PVsyst - Simulation report
Stand alone system
Project: CIPANCUR
Variant: DTR_project no.2
Stand alone system with batteries
System power: 3060 Wp
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
Project summary
Geographical Site Situation Project settings
Babakan Latitude -6.91 °S Albedo 0.20
Indonesia Longitude 106.87 °E
Altitude 571 m
Time zone UTC+7
Meteo data
Babakan
NASA-SSE satellite data 1983-2005 - Synthetic
System summary
PVsyst TRIAL
Stand alone system Stand alone system with batteries
System information
PV Array Battery pack
Nb. of modules 9 units Technology Lithium-ion, LFP
Pnom total 3060 Wp Nb. of units 5 units
Voltage 240 V
Capacity 52 Ah
Results summary
PVsyst TRIAL
Available Energy
Used Energy
4702 kWh/year
3244 kWh/year
Table of contents
2
3
Detailed User's needs 5
Main results 6
Loss diagram 7
Special graphs 8
Cost of the system 9
Financial analysis 10
PVsyst TRIAL
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 2/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
General parameters
Stand alone system Stand alone system with batteries
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 20 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
User's needs
Daily household consumers
Constant over the year
Average 10.1 kWh/Day
PVsyst TRIAL
PV module
Manufacturer
Model
(Original PVsyst database)
Unit Nom. Power 340 Wp
PV Array Characteristics
Generic
CIGS-3400A1
Battery
Manufacturer
Model
Technology
Nb. of units
Generic
Lithium Series 48V 2.4 kWh
Lithium-ion, LFP
5 in series
Number of PV modules 9 units Discharging min. SOC 10.0 %
Nominal (STC) 3060 Wp Stored energy 10.9 kWh
Modules 1 String x 9 In series Battery Pack Characteristics
At operating cond. (50°C) Voltage 240 V
Pmpp 2848 Wp Nominal Capacity 52 Ah (C10)
U mpp 490 V Temperature Fixed 20 °C
I mpp 5.8 A
PVsyst TRIAL
Controller
Universal controller
Technology
Temp coeff.
Converter
Maxi and EURO efficiencies
MPPT converter
-5.0 mV/°C/Elem.
97.0 / 95.0 %
Battery Management control
Threshold commands as
Charging
Discharging
SOC calculation
SOC = 0.96 / 0.80
SOC = 0.10 / 0.35
Total PV power
Nominal (STC) 3.06 kWp
Total 9 modules
Module area 21.1 m²
Array losses
PVsyst TRIAL
Thermal Loss factor Light soaking (with CIS/CIGS technology) DC wiring losses
Module temperature according to irradiance Gain Fraction 3.5 % Global array res. 1338 mΩ
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 3/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
Array losses
IAM loss factor
Incidence effect (IAM): Fresnel, AR coating, n(glass)=1.526, n(AR)=1.290
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 4/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 5/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
Main results
System Production
Available Energy 4702 kWh/year Specific production 1536 kWh/kWp/year
Used Energy 3244 kWh/year Performance Ratio PR 60.44 %
Excess (unused) 1378 kWh/year Solar Fraction SF 87.63 %
Loss of Load Battery aging (State of Wear)
Time Fraction 11.4 % Cycles SOW 97.7 %
Missing Energy 458 kWh/year Static SOW 90.0 %
Battery lifetime 10.0 years
Economic evaluation
Investment Yearly cost LCOE
PVsyst TRIAL
Global 72288572.75 IDR Annuities 0.00 IDR/yr Energy cost 0.00 IDR/kWh
Specific 23624 IDR/Wp Run. costs 0.00 IDR/yr
Payback period 13.0 years
E_Avail
kWh
EUnused
kWh
E_Miss
kWh
E_User
kWh
E_Load
kWh
SolFrac
ratio
January 131.8 111.6 306.1 61.6 88.92 237.3 326.2 0.727
February 118.7 106.4 291.1 53.7 48.39 235.3 283.7 0.829
March 146.3 140.1 381.7 119.8 66.27 245.8 312.0 0.788
April 142.8 148.0 407.3 158.8 49.58 248.3 297.9 0.834
May 144.8 160.7 440.3 139.5 27.68 298.6 326.2 0.915
June 137.4 157.1 430.6 134.5 17.39 280.5 297.9 0.942
July 149.4 169.8 466.1 162.4 15.02 297.0 312.0 0.952
PVsyst TRIAL
August 161.5 173.8 475.6 155.9 13.60 312.6 326.2 0.958
September 165.0 164.5 449.8 177.8 23.40 260.3 283.7 0.918
October 161.2 148.2 407.0 109.8 30.81 295.4 326.2 0.906
November 140.1 120.5 330.9 46.2 30.10 281.9 312.0 0.904
December 138.0 114.5 315.1 57.9 46.96 250.9 297.9 0.842
Year 1736.9 1715.2 4701.7 1377.9 458.10 3243.9 3702.0 0.876
Legends
GlobHor Global horizontal irradiation E_User Energy supplied to the user
GlobEff Effective Global, corr. for IAM and shadings E_Load Energy need of the user (Load)
E_Avail Available Solar Energy SolFrac Solar fraction (EUsed / ELoad)
EUnused Unused energy (battery full)
E_Miss Missing energy
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 6/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
Loss diagram
1737 kWh/m² Global horizontal irradiation
+1.0% Global incident in coll. plane
+3.50%
+0.63%
-2.10%
PV loss due to temperature
PVsyst TRIAL
3482 kWh Effective energy at the output of the array
3702 kWh
-0.22% Battery Self-discharge Current
Energy supplied to the user
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 7/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
Special graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 8/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
Operating costs
PVsyst TRIAL
Item Total
IDR/year
Total (OPEX) 0.00
System summary
Total installation cost 72288572.75 IDR
Operating costs 0.00 IDR/year
Excess energy (battery full) 1378 kWh/year
Used solar energy 3244 kWh/year
Used energy cost 1114.216 IDR/kWh
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 9/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
Financial analysis
Simulation period
Project lifetime 20 years Start year 2023
Financing
Own funds 72288572.75 IDR
Self-consumption
PVsyst TRIAL
Consumption tariff 1700.0000 IDR/kWh
Tariff evolution +0.1 %/year
Return on investment
Payback period 13.0 years
Net present value (NPV) 39058381.68 IDR
Return on investment (ROI) 54.0 %
PVsyst TRIAL
2027 0 5536735 -44660156 38.2%
2028 0 5542271 -39117885 45.9%
2029 0 5547814 -33570071 53.6%
2030 0 5553361 -28016710 61.2%
2031 0 5558915 -22457795 68.9%
2032 0 5564474 -16893322 76.6%
2033 0 5570038 -11323283 84.3%
2034 0 5575608 -5747675 92.0%
2035 0 5581184 -166491 99.8%
2036 0 5586765 5420274 107.5%
2037 0 5592352 11012626 115.2%
2038 0 5597944 16610570 123.0%
2039 0 5603542 22214112 130.7%
2040 0 5609146 27823257 138.5%
PVsyst TRIAL
2041 0 5614755 33438012 146.3%
2042 0 5620370 39058382 154.0%
Total 0 111346954 39058382 154.0%
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 10/11
Project: CIPANCUR
Variant: DTR_project no.2
PVsyst V7.2.18
VC6, Simulation date:
12/09/22 14:14
PVsyst TRIAL
with v7.2.18
Financial analysis
Yearly net profit (IDR)
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
12/09/22 PVsyst Evaluation mode Page 11/11