TOTAL APPLICATION HSRCC TOTAL CREC SINO WIKA REMARK
A. Total Relocation Plan 526 257 95 174
- Need Relocation 470 228 82 160
- Public Facility 467 228 82 157
### - Major Utility 3 0 0 3
- Land only (public facility) 56 29 13 14 KCIC & PSBI

B. Form 01 Total Proposal 319 149 65 105 HSRCC


Form 1 returned (revision) 164 97 26 41 HSRCC
Closed by UGR 9 4 2 3 KCIC
Unnecessary by TDM 4 4 0 0 KCIC
Process Review by KCIC 34 4 2 28 KCIC

C. Form 02 Total Proposal 108 40 35 33


Form 2 returned (Revision) 32 10 16 6 KCIC & HSRCC

D. Form 03 Total Proposal 76 30 19 27


Negotiation Process 25 17 3 5 KCIC
Final Negotiation 51 13 16 22 KCIC
### 1. Need land 19 3 3 13 PSBI
Land Availability by PSBI 19 3 3 13 PSBI
- Under Construction 16 3 3 10
- Finished Relocation 3 0 0 3
2. No need land 32 10 13 9
- Under Construction 15 9 3 3
- Finished Relocation 17 1 10 6

E. Not proposed yet (Include Utility) 151 79 17 55


### No need relocation 15 0 15 0 according to HSRCC
Relocation is on progress / finished 2 0 1 1
Design process 134 79 1 54

DATA HASIL
REKONSILIASI
CDJO-HSRCC

*Dengan adanya tabel otomatis sistem seperti ini, HSRCC bisa mengupdate data pada sheet yang lain
###
###
SUMMARY OF RELOCATION PUBLIC SOCIAL AND UTILITIES
Date : 17-Jul-19
###
TOTAL APPLICATION HSRCC TOTAL CREC SINO WIKA REMARK
A. Total Relocation Plan 669 344 133 192
- Need Relocation 613 315 120 178
- Public Facility 467 228 82 157
### - Major Utility 3 0 0 3
### - Jasamarga Utility 18 1 16 1
- Regular Utility 125 86 22 17
- Land only (public facility) 56 29 13 14 KCIC & PSBI

B. Form 01 Total Proposal 319 149 65 105 HSRCC


Form 1 returned (revision) 164 97 26 41 HSRCC
Closed by UGR 9 4 2 3 KCIC
Unnecessary by TDM 4 4 0 0 KCIC
Process Review by KCIC 34 4 2 28 KCIC

C. Form 02 Total Proposal 108 40 35 33


Form 2 returned (Revision) 32 10 16 6 KCIC & HSRCC

D. Form 03 Total Proposal 76 30 19 27


Negotiation Process 25 17 3 5 KCIC
Final Negotiation 51 13 16 22 KCIC
### 1. Need land 19 3 3 13 PSBI
Land Availability by PSBI 19 3 3 13 PSBI
- Under Construction 16 3 3 10
- Finished Relocation 3 0 0 3
2. No need land 32 10 13 9
- Under Construction 15 9 3 3
- Finished Relocation 17 1 10 6

E. Not proposed yet (Include Utility) 294 166 55 73


### No need relocation 15 0 15 0 according to HSRCC
Relocation is on progress / finished 2 0 1 1
Design process 277 166 39 72

DATA HASIL
REKONSILIASI
CDJO-HSRCC

*Dengan adanya tabel otomatis sistem seperti ini, HSRCC bisa mengupdate data pada sheet yang lain
###
###
PROGRESS FASOS FASUM DAN UTILITAS
UPDATE tanggal 03 July 2019
Sudah diajukan form 1
TOTAL
Area 1 Area 2 Area 3 Area 4
###
###
The Pek Siang Tri Kuswandi Indra Yulianto Rully Tedja
###
KOORDINATOR WILAYAH Jumlah ###
Heru Setiadi Vikannanda
###
###
JKT, BKS (Kot&Kab) KRW, PWK PWK, KBB CMH, BDG (Kot&Kab) ###

A. FASOS FASUM 467 ###


Sudah di cek 86 126 132 123 467 ###
KCIC PSBI Lahan Saja 3 16 36 1 56 ###
###
Sudah di cek dan perlu relokasi 86 126 132 123 467 ###
Sudah di cek, perlu Relok dan ada BA dari pemilik 86 126 132 123 467 ###
Form 01 32 57 32 62 183 ###
Returned to HSRCC 11 28 23 24 86 -183
###
Process Review by KCIC 7 16 6 5 34 ###
Ready for Negotiation 4 5 0 5 14 ###
Final Negosiasi (form-03) 9 9 4 28 50 ###
Butuh Lahan 2 9 3 26 40 ###
Lahan yang sudah disediakan PSBI 0 0 0 0 0 ###
Sudah Proses Relokasi 0 0 0 0 0 ###
Selesai Di relokasi 0 0 0 0 0

Tdk Butuh Lahan 1 2 3 2 8


Sudah Proses Relokasi 1 2 3 2 8
Selesai Di relokasi 8 0 2 0 10

B. UTILITAS MAJOR 3
Sudah di cek dan perlu relokasi 2 0 0 1 3
Sudah di cek, perlu Relok dan ada BA dari pemilik 2 0 0 1 3
Form 01 2 0 0 1 3 3
Returned to HSRCC 0 0 0 0 0 -
Process Review by KCIC 0 0 0 0 0
Ready for Negotiation 0 0 0 0 0
Final Negosiasi (form-03) 2 0 0 1 3
Sedang Proses Relokasi 2 0 0 1 3
Selesai Di relokasi 0 0 0 0 0

C. UTILITAS (Tdk Bth Lahan) 125


sudah di cek dan perlu relokasi 20 16 43 46 125
sudah di cek, perlu Relok dan ada BA dari pemilik 20 16 43 46 125
Form 01 18 13 43 41 115 121
Returned to HSRCC 7 0 23 38 68 6
Process Review by KCIC 0 1 8 1 10
Ready for Negotiation 5 7 6 0 18
Final Negosiasi (form-03) 7 4 9 5 25
Sudah Proses Relokasi 0 0 0 0 0
Selesai Di relokasi 0 0 0 0 0

D. UTILITAS JASAMARGA (Tdk Bth Lahan) 18


Sudah di cek dan perlu relokasi 17 0 0 1 18
Sudah di cek, perlu Relok dan ada BA dari pemilik 17 0 0 1 18
Form 01 17 0 0 1 18 18
Returned to HSRCC 12 0 0 0 12 -
Process Review by KCIC 0 0 0 0 0
Ready for Negotiation 2 0 0 0 2
Final Negosiasi (form-03) 3 0 0 1 4
Sudah Proses Relokasi 0 0 0 0 0
Selesai Di relokasi 0 0 0 0 0
HSRCC HSRCC HSRCC, KCIC HSRCC KCIC
No. NO AREA Nama Fasos Fasum Milleage END Status Kontraktor Design Relokasi Approval Pemilik Form 01 (basic Design) DED Nego Form 03 SPMK Form Number
JENIS STRUKTUR DK STRUKTUR
Date Cover letter HSRCC
REKAP DATA UTILITAS MAJOR
1 1 Area 1-3 Relocation of SUTT Utilitas Major Januari 2020 On schedule Perlu 32 location Open WIKA 1 1 1 1 1 27-Jun-18 EC/HSRCC.CM/KCIC/III/615-2018 F01-132
2 2 2# Bridge 04+774 37+716 Ut Area 1 Gerbang Tol Cikunir 2 + Gardu Tol Utilitas Major Perlu 08+915 Open WIKA 1 1 1 1 1 16-Oct-18 EC/HSRCC.CM/KCIC/X/889-2018 F01-022
3 3 2# Bridge 04+774 37+716 Area 1 Relocation of LRT crossing UGR Perlu 02+600 03+100 closed WIKA 21-Jan-19
4 4 #45 Bridge 126+805 129+668 Area 4 Relocation of pertamina pipe Utilitas Major Agustus 2019 On schedule Perlu 127+750 147+850 Open WIKA 1 1 1 1 1 7-Sep-18 EC/HSRCC.CM/KCIC/VIII/757-2018 F01-156
3 3 3 3 3

REKAP DATA UTILITAS JASAMARGA


1 1 2# Bridge 04+774 37+716 Area 1 Relocated optical fiber Utilitas Jasamarga 19-Dec-18 Delay Perlu KM 15+350 Open SINO 1 1 1 5-Nov-18 EC/HSRCC.CM/KCIC/IX/944-2019 F01-185
2 2 2# Bridge 04+774 37+716 Area 1 Relocated optical fiber Utilitas Jasamarga Perlu KM 4+050 Open WIKA 1 1 1 26-Dec-18 EC/HSRCC.CM/KCIC/XII/1028-2019 F01-302
3 3 1# Bridge DAK 10+048 02+198 Area 1 Relocation of Billboards Utilitas Jasamarga 1-Apr-19 Delay Perlu 02+000 41+000 Open SINO 1 1 1 1-Mar-19 EC/HSRCC.CM/KCIC/III/1209-2019 F01-420
4 4 1# Bridge DAK 10+048 02+198 Area 1 Relocation of Water Supply Pipe Utilitas Jasamarga 3-Apr-19 Delay Perlu 02+000 41+000 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1229-2019 F01-438
Relocation of drainage ditch 21
5 5 1# Bridge DAK 10+048 02+198 Area 1
location
Utilitas Jasamarga 24-Mar-19 Delay Perlu 02+000 41+000 Open SINO 4-Mar-19 EC/HSRCC.CM/KCIC/III/1232-2019 F01-436
1 1 1
6 6 1# Bridge DAK 10+048 02+198 Area 1 Relocation of Street Lamps Utilitas Jasamarga 24-Mar-19 Delay Perlu 02+000 41+000 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1235-2019 F01-435
7 7 1# Bridge DAK 10+048 02+198 Area 1 Relocation of Guardrail (8 location) Utilitas Jasamarga 19-Mar-19 Delay Perlu 02+000 41+000 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1236-2019 F01-437
8 8 1# Bridge DAK 10+048 02+198 Area 1 Relocation of Communication lines Utilitas Jasamarga 11-Mar-19 Delay Perlu 02+000 41+000 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1238-2019 F01-434
9 9 2# Bridge 04+774 37+716 Area 1 Relocation of Concrete fence Utilitas Jasamarga 2-Jul-19 on schedule Perlu 04+000 35+000 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1237-2019 F01-426
10 10 2# Bridge 04+774 37+716 Area 1 Relocation of Tree cutting within ROW Utilitas Jasamarga 24-Jun-19 on schedule Perlu 04+000 35+000 Open SINO 1 1 1 24-Apr-19 EC/HSRCC.CM/KCIC/IV/1374-2019 F01-453
Relocation of light pole and Power
11 11 2# Bridge 04+774 37+716 Area 1 cable Utilitas Jasamarga Maret 2019 Delay Perlu 11+930 15+851 Open SINO 1 1 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1057-2019 F01-187 Rev 1

12 12 2# Bridge 04+774 37+716 Ut Area 1 Relocation of CCTV Utilitas Jasamarga 21-Nov-18 Delay Perlu 15+820 15+851 Open SINO 1 1 1 1 1 12-Nov-18 EC/HSRCC.CM/KCIC/XI/962-2018 F01-198
13 13 2# Bridge 04+774 37+716 Ut Area 1 Relocation of CCTV Utilitas Jasamarga 13-Mar-19 Delay Perlu 20+000 Open SINO 1 1 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1198-2018 F01-359

14 14 2# Bridge 04+774 37+716 Ut Area 1 Relocation of Concrete fence and Utilitas Jasamarga 7-Dec-18 Delay Perlu 20+019 20+293 Open SINO 1 1 1 27-Nov-18 EC/HSRCC.CM/KCIC/XI/988-2018 F01-199
Guardrail
15 15 2# Bridge 04+774 37+716 Area 1 Relocation of ditch Utilitas Jasamarga 9-Mar-19 Delay Perlu 27+853 28+016 Open SINO 1 1 1 8-Apr-19 EC/HSRCC.CM/KCIC/IV/1321-2019 F01-462
16 16 2# Bridge 04+774 37+716 Area 1 Relocation of Street Light Utilitas Jasamarga 3-Apr-19 on schedule Perlu 27+870 28+295 Open SINO 1 1 1 EC/HSRCC.CM/KCIC/V/1469-2019 F01-467
17 17 2# Bridge 04+774 37+716 Area 1 Relocation of CCTV Utilitas Jasamarga 2-Jun-19 on schedule Perlu 28+000 Open SINO 1 1 1 9-May-19 EC/HSRCC.CM/KCIC/V/1447-2019 F01-451
18 18 #44 Bridge 114+551 126+067 Area 4 Relocation of Fiber Optic Utilitas Jasamarga 21-Dec-18 Delay Perlu 114+800 116+900 Open CREC 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/474-2018 F01-257
18 18 18 4 4

