You are on page 1of 6

Version 7.2.

PVsyst - Simulation report


Grid-Connected System

PVsyst TRIAL
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant
No 3D scene defined, no shadings
System power: 7.60 kWp
Casablanca/Oulfa - Morocco

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL Author


Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant

PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9

Project summary
Geographical Site Situation Project settings
Casablanca/Oulfa Latitude 33.57 °N Albedo 0.20
Morocco Longitude -7.67 °W
Altitude 55 m

PVsyst TRIAL
Time zone UTC

Meteo data
Casablanca/Oulfa
MeteoNorm 8.0 station (modified by user) - Synthetic

System summary
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 33 / 0 °

System information
PV Array Inverters

PVsyst TRIAL
Nb. of modules 20 units Nb. of units 2 units
Pnom total 7.60 kWp Pnom total 6.00 kWac
Pnom ratio 1.267

Results summary
Produced Energy 13.55 MWh/year Specific production 1783 kWh/kWp/year Perf. Ratio PR 84.73 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
Special graphs 6

PVsyst TRIAL

PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 2/6
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant

PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used

PVsyst TRIAL
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 33 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model BXO-380 XL Model X1-Air-3.0kW
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 380 Wp Unit Nom. Power 3.00 kWac
Number of PV modules 20 units Number of inverters 2 units

PVsyst TRIAL
Nominal (STC) 7.60 kWp Total power 6.0 kWac
Modules 2 Strings x 10 In series Operating voltage 70-580 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.27
Pmpp 6.89 kWp
U mpp 356 V
I mpp 19 A

Total PV power Total inverter power


Nominal (STC) 8 kWp Total power 6 kWac
Total 20 modules Number of inverters 2 units
Module area 39.0 m² Pnom ratio 1.27
Cell area 34.2 m²

Array losses

PVsyst TRIAL
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 306 mΩ Loss Fraction -0.5 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses Strings Mismatch loss


Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

IAM loss factor


Incidence effect (IAM): Fresnel AR coating, n(glass)=1.526, n(AR)=1.290

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 0.999 0.987 0.962 0.892 0.816 0.681 0.440 0.000

PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 3/6
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant

PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9

Main results
System Production
Produced Energy 13.55 MWh/year Specific production 1783 kWh/kWp/year
Performance Ratio PR 84.73 %

PVsyst TRIAL
Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
January
GlobHor
kWh/m²
90.7
DiffHor
kWh/m²
33.00
Balances and main results

T_Amb
°C
13.70
GlobInc
kWh/m²
139.9
GlobEff
kWh/m²
138.1
EArray
MWh
0.954
E_Grid
MWh
0.925
PR
ratio
0.870
February 115.0 38.30 13.90 162.3 160.1 1.103 1.070 0.867
March 156.1 56.80 15.90 187.1 183.8 1.241 1.204 0.847
April 184.8 67.70 17.20 192.2 188.3 1.270 1.231 0.843
May 213.5 80.10 19.70 200.5 195.9 1.324 1.284 0.843
June 219.7 84.60 21.50 196.9 192.2 1.297 1.258 0.840
July 224.2 83.60 23.30 206.0 201.2 1.343 1.303 0.832
August 205.3 78.10 24.00 207.3 203.1 1.346 1.306 0.829

PVsyst TRIAL
September 167.0 56.00 22.50 191.0 187.4 1.245 1.207 0.832
October 127.6 49.60 20.90 168.3 165.6 1.115 1.081 0.846
November 92.8 36.60 16.70 138.3 136.3 0.941 0.912 0.868
December 74.3 35.20 14.30 114.8 113.1 0.795 0.771 0.884
Year 1871.0 699.60 18.66 2104.5 2065.1 13.973 13.552 0.847

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 4/6
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant

PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9

Loss diagram
1871 kWh/m² Global horizontal irradiation
+12.5% Global incident in coll. plane

PVsyst TRIAL
-1.87% IAM factor on global

2065 kWh/m² * 39 m² coll. Effective irradiation on collectors

efficiency at STC = 19.61% PV conversion

15.78 MWh Array nominal energy (at STC effic.)


-0.27% PV loss due to irradiance level

-8.47% PV loss due to temperature

+0.50% Module quality loss

-2.10% Mismatch loss, modules and strings

-1.12% Ohmic wiring loss

PVsyst TRIAL
14.01 MWh Array virtual energy at MPP

-3.00% Inverter Loss during operation (efficiency)

-0.28% Inverter Loss over nominal inv. power


0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
13.55 MWh Available Energy at Inverter Output
13.55 MWh Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 5/6
Project: Ahmed Alaa Elgaml sec (2)
Variant: New simulation variant

PVsyst V7.2.9
VC0, Simulation date:
19/12/21 00:28
with v7.2.9

Special graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL
System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
19/12/21 PVsyst Evaluation mode Page 6/6

You might also like