Project: SHREE CEMENT JHARKHAND_4.07 MWp


Variant: SHREE CEMENT JHARKHAND_4.07 MWp
Sheds on ground
System power: 4076 kWp
SHREE CEMENT JHARKHAND - India

Author
Saatvik Green Energy Pvt Ltd (India)
Project: SHREE CEMENT JHARKHAND_4.07 MWp
Variant: SHREE CEMENT JHARKHAND_4.07 MWp

PVsyst V7.4.2 Saatvik Green Energy Pvt Ltd (India)


VC1, Simulation date:
30/10/23 16:58
with v7.4.2

Project summary
Geographical Site Situation Project settings
SHREE CEMENT JHARKHAND Latitude 22.75 °N Albedo 0.20
India Longitude 85.86 °E
Altitude 173 m
Time zone UTC+5.5

Meteo data
SHREE CEMENT JHARKHAND
Meteonorm 8.1 (1991-2012), Sat=100% - Synthetic

System summary
Grid-Connected System Sheds on ground

PV Field Orientation Near Shadings User's needs


Fixed plane Linear shadings : Fast (table) Unlimited load (grid)
Tilt/Azimuth 23 / 0 °

System information
PV Array Inverters
Nb. of modules 7479 units Nb. of units 8 units
Pnom total 4076 kWp Pnom total 2800 kWac
Pnom ratio 1.456

Results summary
Produced Energy 5614835 kWh/year Specific production 1378 kWh/kWp/year Perf. Ratio PR 77.32 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Near shading definition - Iso-shadings diagram 5
Main results 6
Loss diagram 7
Predef. graphs 8
P50 - P90 evaluation 9
Single-line diagram 10

30/10/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 2/10
Project: SHREE CEMENT JHARKHAND_4.07 MWp
Variant: SHREE CEMENT JHARKHAND_4.07 MWp

PVsyst V7.4.2 Saatvik Green Energy Pvt Ltd (India)


VC1, Simulation date:
30/10/23 16:58
with v7.4.2

General parameters
Grid-Connected System Sheds on ground

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Nb. of sheds 330 units Transposition Perez
Tilt/Azimuth 23 / 0 ° Sizes Diffuse Perez, Meteonorm
Sheds spacing 5.00 m Circumsolar separate
Collector width 2.29 m
Ground Cov. Ratio (GCR) 45.8 %
Top inactive band 0.02 m
Bottom inactive band 0.02 m
Shading limit angle
Limit profile angle 17.4 °

Horizon Near Shadings User's needs


Free Horizon Linear shadings : Fast (table) Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Saatvik Green Energy Pvt. Ltd Manufacturer Sungrow
Model SGE545-144MHC_15092022 Model SG350-HX
(Custom parameters definition) (Original PVsyst database)
Unit Nom. Power 545 Wp Unit Nom. Power 350 kWac
Number of PV modules 7479 units Number of inverters 8 units
Nominal (STC) 4076 kWp Total power 2800 kWac
Modules 277 Strings x 27 In series Operating voltage 500-1450 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.46
Pmpp 3744 kWp Power sharing within this inverter
U mpp 1050 V
I mpp 3565 A

Total PV power Total inverter power


Nominal (STC) 4076 kWp Total power 2800 kWac
Total 7479 modules Number of inverters 8 units
Module area 19320 m² Pnom ratio 1.46
Cell area 17835 m²

Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 3.0 % Module temperature according to irradiance Global array res. 4.8 mΩ
Uc (const) 29.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

LID - Light Induced Degradation Module Quality Loss Module mismatch losses
Loss Fraction 2.0 % Loss Fraction 2.0 % Loss Fraction 1.0 % at MPP

Strings Mismatch loss IAM loss factor


Loss Fraction 0.2 % ASHRAE Param.: IAM = 1 - bo (1/cosi -1)
bo Param. 0.05

System losses
Unavailability of the system Auxiliaries loss
Time fraction 0.8 % Proportionnal to Power 15.0 W/kW
3.0 days, 0.0 kW from Power thresh.
3 periods

30/10/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 3/10
Project: SHREE CEMENT JHARKHAND_4.07 MWp
Variant: SHREE CEMENT JHARKHAND_4.07 MWp

PVsyst V7.4.2 Saatvik Green Energy Pvt Ltd (India)


VC1, Simulation date:
30/10/23 16:58
with v7.4.2

AC wiring losses
Inv. output line up to injection point
Inverter voltage 800 Vac tri
Loss Fraction 0.00 % at STC
Inverter: SG350-HX
Wire section (8 Inv.) Alu 8 x 3 x 300 mm²
Average wires length 0m

30/10/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 4/10
Project: SHREE CEMENT JHARKHAND_4.07 MWp
Variant: SHREE CEMENT JHARKHAND_4.07 MWp

