You are on page 1of 9

Version 7.3.

PVsyst - Simulation report


Grid-Connected System

Project: CCI BOKAJAN ASSAM_ 1MWp GROUND MOUNTED SOLAR PROJECT


Variant: New simulation variant
Sheds, single array
System power: 1003 kWp
Bokajān - India

Author
Saatvik Green Energy Pvt Ltd (India)
Project: CCI BOKAJAN ASSAM_ 1MWp GROUND
MOUNTED SOLAR PROJECT
PVsyst V7.3.4
Variant: New simulation variant
VC0, Simulation date:
31/07/23 16:53 Saatvik Green Energy Pvt Ltd (India)
with v7.3.4

Project summary
Geographical Site Situation Project settings
Bokajān Latitude 26.01 °N Albedo 0.20
India Longitude 93.76 °E
Altitude 129 m
Time zone UTC+5.5

Meteo data
Bokajān
Meteonorm 8.1 (1991-2000), Sat=100% - Synthetic

System summary
Grid-Connected System Sheds, single array

PV Field Orientation Near Shadings User's needs


Fixed plane Linear shadings Unlimited load (grid)
Tilt/Azimuth 20 / 0 °

System information
PV Array Inverters
Nb. of modules 1840 units Nb. of units 6 units
Pnom total 1003 kWp Pnom total 750 kWac
Pnom ratio 1.337

Results summary
Produced Energy 1347019 kWh/year Specific production 1343 kWh/kWp/year Perf. Ratio PR 79.23 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Near shading definition - Iso-shadings diagram 5
Main results 6
Loss diagram 7
Predef. graphs 8
P50 - P90 evaluation 9

31/07/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 2/9
Project: CCI BOKAJAN ASSAM_ 1MWp GROUND
MOUNTED SOLAR PROJECT
PVsyst V7.3.4
Variant: New simulation variant
VC0, Simulation date:
31/07/23 16:53 Saatvik Green Energy Pvt Ltd (India)
with v7.3.4

General parameters
Grid-Connected System Sheds, single array

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Nb. of sheds 16 units Transposition Perez
Tilt/Azimuth 20 / 0 ° Single array Diffuse Perez, Meteonorm
Sizes Circumsolar separate
Sheds spacing 6.50 m
Collector width 4.58 m
Ground Cov. Ratio (GCR) 70.4 %
Top inactive band 0.02 m
Bottom inactive band 0.02 m
Shading limit angle
Limit profile angle 35.8 °

Horizon Near Shadings User's needs


Free Horizon Linear shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Saatvik Green Energy Pvt. Ltd Manufacturer Sungrow
Model SGE545-144MHC_15092022 Model SG125CX-P2
(Custom parameters definition) (Custom parameters definition)
Unit Nom. Power 545 Wp Unit Nom. Power 125 kWac
Number of PV modules 1840 units Number of inverters 6 units
Nominal (STC) 1003 kWp Total power 750 kWac
Modules 92 Strings x 20 In series Operating voltage 180-1000 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.34
Pmpp 921 kWp Power sharing within this inverter
U mpp 778 V
I mpp 1184 A

Total PV power Total inverter power


Nominal (STC) 1003 kWp Total power 750 kWac
Total 1840 modules Number of inverters 6 units
Module area 4753 m² Pnom ratio 1.34
Cell area 4388 m²

Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 5.0 % Module temperature according to irradiance Global array res. 11 mΩ
Uc (const) 29.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Serie Diode Loss LID - Light Induced Degradation Module Quality Loss
Voltage drop 0.7 V Loss Fraction 2.0 % Loss Fraction 0.0 %
Loss Fraction 0.1 % at STC

Module mismatch losses Strings Mismatch loss


Loss Fraction 0.5 % at MPP Loss Fraction 0.2 %

31/07/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 3/9
Project: CCI BOKAJAN ASSAM_ 1MWp GROUND
MOUNTED SOLAR PROJECT
PVsyst V7.3.4
Variant: New simulation variant
VC0, Simulation date:
31/07/23 16:53 Saatvik Green Energy Pvt Ltd (India)
with v7.3.4

Array losses
IAM loss factor
Incidence effect (IAM): User defined profile

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 1.000 1.000 1.000 1.000 0.985 0.943 0.840 0.000

System losses
Unavailability of the system
Time fraction 2.0 %
7.3 days,
3 periods

AC wiring losses
Inv. output line up to injection point
Inverter voltage 400 Vac tri
Loss Fraction 1.60 % at STC
Inverter: SG125CX-P2
Wire section (6 Inv.) Copper 6 x 3 x 120 mm²
Average wires length 100 m

