Project: Imran Abbasi


Variant: New simulation variant
No 3D scene defined, no shadings
System power: 22.00 kWp

PVsyst TRIALIslamabad - Pakistan

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: Imran Abbasi
Variant: New simulation variant

PVsyst V7.3.4
VC0, Simulation date:
10/06/23 18:06

PVsyst TRIAL
with v7.3.4

Project summary
Geographical Site Situation Project settings
Islamabad Latitude 33.72 °N Albedo 0.20
Pakistan Longitude 73.04 °E
Altitude 585 m
Time zone UTC+5

Meteo data
Islamabad
Meteonorm 8.1 (1991-2000), Sat=100% - Synthetic

System summary

PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 15 / 180 °

System information
PV Array Inverters
Nb. of modules 40 units Nb. of units 1 unit
Pnom total 22.00 kWp Pnom total 20.00 kWac
Pnom ratio 1.100

Results summary
Produced Energy 25807 kWh/year Specific production 1173 kWh/kWp/year Perf. Ratio PR 84.27 %

PVsyst TRIAL
Project and results summary

Main results
Loss diagram
Predef. graphs
Table of contents

General parameters, PV Array Characteristics, System losses


2
3
4
5
6
Single-line diagram 7

PVsyst TRIAL

PVsyst TRIAL
10/06/23 PVsyst Evaluation mode Page 2/7
Project: Imran Abbasi
Variant: New simulation variant

PVsyst V7.3.4
VC0, Simulation date:
10/06/23 18:06

PVsyst TRIAL
with v7.3.4

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 15 / 180 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model JAM72-S30-550-MR Model SG20RT-P2
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 550 Wp Unit Nom. Power 20.0 kWac
Number of PV modules 40 units Number of inverters 2 * MPPT 50% 1 unit
Nominal (STC) 22.00 kWp Total power 20.0 kWac
Modules 2 Strings x 20 In series Operating voltage 160-1000 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.10
Pmpp 20.20 kWp No power sharing between MPPTs
U mpp 760 V
I mpp 27 A

PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 22 kWp Total power 20 kWac
Total 40 modules Number of inverters 1 unit
Module area 103 m² Pnom ratio 1.10

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 471 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses


Loss Fraction 2.0 % at MPP

IAM loss factor

PVsyst TRIAL
Incidence effect (IAM): User defined profile

0° 30° 50° 65° 70° 75° 80° 85° 90°


1.000 1.000 0.999 0.953 0.910 0.853 0.725 0.448 0.000

PVsyst TRIAL
10/06/23 PVsyst Evaluation mode Page 3/7
Project: Imran Abbasi
Variant: New simulation variant

PVsyst V7.3.4
VC0, Simulation date:
10/06/23 18:06

PVsyst TRIAL
with v7.3.4

Main results
System Production
Produced Energy 25807 kWh/year Specific production 1173 kWh/kWp/year
Perf. Ratio PR 84.27 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 69.8 37.73 9.92 51.0 46.9 977 945 0.842

PVsyst TRIAL
February 81.6 39.53 12.94 64.6 61.3 1264 1227 0.864
March 120.4 71.46 18.80 105.0 101.7 2052 2003 0.867
April 157.8 76.51 23.91 144.4 141.4 2781 2719 0.856
May 186.1 92.52 29.96 178.2 175.5 3349 3273 0.835
June 186.7 88.69 31.68 181.7 179.4 3391 3314 0.829
July 180.7 96.75 30.72 174.6 172.0 3287 3214 0.837
August 162.5 97.77 29.26 152.2 149.6 2900 2836 0.847
September 151.1 69.33 27.14 132.1 128.6 2514 2458 0.846
October 122.1 58.44 22.87 98.7 94.3 1877 1831 0.843
November 80.0 43.03 15.94 59.7 55.2 1129 1096 0.835
December 74.3 32.62 11.27 49.9 44.6 923 891 0.811
Year 1573.2 804.39 22.08 1392.0 1350.4 26444 25807 0.843

PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
10/06/23 PVsyst Evaluation mode Page 4/7
Project: Imran Abbasi
Variant: New simulation variant

PVsyst V7.3.4
VC0, Simulation date:
10/06/23 18:06

PVsyst TRIAL
with v7.3.4

Loss diagram
1573 kWh/m² Global horizontal irradiation

-11.52% Global incident in coll. plane

-2.99% IAM factor on global

1350 kWh/m² * 103 m² coll. Effective irradiation on collectors

efficiency at STC = 21.31% PV conversion

29731 kWh Array nominal energy (at STC effic.)

PVsyst TRIAL
-1.79% PV loss due to irradiance level

-7.54% PV loss due to temperature

+0.75% Module quality loss

-2.00% Module array mismatch loss


-0.80% Ohmic wiring loss
26444 kWh Array virtual energy at MPP
-2.26% Inverter Loss during operation (efficiency)
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage

PVsyst TRIAL
-0.04% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
-0.10% Night consumption
25807 kWh Available Energy at Inverter Output
25807 kWh Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
10/06/23 PVsyst Evaluation mode Page 5/7
Project: Imran Abbasi
Variant: New simulation variant

PVsyst V7.3.4
VC0, Simulation date:
10/06/23 18:06

PVsyst TRIAL
with v7.3.4

Predef. graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
10/06/23 PVsyst Evaluation mode Page 6/7
PVsyst V7.3.4
VC0, Simulation date:
10/06/23 18:06
with v7.3.4