REKAP DATA UTILITAS BIASA


Relocation of power line & DK12+700&DK14+5
1 1 1# Bridge DAK 10+048 02+198 Area 1 underground cable (PLN) Utilitas 3-May-19 Delay Perlu 88~DK14+702 Open SINO 1 1 1 12-Jul-19 EC/HSRCC.CM/KCIC/VII/1653-2019 F01-439rev
2 2 1# Tunnel 02+670 04+500 Area 1 Relocated Power Line Utilitas 10-May-18 Delay Perlu 02+450 Open SINO 1 1 1 1 1 7-May-18 EC/HSRCC.CM/KCIC/IV/421-2018 F01-008
3 3 1# Tunnel 02+670 04+500 Area 1 Relocation of asset affected Utilitas to be estimated Perlu 02+600 Open WIKA 1 1 1 21-Jan-19 EC/HSRCC.CM/KCIC/I/1085-2019 F01-324
4 4 1# Tunnel 02+670 04+500 Area 1 Relocation of communication tower Utilitas 11-Mar-19 Delay Perlu 02+800 Open SINO 1 1 1 1 1 15-Mar-19 EC/HSRCC.CM/KCIC/III/1269-2019 F01-329 rev1
5 5 1# Tunnel 02+670 04+500 Area 1 Relocation of Optical Fiber Utilitas to be estimated Perlu 04+150 04+450 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1239-2019 F01-440
6 6 1# Tunnel 02+670 04+500 Area 1 Relocation of Telkom cable Utilitas 9-Feb-19 Delay Perlu 04+170 04+425 Open SINO 1 1 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1058-2019 F01-320
Tunnel outlet power 380v facilities
7 7 1# Tunnel 02+670 04+500 Area 1 relocation Utilitas 8-Apr-19 Delay Perlu 04+170 04+425 Open SINO 1 1 1 1 1 7-Feb-19 EC/HSRCC.CM/KCIC/II/1144-2019 F01-327

8 8 2# Bridge 04+774 37+716 Ut Area 1 Gerbang Tol Pondok Gede Timur Utilitas Perlu 07+366 Not Yet submitted WIKA
9 9 2# Bridge 04+774 37+716 Area 1 Relocation of Bekasi Barat Tol Gate Utilitas Perlu 12+355 Not Yet submitted WIKA
10 10 2# Bridge 04+774 37+716 Area 1 Relocation of Gas Utilitas to be estimated Perlu 14+316 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1228-2019 F01-428
11 11 2# Bridge 04+774 37+716 Area 1 Relocated Power Line 15+240 15+325 Open SINO 1 1 1 12-Jul-19 EC/HSRCC.CM/KCIC/VII/1653-2019 F01-474
12 12 2# Bridge 04+774 37+716 Area 1 Relocation SUTR/SUTM Utilitas 20-Feb-19 Delay Perlu 17+600 Open WIKA 1 1 1 21-Jan-19 EC/HSRCC.CM/KCIC/I/1086-2019 F01-323
13 13 2# Bridge 04+774 37+716 Area 1 BTS Relocation Utilitas 2-Dec-19 on schedule UGR 19+100 closed WIKA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1222-2019 F01-443
Relocation of undergorund cable TM
14 14 2# Bridge 04+774 37+716 Area 1 asset PLN Utilitas 8-Dec-18 Delay Perlu 19+120 Open WIKA 8-Nov-18 EC/HSRCC.CM/KCIC/XI/955-2018 F01-196
1 1 1
Relocation of base transmission
15 15 2# Bridge 04+774 37+716 Area 1 station Utilitas 30-Aug-19 on schedule Perlu 19+120 Open SINO 1 1 1 3-May-19 EC/HSRCC.CM/KCIC/V/1423-2019 F01-429rev
Relocation of SKTT 150 KV GI Ganda
16 16 2# Bridge 04+774 37+716 Area 1 Utilitas 19-Apr-19 Delay Perlu 26+000 Open WIKA 16-Oct-18 EC/HSRCC.CM/KCIC/X/887-2018 F01-153
Mekar 1 1 1
17 17 2# Bridge 04+774 37+716 Area 1 Relocation of power cable Utilitas 31-Aug-19 on schedule Perlu 30+621 Open SINO 1 1 1 1 1 3-May-19 EC/HSRCC.CM/KCIC/V/1429-2019 F01-433rev
18 18 2# Bridge 04+774 37+716 Area 1 Telkom manhole, route duct and FO Utilitas 17-Apr-19 Delay Perlu 30+631 SINO 1 1 1 25-Mar-19 EC/HSRCC.CM/KCIC/III/1290-2019 F01-461
19 19 2# Bridge 04+774 37+716 Area 1 Relocation of 20kV Power Line Utilitas Maret 2019 Delay Perlu 31+924 33+676 Open SINO 1 1 1 1 1 26-Dec-18 EC/HSRCC.CM/KCIC/IX/1026-2018 F01-169
20 20 2# Bridge 04+774 37+716 Area 1 Relocation of power cable Utilitas 31-Aug-19 on schedule Perlu 33+676 34+350 Open SINO 1 1 1 1 1 3-May-19 EC/HSRCC.CM/KCIC/V/1429-2019 F01-432rev
21 1 14# Bridge 58+261 58+952 Area 2 Relocation of Water Supply Pipe Utilitas Januari 2019 Delay Perlu 58+300 Open SINO 1 1 1 1 1 2-Oct-18 EC/HSRCC.CM/KCIC/X/858-2018 F01-172
22 2 17# Bridge 64+161 66+969 Area 2 Power relocation Utilitas 23-Jun-19 Delay Perlu 64+286 Open SINO 1 1 1 24-May-19 EC/HSRCC.CM/KCIC/V/1502-2019 F01-082rev
23 3 17# Bridge 64+161 66+969 Area 2 Power relocation Utilitas 23-Jun-19 on schedule Perlu 64+880 Open SINO 1 1 1 24-May-19 EC/HSRCC.CM/KCIC/V/1502-2019 F01-084rev
24 4 17# Bridge 64+161 66+969 Area 2 Cross Pipeline steel bridge Utilitas 24-Mar-19 Delay Perlu 65+785 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/II/1241-2019 F01-079
25 5 17# Bridge 64+161 66+969 Area 2 Cross Pipeline steel bridge Utilitas 24-Mar-19 Delay Perlu 65+977 Open SINO 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/II/1241-2019 F01-080
Relocation of Electrical Network
26 6 18# Subgrade 66+969 70+181 Area 2 medium voltage Utilitas 27-Apr-19 Delay Perlu 67+750 Open WIKA 26-Feb-19 EC/HSRCC.CM/KCIC/II/1185-2019 F01-357
1 1 1 1 1
27 7 19# bridge 71+604 72+117 Area 2 Relocation of fiber optic Utilitas 7-Aug-19 on schedule Perlu 71+800 Open WIKA 1 1 1 9-May-19 EC/HSRCC.CM/KCIC/V/1448-2019 F01-466
28 8 19# bridge 71+604 72+117 Area 2 SUTM Relocation Utilitas 2-Jun-19 on schedule Perlu 71+850 Open WIKA 1 1 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1222-2019 F01-442
29 9 20# Bridge 73+011 73+902 Area 2 River relocation Selokan/Saluran Air/Irigasi Perlu 73+500 Not Yet submitted SINO
30 10 20# Bridge 73+011 73+902 Area 2 Power relocation Utilitas 23-Jun-19 on schedule Perlu 73+980 Open SINO 1 1 1 24-May-19 EC/HSRCC.CM/KCIC/V/1502-2019 F01-170rev
31 11 #22 Subgrade 75+040 75+110 Area 2 Power relocation Utilitas 23-Jun-19 on schedule Perlu 75+104 Open SINO 1 1 1 24-May-19 EC/HSRCC.CM/KCIC/V/1502-2019 F01-100rev
32 12 #26 Subgrade 78+295 79+024 Area 2 Power relocation Utilitas 23-Jun-19 on schedule Perlu 78+850 Open SINO 1 1 1 24-May-19 EC/HSRCC.CM/KCIC/V/1502-2019 F01-171rev
33 13 #24 Bridge 80+976 81+906 Area 2 River relocation Selokan/Saluran Air/Irigasi Perlu 81+600 Not Yet submitted WIKA
34 14 #25 Bridge 82+075 82+769 Area 2 Relocation of Electrical Network Utilitas 12-Apr-19 Delay Perlu 82+600 Open WIKA 1 1 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1189-2019 F01-182REV1
35 15 #25 Bridge 82+075 82+769 Area 2 Relocation of fiber optic Utilitas 7-Aug-19 on schedule Perlu 82+600 Open WIKA 1 1 1 9-May-19 EC/HSRCC.CM/KCIC/V/1448-2019 F01-465
36 16 #33 Subgrade 86+950 87+900 Area 2 River relocation Selokan/Saluran Air/Irigasi Perlu 87+700 Not Yet submitted WIKA
37 1 #37 Subgrade 93+340 93+660 Area 3 Relocation of Communication cable Utilitas to be estimated Perlu 93+600 Open CREC 1 1 1 24-Apr-19 EC/HSRCC.CM/KCIC/IV/1375-2019 F01-307 rev
38 2 #37 Subgrade 93+340 93+660 Area 3 SUTM 20KV Relocation (Cikalong) Utilitas 24-May-19 on schedule Perlu 93+600 Open CREC 1 1 1 1 1 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-228 rev
39 3 #37 Subgrade 93+340 93+660 Area 3 Relocation of Communication cable Utilitas to be estimated Perlu 93+605 Open CREC 1 1 1 24-Apr-19 EC/HSRCC.CM/KCIC/IV/1375-2019 F01-452
40 4 #32 Bridge 97+014 97+248 Area 3 SUTM Relocation Utilitas 3-May-19 Delay Perlu 97+000 Open WIKA 1 1 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1222-2019 F01-441
SUTM 320V Relocation (Cikuda
41 5 #42 Subgrade 99+460 99+520 Area 3 Utilitas 24-May-19 on schedule Perlu 99+505 Open CREC 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-230rev
Cempaka) 1 1 1 1 1
42 6 #10 Tunnel 99+820 100+070 Area 3 Relocation of pipeline Utilitas 12-Mar-19 Delay Perlu 99+960 Open CREC 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1187-2019 F01-247
43 7 #10 Tunnel 99+820 100+070 Area 3 Relocation of SUTM/SUTR Utilitas 20-Feb-19 Delay Perlu 100+000 101+100 Open WIKA 1 1 1 1 1 21-Jan-19 EC/HSRCC.CM/KCIC/I/1087-2019 F01-306
44 8 #35 Bridge 101+435 102+260 Area 3 Relocation of Pipeline Utilitas 13-Mar-19 Delay Perlu 101+715 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1199-2019 F01-231
45 9 #35 Bridge 101+435 102+260 Area 3 Relocation of pipeline Utilitas 7-May-19 Delay Perlu 102+150 Open CREC 1 1 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1186-2019 F01-322
Relocation of SUTM/SUTR (Cikuda
46 10 #36 Bridge 102+901 103+621 Area 3 Campaka) Utilitas 24-Apr-19 Delay Perlu 103+035 103+039 Open CREC 1 1 1 10-Apr-19 EC/HSRCC.CM/KCIC/IV/1332-2019 F01-263 REV1
47 11 #36 Bridge 102+901 103+621 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 103+040 Open CREC 1 1 1 14-Jun-19 EC/HSRCC.CM/KCIC/VI/1547-2019 F01-308rev
48 12 #36 Bridge 102+901 103+621 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 103+041 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-321
49 13 #36 Bridge 102+901 103+621 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 103+050 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-309
50 14 #36 Bridge 102+901 103+621 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 103+053 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-318
51 15 #36 Bridge 102+901 103+621 Area 3 Relocation of Pipeline Utilitas 13-Mar-19 Delay Perlu 103+245 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1199-2019 F01-232
52 16 #36 Bridge 102+901 103+621 Area 3 Relocation of SUTM (Cikurutug) Utilitas 24-Apr-19 Delay Perlu 103+250 Open CREC 1 1 1 1 1 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-260 rev
53 17 #36 Bridge 102+901 103+621 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 103+253 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-319
54 18 #36 Bridge 102+901 103+621 Area 3 Relocation of Communication cable Utilitas 7-May-19 Delay Perlu 103+260 Open CREC 1 1 1 24-Apr-19 EC/HSRCC.CM/KCIC/IV/1375-2019 F01-310 rev
55 19 #37 Subgrade 103+808 104+534 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 103+885 Open CREC 1 1 1 14-Jun-19 EC/HSRCC.CM/KCIC/VI/1547-2019 F01-311
56 20 #37 Subgrade 103+808 104+534 Area 3 Relocation of Pipeline Utilitas 13-Mar-19 Delay Perlu 103+885 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1199-2019 F01-235
57 21 #37 Subgrade 103+808 104+534 Area 3 Relocation of SUTM/SUTR (tagog Apu) Utilitas 24-May-19 on schedule Perlu 103+979 103+987 Open CREC 1 1 1 1 1 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-259 rev
58 22 #38 Bridge 105+160 105+427 Area 3 Relocation of Pipeline Utilitas 13-Mar-19 Delay Perlu 105+177 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1199-2019 F01-234
59 23 #50 Subgrade 105+427 105+626 Area 3 Relocation of SUTM Utilitas 24-Apr-19 Delay Perlu 105+451 Open CREC 1 1 1 10-Apr-19 EC/HSRCC.CM/KCIC/IV/1332-2019 F01-261 REV1
60 24 #39 Bridge 105+626 105+795 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 105+719 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-312
61 25 #39 Bridge 105+626 105+795 Area 3 SUTM 380V Relocation Utilitas 24-Apr-19 Delay Perlu 105+720 Open CREC 1 1 1 10-Apr-19 EC/HSRCC.CM/KCIC/IV/1332-2019 F01-227 REV1
62 26 #12 Tunnel 107+070 108+300 Area 3 Relocation of SUTM Utilitas to be estimated Perlu 108+230 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1193-2019 F01-264
