You are on page 1of 7

Version 7.2.

21

PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System

Project: LAGHOUAT 500


Variant: Nouvelle variante de simulation
Tables on a building
System power: 5.40 kWp

PVsyst TRIAL Laghouat - Algeria

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: LAGHOUAT 500
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
15/05/23 19:10

PVsyst TRIAL
with v7.2.21

Project summary
Geographical Site Situation Project settings
Laghouat Latitude 33.80 °N Albedo 0.20
Algeria Longitude 2.87 °E
Altitude 763 m
Time zone UTC+1

Meteo data
Laghouat
NASA-SSE satellite data 1983-2005 - Synthétique

System summary

PVsyst TRIAL
Grid-Connected System Tables on a building

PV Field Orientation Near Shadings User's needs


Fixed plane Linear shadings Unlimited load (grid)
Tilt/Azimuth 30 / 0 °

System information
PV Array Inverters
Nb. of modules 18 units Nb. of units 1 unit
Pnom total 5.40 kWp Pnom total 5.00 kWac
Pnom ratio 1.080

Results summary
Produced Energy 8.82 MWh/year Specific production 1633 kWh/kWp/year Perf. Ratio PR 78.70 %

PVsyst TRIAL
Project and results summary
General parameters, PV Array Characteristics, System losses
Near shading definition - Iso-shadings diagram
Main results
Loss diagram
Table of contents
2
3
4
5
6
Special graphs 7

PVsyst TRIAL

PVsyst TRIAL
15/05/23 PVsyst Evaluation mode Page 2/7
Project: LAGHOUAT 500
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
15/05/23 19:10

PVsyst TRIAL
with v7.2.21

General parameters
Grid-Connected System Tables on a building

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Nb. of sheds 2 units Transposition Perez
Tilt/Azimuth 30 / 0 ° Sizes Diffuse Perez, Meteonorm
Sheds spacing 6.35 m Circumsolar separate
Collector width 3.01 m
Ground Cov. Ratio (GCR) 47.4 %
Shading limit angle
Limit profile angle 22.0 °

PVsyst TRIAL
Horizon Near Shadings User's needs
Free Horizon Linear shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model TDB156X156-72-P 300W Model SOFAR 5KTLM-G2
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 300 Wp Unit Nom. Power 5.00 kWac
Number of PV modules 18 units Number of inverters 2 * MPPT 50% 1 unit
Nominal (STC) 5.40 kWp Total power 5.0 kWac
Modules 2 Strings x 9 In series Operating voltage 90-580 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.08

PVsyst TRIAL
Pmpp 4759 Wp
U mpp 290 V
I mpp 16 A

Total PV power Total inverter power


Nominal (STC) 5 kWp Total power 5 kWac
Total 18 modules Number of inverters 1 unit
Module area 35.0 m² Pnom ratio 1.08
Cell area 31.0 m²

Array losses
Thermal Loss factor DC wiring losses LID - Light Induced Degradation
Module temperature according to irradiance Global array res. 303 mΩ Loss Fraction 1.3 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC

PVsyst TRIAL
Uv (wind) 0.0 W/m²K/m/s

Module Quality Loss Module mismatch losses Strings Mismatch loss


Loss Fraction 1.5 % Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

IAM loss factor


ASHRAE Param.: IAM = 1 - bo (1/cosi -1)
bo Param. 0.05

PVsyst TRIAL
15/05/23 PVsyst Evaluation mode Page 3/7
Project: LAGHOUAT 500
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
15/05/23 19:10

PVsyst TRIAL
with v7.2.21

Near shadings parameter


Perspective of the PV-field and surrounding shading scene

PVsyst TRIAL
Iso-shadings diagram

PVsyst TRIAL
Orientation #1

PVsyst TRIAL

PVsyst TRIAL
15/05/23 PVsyst Evaluation mode Page 4/7
Project: LAGHOUAT 500
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
15/05/23 19:10

PVsyst TRIAL
with v7.2.21

Main results
System Production
Produced Energy 8.82 MWh/year Specific production 1633 kWh/kWp/year
Performance Ratio PR 78.70 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh ratio
January 89.9 28.83 6.62 140.5 136.6 0.661 0.646 0.852

PVsyst TRIAL
February 109.2 31.92 8.83 152.1 148.2 0.699 0.684 0.833
March 153.4 46.81 12.55 186.1 181.2 0.834 0.815 0.811
April 181.2 54.90 16.37 192.5 186.5 0.841 0.822 0.791
May 205.5 65.41 21.60 197.7 191.2 0.844 0.825 0.773
June 208.2 65.70 26.91 191.3 184.8 0.792 0.774 0.749
July 217.6 63.86 30.17 204.4 197.7 0.827 0.808 0.732
August 189.7 60.76 29.56 194.7 188.9 0.791 0.773 0.735
September 158.4 48.90 24.54 182.9 177.9 0.766 0.748 0.758
October 124.0 40.92 18.70 162.9 158.7 0.713 0.696 0.792
November 90.9 30.60 12.44 137.4 133.7 0.632 0.617 0.832
December 81.2 26.97 7.96 132.6 128.8 0.623 0.609 0.850
Year 1809.3 565.58 18.07 2075.0 2014.2 9.023 8.818 0.787

PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
15/05/23 PVsyst Evaluation mode Page 5/7
Project: LAGHOUAT 500
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
15/05/23 19:10

PVsyst TRIAL
with v7.2.21

Loss diagram
1809 kWh/m² Global horizontal irradiation
+14.7% Global incident in coll. plane

-0.52% Near Shadings: irradiance loss

-2.43% IAM factor on global

2014 kWh/m² * 35 m² coll. Effective irradiation on collectors

efficiency at STC = 15.48% PV conversion

10.90 MWh Array nominal energy (at STC effic.)

PVsyst TRIAL -1.50%


-1.30%
-0.39%

-11.67%
PV loss due to irradiance level

PV loss due to temperature

Module quality loss


LID - Light induced degradation

-2.10% Mismatch loss, modules and strings

-1.14% Ohmic wiring loss


9.02 MWh Array virtual energy at MPP
-2.27% Inverter Loss during operation (efficiency)
0.00% Inverter Loss over nominal inv. power

PVsyst TRIAL
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
-0.01% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
8.82 MWh Available Energy at Inverter Output
8.82 MWh Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
15/05/23 PVsyst Evaluation mode Page 6/7
Project: LAGHOUAT 500
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
15/05/23 19:10

PVsyst TRIAL
with v7.2.21

Special graphs
Diagramme d'entrée/sortie journalier

PVsyst TRIAL

PVsyst TRIAL Distribution de la puissance de sortie système

PVsyst TRIAL

PVsyst TRIAL
15/05/23 PVsyst Evaluation mode Page 7/7

You might also like