Project summary
Geographical Site Situation Project settings
Calchaquí Latitude -29.81 °S Albedo 0.20
Argentina Longitude -60.56 °W
Altitude 42 m
Time zone UTC-3
Weather data
Calchaquí
Meteonorm 8.1 (2001-2010), Sat=100% - Sintético
System summary
PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
Nb. of modules 26 units Nb. of units 1 unit
Pnom total 6.76 kWp Pnom total 6.50 kWac
Pnom ratio 1.040
User's needs
Unlimited load (grid)
PVsyst TRIAL
Produced Energy 11922.57 kWh/year
Table of contents
2
3
Main results 4
Loss diagram 5
Predef. graphs 6
Single-line diagram 7
PVsyst TRIAL
PVsyst TRIAL
11/04/24 PVsyst Evaluation mode Page 2/7
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
11/04/24 14:09
PVsyst TRIAL
with V7.4.6
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Tracking algorithm Trackers configuration
Tracking sun-shields Astronomic calculation No 3D scene defined
Facade orientation 0°
Models used
Transposition Perez
Diffuse Perez, Meteonorm
Circumsolar separate
PVsyst TRIAL
Free Horizon No Shadings Unlimited load (grid)
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model AXIpremium AC-260M/156-60S Model HPS-6500
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 260 Wp Unit Nom. Power 6.50 kWac
Number of PV modules 26 units Number of inverters 2 * MPPT 50% 1 unit
Nominal (STC) 6.76 kWp Total power 6.5 kWac
Modules 2 string x 13 In series Operating voltage 80-550 V
At operating cond. (50°C) Max. power (=>25°C) 6.60 kWac
Pmpp 6.09 kWp Pnom ratio (DC:AC) 1.04
PVsyst TRIAL
U mpp 359 V No power sharing between MPPTs
I mpp 17 A
Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 353 mΩ Loss Fraction -0.5 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
Module mismatch losses
Loss Fraction 2.0 % at MPP
IAM loss factor
ASHRAE Param.: IAM = 1 - bo (1/cosi -1)
bo Param. 0.05
PVsyst TRIAL
11/04/24 PVsyst Evaluation mode Page 3/7
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
11/04/24 14:09
PVsyst TRIAL
with V7.4.6
Main results
System Production
Produced Energy 11922.57 kWh/year Specific production 1764 kWh/kWp/year
Perf. Ratio PR 83.19 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
February 176.7 70.01 25.69 181.9 177.5 1012 989 0.804
March 162.2 66.97 23.50 180.6 176.6 1022 998 0.818
April 127.4 50.57 20.08 160.4 157.4 924 903 0.833
May 101.9 40.04 16.48 155.2 152.7 919 898 0.856
June 86.4 34.23 13.77 143.6 141.6 868 848 0.874
July 93.0 35.71 13.11 148.1 145.9 894 873 0.872
August 122.0 47.61 15.13 169.9 167.0 1012 990 0.862
September 143.2 58.13 17.35 166.0 162.6 970 947 0.844
October 173.3 77.50 20.75 181.2 176.7 1041 1017 0.830
November 192.9 82.66 22.63 194.0 189.3 1099 1074 0.819
December 222.4 88.96 25.30 221.4 216.0 1235 1206 0.806
Year 1819.3 739.18 20.02 2120.0 2075.7 12202 11923 0.832
PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
11/04/24 PVsyst Evaluation mode Page 4/7
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
11/04/24 14:09
PVsyst TRIAL
with V7.4.6
Loss diagram
1819 kWh/m² Global horizontal irradiation
+16.5% Global incident in coll. plane
PVsyst TRIAL
-0.29% PV loss due to irradiance level
PVsyst TRIAL
-0.05% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
11923 kWh Available Energy at Inverter Output
11923 kWh Energy injected into grid
PVsyst TRIAL
PVsyst TRIAL
11/04/24 PVsyst Evaluation mode Page 5/7
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
11/04/24 14:09
PVsyst TRIAL
with V7.4.6
Predef. graphs
Diagrama entrada/salida diaria
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
11/04/24 PVsyst Evaluation mode Page 6/7
PVsyst V7.4.6
VC0, Simulation date:
11/04/24 14:09
PVsyst TRIAL
with V7.4.6
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL