PVsyst - Simulation report
Grid-Connected System

Project: 200kW ongrid system Askari 13 RWP


Variant: New simulation variant
No 3D scene defined, no shadings
System power: 154 kWp

PVsyst TRIAL
Askari 13 rawalpindi - Pakistan

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: 200kW ongrid system Askari 13 RWP
Variant: New simulation variant

PVsyst V7.4.5
VC0, Simulation date:
03/04/24 11:05

PVsyst TRIAL
with v7.4.5

Project summary
Geographical Site Situation Project settings
Askari 13 rawalpindi Latitude 33.57 °N Albedo 0.20
Pakistan Longitude 73.06 °E
Altitude 508 m
Time zone UTC+5

Meteo data
askari 13 rawalpindi
Meteonorm 8.1 (2016-2021), Sat=100% - Synthetic

System summary

PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 30 / 0 °

System information
PV Array Inverters
Nb. of modules 266 units Nb. of units 0.8 unit
Pnom total 154 kWp Pnom total 156 kWac
Pnom ratio 0.992

Results summary
Produced Energy 227564 kWh/year Specific production 1475 kWh/kWp/year Perf. Ratio PR 86.73 %

PVsyst TRIAL
Project and results summary

Main results
Loss diagram
Predef. graphs
Table of contents

General parameters, PV Array Characteristics, System losses


2
3
4
5
6

PVsyst TRIAL

PVsyst TRIAL
03/04/24 PVsyst Evaluation mode Page 2/6
Project: 200kW ongrid system Askari 13 RWP
Variant: New simulation variant

PVsyst V7.4.5
VC0, Simulation date:
03/04/24 11:05

PVsyst TRIAL
with v7.4.5

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Transposition Perez
Tilt/Azimuth 30 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model LR5-72HTH-580M Model SUN2000-215KTL-H0
(Custom parameters definition) (Original PVsyst database)
Unit Nom. Power 580 Wp Unit Nom. Power 200 kWac
Number of PV modules 266 units Number of inverters 7 * MPPT 11% 0.8 unit
Nominal (STC) 154 kWp Total power 156 kWac
Modules 14 string x 19 In series Operating voltage 550-1500 V
At operating cond. (50°C) Max. power (=>30°C) 215 kWac
Pmpp 140 kWp Pnom ratio (DC:AC) 0.99
U mpp 738 V No power sharing between MPPTs
I mpp 190 A

PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 154 kWp Total power 156 kWac
Total 266 modules Nb. of inverters 1 unit
Module area 687 m² 0.2 unused
Cell area 469 m² Pnom ratio 0.99

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 65 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses Strings Mismatch loss


Loss Fraction 1.0 % at MPP Loss Fraction 0.1 %

PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): User defined profile

0° 25° 45° 60° 65° 70° 75° 80° 90°


1.000 1.000 0.995 0.962 0.936 0.903 0.851 0.754 0.000

PVsyst TRIAL
03/04/24 PVsyst Evaluation mode Page 3/6
Project: 200kW ongrid system Askari 13 RWP
Variant: New simulation variant

PVsyst V7.4.5
VC0, Simulation date:
03/04/24 11:05

PVsyst TRIAL
with v7.4.5

Main results
System Production
Produced Energy 227564 kWh/year Specific production 1475 kWh/kWp/year
Perf. Ratio PR 86.73 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 69.9 35.20 10.27 99.7 98.2 14387 14205 0.924

PVsyst TRIAL
February 80.5 47.69 13.21 99.7 98.2 14265 14087 0.916
March 119.7 65.53 18.93 135.0 132.7 18600 18372 0.882
April 155.9 80.75 23.92 161.4 158.2 21662 21411 0.860
May 182.1 96.12 29.71 174.9 171.2 22933 22653 0.839
June 182.8 96.33 31.32 170.2 166.8 22223 21957 0.836
July 180.0 98.53 30.47 169.9 166.5 22345 22073 0.842
August 158.9 92.84 29.09 158.9 155.9 21103 20849 0.850
September 148.2 72.65 27.06 164.3 161.4 21806 21561 0.850
October 118.7 55.62 22.92 149.8 147.7 20289 20052 0.868
November 78.4 38.39 16.15 108.9 107.3 15258 15074 0.897
December 72.6 34.75 11.59 107.8 106.4 15462 15271 0.919
Year 1547.8 814.39 22.10 1700.7 1670.5 230331 227564 0.867

PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
03/04/24 PVsyst Evaluation mode Page 4/6
Project: 200kW ongrid system Askari 13 RWP
Variant: New simulation variant

PVsyst V7.4.5
VC0, Simulation date:
03/04/24 11:05

PVsyst TRIAL
with v7.4.5

Loss diagram
1548 kWh/m² Global horizontal irradiation
+9.9% Global incident in coll. plane

-1.78% IAM factor on global

1670 kWh/m² * 687 m² coll. Effective irradiation on collectors

efficiency at STC = 22.49% PV conversion

258149 kWh Array nominal energy (at STC effic.)

PVsyst TRIAL
-0.32% PV loss due to irradiance level

-9.26% PV loss due to temperature

+0.75% Module quality loss

-1.10% Mismatch loss, modules and strings


-1.00% Ohmic wiring loss
230331 kWh Array virtual energy at MPP
-1.20% Inverter Loss during operation (efficiency)
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage

PVsyst TRIAL
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
227564 kWh Available Energy at Inverter Output
227564 kWh Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
03/04/24 PVsyst Evaluation mode Page 5/6
Project: 200kW ongrid system Askari 13 RWP
Variant: New simulation variant

PVsyst V7.4.5
VC0, Simulation date:
03/04/24 11:05

PVsyst TRIAL
with v7.4.5

Predef. graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
03/04/24 PVsyst Evaluation mode Page 6/6