Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant
No 3D scene defined, no shadings
System power: 7.60 kWp
Casablanca/Oulfa - Morocco
PVsyst TRIAL
PVsyst TRIAL
PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9
Project summary
Geographical Site Situation Project settings
Casablanca/Oulfa Latitude 33.57 °N Albedo 0.20
Morocco Longitude -7.67 °W
Altitude 55 m
PVsyst TRIAL
Time zone UTC
Meteo data
Casablanca/Oulfa
MeteoNorm 8.0 station (modified by user) - Synthetic
System summary
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
PVsyst TRIAL
Nb. of modules 20 units Nb. of units 2 units
Pnom total 7.60 kWp Pnom total 6.00 kWac
Pnom ratio 1.267
Results summary
Produced Energy 13.55 MWh/year Specific production 1783 kWh/kWp/year Perf. Ratio PR 84.73 %
Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
Special graphs 6
PVsyst TRIAL
PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 2/6
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant
PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Sheds configuration Models used
PVsyst TRIAL
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 33 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model BXO-380 XL Model X1-Air-3.0kW
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 380 Wp Unit Nom. Power 3.00 kWac
Number of PV modules 20 units Number of inverters 2 units
PVsyst TRIAL
Nominal (STC) 7.60 kWp Total power 6.0 kWac
Modules 2 Strings x 10 In series Operating voltage 70-580 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.27
Pmpp 6.89 kWp
U mpp 356 V
I mpp 19 A
Array losses
PVsyst TRIAL
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 306 mΩ Loss Fraction -0.5 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 3/6
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant
PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9
Main results
System Production
Produced Energy 13.55 MWh/year Specific production 1783 kWh/kWp/year
Performance Ratio PR 84.73 %
PVsyst TRIAL
Normalized productions (per installed kWp) Performance Ratio PR
PVsyst TRIAL
January
GlobHor
kWh/m²
90.7
DiffHor
kWh/m²
33.00
Balances and main results
T_Amb
°C
13.70
GlobInc
kWh/m²
139.9
GlobEff
kWh/m²
138.1
EArray
MWh
0.954
E_Grid
MWh
0.925
PR
ratio
0.870
February 115.0 38.30 13.90 162.3 160.1 1.103 1.070 0.867
March 156.1 56.80 15.90 187.1 183.8 1.241 1.204 0.847
April 184.8 67.70 17.20 192.2 188.3 1.270 1.231 0.843
May 213.5 80.10 19.70 200.5 195.9 1.324 1.284 0.843
June 219.7 84.60 21.50 196.9 192.2 1.297 1.258 0.840
July 224.2 83.60 23.30 206.0 201.2 1.343 1.303 0.832
August 205.3 78.10 24.00 207.3 203.1 1.346 1.306 0.829
PVsyst TRIAL
September 167.0 56.00 22.50 191.0 187.4 1.245 1.207 0.832
October 127.6 49.60 20.90 168.3 165.6 1.115 1.081 0.846
November 92.8 36.60 16.70 138.3 136.3 0.941 0.912 0.868
December 74.3 35.20 14.30 114.8 113.1 0.795 0.771 0.884
Year 1871.0 699.60 18.66 2104.5 2065.1 13.973 13.552 0.847
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 4/6
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant
PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9
Loss diagram
1871 kWh/m² Global horizontal irradiation
+12.5% Global incident in coll. plane
PVsyst TRIAL
-1.87% IAM factor on global
PVsyst TRIAL
14.01 MWh Array virtual energy at MPP
PVsyst TRIAL
PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 5/6
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant
PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9
Special graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
System Output Power Distribution
PVsyst TRIAL
PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 6/6