PVsyst - Simulation report
Grid-Connected System
PVsyst TRIAL
Latifabad Unit:7 Block:B - Pakistan
PVsyst TRIAL
PVsyst TRIAL
Muhammad Hamza 19EL04
PVsyst TRIAL
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
Project summary
Geographical Site Situation Project settings
Latifabad Unit:7 Block:B Latitude 25.37 °N Albedo 0.20
Pakistan Longitude 68.36 °E
Altitude 25 m
Time zone UTC+5
Meteo data
Latifabad Unit:7 Block:B
Meteonorm 8.0 (1996-2015), Sat=100% - Synthetic
System summary
PVsyst TRIAL
Grid-Connected System Sumitted to: Dr.Nayyar Hussain Mirjat
System information
PV Array Inverters
Nb. of modules 16 units Nb. of units 1 unit
Pnom total 5.04 kWp Pnom total 4950 W
Pnom ratio 1.018
Results summary
Produced Energy 8.02 MWh/year Specific production 1591 kWh/kWp/year Perf. Ratio PR 79.17 %
Apparent energy 8.10 MVAh
PVsyst TRIAL
Project and results summary
PVsyst TRIAL
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 2/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
General parameters
Grid-Connected System Sumitted to: Dr.Nayyar Hussain Mirjat
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Transposition Perez
Tilt/Azimuth 25 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
PVsyst TRIAL
Power factor
Cos(phi) (lagging) 0.990
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model PM318B01_315 Model SUN2000-4.95KTL- JPL1
(Custom parameters definition) (Original PVsyst database)
Unit Nom. Power 315 Wp Unit Nom. Power 4.95 kWac
Number of PV modules 16 units Number of inverters 2 * MPPT 50% 1 unit
Nominal (STC) 5.04 kWp Total power 5.0 kWac
Modules 2 Strings x 8 In series Operating voltage 90-560 V
At operating cond. (50°C) Max. power (=>40°C) 5.21 kWac
Pmpp 4567 Wp Pnom ratio (DC:AC) 1.02
PVsyst TRIAL
U mpp 388 V
I mpp 12 A
Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 3.0 % Module temperature according to irradiance Global array res. 555 mΩ
Uc (const) 29.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
LID - Light Induced Degradation
Loss Fraction
0.1 %
Module Quality Loss
Loss Fraction
AC wiring losses
Inv. output line up to injection point
Inverter voltage 202 Vac mono
Loss Fraction 1.53 % at STC
Inverter: SUN2000-4.95KTL- JPL1
Wire section (1 Inv.) Copper 1 x 2 x 4 mm²
Wires length 13 m
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 3/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
PVsyst TRIAL
Iso-shadings diagram
PVsyst TRIAL
Orientation #1
PVsyst TRIAL
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 4/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
Main results
System Production
Produced Energy 8.02 MWh/year Specific production 1591 kWh/kWp/year
Apparent energy 8.10 MVAh Performance Ratio PR 79.17 %
Economic evaluation
Investment Yearly cost LCOE
Global 340000.00 INR Annuities 0.00 INR/yr Energy cost 6.00 INR/kWh
Specific 67.5 INR/Wp Run. costs 34464.60 INR/yr
Payback period 10.5 years
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
GlobHor DiffHor T_Amb GlobInc GlobEff EArray
kWh/m² kWh/m² °C kWh/m² kWh/m² MWh
January 118.7 47.9 16.82 157.2 149.3 0.687
February 129.3 55.3 20.16 157.8 149.9 0.677
March 170.1 76.2 26.32 188.3 178.7 0.783
April 184.2 87.2 30.32 186.5 176.7 0.760
May 200.3 101.4 33.83 189.0 178.5 0.760
June 189.7 103.4 33.58 174.1 164.4 0.705
July 161.9 105.5 32.32 150.5 141.8 0.616
August 153.6 101.7 30.53 150.1 141.7 0.620
September 165.4 80.2 29.90 176.7 167.5 0.729
October 149.6 70.0 28.71 175.0 166.2 0.724
November 121.2 50.8 22.97 156.5 148.6 0.665
December 110.1 49.9 18.15 147.4 139.9 0.643
PVsyst TRIAL
Year 1854.2 929.6 27.00 2009.0 1903.2 8.369
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation
T_Amb Ambient Temperature
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 5/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
Loss diagram
1854 kWh/m² Global horizontal irradiation
+8.4% Global incident in coll. plane
+0.75%
-0.62%
-8.40%
Array nominal energy (at STC effic.)
PV loss due to irradiance level
PVsyst TRIAL
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
-0.39% Night consumption
8.08 MWh Available Energy at Inverter Output
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 6/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
Special graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 7/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
PVsyst TRIAL
P99 7442 kWh
P95 7611 kWh
Probability distribution
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 8/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
PVsyst TRIAL
Wiring 1 5000.00 5000.00
Combiner box 1 4000.00 4000.00
Monitoring system, display screen 1 12000.00 12000.00
Measurement system, pyranometer 1 14000.00 14000.00
Surge arrester 1 10000.00 10000.00
Studies and analysis
Engineering 1 30000.00 30000.00
Installation
Transport 1 4000.00 4000.00
Grid connection 1 20000.00 20000.00
Total 340000.00
Depreciable asset 241000.00
PVsyst TRIAL
Operating costs
Item Total
INR/year
Maintenance
Repairs 20000.00
Cleaning 6900.00
Total (OPEX) 26900.00
Including inflation (2.00%) 34464.60
System summary
Total installation cost 340000.00 INR
Operating costs (incl. inflation 2.00%/year) 34464.60 INR/year
PVsyst TRIAL
Produced Energy 8017 kWh/year
Cost of produced energy (LCOE) 5.996 INR/kWh
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 9/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
Financial analysis
Simulation period
Project lifetime 25 years Start year 2023
PVsyst TRIAL
Financing
Own funds
Electricity sale
Feed-in tariff
Duration of tariff warranty
Annual connection tax
340000.00 INR
7.7000
20
0.00
INR/kWh
years
INR/kWh
Annual tariff variation 0.0 %/year
Feed-in tariff decrease after warranty 0.00 %
Return on investment
Payback period 10.5 years
Net present value (NPV) 347628.19 INR
Return on investment (ROI) 102.2 %
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 10/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
Financial analysis
Detailed economic results (INR)
PVsyst TRIAL
2030 61970 30900 0 31070 0 31070 -75124 77.9%
2031 61970 31518 0 30452 0 30452 -44672 86.9%
2032 61970 32148 0 29822 0 29822 -14850 95.6%
2033 61970 32791 0 29179 0 29179 14329 104.2%
2034 61970 33447 0 28523 0 28523 42852 112.6%
2035 61970 34116 0 27854 0 27854 70706 120.8%
2036 61970 34798 0 27172 0 27172 97877 128.8%
2037 61970 35494 0 26476 0 26476 124353 136.6%
2038 61970 36204 0 25766 0 25766 150119 144.2%
2039 61970 36928 0 25042 0 25042 175161 151.5%
2040 61970 37666 0 24303 0 24303 199464 158.7%
2041 61970 38420 0 23550 0 23550 223014 165.6%
2042 61970 39188 0 22782 0 22782 245795 172.3%
2043 61970 39972 0 21998 0 21998 267793 178.8%
PVsyst TRIAL
2044 61970 40771 0 21198 0 21198 288991 185.0%
2045 61970 41587 0 20383 0 20383 309374 191.0%
2046 61970 42419 0 19551 0 19551 328925 196.7%
2047 61970 43267 0 18703 0 18703 347628 202.2%
Total 1549243 861615 0 687628 0 687628 347628 202.2%
PVsyst TRIAL
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 11/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
Financial analysis
Yearly net profit (kINR)
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 12/13
Project: 5 KW Solar Model By 19EL04
Variant: New simulation variant
PVsyst V7.2.21
VC0, Simulation date:
20/12/22 02:44
PVsyst TRIAL
with v7.2.21
PVsyst TRIAL
Annual degradation: 1.0 %
PVsyst TRIAL
Inverters 294 kgCO2/units 1.00 units 294
PVsyst TRIAL
PVsyst TRIAL
20/12/22 PVsyst Evaluation mode Page 13/13