31/07/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 4/9
Project: CCI BOKAJAN ASSAM_ 1MWp GROUND
MOUNTED SOLAR PROJECT
PVsyst V7.3.4
Variant: New simulation variant
VC0, Simulation date:
31/07/23 16:53 Saatvik Green Energy Pvt Ltd (India)
with v7.3.4

Near shadings parameter


Perspective of the PV-field and surrounding shading scene

Iso-shadings diagram
Orientation #1

31/07/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 5/9
Project: CCI BOKAJAN ASSAM_ 1MWp GROUND
MOUNTED SOLAR PROJECT
PVsyst V7.3.4
Variant: New simulation variant
VC0, Simulation date:
31/07/23 16:53 Saatvik Green Energy Pvt Ltd (India)
with v7.3.4

Main results
System Production
Produced Energy 1347019 kWh/year Specific production 1343 kWh/kWp/year
Perf. Ratio PR 79.23 %

Normalized productions (per installed kWp) Performance Ratio PR

Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 110.9 47.59 16.85 140.9 129.4 119578 115709 0.819
February 112.2 57.12 19.72 131.8 122.2 111869 108322 0.820
March 150.4 80.03 23.34 163.8 152.3 137163 132846 0.809
April 142.5 89.87 24.66 143.6 132.6 119756 116058 0.806
May 143.0 82.03 26.87 136.8 126.4 112941 101781 0.742
June 136.8 86.10 27.96 128.7 118.5 106340 97240 0.753
July 129.6 88.93 28.78 123.0 113.0 101013 97979 0.794
August 142.8 85.32 29.07 140.7 130.0 115876 104850 0.743
September 130.5 72.81 27.93 137.2 127.2 113029 109473 0.795
October 125.1 60.55 26.25 142.9 132.8 118329 114546 0.799
November 123.3 45.02 21.87 157.4 145.4 131933 127766 0.809
December 111.6 40.29 18.32 148.4 135.4 124424 120451 0.809
Year 1558.8 835.68 24.33 1695.3 1565.2 1412252 1347019 0.792

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

31/07/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 6/9
Project: CCI BOKAJAN ASSAM_ 1MWp GROUND
MOUNTED SOLAR PROJECT
PVsyst V7.3.4
Variant: New simulation variant
VC0, Simulation date:
31/07/23 16:53 Saatvik Green Energy Pvt Ltd (India)
with v7.3.4

Loss diagram
1559 kWh/m² Global horizontal irradiation
+8.8% Global incident in coll. plane

-2.65% Near Shadings: irradiance loss

-0.17% IAM factor on global

-5.00% Soiling loss factor

1565 kWh/m² * 4753 m² coll. Effective irradiation on collectors

efficiency at STC = 21.16% PV conversion

1573977 kWh Array nominal energy (at STC effic.)

-1.16% PV loss due to irradiance level

-5.63% PV loss due to temperature

-2.00% LID - Light induced degradation

-0.65% Mismatch loss, modules and strings

-0.97% Ohmic wiring loss


1415500 kWh Array virtual energy at MPP

-2.35% Inverter Loss during operation (efficiency)

-0.23% Inverter Loss over nominal inv. power


0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
-0.01% Night consumption
1378760 kWh Available Energy at Inverter Output

-0.77% AC ohmic loss

-1.54% System unavailability

1347019 kWh Energy injected into grid

31/07/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 7/9
Project: CCI BOKAJAN ASSAM_ 1MWp GROUND
MOUNTED SOLAR PROJECT
PVsyst V7.3.4
Variant: New simulation variant
VC0, Simulation date:
31/07/23 16:53 Saatvik Green Energy Pvt Ltd (India)
with v7.3.4

Predef. graphs
Daily Input/Output diagram

System Output Power Distribution

31/07/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 8/9
Project: CCI BOKAJAN ASSAM_ 1MWp GROUND
MOUNTED SOLAR PROJECT
PVsyst V7.3.4
Variant: New simulation variant
VC0, Simulation date:
31/07/23 16:53 Saatvik Green Energy Pvt Ltd (India)
with v7.3.4

P50 - P90 evaluation


Meteo data Simulation and parameters uncertainties
Source Meteonorm 8.1 (1991-2000), Sat=100% PV module modelling/parameters 1.0 %
Kind Monthly averages Inverter efficiency uncertainty 0.5 %
Synthetic - Multi-year average Soiling and mismatch uncertainties 1.0 %
Year-to-year variability(Variance) 5.1 % Degradation uncertainty 1.0 %
Specified Deviation
Climate change 0.0 %

Global variability (meteo + system) Annual production probability


Variability (Quadratic sum) 5.4 % Variability 72.8 MWh
P50 1347.0 MWh
P90 1253.7 MWh
P75 1298.0 MWh

Probability distribution

31/07/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 9/9