You are on page 1of 7

Version 7.3.

PVsyst - Simulation report


Grid-Connected System

Project: Coca-Cola Beverages Philippines Inc. – Misamis Oriental


Variant: New simulation variant
No 3D scene defined, no shadings
System power: 279 kWp
Villanueva, Misamis Oriental - Philippines

Author
Project: Coca-Cola Beverages Philippines Inc. – Misamis
Oriental
PVsyst V7.3.1
Variant: New simulation variant
VC0, Simulation date:
01/19/24 16:31
with v7.3.1

Project summary
Geographical Site Situation Project settings
Villanueva, Misamis Oriental Latitude 8.58 °N Albedo 0.20
Philippines Longitude 124.77 °E
Altitude 12 m
Time zone UTC+8

Meteo data
Villanueva, Misamis Oriental
Meteonorm 8.1 (2016-2021), Sat=100% - Synthetic

System summary
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 10 / -160 °

System information
PV Array Inverters
Nb. of modules 697 units Nb. of units 6 units
Pnom total 279 kWp Pnom total 240 kWac
Pnom ratio 1.162

Results summary
Produced Energy 469044 kWh/year Specific production 1682 kWh/kWp/year Perf. Ratio PR 83.90 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 5
Loss diagram 6
Predef. graphs 7

01/19/24 Page 2/7


Project: Coca-Cola Beverages Philippines Inc. – Misamis
Oriental
PVsyst V7.3.1
Variant: New simulation variant
VC0, Simulation date:
01/19/24 16:31
with v7.3.1

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 10 / -160 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer CSI Solar Manufacturer SolarEdge
Model CS3W-400P HE Model SE40K-EU-APAC/AUS
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 400 Wp Unit Nom. Power 40.0 kWac
Number of PV modules 697 units Number of inverters 6 units
Nominal (STC) 279 kWp Total power 240 kWac
Optimizer Array 17 Strings x 41 In series Operating voltage 850 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.04
Pmpp 253 kWp
Output of optimizers
Voper 850 V
I at Poper 298 A

SolarEdge Power Optimizer


Model P401 WorldWide
Unit Nom. Power 400 W
Input modules One module

Physical inverters
SE40K-EU-APAC/AUS
Inverters #1, #2, #3, #4, #5 with 3 strings
3 strings of 41 optimizers P401 WorldWide
SE40K-EU-APAC/AUS
Inverter #6 with 2 strings
2 strings of 41 optimizers P401 WorldWide

Total PV power Total inverter power


Nominal (STC) 279 kWp Total power 240 kWac
Total 697 modules Number of inverters 6 units
Module area 1540 m² Pnom ratio 1.16
Cell area 1383 m²

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 39 mΩ Loss Fraction -0.3 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses


Loss Fraction (Fixed voltage) 0.0 %

01/19/24 Page 3/7


Project: Coca-Cola Beverages Philippines Inc. – Misamis
Oriental
PVsyst V7.3.1
Variant: New simulation variant
VC0, Simulation date:
01/19/24 16:31
with v7.3.1

Array losses
IAM loss factor
Incidence effect (IAM): User defined profile

10° 20° 30° 40° 50° 60° 70° 80° 90°


1.000 1.000 1.000 0.990 0.990 0.970 0.920 0.760 0.000

01/19/24 Page 4/7


Project: Coca-Cola Beverages Philippines Inc. – Misamis
Oriental
PVsyst V7.3.1
Variant: New simulation variant
VC0, Simulation date:
01/19/24 16:31
with v7.3.1

Main results
System Production
Produced Energy 469044 kWh/year Specific production 1682 kWh/kWp/year
Performance Ratio PR 83.90 %

Normalized productions (per installed kWp) Performance Ratio PR

Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 152.3 69.70 26.08 138.8 135.0 33494 32950 0.852
February 155.6 60.28 26.24 145.2 142.2 34808 34242 0.846
March 186.9 78.45 27.01 181.6 178.3 43028 42332 0.836
April 191.5 72.85 27.54 192.7 189.9 45155 44425 0.827
May 181.4 80.63 28.11 186.8 184.0 44235 43521 0.836
June 172.0 67.60 27.18 179.8 177.2 42526 41838 0.835
July 173.4 76.12 27.46 180.2 177.4 42806 42116 0.838
August 179.9 81.01 27.60 182.9 180.2 43438 42737 0.838
September 172.7 76.60 27.11 170.8 167.9 40407 39757 0.835
October 186.7 67.12 27.29 175.7 171.9 41843 41170 0.840
November 154.1 63.53 26.60 140.8 136.9 33759 33215 0.846
December 144.1 69.14 26.71 129.8 125.6 31245 30742 0.850
Year 2050.6 863.03 27.08 2005.1 1966.3 476743 469044 0.839

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

01/19/24 Page 5/7


Project: Coca-Cola Beverages Philippines Inc. – Misamis
Oriental
PVsyst V7.3.1
Variant: New simulation variant
VC0, Simulation date:
01/19/24 16:31
with v7.3.1

Loss diagram
2051 kWh/m² Global horizontal irradiation

-2.22% Global incident in coll. plane


-1.93% IAM factor on global

1966 kWh/m² * 1540 m² coll. Effective irradiation on collectors

efficiency at STC = 18.12% PV conversion

548501 kWh Array nominal energy (at STC effic.)


-0.60% PV loss due to irradiance level

-11.02% PV loss due to temperature

-0.77% Optimizer efficiency loss


-0.47% Optimizer current overload loss
+0.33% Module quality loss

0.00% Module array mismatch loss


-0.82% Ohmic wiring loss
476743 kWh Array virtual energy at MPP
-1.61% Inverter Loss during operation (efficiency)
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
469044 kWh Available Energy at Inverter Output
469044 kWh Energy injected into grid

01/19/24 Page 6/7


Project: Coca-Cola Beverages Philippines Inc. – Misamis
Oriental
PVsyst V7.3.1
Variant: New simulation variant
VC0, Simulation date:
01/19/24 16:31
with v7.3.1

Predef. graphs
Daily Input/Output diagram

System Output Power Distribution

01/19/24 Page 7/7