Project: Capstone Project Fall 20-21
Variant: Project simulation variant
Tables on a building
System power: 209 kWp
Chāndara - Bangladesh
PVsyst TRIAL
PVsyst TRIAL
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
Project summary
Geographical Site Situation Project settings
Chāndara Latitude 24.04 °N Albedo 0.20
Bangladesh Longitude 90.26 °E
Altitude 15 m
PVsyst TRIAL
Time zone UTC+6
Meteo data
Chāndara
Meteonorm 7.3 (1981-2010), Sat=100% - Synthetic
System summary
Grid-Connected System Tables on a building
Simulation for year no 25
System information
PVsyst TRIAL
PV Array Inverters
Nb. of modules 522 units Nb. of units 3 units
Pnom total 209 kWp Pnom total 180 kWac
Grid power limit 1000 kWac
Grid lim. Pnom ratio 0.209
Results summary
Produced Energy 247.5 MWh/year Specific production 1185 kWh/kWp/year Perf. Ratio PR 60.86 %
Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Near shading definition - Iso-shadings diagram 5
PVsyst TRIAL
Main results 6
Loss diagram 7
Special graphs 8
P50 - P90 evaluation 9
Cost of the system 10
CO₂ Emission Balance 11
PVsyst TRIAL
16/01/21 PVsyst Evaluation mode Page 2/11
Project: Capstone Project Fall 20-21
Variant: Project simulation variant
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
General parameters
Grid-Connected System Tables on a building
PV Field Orientation
Orientation Sheds configuration Models used
PVsyst TRIAL
Fixed plane Nb. of sheds 522 units Transposition Perez
Tilt/Azimuth 25 / 0 ° Sizes Diffuse Perez, Meteonorm
Sheds spacing 1.95 m Circumsolar separate
Collector width 2.15 m
Ground Cov. Ratio (GCR) 110.1 %
Shading limit angle
Limit profile angle 89.8 °
PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model Mono 400 Wp 72 cells Model 60 kWac string inverter
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 400 Wp Unit Nom. Power 60.0 kWac
Number of PV modules 522 units Number of inverters 3 units
Nominal (STC) 209 kWp Total power 180 kWac
Modules 18 Strings x 29 In series Operating voltage 500-1450 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.16
Pmpp 189 kWp
U mpp 1000 V
I mpp 189 A
PVsyst TRIAL
Nominal (STC) 209 kWp Total power 180 kWac
Total 522 modules Nb. of inverters 3 units
Module area 1170 m² Pnom ratio 1.16
Cell area 519 m²
Array losses
Array Soiling Losses
Average loss Fraction 3.0 %
Jan. Feb. Mar. Apr. May June July Aug. Sep. Oct. Nov. Dec.
3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
PVsyst TRIAL
Module temperature according to irradiance Global array res. 84 mΩ Voltage drop 0.7 V
Uc (const) 20.0 W/m²K Loss Fraction 1.4 % at STC Loss Fraction 0.1 % at STC
Uv (wind) 0.0 W/m²K/m/s
LID - Light Induced Degradation Module Quality Loss Module mismatch losses
Loss Fraction 2.0 % Loss Fraction -0.4 % Loss Fraction 2.0 % at MPP
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
Array losses
Strings Mismatch loss Module average degradation
Loss Fraction 0.1 % Year no 25
Loss factor 0.4 %/year
Mismatch due to degradation
PVsyst TRIAL
Imp RMS dispersion 0.4 %/year
Vmp RMS dispersion 0.4 %/year
Spectral correction
FirstSolar model
Coefficient Set C0 C1 C2 C3 C4 C5
0 0 0 0 0 0
PVsyst TRIAL
Unavailability of the system
Time fraction 2.0 %
7.3 days,
5 periods
System losses
Auxiliaries loss
AC wiring losses
Inv. output line up to injection point
Inverter voltage 800 Vac tri
Loss Fraction 0.4 % at STC
Inverter: 60 kWac string inverter
PVsyst TRIAL
Wire section (3 Inv.) Copper 3 x 3 x 25 mm²
Average wires length 50 m
PVsyst TRIAL
16/01/21 PVsyst Evaluation mode Page 4/11
Project: Capstone Project Fall 20-21
Variant: Project simulation variant