63 27 #42 Bridge 109+152 109+763 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 109+474 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-313
64 28 #43 Bridge 110+009 113+387 Area 3 Relocation of SUTM Utilitas to be estimated Perlu 110+094 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1193-2019 F01-262
Relocation of SUTM (Taman bunga
65 29 #43 Bridge 110+009 113+387 Area 3 Utilitas 24-May-19 on schedule Perlu 110+763 110+882 Open CREC 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-267rev
Cilame) 1 1 1 1 1
66 30 #43 Bridge 110+009 113+387 Area 3 Relocation of Pipeline Utilitas 8-May-19 Delay Perlu 110+865 110+920 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1199-2019 F01-236
67 31 #43 Bridge 110+009 113+387 Area 3 Relocation of Pipeline Utilitas 13-Mar-19 Delay Perlu 111+000 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1199-2019 F01-233
Relocation of SUTM/SUTR (Cilame
68 32 #43 Bridge 110+009 113+387 Area 3 Utilitas 24-May-19 on schedule Perlu 111+020 Open CREC 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-266 rev
Utama) 1 1 1 1 1
69 33 #43 Bridge 110+009 113+387 Area 3 Relocation of SUTM Utilitas to be estimated Perlu 111+358 Open CREC 1 1 1 EC/HSRCC.CM/KCIC/V/1467-2019 F01-468
70 34 #43 Bridge 110+009 113+387 Area 3 Relocation of SUTM (Jl Simpati Cilame) Utilitas 24-May-19 on schedule Perlu 111+595 111+600 Open CREC 1 1 1 1 1 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-268rev
71 35 #43 Bridge 110+009 113+387 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 111+492 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-314
72 36 #43 Bridge 110+009 113+387 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 112+595 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-315
SUTM 20KV Relocation
73 37 #43 Bridge 110+009 113+387 Area 3 (Gadobangkong) Utilitas to be estimated Perlu 112+601 Open CREC 1 1 1 14-Jun-19 EC/HSRCC.CM/KCIC/VI/1549-2019 F01-229rev
74 38 #43 Bridge 110+009 113+387 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 112+605 Open CREC 1 1 1 14-Jun-19 EC/HSRCC.CM/KCIC/VI/1547-2019 F01-316rev
75 39 #43 Bridge 110+009 113+387 Area 3 Relocation of SUTM (lembah teratai) Utilitas 24-May-19 on schedule Perlu 113+182 Open CREC 1 1 1 1 1 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-463rev
76 40 #56 Subgrade 113+391 113+440 Area 3 Relocation of Communication cable Utilitas 17-Mar-19 Delay Perlu 113+390 Open CREC 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/1056-2019 F01-317
Relocation of SUTM 20kv (Gado
77 41 #56 Subgrade 113+391 113+440 Area 3 Utilitas to be estimated Perlu 113+400 Open CREC 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-460rev
bangkong) 1 1 1 1 1
78 42 #44 Bridge 114+551 126+067 Area 3 Relocation of Power Pole Utilitas 14-Dec-18 Delay Perlu 114+613 114+678 Open CREC 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/474-2018 F01-258
79 43 #44 Bridge 114+551 126+067 Area 3 Relocation of Power Pole Utilitas 21-Dec-18 Delay Perlu 115+106 Open CREC 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/474-2018 F01-276
80 1 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 117+388 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-360
81 2 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 117+388 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-368
82 3 #44 Bridge 114+551 126+067 Area 4 River relocation Selokan/Saluran Air/Irigasi Perlu 120+500 Not Yet submitted CREC
83 4 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication Cable Ir Utilitas to be estimated Perlu 121+300 121+550 Open CREC 1 1 1 3-Jul-19 EC/HSRCC.CM/KCIC/VII/1626-2019 F01-370rev
84 5 #44 Bridge 114+551 126+067 Area 4 Refairing Fiber Optic Backbone Highwa Utilitas 24-May-19 on schedule Perlu 121+800 Open CREC 1 1 1 24-Apr-19 EC/HSRCC.CM/KCIC/IV/1370-2019 F01-464
85 6 #44 Bridge 114+551 126+067 Area 4 River relocation Selokan/Saluran Air/Irigasi Perlu 122+300 Not Yet submitted CREC
86 7 #44 Bridge 114+551 126+067 Area 4 River relocation Selokan/Saluran Air/Irigasi Perlu 122+600 Not Yet submitted CREC
87 8 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 123+387 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-371
88 9 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 125+130 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-361
89 10 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 125+523 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-372
90 11 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 125+592 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-373
91 12 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole 1 Utilitas to be estimated Perlu 125+675 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-374
92 13 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole 2 Utilitas to be estimated Perlu 125+675 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-375
93 14 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole 3 Utilitas to be estimated Perlu 125+675 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-376
94 15 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole 4 Utilitas to be estimated Perlu 125+675 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-377
95 16 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole 5 Utilitas to be estimated Perlu 125+675 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-362
96 17 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 125+900 126+125 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-364
97 18 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 125+900 125+910 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-378
98 19 #44 Bridge 114+551 126+067 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 125+900 126+115 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-379
99 20 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 127+156 127+258 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-380
100 21 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 127+780 125+890 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-363
101 22 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole 1 Utilitas to be estimated Perlu 128+900 129+440 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-365
102 23 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole 2 Utilitas to be estimated Perlu 128+900 129+440 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-381
103 24 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole 1 Utilitas to be estimated Perlu 129+450 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-382
104 25 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole 2 Utilitas to be estimated Perlu 129+450 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-383
105 26 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole 3 Utilitas to be estimated Perlu 129+450 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-384
106 27 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole 4 Utilitas to be estimated Perlu 129+450 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-385
107 28 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 129+480 129+745 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-386
108 29 #45 Bridge 126+805 129+668 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 129+560 129+720 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-366
109 30 #46 Bridge 130+966 139+294 Area 4 Relocation of Communication Cable Ir Utilitas to be estimated Perlu 121+002 121+246 Open CREC 1 1 1 3-Jul-19 EC/HSRCC.CM/KCIC/VII/1626-2019 F01-369rev
110 31 #46 Bridge 130+966 139+294 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 132+021 132+240 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-387
111 32 #46 Bridge 130+966 139+294 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 132+030 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-367
112 33 #46 Bridge 130+966 139+294 Area 4 Relocation of Communication pole Utilitas to be estimated Perlu 132+110 132+210 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-388
113 34 #46 Bridge 130+966 139+294 Area 4 Relocation of Communication pole 1 Utilitas to be estimated Perlu 132+216 132+240 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-389
114 35 #46 Bridge 130+966 139+294 Area 4 Relocation of Communication pole 2 Utilitas to be estimated Perlu 132+216 132+240 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-390
115 36 #46 Bridge 130+966 139+294 Area 4 Relocation of Communication pole 1 Utilitas to be estimated Perlu 132+240 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-391
116 37 #46 Bridge 130+966 139+294 Area 4 Relocation of Communication pole 2 Utilitas to be estimated Perlu 132+240 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/III/1197-2019 F01-392
117 38 #46 Bridge 130+966 139+294 Area 4 Relocation of SUTM Utilitas 3-May-19 Delay Perlu 135+600 Open WIKA 1 1 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1222-2019 F01-444
118 39 #46 Bridge 130+966 139+294 Area 4 River relocation Selokan/Saluran Air/Irigasi Perlu 137+100 Not Yet submitted CREC
119 40 #60 Subgrade 139+294 139+672 Area 4 River relocation Selokan/Saluran Air/Irigasi Perlu 139+600 Not Yet submitted CREC
120 41 #61 Subgrade 139+737 142+338 Area 4 Relocation of SUTM Utilitas to be estimated Perlu 140+816 141+288 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1193-2019 F01-344
121 42 #61 Subgrade 139+737 142+338 Area 4 Relocation of telekom tower Utilitas to be estimated Perlu 141+120 141+200 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1192-2019 F01-341
122 43 #61 Subgrade 139+737 142+338 Area 4 Relocation of SUTM Perlu 141+130 141+900 Open CREC 1 1 1 9-Jul-19 EC/HSRCC.CM/KCIC/II/1636-2019 F01-473
123 44 #61 Subgrade 139+737 142+338 Area 4 Relocation of telekom tower Utilitas to be estimated 141+168 141+199 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1192-2019 F01-342
124 45 EMU Depot Subgrade 143+000 145+250 Area 4 Relocation of telekom tower Utilitas 27-Jul-19 on schedule Perlu 144+800 145+450 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1192-2019 F01-350
125 46 EMU Depot Subgrade 143+000 145+250 Area 4 Relocation of SUTM Utilitas 28-May-19 Delay Perlu 144+800 145+440 Open CREC 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1193-2019 F01-349
115 115 115 26 26
No. NO JENIS AREA
DK STRUKTUR
STRUKTUR
REKAP DATA UTILITAS MAJOR
1 1 Area 1-3
2 2 2# Bridge 04+774 37+716 Ut Area 1
3 3 2# Bridge 04+774 37+716 Area 1
4 4 #45 Bridge 126+805 129+668 Area 4