PVsyst V7.4.2 Saatvik Green Energy Pvt Ltd (India)


VC1, Simulation date:
30/10/23 16:58
with v7.4.2

Near shadings parameter


Perspective of the PV-field and surrounding shading scene

Iso-shadings diagram
Orientation #1

30/10/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 5/10
Project: SHREE CEMENT JHARKHAND_4.07 MWp
Variant: SHREE CEMENT JHARKHAND_4.07 MWp

PVsyst V7.4.2 Saatvik Green Energy Pvt Ltd (India)


VC1, Simulation date:
30/10/23 16:58
with v7.4.2

Main results
System Production
Produced Energy 5614835 kWh/year Specific production 1378 kWh/kWp/year
Perf. Ratio PR 77.32 %

Normalized productions (per installed kWp) Performance Ratio PR

Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 123.5 51.38 18.31 157.7 147.8 527120 491549 0.765
February 127.3 57.75 22.61 149.5 140.4 491671 460220 0.755
March 164.3 76.74 27.73 178.6 167.4 573296 559347 0.768
April 174.1 88.22 30.93 174.0 162.3 554547 541126 0.763
May 182.8 95.35 32.24 172.0 159.8 551662 538048 0.767
June 149.8 93.79 30.59 138.0 127.5 448121 436693 0.776
July 129.4 94.42 29.00 120.5 110.7 393730 383490 0.781
August 128.7 79.50 28.55 123.8 114.5 403307 392898 0.778
September 127.4 75.15 27.96 130.9 121.7 423544 389919 0.731
October 130.9 78.29 26.84 145.5 135.6 478894 467204 0.788
November 120.8 58.09 22.27 148.3 138.8 494559 482526 0.798
December 111.3 53.10 18.59 142.6 133.4 483513 471817 0.812
Year 1670.2 901.79 26.31 1781.5 1659.8 5823963 5614835 0.773

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

30/10/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 6/10
Project: SHREE CEMENT JHARKHAND_4.07 MWp
Variant: SHREE CEMENT JHARKHAND_4.07 MWp

PVsyst V7.4.2 Saatvik Green Energy Pvt Ltd (India)


VC1, Simulation date:
30/10/23 16:58
with v7.4.2

Loss diagram
1670 kWh/m² Global horizontal irradiation
+6.7% Global incident in coll. plane

-1.51% Near Shadings: irradiance loss

-2.48% IAM factor on global

-3.00% Soiling loss factor

1660 kWh/m² * 19320 m² coll. Effective irradiation on collectors

efficiency at STC = 21.16% PV conversion

6784220 kWh Array nominal energy (at STC effic.)


-1.06% PV loss due to irradiance level

-6.72% PV loss due to temperature

-2.00% Module quality loss

-2.00% LID - Light induced degradation


-1.15% Mismatch loss, modules and strings
-0.93% Ohmic wiring loss
5888469 kWh Array virtual energy at MPP
-0.96% Inverter Loss during operation (efficiency)
-1.11% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
0.00% Night consumption
5766885 kWh Available Energy at Inverter Output

-1.48% Auxiliaries (fans, other)


0.00% AC ohmic loss
-1.17% System unavailability
5614835 kWh Energy injected into grid

30/10/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 7/10
Project: SHREE CEMENT JHARKHAND_4.07 MWp
Variant: SHREE CEMENT JHARKHAND_4.07 MWp

PVsyst V7.4.2 Saatvik Green Energy Pvt Ltd (India)


VC1, Simulation date:
30/10/23 16:58
with v7.4.2

Predef. graphs
Daily Input/Output diagram

System Output Power Distribution

30/10/23 PVsyst Licensed to Saatvik Green Energy Pvt Ltd (India) Page 8/10
Project: SHREE CEMENT JHARKHAND_4.07 MWp
Variant: SHREE CEMENT JHARKHAND_4.07 MWp

PVsyst V7.4.2 Saatvik Green Energy Pvt Ltd (India)


VC1, Simulation date:
30/10/23 16:58
with v7.4.2

P50 - P90 evaluation


Meteo data Simulation and parameters uncertainties
Source Meteonorm 8.1 (1991-2012), Sat=100% PV module modelling/parameters 1.0 %
Kind Monthly averages Inverter efficiency uncertainty 0.5 %
Synthetic - Multi-year average Soiling and mismatch uncertainties 1.0 %
Year-to-year variability(Variance) 4.5 % Degradation uncertainty 1.0 %
Specified Deviation
Climate change 0.0 %

Global variability (meteo + system) Annual production probability


Variability (Quadratic sum) 4.8 % Variability 271 MWh
P50 5615 MWh
P90 5267 MWh
P75 5432 MWh

Probability distribution