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
16/01/21 PVsyst Evaluation mode Page 5/11
Project: Capstone Project Fall 20-21
Variant: Project simulation variant
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
Main results
System Production
Produced Energy 247.5 MWh/year Specific production 1185 kWh/kWp/year
Performance Ratio PR 60.86 %
PVsyst TRIAL
Normalized productions (per installed kWp) Performance Ratio PR
PVsyst TRIAL
January
GlobHor
kWh/m²
125.7
DiffHor
kWh/m²
52.7
Balances and main results
T_Amb
°C
17.09
GlobInc
kWh/m²
165.5
GlobEff
kWh/m²
155.7
EArray
MWh
24.75
E_Grid
MWh
21.32
PR
ratio
0.617
February 137.1 56.3 20.66 166.2 156.9 24.22 20.99 0.605
March 173.3 79.2 25.26 190.1 178.7 27.01 24.65 0.621
April 178.9 90.6 27.37 179.2 167.5 25.23 22.94 0.613
May 180.5 106.4 28.06 169.3 157.3 23.88 20.49 0.580
June 145.1 98.0 27.71 133.0 122.6 18.84 15.85 0.571
July 148.8 89.1 28.18 136.5 126.1 19.25 16.87 0.592
August 144.4 92.2 28.41 138.5 128.0 19.59 17.31 0.598
PVsyst TRIAL
September 143.5 79.7 27.63 149.2 138.9 21.15 18.94 0.608
October 142.8 66.8 26.76 164.5 154.4 23.49 21.31 0.621
November 139.0 42.5 22.81 183.1 173.0 26.58 24.47 0.640
December 126.4 47.0 18.91 172.2 162.1 25.54 22.32 0.621
Year 1785.7 900.5 24.92 1947.2 1821.2 279.52 247.46 0.609
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
16/01/21 PVsyst Evaluation mode Page 6/11
Project: Capstone Project Fall 20-21
Variant: Project simulation variant
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
Loss diagram
1786 kWh/m² Global horizontal irradiation
+9.0% Global incident in coll. plane
PVsyst TRIAL
-1.74% Near Shadings: irradiance loss
PVsyst TRIAL
-9.67% PV loss due to temperature
PVsyst TRIAL
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
-0.01% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
274.5 MWh Available Energy at Inverter Output
PVsyst TRIAL
247.5 MWh Energy injected into grid
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
Special graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
System Output Power Distribution
PVsyst TRIAL
PVsyst TRIAL
16/01/21 PVsyst Evaluation mode Page 8/11
Project: Capstone Project Fall 20-21
Variant: Project simulation variant
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
PVsyst TRIAL
Year-to-year variability(Variance) 5.0 % Degradation uncertainty 1.0 %
Specified Deviation
Climate change 0.5 %
Probability distribution
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
16/01/21 PVsyst Evaluation mode Page 9/11
Project: Capstone Project Fall 20-21
Variant: Project simulation variant
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
PVsyst TRIAL
Total 0.00
Depreciable asset 0.00
Operating costs
Item Total
EUR/year
Total (OPEX) 0.00
System summary
Total installation cost 0.00 EUR
Operating costs 0.00 EUR/year
PVsyst TRIAL
Produced Energy 247 MWh/year
Cost of produced energy (LCOE) 0.000 EUR/kWh
PVsyst TRIAL
PVsyst TRIAL
16/01/21 PVsyst Evaluation mode Page 10/11
Project: Capstone Project Fall 20-21
Variant: Project simulation variant
PVsyst V7.1.2
VC0, Simulation date:
16/01/21 20:38
with v7.1.2
PVsyst TRIAL
Replaced Emissions
Total: 4335.4 tCO₂
System production: 247.46 MWh/yr
Grid Lifecycle Emissions: 584 gCO₂/kWh
Source: IEA List
Country: Bangladesh
Lifetime: 30 years
Annual degradation: 1.0 %
PVsyst TRIAL
Item
Modules
Supports
LCE
1713 kgCO2/kWp
3.90 kgCO2/kg
System Lifecycle Emissions Details
Quantity
209 kWp
5220 kg
Subtotal
[kgCO₂]
357616
20333
Inverters 386 kgCO2/units 3.00 units 1158
PVsyst TRIAL
PVsyst TRIAL
16/01/21 PVsyst Evaluation mode Page 11/11