*Formula COUNTIF sudah menghitung sampai baris paling bawah, jadi bisa insert row dan menambahkan baris
Nama Fasos Fasum
*Kolom Patokan COUNTIF

Relocation of SUTT Utilitas Major Januari 2020 On schedule Perlu


Gerbang Tol Cikunir 2 + Gardu ToUtilitas Major Perlu
Relocation of LRT crossing UGR Perlu
Relocation of pertamina pipe Utilitas Major Agustus 2019 On schedule Perlu

an menambahkan baris *Hanya boleh diinput "PERLU" jika mau dihitung d


Milleage END Status Kontraktor Design Relokasi Approval Pemilik
an COUNTIF *Kolom Patokan COUNTIF *Kolom Patokan COUNT

32 location Open WIKA 1 1


08+915 Open WIKA 1 1
02+600 03+100 closed WIKA
127+750 147+850 Open WIKA 1 1

diinput "PERLU" jika mau dihitung dalam summary


Form 01 (basic Design) DED Nego Form 03 SPMK Form Number Clarification/
*Kolom Patokan COUNTIF Date Cover letter HSRCC Price Proposal

1 1 1 27-Jun-18 F01-132
EC/HSRCC.CM/KCIC/III/615-2018
1 1 1 16-Oct-18
EC/HSRCC.CM/KCIC/X/889-2018
F01-022 ###
21-Jan-19
1 1 1 7-Sep-18
EC/HSRCC.CM/KCIC/VIII/757-2018
F01-156

*Hanya boleh diinput "1" jika mau dihitung dalam summary


Clarification/ Negotiation
Final Negotiation tgl Nego BA Nego

### 26-Mar-19
No. NO JENIS AREA Nama Fasos Fasum
DK STRUKTUR
STRUKTUR
REKAP DATA UTILITAS JASAMARGA
Relocated Utilitas
1 1 2# Bridge 04+774 37+716 Area 1
optical fiber Jasamarga
Relocated Utilitas
2 2 2# Bridge 04+774 37+716 Area 1
optical fiber Jasamarga
Relocation of Utilitas
3 3 1# Bridge DAK 10+048 02+198 Area 1
Billboards Jasamarga

Relocation of
Utilitas
4 4 1# Bridge DAK 10+048 02+198 Area 1 Water Supply
Jasamarga
Pipe

Relocation of
5 5 1# Bridge DAK 10+048 02+198 Area 1 drainage Utilitas
ditch 21 Jasamarga
location

Relocation of Utilitas
6 6 1# Bridge DAK 10+048 02+198 Area 1
Street Lamps Jasamarga

