V7.4.5
VC0, Simulation date:
17/03/24 16:58
PVsyst TRIAL
with v7.4.5
Project summary
Geographical Site Situation Project settings
Kafr Sūsah Latitude 33.49 °N Albedo 0.20
Syria Longitude 36.26 °E
Altitude 696 m
Time zone UTC+3
Meteo data
Kafr Sūsah
Meteonorm 8.1 (2006-2011), Sat=100% - Synthetic
System summary
PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
Nb. of modules 40 units Nb. of units 1 unit
Pnom total 12.00 kWp Pnom total 10.00 kWac
Pnom ratio 1.200
Results summary
Produced Energy 22678 kWh/year Specific production 1890 kWh/kWp/year Perf. Ratio PR 84.53 %
PVsyst TRIAL
Project and results summary
Main results
Loss diagram
Predef. graphs
Table of contents
PVsyst TRIAL
PVsyst TRIAL
17/03/24 PVsyst Evaluation mode Page 2/7
Project: New Project
Variant: New simulation variant
PVsyst V7.4.5
VC0, Simulation date:
17/03/24 16:58
PVsyst TRIAL
with v7.4.5
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 30 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model PS-M60-300/BF Model MOD 10KTL3-X
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 300 Wp Unit Nom. Power 10.00 kWac
Number of PV modules 40 units Number of inverters 1 unit
Nominal (STC) 12.00 kWp Total power 10.0 kWac
Modules 2 string x 20 In series Operating voltage 140-1000 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.20
Pmpp 10.90 kWp Power sharing within this inverter
U mpp 594 V
I mpp 18 A
PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 12 kWp Total power 10 kWac
Total 40 modules Number of inverters 1 unit
Module area 65.3 m² Pnom ratio 1.20
Cell area 58.0 m²
Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 540 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): Fresnel, AR coating, n(glass)=1.526, n(AR)=1.290
PVsyst TRIAL
17/03/24 PVsyst Evaluation mode Page 3/7
Project: New Project
Variant: New simulation variant
PVsyst V7.4.5
VC0, Simulation date:
17/03/24 16:58
PVsyst TRIAL
with v7.4.5
Main results
System Production
Produced Energy 22678 kWh/year Specific production 1890 kWh/kWp/year
Perf. Ratio PR 84.53 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
February 104.2 42.53 8.05 139.8 137.6 1531 1505 0.897
March 160.3 51.77 12.58 194.0 190.6 2060 2024 0.869
April 189.3 66.89 16.89 201.1 197.3 2092 2055 0.852
May 223.9 72.79 22.05 212.8 207.8 2160 2123 0.831
June 248.5 50.38 25.84 223.7 218.2 2212 2173 0.809
July 242.1 59.73 28.48 222.8 217.3 2178 2140 0.800
August 218.3 59.73 28.19 220.7 215.8 2165 2128 0.803
September 180.2 42.31 24.67 208.7 204.8 2069 2033 0.812
October 139.9 42.58 19.83 184.8 181.8 1906 1873 0.845
November 99.5 33.53 11.99 147.0 144.9 1588 1561 0.885
December 85.6 30.65 7.34 135.5 133.5 1504 1479 0.910
Year 1985.7 583.66 17.71 2235.6 2192.2 23078 22678 0.845
PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
17/03/24 PVsyst Evaluation mode Page 4/7
Project: New Project
Variant: New simulation variant
PVsyst V7.4.5
VC0, Simulation date:
17/03/24 16:58
PVsyst TRIAL
with v7.4.5
Loss diagram
1986 kWh/m² Global horizontal irradiation
+12.6% Global incident in coll. plane
PVsyst TRIAL
-0.36% PV loss due to irradiance level
PVsyst TRIAL
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
-0.02% Night consumption
22678 kWh Available Energy at Inverter Output
22678 kWh Energy injected into grid
PVsyst TRIAL
PVsyst TRIAL
17/03/24 PVsyst Evaluation mode Page 5/7
Project: New Project
Variant: New simulation variant
PVsyst V7.4.5
VC0, Simulation date:
17/03/24 16:58
PVsyst TRIAL
with v7.4.5
Predef. graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
17/03/24 PVsyst Evaluation mode Page 6/7
PVsyst V7.4.5
VC0, Simulation date:
17/03/24 16:58
PVsyst TRIAL
with v7.4.5
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL