You are on page 1of 6

Version 7.2.

11

PVsyst - Simulation report


Stand alone system

Project: PJU TIMEH


Variant: New simulation variant
Stand alone system with batteries
System power: 200 Wp
Rawacan - Indonesia

Author
Project: PJU TIMEH
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
17/06/23 12:19
with v7.2.11

Project summary
Geographical Site Situation Project settings
Rawacan Latitude -6.20 °S Albedo 0.20
Indonesia Longitude 106.59 °E
Altitude 18 m
Time zone UTC+7

Meteo data
Rawacan
Meteonorm 8.0 (2010-2014), Sat=100% - Synthetic

System summary
Stand alone system Stand alone system with batteries

PV Field Orientation User's needs


Fixed plane Fixed constant load
Tilt/Azimuth 10 / 0 ° 23 W
Global
199 kWh/Year

System information
PV Array Battery pack
Nb. of modules 1 unit Technology Lead-acid, sealed, Gel
Pnom total 200 Wp Nb. of units 1 unit
Voltage 12 V
Capacity 65 Ah

Results summary
Available Energy 280.8 kWh/year Specific production 1404 kWh/kWp/year Perf. Ratio PR 55.30 %
Used Energy 195.2 kWh/year Solar Fraction SF 97.94 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
Special graphs 6

17/06/23 PVsyst Licensed to Page 2/6


Project: PJU TIMEH
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
17/06/23 12:19
with v7.2.11

General parameters
Stand alone system Stand alone system with batteries

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 10 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

User's needs
Fixed constant load
23 W
Global
199 kWh/Year

PV Array Characteristics
PV module Battery
Manufacturer Renesola Manufacturer Narada
Model JC200S-24/Db Model MPG 12V 65 F
(Original PVsyst database) Technology Lead-acid, sealed, Gel
Unit Nom. Power 200 Wp Nb. of units 1 Unit
Number of PV modules 1 unit Discharging min. SOC 20.0 %
Nominal (STC) 200 Wp Stored energy 0.6 kWh
Modules 1 String x 1 In series Battery Pack Characteristics
At operating cond. (50°C) Voltage 12 V
Pmpp 179 Wp Nominal Capacity 65 Ah (C10)
U mpp 33 V Temperature Fixed 20 °C
I mpp 5.4 A

Controller Battery Management control


Manufacturer Victron Threshold commands as Battery voltage
Model SmartSolar MPPT 75/10 12V Charging 14.1 / 12.8 V
Technology MPPT converter Corresp. SOC 0.93 / 0.80
Temp coeff. -2.7 mV/°C/Elem. Discharging 11.8 / 12.4 V
Converter Corresp. SOC 0.19 / 0.50
Maxi and EURO efficiencies 98.0 / 96.0 %

Total PV power
Nominal (STC) 0 kWp
Total 1 modules
Module area 1.3 m²
Cell area 1.1 m²

Array losses
Thermal Loss factor DC wiring losses Serie Diode Loss
Module temperature according to irradiance Global array res. 103 mΩ Voltage drop 0.7 V
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC Loss Fraction 1.9 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module Quality Loss Module mismatch losses Strings Mismatch loss


Loss Fraction -0.8 % Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

IAM loss factor


ASHRAE Param: IAM = 1 - bo(1/cosi -1)
bo Param. 0.05

17/06/23 PVsyst Licensed to Page 3/6


Project: PJU TIMEH
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
17/06/23 12:19
with v7.2.11

Main results
System Production
Available Energy 280.8 kWh/year Specific production 1404 kWh/kWp/year
Used Energy 195.2 kWh/year Performance Ratio PR 55.30 %
Excess (unused) 77.4 kWh/year Solar Fraction SF 97.94 %
Loss of Load Battery aging (State of Wear)
Time Fraction 2.1 % Cycles SOW 83.8 %
Missing Energy 4.1 kWh/year Static SOW 91.7 %

Normalized productions (per installed kWp) Performance Ratio PR

Balances and main results

GlobHor GlobEff E_Avail EUnused E_Miss E_User E_Load SolFrac


kWh/m² kWh/m² kWh kWh kWh kWh kWh ratio
January 128.5 117.6 19.20 3.558 2.149 14.78 16.93 0.873
February 139.1 131.3 21.58 5.637 0.000 15.29 15.29 1.000
March 145.2 141.2 23.07 5.847 0.441 16.48 16.93 0.974
April 146.8 148.0 24.01 7.063 0.000 16.38 16.38 1.000
May 141.4 145.5 23.87 6.099 0.000 16.93 16.93 1.000
June 139.0 146.1 24.01 7.103 0.100 16.28 16.38 0.994
July 149.0 155.8 25.61 7.902 0.000 16.93 16.93 1.000
August 156.0 159.0 25.91 8.203 0.000 16.93 16.93 1.000
September 157.2 155.3 25.40 8.355 0.000 16.38 16.38 1.000
October 168.8 161.6 26.13 9.000 0.601 16.33 16.93 0.964
November 142.6 132.3 21.76 5.334 0.369 16.01 16.38 0.977
December 134.2 122.6 20.21 3.347 0.443 16.48 16.93 0.974
Year 1747.7 1716.4 280.77 77.448 4.103 195.19 199.29 0.979

Legends
GlobHor Global horizontal irradiation E_User Energy supplied to the user
GlobEff Effective Global, corr. for IAM and shadings E_Load Energy need of the user (Load)
E_Avail Available Solar Energy SolFrac Solar fraction (EUsed / ELoad)
EUnused Unused energy (battery full)
E_Miss Missing energy

17/06/23 PVsyst Licensed to Page 4/6


Project: PJU TIMEH
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
17/06/23 12:19
with v7.2.11

Loss diagram
1748 kWh/m² Global horizontal irradiation
+1.0% Global incident in coll. plane

-2.75% IAM factor on global

1716 kWh/m² * 1 m² coll. Effective irradiation on collectors

efficiency at STC = 15.72% PV conversion

344.5 kWh Array nominal energy (at STC effic.)


-0.55% PV loss due to irradiance level

-12.03% PV loss due to temperature

+0.75% Module quality loss

-2.10% Mismatch loss, modules and strings

-3.16% Ohmic wiring loss

-26.90% Unused energy (battery full)

210.3 kWh Effective energy at the output of the array

-3.27% Converter Loss during operation (efficiency)


-0.10% Converter Loss over nominal conv. power
-0.01% Converter Loss due to power threshold
0.00% Converter Loss over nominal conv. voltage
0.00% Converter Loss due to voltage threshold
203.3 kWh Converter losses (effic, overload)
Missing
Direct use Stored Battery Storage
energy 30.0% 70.0%
-0.15% Battery Stored Energy balance
2.06%
-3.22% Battery efficiency loss
4.1 kWh
-1.99% Charge/Disch. Current Efficiency Loss
-0.17% Gassing Current (electrolyte dissociation)
-0.14% Battery Self-discharge Current
195.2 kWh Energy supplied to the user

199.3 kWh Energy need of the user (Load)

17/06/23 PVsyst Licensed to Page 5/6


Project: PJU TIMEH
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
17/06/23 12:19
with v7.2.11

Special graphs
Daily Input/Output diagram

17/06/23 PVsyst Licensed to Page 6/6