Relocation of Utilitas
7 7 1# Bridge DAK 10+048 02+198 Area 1 Guardrail (8
Jasamarga
location)

Relocation of
Utilitas
8 8 1# Bridge DAK 10+048 02+198 Area 1 Communicati
Jasamarga
on lines

Utilitas
9 9 2# Bridge 04+774 37+716 Area 1
Relocation of Jasamarga
Utilitas
10 10 2# Bridge 04+774 37+716 Area 1
Relocation of Jasamarga

Relocation of
light pole Utilitas
11 11 2# Bridge 04+774 37+716 Area 1
and Power Jasamarga
cable

Relocation of Utilitas
12 12 2# Bridge 04+774 37+716 Ut Area 1
CCTV Jasamarga
Relocation of Utilitas
13 13 2# Bridge 04+774 37+716 Ut Area 1
CCTV Jasamarga

Relocation of
Concrete Utilitas Jasamarga
14 14 2# Bridge 04+774 37+716 Ut Area 1
fence and
Guardrail

Relocation ofUtilitas Jasamarga


15 15 2# Bridge 04+774 37+716 Area 1
ditch
Relocation of
16 16 2# Bridge 04+774 37+716 Area 1 Utilitas Jasamarga
Street Light

17 17 2# Bridge 04+774 37+716 Area 1 Relocation ofUtilitas Jasamarga


CCTV
Relocation of Utilitas
18 18 #44 Bridge 114+551 126+067 Area 4
Fiber Optic Jasamarga
Milleage END Status
*Kolom Patokan COUNTIF *Kolom Patokan COUNTIF

19-Dec-18 Delay Perlu KM 15+350 Open

Perlu KM 4+050 Open

1-Apr-19 Delay Perlu 02+000 41+000 Open

3-Apr-19 Delay Perlu 02+000 41+000 Open

24-Mar-19 Delay Perlu 02+000 41+000 Open

24-Mar-19 Delay Perlu 02+000 41+000 Open

19-Mar-19 Delay Perlu 02+000 41+000 Open

11-Mar-19 Delay Perlu 02+000 41+000 Open

2-Jul-19 on schedule Perlu Open


04+000 35+000

24-Jun-19 on schedule Perlu Open


04+000 35+000

Maret 2019 Delay Perlu 11+930 15+851 Open

21-Nov-18 Delay Perlu 15+820 15+851 Open

13-Mar-19 Delay Perlu 20+000 Open

7-Dec-18 Delay Perlu 20+019 20+293 Open

9-Mar-19 Delay Perlu 27+853 28+016 Open


3-Apr-19 on schedule Perlu 27+870 28+295 Open

2-Jun-19 on schedule Perlu 28+000 Open

21-Dec-18 Delay Perlu 114+800 116+900 Open

*Hanya boleh diinput "PERLU" jika mau dihitung dalam summary


Kontraktor Design Relokasi
Approval PemilikForm 01 (basic Design) DED Nego Form 03 SPMK
*Kolom Patokan COUNTIF *Kolom Patokan COUNTIF

SINO
1 1 1

WIKA 1 1 1

SINO
1 1 1

SINO
1 1 1

SINO

1 1 1

SINO
1 1 1

SINO
1 1 1

SINO
1 1 1

SINO
1 1 1

SINO
1 1 1

SINO 1 1 1 1 1

SINO 1 1
1 1 1

SINO 1 1 1 1 1

SINO 1 1 1

SINO 1 1 1
SINO 1 1 1

SINO 1 1 1

CREC 1 1 1 1 1

*Hanya boleh diinput "1" jika mau dihitung dalam summary


Form Number Clarification/ Negotiation
Date Cover letter HSRCC Price ProposalFinal Negotiation tgl Nego BA Nego

5-Nov-18
EC/HSRCC.CM/KCIC/IX/944-2019
F01-185

26-Dec-18
EC/HSRCC.CM/KCIC/XII/1028-2019
F01-302

1-Mar-19
EC/HSRCC.CM/KCIC/III/1209-2019
F01-420

4-Mar-19
EC/HSRCC.CM/KCIC/III/1229-2019
F01-438

4-Mar-19
EC/HSRCC.CM/KCIC/III/1232-2019
F01-436

4-Mar-19
EC/HSRCC.CM/KCIC/III/1235-2019
F01-435

4-Mar-19
EC/HSRCC.CM/KCIC/III/1236-2019
F01-437

4-Mar-19
EC/HSRCC.CM/KCIC/III/1238-2019
F01-434

4-Mar-19
EC/HSRCC.CM/KCIC/III/1237-2019
F01-426

24-Apr-19
EC/HSRCC.CM/KCIC/IV/1374-2019
F01-453

11-Jan-19
EC/HSRCC.CM/KCIC/I/1057-2019
F01-187 Rev 1

12-Nov-18
EC/HSRCC.CM/KCIC/XI/962-2018
F01-198

27-Feb-19
EC/HSRCC.CM/KCIC/II/1198-2018
F01-359 205,684,545 188,989,091 12-Mar-19

27-Nov-18
EC/HSRCC.CM/KCIC/XI/988-2018
F01-199

8-Apr-19 F01-462
EC/HSRCC.CM/KCIC/IV/1321-2019
F01-467 746,846,100
EC/HSRCC.CM/KCIC/V/1469-2019

9-May-19 F01-451 609,950,000


EC/HSRCC.CM/KCIC/V/1447-2019

7-Dec-18
EC/HSRCC.CM/KCIC/XII/474-2018
F01-257

g dalam summary
No. NO JENIS AREA
DK STRUKTUR
STRUKTUR
REKAP DATA UTILITAS BIASA

80 1 #44 Bridge 114+551 126+067


Area 4

81 2 #44 Bridge 114+551 126+067


Area 4
82 3 #44 Bridge 114+551 126+067 Area 4

83 4 #44 Bridge 114+551 126+067


Area 4
84 5 #44 Bridge 114+551 126+067 Area 4
85 6 #44 Bridge 114+551 126+067 Area 4
86 7 #44 Bridge 114+551 126+067 Area 4

87 8 #44 Bridge 114+551 126+067


Area 4

88 9 #44 Bridge 114+551 126+067


Area 4

89 10 #44 Bridge 114+551 126+067


Area 4

90 11 #44 Bridge 114+551 126+067


Area 4

91 12 #44 Bridge 114+551 126+067


Area 4

92 13 #44 Bridge 114+551 126+067


Area 4

93 14 #44 Bridge 114+551 126+067


Area 4

94 15 #44 Bridge 114+551 126+067


Area 4

95 16 #44 Bridge 114+551 126+067


Area 4

96 17 #44 Bridge 114+551 126+067


Area 4

97 18 #44 Bridge 114+551 126+067


Area 4

98 19 #44 Bridge 114+551 126+067


Area 4

99 20 #45 Bridge 126+805 129+668


Area 4

100 21 #45 Bridge 126+805 129+668


Area 4

101 22 #45 Bridge 126+805 129+668


Area 4
102 23 #45 Bridge 126+805 129+668
Area 4

103 24 #45 Bridge 126+805 129+668


Area 4

104 25 #45 Bridge 126+805 129+668


Area 4

105 26 #45 Bridge 126+805 129+668


Area 4

106 27 #45 Bridge 126+805 129+668


Area 4

107 28 #45 Bridge 126+805 129+668


Area 4

108 29 #45 Bridge 126+805 129+668


Area 4

109 30 #46 Bridge 130+966 139+294


Area 4

110 31 #46 Bridge 130+966 139+294


Area 4

111 32 #46 Bridge 130+966 139+294


Area 4

112 33 #46 Bridge 130+966 139+294


Area 4

113 34 #46 Bridge 130+966 139+294


Area 4

114 35 #46 Bridge 130+966 139+294


Area 4

115 36 #46 Bridge 130+966 139+294


Area 4

116 37 #46 Bridge 130+966 139+294


Area 4
117 38 #46 Bridge 130+966 139+294 Area 4
118 39 #46 Bridge 130+966 139+294 Area 4
119 40 #60 Subgrade 139+294 139+672 Area 4

120 41 #61 Subgrade 139+737 142+338 Area 4

121 42 #61 Subgrade 139+737 142+338 Area 4

122 43 #61 Subgrade 139+737 142+338 Area 4

123 44 #61 Subgrade 139+737 142+338 Area 4

124 45 EMU Depot Subgrade143+000 145+250 Area 4


125 46 EMU Depot Subgrade143+000 145+250 Area 4
Nama Fasos Fasum
*Kolom Patokan COUNTIF

to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas
Relocation of Communication pole estimated
River relocation Selokan/Saluran Air/Irigasi
to be
Utilitas
Relocation of Communication Cable Iron pole estimated
Refairing Fiber Optic Backbone Highway Soroj Utilitas 24-May-19 on schedule
River relocation Selokan/Saluran Air/Irigasi
River relocation Selokan/Saluran Air/Irigasi

Utilitas to be
Relocation of Communication pole estimated
to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas
Relocation of Communication pole estimated

Utilitas to be
Relocation of Communication pole estimated

Utilitas to be
Relocation of Communication pole 1 estimated
to be
Utilitas
Relocation of Communication pole 2 estimated
to be
Utilitas
Relocation of Communication pole 3 estimated
to be
Utilitas
Relocation of Communication pole 4 estimated
to be
Utilitas
Relocation of Communication pole 5 estimated
to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas estimated
Relocation of Communication pole
to be
Utilitas
Relocation of Communication pole estimated

Utilitas to be
Relocation of Communication pole estimated
to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas estimated
Relocation of Communication pole 1
to be
Utilitas
Relocation of Communication pole 2 estimated

Utilitas to be
Relocation of Communication pole 1 estimated
to be
Utilitas
Relocation of Communication pole 2 estimated
to be
Utilitas
Relocation of Communication pole 3 estimated
to be
Utilitas
Relocation of Communication pole 4 estimated
to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas estimated
Relocation of Communication Cable Iron pole
to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas
Relocation of Communication pole estimated
to be
Utilitas
Relocation of Communication pole 1 estimated

Utilitas to be
Relocation of Communication pole 2 estimated
to be
Utilitas
Relocation of Communication pole 1 estimated
to be
Utilitas
Relocation of Communication pole 2 estimated
Relocation of SUTM Utilitas 3-May-19 Delay
River relocation Selokan/Saluran Air/Irigasi
River relocation Selokan/Saluran Air/Irigasi
to be
Relocation of SUTM Utilitas
estimated
to be
Relocation of telekom tower Utilitas
estimated
Relocation of SUTM
to be
Relocation of telekom tower Utilitas
estimated
Relocation of telekom tower Utilitas 27-Jul-19 on schedule
Relocation of SUTM Utilitas 28-May-19 Delay
Milleage END Status Kontraktor Design Relokasi
*Kolom Patokan COUNTIF *Kolom Patokan COUNTIF

Perlu Open CREC


117+388 1

Perlu Open CREC


117+388 1
Perlu 120+500 Not Yet submi CREC

Perlu Open CREC


121+300 121+550 1
Perlu 121+800 Open CREC 1
Perlu 122+300 Not Yet submi CREC
Perlu 122+600 Not Yet submi CREC

Perlu Open CREC


123+387 1

Perlu Open CREC


125+130 1

Perlu Open CREC


125+523 1

Perlu Open CREC


125+592 1

Perlu Open CREC


125+675 1

Perlu Open CREC


125+675 1

Perlu Open CREC


125+675 1

Perlu Open CREC


125+675 1

Perlu Open CREC


125+675 1

Perlu Open CREC


125+900 126+125 1

Perlu Open CREC


125+900 125+910 1

Perlu Open CREC


125+900 126+115 1

Perlu Open CREC


127+156 127+258 1

Perlu Open CREC


127+780 125+890 1

Perlu Open CREC


128+900 129+440 1
Perlu Open CREC
128+900 129+440 1

Perlu Open CREC


129+450 1

Perlu Open CREC


129+450 1

Perlu Open CREC


129+450 1

Perlu Open CREC


129+450 1

Perlu Open CREC


129+480 129+745 1

Perlu Open CREC


129+560 129+720 1

Perlu Open CREC


121+002 121+246 1

Perlu Open CREC


132+021 132+240 1

Perlu Open CREC


132+030 1

Perlu Open CREC


132+110 132+210 1

Perlu Open CREC


132+216 132+240 1

Perlu Open CREC


132+216 132+240 1

Perlu Open CREC


132+240 1

Perlu Open CREC


132+240 1
Perlu 135+600 Open WIKA 1
Perlu 137+100 Not Yet submi CREC
Perlu 139+600 Not Yet submi CREC

Perlu 140+816 141+288 Open CREC


1

Perlu 141+120 141+200 Open CREC


1
Perlu 141+130 141+900 Open CREC 1

Perlu 141+168 141+199 Open CREC


1
Perlu 144+800 145+450 Open CREC 1
Perlu 144+800 145+440 Open CREC 1
*Hanya boleh diinput :
1. "Perlu"
2. "Perlu menjadi UGR"
Approval PemilikForm 01 (basic Design) DED Nego Form 03 SPMK
*Kolom Patokan COUNTIF

