Project: Mini Grid for Kisooba Trading Center in Luweero
District
PVsyst V7.3.1
Variant: New simulation variant
VC0, Simulation date:
17/03/24 16:22
with v7.3.1
Project summary
Geographical Site Situation Project settings
Mubanda Latitude 0.61 °N Albedo 0.20
Uganda Longitude 32.49 °E
Altitude 1229 m
Time zone UTC+3
Meteo data
Mini Grid for Kisooba Trading Center in Luweero Di
Meteonorm 8.1 (1991-2007), Sat=100% - Synthetic
System summary
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
Nb. of modules 234 units Nb. of units 1 unit
Pnom total 101 kWp Pnom total 100 kWac
Pnom ratio 1.006
Results summary
Produced Energy 184314 kWh/year Specific production 1832 kWh/kWp/year Perf. Ratio PR 85.15 %
Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
Predef. graphs 6
Single-line diagram 7
Cost of the system 8
Financial analysis 10
CO₂ Emission Balance 13
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 12 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
PV Array Characteristics
PV module Inverter
Manufacturer Jinkosolar Manufacturer Eltek Valere
Model JKM-430N-54HL4 Model Theia Central 100 TL
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 430 Wp Unit Nom. Power 100 kWac
Number of PV modules 234 units Number of inverters 1 unit
Nominal (STC) 101 kWp Total power 100 kWac
Modules 13 Strings x 18 In series Operating voltage 450-820 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.01
Pmpp 93.1 kWp
U mpp 528 V
I mpp 176 A
Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 49 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
Main results
System Production
Produced Energy 184314 kWh/year Specific production 1832 kWh/kWp/year
Performance Ratio PR 85.15 %
Economic evaluation
Investment Yearly cost LCOE
Global 64,019.96 USD Annuities 0.00 USD/yr Energy cost 0.21 USD/kWh
Specific 0.64 USD/Wp Run. costs 29,095.04 USD/yr
Payback period 6.3 years
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
Loss diagram
2168 kWh/m² Global horizontal irradiation
Predef. graphs
Daily Input/Output diagram
Item Total
USD/year
Maintenance
Provision for inverter replacement 5,000.00
Salaries 2,400.00
Repairs 4,000.00
Cleaning 3,000.00
Security fund 3,000.00
Insurance
Facilities insurance 1,000.00
Liability insurance 1,000.00
Lack of sunlight insurance 1,000.00
Loan insurance 500.00
Administrative, accounting 1,200.00
Taxes
Property taxes 100.00
Other taxes 50.00
Subsidies -150.00
Total (OPEX) 22,100.00
Including inflation (2.80%) 29,095.04
System summary
Total installation cost 64,019.96 USD
Operating costs (incl. inflation 2.80%/year) 29,095.04 USD/year
Produced Energy 184 MWh/year
Cost of produced energy (LCOE) 0.208 USD/kWh
Financial analysis
Simulation period
Project lifetime 20 years Start year 2025
Depreciable assets
Financing
Own funds 64,019.00 USD
Subsidies 0.96 USD
Electricity sale
Feed-in tariff 0.2675 USD/kWh
Duration of tariff warranty 20 years
Annual connection tax 0.00 USD/kWh
Annual tariff variation 0.0 %/year
Feed-in tariff decrease after warranty 0.00 %
Return on investment
Payback period 6.3 years
Net present value (NPV) 21,461.93 USD
Internal rate of return (IRR) 28.07 %
Return on investment (ROI) 33.5 %
Paid dividends 29,641.44 USD
Financial analysis
Detailed economic results (USD)
Year Electricity Own Run. Deprec. Taxable Taxes After-tax Divid. Cumul. %
Financial analysis
Cumulative cashflow (kUSD)