1 1

1 1

1 1
1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1
1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1
1 1 1 1

1 1

1 1
1 1

1 1
1 1
1 1
*Hanya boleh diinput "1" jika mau dihitung dalam summary
Form Number Clarification/ Negotiation
Date Cover letter HSRCC Price Proposal Final Negotiation

27-Feb-19 F01-360
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-368
EC/HSRCC.CM/KCIC/III/1197-2019

3-Jul-19 F01-370rev
EC/HSRCC.CM/KCIC/VII/1626-2019 158,961,114
24-Apr-19
EC/HSRCC.CM/KCIC/IV/1370-2019
F01-464 79,948,687

27-Feb-19 F01-371
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-361
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-372
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-373
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-374
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-375
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-376
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-377
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-362
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-364
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-378
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-379
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-380
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-363
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-365
EC/HSRCC.CM/KCIC/III/1197-2019
27-Feb-19 F01-381
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-382
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-383
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-384
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-385
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-386
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-366
EC/HSRCC.CM/KCIC/III/1197-2019

3-Jul-19 F01-369rev
EC/HSRCC.CM/KCIC/VII/1626-2019 134,775,406

27-Feb-19 F01-387
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-367
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-388
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-389
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-390
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-391
EC/HSRCC.CM/KCIC/III/1197-2019

27-Feb-19 F01-392
EC/HSRCC.CM/KCIC/III/1197-2019
EC/HSRCC.CM/KCIC/III/1222-2019
4-Mar-19 F01-444

27-Feb-19
EC/HSRCC.CM/KCIC/II/1193-2019
F01-344

EC/HSRCC.CM/KCIC/II/1192-2019
F01-341
27-Feb-19
EC/HSRCC.CM/KCIC/II/1636-2019
9-Jul-19 F01-473 422,389,317

EC/HSRCC.CM/KCIC/II/1192-2019
F01-342
27-Feb-19
EC/HSRCC.CM/KCIC/II/1192-2019
27-Feb-19 F01-350
27-Feb-19
EC/HSRCC.CM/KCIC/II/1193-2019
F01-349
cation/ Negotiation
tgl Nego BA Nego
Form Number

Start End
NO JENIS STRUKTUR DK STRUKTUR PRASARANA SARANA UTILITAS PERLU RELOKASI? AREA (Section) KONTRAKTOR SUBKONTRAKTOR Prelim Design Approval Pemilik Form 01 (basic Design) Nego Form 03 SPMK
Date Cover letter HSRCC

DK DK

1. JAKARTA TIMUR
II PEMERINTAH PROVINSI 2
1 #1 Bridge DAK 10+048 02+198 PEMAKAMAN UMUM NYI KENDIL PERLU 01+343 - Area 1 WIKA PT .PUTRA PANDAWA UTAMA
2 #1 Bridge DAK 10+048 02+198 Mushola Nur'alif (Kramat Nyi Djendil) PERLU 01+343 - Area 1 WIKA WIKA Section 1 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1223-2019 F01-239 REV2
V BELUM JELAS ALAS HAKNYA 4
3 #1 Bridge DAK 10+048 02+198 RELOCATION OF RIVER PERLU 02+080 Area 1 WIKA PT CITRA KREASI / WIKA Section 1 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1220-2019 F01-011 REV1
4 #1 Subgrade 02+198 02+670 LAPANGAN BASKET DAN TAMAN PERLU 2+510 - Area 1 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB / PT. MBS
5 #1 Subgrade 02+198 02+670 SEKRETARIAT DAN TAMAN RT 07/05 PERLU 2+471 - Area 1 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB/RW setempat 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/476-2018 F01-246
6 #1 Subgrade 02+198 02+670 SEKRETARIAT RT.09 DAN RT.08 /012 (DI DNP TERTULIS KANTOR RW) PERLU 2+469 - Area 1 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB/RW setempat 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/476-2018 F01-244
IX NON PEMERINTAH
TOTAL 6 4 4 4 - -
2. KOTA BEKASI
I PEMERINTAH PUSAT -
II PEMERINTAH PROVINSI -
III PEMERINTAH KOTA/KABUPATEN 21
7 #1 Tunnel 02+670 04+500 JALAN ANUGRAH RAYA PERLU 3+700 4+185 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
8 #1 Tunnel 02+670 04+500 RELOCATION OF DITCH PERLU 4+150 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1234-2019 F01-425
9 #1 Tunnel 02+670 04+500 ROAD RELOCATION Jalan Anugrah Raya PERLU 4+170 04+425 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 23-Jan-19 EC/HSRCC.CM/KCIC/IV/1388-2019 F01-116rev
10 #2 Bridge 04+774 37+716 JEMBATAN CURUG PERLU 4+450 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA/PT. TRIJAYA INDOSARAN
11 #2 Bridge 04+774 37+716 TUGU BATAS PERLU Area 1 SINO 1 PT. DYACONS PRIMA UTAMA/PT Kreasi Mitra tdk ada?
12 Saluran Air PERLU Area 1 SINO 1 PT RAHMANDIKA
13 #2 Bridge 04+774 37+716 JALAN VILLA JATIBENING TOL PERLU 07+700 Area 1 SINO 1 PT. DYACONS PRIMA UTAMA/PT Kreasi Mitra
14 #2 Bridge 04+771 37+716 JALAN CIKUNIR RAYA DAN JALAN GALAXY RAYA PERLU 8+915 9+940 Area 1 WIKA PT RIZKY INDERA CIPTA 1 1 1 13-Feb-19 EC/HSRCC.CM/KCIC/II/1149-2019 F01-328
15 #2 Bridge 04+774 37+716 JLJ OFFICE RELOCATION PERLU 9+000 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 15-Mar-19 EC/HSRCC.CM/KCIC/III/1270-2019 F01-459
16 #2 Bridge 04+774 37+716 ROAD RELOCATION PERLU 9+140 10+040 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1231-2019 F01-183
17 #2 Bridge 04+774 37+716 JALAN KOMPLEK PERUM PELANGI PERLU 9+350 9+466 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
18 #2 Bridge 04+771 37+716 SD NEGERI 7 JAKASETIA PERLU 9+620 9+650 Area 1 WIKA PT SARANA NUSANTARA/PT DKR 1 1 1 1 1 13-Feb-19 EC/HSRCC.CM/KCIC/II/1148-2019 F01-024rev
19 #2 Bridge 04+771 37+716 JALAN PERUMAHAN ARJUNA PERLU 10+200 Area 1 WIKA PT RIZKY INDERA CIPTA
20 #2 Bridge 04+771 37+716 JALAN PERUMAHAN VILLA JAKASETIA PERLU 10+600 Area 1 WIKA PT. DYACONS PRIMA UTAMA/ PT Citra Kreasi/PT BKB
21 #2 Bridge 04+774 37+716 JALAN PEMUKIMAN PERLU 13+190 Area 1 SINO 1 PT. DYACONS PRIMA UTAMA/PT Kreasi Mitra
22 #2 Bridge 04+774 37+716 TAMAN PERUM PONDOK BEKASI PERLU 13+600 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
23 #2 Bridge 04+771 37+716 POS RT 05/10 PERLU 13+600 Area 1 WIKA PT .PUTRA PANDAWA UTAMA
24 #2 Bridge 04+771 37+716 POS RW 10 PERLU 13+900 Area 1 WIKA PT .PUTRA PANDAWA UTAMA
25 #2 Bridge 04+774 37+716 RELOCATION OF PDAM PIPE PERLU 14+000 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 1-Mar-19 EC/HSRCC.CM/KCIC/IV/1390-2019 F01-422rev
26 #2 Bridge 04+774 37+716 SALURAN PONDOK BEKASI BARU PERLU 14+300 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
27 #2 Bridge 04+774 37+716 JALAN, SALURAN PERLU 14+195 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
28 #2 Bridge 04+774 37+716 POS SECURITY PERLU 14+195 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
29 #2 Bridge 04+774 37+716 JALAN DAN TAMAN PENGASINAN PERLU 14+199 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/II/1231-2019 F01-430

30 #2 Bridge 04+774 37+716 JALAN PEMUKIMAN PERLU 14+300 SINO 1


Area 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 28-Feb-19 EC/HSRCC.CM/KCIC/II/1203-2019 F01-418
31 #2 Bridge 04+774 37+716 JALAN TEUKU UMAR PERLU 14+700 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
32 #2 Bridge 04+771 37+716 POS SKRETARIAT RW 10 Pos yandu, PAUD PERLU 14+330 14+330 Area 1 WIKA PT .PUTRA PANDAWA UTAMA
33 #2 Bridge 04+774 37+716 POS RT 5/10 SEPANJANG JAYA PERLU 14+474 14+474 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
34 #2 Bridge 04+771 37+716 TEMPAT WUDLU MASJID BAITUL HIKMAH RW PERLU 14+841 Area 1 WIKA SUDAH SELESAI 1 1 1 1 1 5-Nov-18 EC/HSRCC.CM/KCIC/IX/946-2018 F01-016 Rev1
35 #2 Bridge 04+774 37+716 JALAN PEMUKIMAN A DAN B PERLU 17+700 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
36 #2 Bridge 04+774 37+716 POS RT 09/15 (I) PERLU 15+053 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
37 #2 Bridge 04+774 37+716 POS RT 09/15 (II) PERLU 15+150 Area 1 SINO 1 PT. DYACONS PRIMA UTAMA/PT Kreasi Mitra
38 #2 Bridge 04+774 37+716 JALAN PERLU 15+800 19+230 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/II/1230-2019 F01-424
IX NON PEMERINTAH 11
39 #2 Bridge 04+774 37+716 JALAN KOMPLEK VILLA JATIBENING TOL PERLU 07+700 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
40 #2 Bridge 04+774 37+716 POS KEAMANAN LINGKUNGAN PERLU Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
41 #2 Bridge 04+774 37+716 TEMPAT PENAMPUNGAN SAMPAH PERLU Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
42 #2 Bridge 04+774 37+716 LAPANG TENIS VILLA JATI BENING PERLU 07+540 07+800 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
43 #2 Bridge 04+774 37+716 KOLAM PENAMPUNGAN AIR PERLU Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
44 #2 Bridge 04+774 37+716 TAMAN GREEN LEAF PERLU 8+380 8+480 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
45 #2 Bridge 04+774 37+716 JALAN PERUMAHAN GALAKSI PERLU 9+815 9+940 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
46 #2 Bridge 04+774 37+716 TEMPAT PEMBAKARAN SAMPAH VJS PERLU 10+730 10+750 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
47 #2 Bridge 04+774 37+716 LAPANGAN TENIS GRIYA METROPOLITAN PERLU 11+683 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1237-2019 F01-427
48 #2 Bridge 04+774 37+716 POS RT SEPANJANG JAYA PERLU - Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
49 #2 Bridge 04+774 37+716 POS SATPAM GRIYA MITRA ASRI PERLU 14+660 14+660 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
TOTAL 32 12 12 12 4 4
3. KABUPATEN BEKASI
III PEMERINTAH KOTA/KABUPATEN 25
50 #2 Bridge 04+774 37+716 Jalan Jatimulya PERLU 15+866 15+877 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
51 #2 Bridge 04+771 37+716 POMPA BAK KONTROL 1,5 X 1,5 M dan gardu pompa PERLU 16+000 Area 1 WIKA PT .PUTRA PANDAWA UTAMA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1221-2019 F01-449
52 #2 Bridge 04+771 37+716 SALURAN DAN JEMBATAN CROSSING PERLU 16+085 16+100 Area 1 WIKA SUDAH SELESAI 1 1 1 1 1 5-Nov-18 EC/HSRCC.CM/KCIC/IX/941-2018 F01-186
53 #2 Bridge 04+771 37+716 Saluran (3m), saluran (1,5m), saluran rumah (40cm) dan jalan 5m PERLU 16+000 Area 1 WIKA PT SARANA NUSANTARA/PT PUTRA PANDAWA 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/476-2018 F01-241
54 #2 Bridge 04+771 37+716 SALURAN RT 03/15 dan Jalan 5m PERLU 16+130 Area 1 WIKA PT SARANA NUSANTARA/PT PUTRA PANDAWA 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/476-2018 F01-242
55 #2 Bridge 04+771 37+716 SALURAN RT 09 DAN RT 10 dan jalan 5m PERLU 16+200 Area 1 WIKA PT SARANA NUSANTARA/PT PUTRA PANDAWA 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/476-2018 F01-243
56 #2 Bridge 04+771 37+716 CITIZEN POST RT 10 PERLU 16+360 Area 1 WIKA PT. MITRA USAHA 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/1458-2018 F01-269rev
57 #2 Bridge 04+774 37+716 Jalan Kavling PERLU 16+000 16+093 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
58 #2 Bridge 04+774 37+716 Jalan Kavling PERLU 16+105 16+180 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
59 #2 Bridge 04+771 37+716 TPA ZIYADATURRAHMAN PERLU 16+178 Area 1 WIKA SUDAH SELESAI 1 1 1 16-May-19 EC/HSRCC.CM/KCIC/II/1148-2019 F01-018 REV 2
60 #2 Bridge 04+774 37+716 Jalan Kavling PERLU 16+200 16+450 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
61 #2 Bridge 04+771 37+716 TAMAN PEMDA PERLU 16+750 Area 1 WIKA PT CITRA KREASI/PT BKB / PT. MBS
62 #2 Bridge 04+771 37+716 JALAN PEMUKIMAN (MELATI UJUNG) PERLU 16+800 Area 1 WIKA PT CITRA KREASI/PT BKB / PT. MBS
63 #2 Bridge 04+771 37+716 GEDUNG SERBAGUNA PERLU 16+900 Area 1 WIKA PT CITRA KREASI/PT BKB 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/476-2018 F01-245
64 #2 Bridge 04+774 37+716 Sarana Olah Raga Terapi PERLU Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
65 Jalan Jatimulya PERLU Area 1 SINO 1 PT RAHMANDIKA
66 Jalan Jatimulya (Toyogiri) PERLU Area 1 SINO 1 PT RAHMANDIKA
67 #2 Bridge 04+771 37+716 JALAN (6,4M) WARGA DITANAH JASAMARGA PERLU 17+100 Area 1 WIKA PT .PUTRA PANDAWA UTAMA
68 #2 Bridge 04+771 37+716 JALAN PEMUKIMAN WARGA PERLU 17+500 Area 1 WIKA WIKA Section 1
69 #2 Bridge 04+771 37+716 JALAN TEROWONGAN CROSSING TOL PERLU 17+600 Area 1 WIKA PT .PUTRA PANDAWA UTAMA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1218-2018 F01-445
70 #2 Bridge 04+771 37+716 AKSES RIGID 1,2 M PERLU 18+600 Area 1 WIKA PT .PUTRA PANDAWA UTAMA/PT.CITRA KREASI/PT BKB / PT. MBS
71 #2 Bridge 04+771 37+716 JALAN PEMUKIMAN PERLU 19+500 Area 1 WIKA WIKA SECTION 1 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-203
72 #2 Bridge 04+771 37+716 JALAN PEMUKIMAN PERLU 20+300 Area 1 WIKA PT SARANA NUSANTARA / PT Citra Kreasi/PT BKB / PT. MBS
73 #2 Bridge 04+771 37+716 Parking Bay PERLU 33+080 33+200 Area 1 SINO PT.MBS
74 #2 Bridge 04+774 37+716 RELOCATION OF PDAM PIPE PERLU 30+000 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 1-Mar-19 EC/HSRCC.CM/KCIC/IV/1390-2019 F01-421rev
V BELUM JELAS ALAS HAKNYA 6 - - - - - - - - -
75 #2 Bridge 04+774 37+716 Jl. Kp Buaran Lambangsari PERLU 19+230 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
76 #2 Bridge 04+774 37+716 Jalan Desa lambangsari PERLU 20+300 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA/PT. TRIJAYA INDOSARAN
77 #2 Bridge 04+774 37+716 Drainase PERLU 20+429 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
78 #2 Bridge 04+774 37+716 Jalan Jayamukti PERLU 35+500 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA/PT. TRIJAYA INDOSARAN
79 #2 Bridge 04+774 37+716 JALAN WARGA PERLU 33+300 33+800 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
80 #2 Bridge 04+774 37+716 JALAN PERLU 33+409 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 28-Feb-19 EC/HSRCC.CM/KCIC/II/1203-2019 F01-417
81 #2 Bridge 04+774 37+716 Jalan Cibatu PERLU 33+416 33+429 Area 1 SINO 1 PT. TRIJAYA INDOSARANA KARYA
VI WAKAF <5000 M2 2
82 #2 Bridge 04+774 37+716 JALAN WARGA PERLU 31+300 Area 1 SINO 1 PT. DYACONS PRIMA UTAMA/PT Kreasi Mitra
83 #2 Bridge 04+774 37+716 JALAN WARGA PERLU 32+595 Area 1 SINO 1 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/II/1231-2019 F01-431
TOTAL #REF! 13 13 13 7 7
4. KABUPATEN KARAWANG
II PEMERINTAH PROVINSI 34
Form Number

Start End
NO JENIS STRUKTUR DK STRUKTUR PRASARANA SARANA UTILITAS PERLU RELOKASI? AREA (Section) KONTRAKTOR SUBKONTRAKTOR Prelim Design Approval Pemilik Form 01 (basic Design) Nego Form 03 SPMK
Date Cover letter HSRCC

DK DK

84 #5 Subgrade 41+788 43+163 JALAN PERLU 41+750 Area 1 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB / PT. MBS 1 1 1 29-May-19 EC/HSRCC.CM/KCIC/V/1524-2019 F01-470
85 #5 Subgrade 41+788 43+163 JALAN PERLU 41+850 42+000 Area 1 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB / PT. MBS 1 1 1 29-May-19 EC/HSRCC.CM/KCIC/V/1524-2019 F01-469
86 #5 Subgrade 41+788 43+163 JALAN PERLU 41+994 42+000 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/ PT. Putra Pandawa
87 #5 Subgrade 41+788 43+163 PT. CERES PERLU 42+867 42+898 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB / PT. MBS
88 #8 Subgrade 48+500 48+739 JALAN PERLU 48+500 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-455
89 #9 Subgrade 49+300 51+169 JALAN PERLU 49+450 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-456
90 #9 Subgrade 49+300 51+169 JALAN PERLU 50+693 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-204
91 #9 Subgrade 49+300 51+169 JALAN PERLU 51+065 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-457
92 #11 Subgrade 52+846 53+866 JALAN PERLU 52+500 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-458
93 #11 Subgrade 52+846 53+866 JALAN PERLU 53+200 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-265
94 #11 Subgrade 52+846 53+866 JALAN PERLU 53+639 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-205
95 #12 Subgrade 54+068 55+719 JALAN PERLU 54+050 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-278
96 #12 Subgrade 54+068 55+719 JALAN PERLU 54+250 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-279
97 #12 Subgrade 54+068 55+719 JALAN / no need relocation PERLU 54+640 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-280
98 #12 Subgrade 54+068 55+719 JALAN PERLU 55+228 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi/PT BKB 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-206
99 #12 Subgrade 54+068 55+719 JALAN PERLU 55+280 Area2 WIKA PT UTAMA MEMBANGUN / PT. Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-281
100 #13 Subgrade 55+985 57+085 JALAN / no need relocation PERLU 56+190 Area2 WIKA PT UTAMA MEMBANGUN / PT. Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-282
101 #13 Subgrade 55+985 57+085 JALAN PERLU 57+890 Area2 WIKA PT UTAMA MEMBANGUN / PT. Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-283
102 #15 Subgrade 58+952 60+467 JALAN (SURVEY15-8-18) PERLU 58+644 58+661 Area2 WIKA PT SARANA NUSANTARA
103 #15 Subgrade 58+952 60+467 JALAN PERLU 58+975 58+993 Area2 SINO 2 PT KREASI MITRA
104 #15 Subgrade 58+952 60+467 JALAN PERLU 59+300 Area2 WIKA PT UTAMA MEMBANGUN / PT. Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-284
105 #15 Subgrade 58+952 60+467 JALAN PERLU 59+433 59+663 Area2 WIKA PT UTAMA MEMBANGUN / PT. Sarana Nusantara
106 #15 Subgrade 58+952 60+467 JALAN PERLU 60+120 Area2 WIKA PT UTAMA MEMBANGUN / PT. Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-285
107 #15 Bridge 60+467 60+766 JALAN PERLU 60+740 60+886 Area2 WIKA PT CITRA KREASI/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-286
108 #16 Bridge 61+101 61+236 JALAN PERLU 61+220 Area2 WIKA PT CITRA KREASI/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-287
109 #17 Subgrade 61+236 64+161 JALAN PERLU 62+980 Area2 WIKA PT CITRA KREASI/PT BKB 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-207
110 #17 Subgrade 61+236 64+161 JALAN PERLU 63+900 Area2 WIKA PT CITRA KREASI/PT BKB 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-208
111 #17 Bridge 64+161 66+969 JALAN PERLU 64+420 64+440 Area2 SINO 2 PT KREASI MITRA/PT. TRIJAYA INDOSARANA KARYA 1 1 1 28-Feb-19 EC/HSRCC.CM/KCIC/II/1203-2019 F01-074 REV1
112 #17 Bridge 64+161 66+969 RELOCATION OF WATER SUPPLY PIPE PERLU 64+800 Area2 SINO 2 PT KREASI MITRA/PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 2-Oct-18 EC/HSRCC.CM/KCIC/X/858-2018 F01-173
113 #17 Bridge 64+161 66+969 RELOCATION OF WATER SUPPLY PIPE PERLU 64+955 Area2 SINO 2 PT KREASI MITRA/PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 2-Oct-18 EC/HSRCC.CM/KCIC/X/858-2018 F01-174
114 #17 Bridge 64+161 66+969 JALAN PERLU 64+980 Area2 SINO 2 PT KREASI MITRA
115 #17 Bridge 64+161 66+969 RELOCATION OF WATER SUPPLY PIPE PERLU 65+575 Area2 SINO 2 PT KREASI MITRA/PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 2-Oct-18 EC/HSRCC.CM/KCIC/X/858-2018 F01-087
116 #17 Bridge 64+161 66+969 JALAN PERLU 66+910 Area2 WIKA PT CITRA KREASI/PT BKB 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-209
117 #17 Bridge 64+161 66+969 RELOCATION OF WATER SUPPLY PIPE PERLU 66+970 Area2 SINO 2 PT KREASI MITRA/PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 2-Oct-18 EC/HSRCC.CM/KCIC/X/858-2018 F01-096
III PEMERINTAH KOTA/KABUPATEN -
V BELUM JELAS ALAS HAKNYA 2
118 Jalan kec Teluk jambe PERLU 41+825 42+00 Area2 CREC PT RAHMANDHIKA
119 Jalan Desa wanakerta PERLU 42+00 - Area2 CREC PT RAHMANDHIKA
IX NON PEMERINTAH 1
120 #5 Subgrade 41+788 43+163 Masjid PERLU 41+750 - Area 1 WIKA PT. PUTRA PANDAWA 1 1 1 3-Jul-18 EC/HSRCC.CM/KCIC/IX/641-2018 F01-030
TOTAL 37 28 28 28 4 4
5. KABUPATEN PURWAKARTA
II PEMERINTAH PROVINSI 1
121 #4 Tunnel 76+895 78+295 Lapangan Bola PERLU 78+250 - Area2 SINO 2 KCIC/PSBI-UGR 1 1 1 1-May-19 EC/HSRCC.CM/KCIC/V/559-2018 F01-112
III PEMERINTAH KOTA/KABUPATEN 11
122 #18 Subgrade 66+969 70+181 Mushola PERLU 67+000 - Area2 WIKA PT. KARYA MANDIRI 1 1 1 1 1 5-Jul-18 EC/HSRCC.CM/KCIC/V/656-2018 F01-032
123 #18 Subgrade 66+969 70+181 Jalan Kp Neglasari PERLU 69+900 - Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT BKB
124 #18 Subgrade 66+969 70+181 Jalan Kp Neglasari PERLU 69+950 - Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT BKB
125 #19 Subgrade 70+875 71+604 Jalan Kp Cilegong PERLU 70+900 - Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT BKB
126 #20 Bridge 73+011 73+902 Jalan Kp Tegal Nangklak PERLU 73+650 - Area2 WIKA PT ANDIKA PERSADA / PT. Sarana Nusantara
127 #24 Bridge 80+976 81+906 Jalan Kp Cidadapan PERLU 81+900 - Area2 WIKA PT ANDIKA PERSADA / PT PUTRA PANDAWA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-216
128 #30 Subgrade 83+261 85+046 Jalan Kp Buluh PERLU 84+075 - Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT BKB
129 #28 Bridge 85+333 85+468 Jalan Kp Cihuni PERLU 85+450 - Area3 WIKA PT ANDIKA PERSADA 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-294
130 #28 Bridge 85+333 85+468 Jalan Raya Militer PERLU 88+100 - Area3 WIKA PT ANDIKA PERSADA
131 #18 Subgrade 66+969 70+181 JALAN / no need relocation PERLU 67+720 Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-288
132 #18 Subgrade 66+969 70+181 JALAN / no need relocation PERLU 67+780 Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT BKB 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-289
IV TANAH KAS DESA 84
133 #18 Subgrade 66+969 70+181 Jalan Desa Kp Cikaobandung PERLU 67+000 - Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT MBS 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-210
134 #4 Tunnel 76+895 78+295 Gang PERLU 66+980 - Area2 WIKA PT KREASI MITRA
135 #4 Tunnel 76+895 78+295 Saluran PERLU 67+250 - Area2 WIKA PT KREASI MITRA
136 #4 Tunnel 76+895 78+295 Gang PERLU 67+300 - Area2 CREC PT KREASI MITRA
137 #4 Tunnel 76+895 78+295 Gang PERLU 68+050 - Area2 WIKA PT KREASI MITRA
138 #4 Tunnel 76+895 78+295 Jalan Desa Kp Cilalawak PERLU 67+900 - Area2 WIKA PT KREASI MITRA
139 #4 Tunnel 76+895 78+295 Saluran Air PERLU 68+300 - Area2 WIKA PT KREASI MITRA
140 #4 Tunnel 76+895 78+295 Saluran Air PERLU 68+450 - Area2 WIKA PT KREASI MITRA
141 #18 Subgrade 66+969 70+181 Mushola (saluran air) PERLU 68+550 - Area2 WIKA PT ANDIKA PERSADA / PT KARYA MANDIRI 1 1 1 1 1 5-Jul-18 EC/HSRCC.CM/KCIC/V/656-2018 F01-034
142 #4 Tunnel 76+895 78+295 Saluran Air PERLU 68+700 - Area2 WIKA PT KREASI MITRA
143 #4 Tunnel 76+895 78+295 Saluran Air PERLU 68+850 - Area2 WIKA PT KREASI MITRA
144 #4 Tunnel 76+895 78+295 Saluran Air PERLU 69+000 - Area2 WIKA PT KREASI MITRA
145 #18 Subgrade 66+969 70+181 Jalan Desa Kp Cilalawak PERLU 68+440 - Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT BKB 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-211
146 #4 Tunnel 76+895 78+295 Saluran PERLU 69+340 - Area2 WIKA PT KREASI MITRA
147 #4 Tunnel 76+895 78+295 Saluran PERLU 69+470 - Area2 WIKA PT KREASI MITRA
148 #18 Subgrade 66+969 70+181 JALAN PERLU 69+710 Area2 WIKA PT ANDIKA PERSADA / PT CITRA KREASI/PT BKB 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-212
149 #18 Bridge 70+181 70+875 Road relocation PERLU 70+850 - Area2 WIKA PT ANDIKA PERSADA / PT Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-290
150 #18 Bridge 70+181 70+875 Road relocation / no need relocation PERLU 70+850 - Area2 WIKA PT ANDIKA PERSADA / PT Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-291
151 #19 Subgrade 70+875 71+604 Jalan Desa PERLU 70+970 - Area2 WIKA PT ANDIKA PERSADA / PT Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-292
152 #4 Tunnel 76+895 78+295 Saluran PERLU 71+015 - Area2 WIKA PT KREASI MITRA
153 #19 Subgrade 70+875 71+604 Gang PERLU 71+100 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi / PT Sarana Nusantara
154 #19 Bridge 71+604 72+117 Gang PERLU 71+810 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi / PT Sarana Nusantara
155 #4 Tunnel 76+895 78+295 Gang PERLU 71+870 - Area2 WIKA PT KREASI MITRA
156 #4 Tunnel 76+895 78+295 Selokan PERLU 72+160 - Area2 WIKA PT KREASI MITRA
157 #20 Subgrade 72+117 73+011 JALAN PERLU 72+310 Area2 WIKA PT CITRA KREASI / PT Sarana Nusantara 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-213
158 #4 Tunnel 76+895 78+295 Gang PERLU 72+450 - Area2 WIKA PT KREASI MITRA
159 #4 Tunnel 76+895 78+295 Selokan PERLU 72+570 - Area2 WIKA PT KREASI MITRA
160 #20 Bridge 73+011 73+902 GANG PERLU 73+900 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi / PT Sarana Nusantara
161 #4 Tunnel 76+895 78+295 Saluran PERLU 73+790 - Area2 WIKA PT KREASI MITRA
162 #20 Bridge 73+011 73+902 Saluran PERLU 73+800 Area2 CREC PT RAHMANDHIKA
163 #20 Bridge 73+011 73+902 Gang PERLU 73+900 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi / PT Sarana Nusantara
164 #3 Tunnel 74+010 75+040 RELOCATION OF WATER SUPPLY PIPE PERLU 74+020 Area2 SINO 2 PT. TRIJAYA INDOSARANA KARYA 1 1 1 4-Jan-19 EC/HSRCC.CM/KCIC/I/1045-2019 F01-202
165 #22 Subgrade 75+040 75+110 Jalan Kp Pasir Ipis PERLU 75+060 - Area2 SINO 2 PT. TRIJAYA INDOSARANA KARYA 1 1 1 1-Mar-19 EC/HSRCC.CM/KCIC/III/1210-2019 F01-099
166 #22 Subgrade 75+040 75+110 Jalan Kp Pasir Ipis PERLU 75+080 - Area2 SINO 2 PT KREASI MITRA/ PT. TRIJAYA INDOSARANA KARYA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1241-2019 F01-454
167 #21 bridge 75+110 75+508 Jalan Kp Mekarsari PERLU 75+280 Area2 SINO 2 PT RAHMANDIKA
168 #21 bridge 75+110 75+508 RELOCATION OF WATER SUPPLY PIPE PERLU 75+200 Area2 SINO 2 PT. TRIJAYA INDOSARANA KARYA 1 1 1 1 1 2-Oct-18 EC/HSRCC.CM/KCIC/X/858-2018 F01-175
169 #21 bridge 75+110 75+508 River Relocation PERLU 75+300 - Area2 SINO 2 PT KREASI MITRA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1233-2019 F01-423
170 #21 Bridge 75+110 75+508 Relocation of Islamic School facility PERLU 75+350 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi/PT BKB 1 1 1 3-Jul-18 EC/HSRCC.CM/KCIC/V/641-2018 F01-039
171 #21 Bridge 75+110 75+508 Relocation of Mosque in Islamic School facility PERLU 75+350 Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi/PTBKB 1 1 1 3-Jul-18 EC/HSRCC.CM/KCIC/V/641-2018 F01-036
172 #21 bridge 75+110 75+508 Jalan Kp Mekarsari PERLU 75+420 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
173 #21 bridge 75+110 75+508 Jalan Kp Mekarsari PERLU 75+450 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
174 #21 bridge 75+110 75+508 gang PERLU 75+500 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
Form Number

Start End
NO JENIS STRUKTUR DK STRUKTUR PRASARANA SARANA UTILITAS PERLU RELOKASI? AREA (Section) KONTRAKTOR SUBKONTRAKTOR Prelim Design Approval Pemilik Form 01 (basic Design) Nego Form 03 SPMK
Date Cover letter HSRCC

DK DK

175 #3 Tunnel 75+545 76+300 gang PERLU 75+700 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
176 #3 Tunnel 75+545 76+300 Saluran PERLU 75+960 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
177 #22 Bridge 76+371 76+769 RELOCATION OF CHANNEL PERLU 76+380 Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1188-2019 F01-358
178 #4 Tunnel 76+895 78+295 RELOCATED CRUSHED STONE ROAD PERLU 76+985 96+995 Area2 SINO 2 PT. TRIJAYA INDOSARANA KARYA 1 1 1 1-Mar-19 EC/HSRCC.CM/KCIC/III/1210-2019 F01-105
179 #4 Tunnel 76+895 78+295 JALAN PERLU 78+100 78+300 Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA 1 1 1 1-Mar-19 EC/HSRCC.CM/KCIC/III/1210-2019 F01-106
180 #4 Tunnel 76+895 78+295 RELOCATED CRUSHED STONE ROAD PERLU 78+250 78+370 Area2 SINO 2 PT. TRIJAYA INDOSARANA KARYA 1 1 1 28-Feb-19 EC/HSRCC.CM/KCIC/II/1203-2019 F01-419
181 #26 Subgrade 78+295 79+024 RELOCATION OF TOMBS PERLU 78+400 Area2 SINO 2 KCIC/PSBI-UGR 1 1 1 11-Jan-19 EC/HSRCC.CM/KCIC/I/059-2019 F01-303
182 #26 Subgrade 78+295 79+024 Saluran PERLU 78+550 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
183 #26 Subgrade 78+295 79+024 JALAN PERLU 78+700 79+080 Area2 SINO 2 PT. TRIJAYA INDOSARANA KARYA
184 #26 Subgrade 78+295 79+024 SDN 1 MALANGNENGAH PERLU 78+820 - Area2 WIKA PT RAHMANDHIKA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1223-2019 F01-040rev
185 #26 Subgrade 78+295 79+024 Saluran PERLU 78+840 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
186 #23 Bridge 79+024 80+518 Gang PERLU 80+280 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi /PT PUTRA PANDAWA
187 #23 Bridge 79+024 80+518 Selokan PERLU 80+400 - Area2 WIKA PT ANDIKA PERSADA / PT PUTRA PANDAWA
188 #24 Bridge 80+976 81+906 Saluran PERLU 81+130 - Area2 WIKA PT .PUTRA PANDAWA UTAMA
189 #24 Bridge 80+976 81+906 Saluran PERLU 81+150 - Area2 WIKA PT ANDIKA PERSADA / PT PUTRA PANDAWA
190 #24 Bridge 80+976 81+906 Saluran PERLU 81+170 - Area2 WIKA PT .PUTRA PANDAWA UTAMA
191 #24 Bridge 80+976 81+906 Saluran PERLU 81+320 - Area2 WIKA PT ANDIKA PERSADA / PT PUTRA PANDAWA
192 #24 Bridge 80+976 81+906 Saluran PERLU 81+350 - Area2 WIKA PT ANDIKA PERSADA / PT PUTRA PANDAWA
193 #24 Bridge 80+976 81+906 Gang PERLU 81+400 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi/PT PUTRA PANDAWA
194 #24 Bridge 80+976 81+906 Road relocation PERLU 81+100 Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi/PT PUTRA PANDAWA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-214
195 #24 Bridge 80+976 81+906 Road Relocation PERLU 81+561 Area2 WIKA PT ANDIKA PERSADA / PT PUTRA PANDAWA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-215
196 #24 Bridge 80+976 81+906 Saluran PERLU 81+700 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
197 #24 Bridge 80+976 81+906 Selokan PERLU 81+620 - Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT PUTRA PANDAWA
198 #25 Bridge 82+075 82+769 Jalan Kp Gunung PERLU 82+277 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi / PT PUTRA PANDAWA
199 #24 Bridge 80+976 81+906 Selokan PERLU 81+620 - Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT PUTRA PANDAWA
200 #24 Bridge 80+976 81+906 SELOKAN PERLU 81+626 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT PUTRA PANDAWA
201 #24 Bridge 80+976 81+906 SELOKAN PERLU 81+631 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT PUTRA PANDAWA
202 #24 Bridge 80+976 81+906 SELOKAN PERLU 81+695 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT PUTRA PANDAWA
203 #24 Bridge 80+976 81+906 SELOKAN PERLU 81+700 Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT PUTRA PANDAWA
204 #25 Bridge 82+075 82+769 Gang PERLU 82+650 - Area2 WIKA PT. DYACOS PRIMA UTAMA/ PT Citra Kreasi / PT PUTRA PANDAWA
205 #29 Subgrade 82+769 82+895 Selokan PERLU 82+800 - Area2 SINO 2 PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA
206 #26 Bridge 82+895 83+261 Selokan PERLU 82+900 - Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT Sarana Nusantara
207 #26 Bridge 82+895 83+261 Selokan PERLU 83+120 - Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT Sarana Nusantara
208 #30 Subgrade 83+261 85+046 Selokan PERLU 83+432 - Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT Sarana Nusantara
209 #26 Bridge 82+895 83+261 Jalan Kp Pangkalan PERLU 83+200 - Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT Sarana Nusantara 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-293
210 #30 Subgrade 83+261 85+046 Selokan PERLU 83+648 - Area2 WIKA PT. TRIJAYA INDOSARANA KARYA / PT Citra Kreasi / PT Sarana Nusantara
211 #30 Subgrade 83+261 85+046 Saluran PERLU 84+140 - Area2 WIKA PT .PUTRA PANDAWA UTAMA/PT Andika Persada / PT Sarana Nusantara
212 #30 Subgrade 83+261 85+046 Gang/JALAN PERLU 84+820 - Area2 WIKA PT PUTRA PANDAWA UTAMA/PT. SINABUNG JAYA SEJAHTERA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-217
213 #33 Subgrade 86+950 87+900 Mushola PERLU 86+950 Area3 WIKA SUDAH SELESAI 1 1 1 1 1 1-May-18 EC/HSRCC.CM/KCIC/V/488-2018 F01-041rev
214 #33 Subgrade 86+950 87+900 Jalan Kp Babakan Calibur PERLU 87+300 - Area3 WIKA PT ANDIKA PERSADA 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-295
215 #33 Subgrade 86+950 87+900 Mushola PERLU 87+400 Area3 WIKA SUDAH SELESAI 1 1 1 1 1 5-Jul-18 EC/HSRCC.CM/KCIC/V/656-2018 F01-042rev
216 #34 Subgrade 88+125 88+226 JALAN DAN IRIGASI PERLU 88+100 Area3 WIKA PT ANDIKA PERSADA
VI WAKAF <5000 M2 1
217 #30 Subgrade 83+261 85+046 Mushola PERLU 83+515 - Area2 WIKA PT. MITRA USAHA 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/479-2018 F01-037 REV 1
VII WAKAF >5000 M2 -
VIII WAKAF LISAN 1
218 #18 Subgrade 66+969 70+181 Mushola PERLU 68+550 - Area2 CREC PT. MITRA USAHA
TOTAL 98 35 35 35 6 6
6. KABUPATEN BANDUNG BARAT
I PEMERINTAH PUSAT -
II PEMERINTAH PROVINSI -
III PEMERINTAH KOTA/KABUPATEN 2
219 #36 Bridge 102+901 103+621 Rumah Pemotongan Hewan (RPH) PERLU 103+150 103+150 Area3 CREC PSBI ?
220 #36 Bridge 102+901 103+621 Rumah Pemotongan Hewan (RPH) PERLU 103+215 103+215 Area3 CREC PSBI ?
IV TANAH KAS DESA 115
221 #6 Tunnel 88+900 93+340 Jalan kp ciporang PERLU 89+040 89+040 Area3 CREC PT. INA HASTA MANDIRI
222 #6 Tunnel 88+900 93+340 Jalan kp hegarmanah PERLU 90+230 90+230 Area3 CREC PT. INA HASTA MANDIRI
223 #6 Tunnel 88+900 93+340 Jalan sirna sari PERLU 90+920 90+920 Area3 CREC PT. INA HASTA MANDIRI
224 #6 Tunnel 88+900 93+340 Jalan sukaluyu PERLU 91+440 91+440 Area3 CREC PT. INA HASTA MANDIRI
225 #6 Tunnel 88+900 93+340 Jalan sukaluyu PERLU 91+675 91+675 Area3 CREC PT. INA HASTA MANDIRI
226 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 90+500 90+500 Area3 CREC PT ANDIKA PERSADA
227 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 90+850 90+850 Area3 CREC PT ANDIKA PERSADA
228 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 91+175 91+175 Area3 CREC PT ANDIKA PERSADA
229 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 91+225 91+225 Area3 CREC PT ANDIKA PERSADA
230 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 91+450 91+450 Area3 CREC PT ANDIKA PERSADA
231 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 91+530 91+530 Area3 CREC PT ANDIKA PERSADA
232 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 91+595 91+595 Area3 CREC PT ANDIKA PERSADA
233 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 91+675 91+675 Area3 CREC PT. INA HASTA MANDIRI
234 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 91+700 91+700 Area3 CREC PT. INA HASTA MANDIRI
235 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 91+800 91+800 Area3 CREC PT. INA HASTA MANDIRI
236 #6 Tunnel 88+900 93+340 Jalan pangkalan PERLU 91+260 91+260 Area3 CREC PT. INA HASTA MANDIRI
237 #6 Tunnel 88+900 93+340 Jalan sumumput PERLU 91+725 91+725 Area3 CREC PT. INA HASTA MANDIRI
238 #6 Tunnel 88+900 93+340 Jalan sumumput PERLU 91+790 91+790 Area3 CREC PT. INA HASTA MANDIRI
239 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 90+225 90+225 Area3 CREC PT. INA HASTA MANDIRI
240 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 90+250 90+250 Area3 CREC PT. INA HASTA MANDIRI
241 #6 Tunnel 88+900 93+340 Saluran Air (Selokan) PERLU 90+350 90+350 Area3 CREC PT. INA HASTA MANDIRI
242 #6 Tunnel 88+900 93+340 Jalan Desa PERLU 92+910 Area3 CREC PT RAHMANDHIKA
243 #6 Tunnel 88+900 93+340 Gang PERLU Area3 CREC PT RAHMANDHIKA
244 #6 Tunnel 88+900 93+340 Jalan dangdeur PERLU Area3 CREC PT RAHMANDHIKA
245 #6 Tunnel 88+900 93+340 Jalan cigebling PERLU Area3 CREC PT RAHMANDHIKA
246 #37 Subgrade 93+340 93+660 Road relocation PERLU 93+550 Area3 CREC PT. INA HASTA MANDIRI 1 1 1 21-Mar-19 EC/HSRCC.CM/KCIC/III/1288-2019 F01-249 rev1
247 #37 Subgrade 93+340 93+660 Saluran Air (Selokan) PERLU 93+010 93+010 Area3 CREC PT. INA HASTA MANDIRI
248 #37 Subgrade 93+340 93+660 Saluran Air (Selokan) PERLU 93+145 93+145 Area3 CREC PT. INA HASTA MANDIRI
249 #37 Subgrade 93+340 93+660 Saluran Air (Sungai) PERLU 93+390 93+390 Area3 CREC PT. INA HASTA MANDIRI
250 #37 Subgrade 93+340 93+660 Saluran Air (Selokan) PERLU 93+450 93+450 Area3 CREC PT. INA HASTA MANDIRI
251 #37 Subgrade 93+340 93+660 Saluran Air (Selokan) PERLU 93+535 93+535 Area3 CREC PT. INA HASTA MANDIRI
252 #7 Tunnel 93+660 94+895 Saluran Air (Selokan) PERLU 93+680 93+680 Area3 CREC PT. INA HASTA MANDIRI
253 #7 Tunnel 93+660 94+895 Saluran Air (Selokan) PERLU 93+850 93+850 Area3 CREC PT. INA HASTA MANDIRI
254 #7 Tunnel 93+660 94+895 Saluran Air (Selokan) PERLU 93+855 93+855 Area3 CREC PT. INA HASTA MANDIRI
255 #7 Tunnel 93+660 94+895 JALAN PERLU 94+880 Area3 CREC PT. INA HASTA MANDIRI 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-250
256 #31 Bridge 95+041 95+471 JALAN PERLU 95+068 Area3 WIKA PT ANDIKA PERSADA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-218
257 #31 Brigde 95+041 95+471 Saluran Air (Selokan) PERLU 95+130 95+130 Area3 CREC PT. INA HASTA MANDIRI
258 #31 Brigde 95+041 95+471 Saluran Air (Selokan) PERLU 95+325 95+325 Area3 CREC PT. INA HASTA MANDIRI
259 #8 Tunnel 95+472 96+080 JALAN PERLU 95+920 Area3 CREC PT. INA HASTA MANDIRI
260 #40 Subgrade 96+080 97+022 Jalan cikuda PERLU 96+980 Area3 WIKA SUDAH DI DESAIN SUB CREC
261 #40 Subgrade 96+080 97+022 Jalan Cikuda PERLU 96+700 Area3 CREC PT RAHMANDHIKA
262 #9 Tunnel 97+320 99+485 Jalan Ciasri PERLU 97+395 Area3 CREC PT RAHMANDHIKA
263 #32 Bridge 97+014 97+248 Selokan PERLU 97+0,80 97+0,80 Area3 CREC PT. DYACONS PRIMA UTAMA
264 #32 Bridge 97+014 97+248 JALAN PERLU 97+240 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1217-2019 F01-448
265 #9 Tunnel 97+320 99+485 Jalan Desa sumur bandung PERLU 98+710 98+710 Area3 CREC PT. ANDIKA PERSADA
266 #9 Tunnel 97+320 99+485 Jalan Desa sumur bandung PERLU 98+890 98+890 Area3 CREC PT. ANDIKA PERSADA
267 #9 Tunnel 97+320 99+485 Road Relocation PERLU 99+450 Area3 CREC PT. ANDIKA PERSADA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-001/251
268 Jalan tanah desa sumur bandung PERLU Area3 CREC PT RAHMANDHIKA
269 #10 Tunnel 99+820 100+070 Jalan Desa nyalindung PERLU 99+940 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-330
Form Number

Start End
NO JENIS STRUKTUR DK STRUKTUR PRASARANA SARANA UTILITAS PERLU RELOKASI? AREA (Section) KONTRAKTOR SUBKONTRAKTOR Prelim Design Approval Pemilik Form 01 (basic Design) Nego Form 03 SPMK
Date Cover letter HSRCC

DK DK

270 Jalan desa nyalindung PERLU Area3 CREC PT RAHMANDHIKA


271 #44 Subgrade 100+070 100+853 JALAN PERLU 100+250 Area3 WIKA PT ANDIKA PERSADA 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-296
272 #44 Subgrade 100+070 100+853 JALAN PERLU 100+264 Area3 WIKA PT ANDIKA PERSADA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-220
273 #44 Subgrade 100+070 100+853 Jalan Desa nyalindung PERLU 100+490 100+490 Area3 CREC PT. DYACONS PRIMA UTAMA
274 #44 Subgrade 100+070 100+853 Jalan Desa nyalindung PERLU 100+810 100+810 Area3 CREC PT. DYACONS PRIMA UTAMA
275 #44 Subgrade 100+070 100+853 Jalan PERLU 100+400 100+400 Area3 CREC PT. DYACONS PRIMA UTAMA
276 #44 Subgrade 100+070 100+853 Selokan/ Sawah Desa PERLU 100+300 100+300 Area3 CREC PT. DYACONS PRIMA UTAMA
277 #44 Subgrade 100+070 100+853 Selokan PERLU 100+320 100+320 Area3 CREC PT. DYACONS PRIMA UTAMA
278 #44 Subgrade 100+070 100+853 Selokan PERLU 100+710 Area3 WIKA PT ANDIKA PERSADA 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-297
279 #44 Subgrade 100+070 100+853 Selokan PERLU 100+210 100+210 Area3 CREC PT. DYACONS PRIMA UTAMA
280 #44 Subgrade 100+070 100+853 Selokan PERLU 100+250 100+250 Area3 CREC PT. DYACONS PRIMA UTAMA
281 #34 Bridge 100+870 101+006 JALAN PERLU 100+939 Area3 WIKA SUDAH DI DESAIN SUB CREC 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-221
282 #45 Subgrade 101+022 101+435 JALAN PERLU 101+100 Area3 WIKA PT ANDIKA PERSADA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-222
283 #45 Subgrade 101+022 101+435 JALAN PERLU 101+390 Area3 WIKA PT ANDIKA PERSADA 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1200-2019 F01-298
284 Jalan desa cempaka mekar PERLU 102+085 Area3 CREC PT RAHMANDHIKA
285 #47 Subgrade 102+660 102+933 Jalan desa cempaka mekar PERLU 102+820 102+820 Area3 CREC PT. DYACONS PRIMA UTAMA
286 #47 Subgrade 102+660 102+933 Jalan desa cempaka mekar PERLU 102+935 102+935 Area3 CREC PT. DYACONS PRIMA UTAMA
287 #36 Bridge 102+901 103+621 Jalan desa cempaka mekar PERLU 102+945 102+945 Area3 CREC PT. DYACONS PRIMA UTAMA
288 Gang PERLU Area3 CREC PT RAHMANDHIKA
289 #36 Bridge 102+901 103+621 Road Relocation PERLU 103+550 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-347
290 #48 Subgrade 103+621 103+808 Jalan desa cempaka mekar PERLU 103+650 Area3 WIKA PT ANDIKA PERSADA
291 #36 Bridge 102+901 103+621 Jalan desa cempaka mekar PERLU 103+900 103+900 Area3 CREC PT. DYACONS PRIMA UTAMA
292 #37 Subgrade 103+808 104+534 Jalan desa togog apu PERLU 103+840 Area3 CREC PT. DYACONS PRIMA UTAMA
293 #37 Subgrade 103+808 104+534 Gang PERLU 103+350 103+950 Area3 CREC PT. DYACONS PRIMA UTAMA
294 #37 Subgrade 103+808 104+534 Gang PERLU 103+960 103+960 Area3 CREC PT. DYACONS PRIMA UTAMA
295 #37 Subgrade 103+808 104+534 Jalan desa togog apu PERLU 104+480 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-331
296 #37 Subgrade 103+808 104+534 Jalan desa togog apu PERLU 104+500 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-332
297 #38 Bridge 105+160 105+427 Jalan desa togog apu PERLU 105+185 105+185 Area3 CREC PT. DYACONS PRIMA UTAMA
298 #38 Bridge 105+160 105+427 Jalan desa togog apu PERLU 105+380 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-333
299 #38 Bridge 105+160 105+427 Jalan desa togog apu PERLU 105+480 105+480 Area3 CREC PT. DYACONS PRIMA UTAMA
300 #38 Bridge 105+160 105+427 Jalan desa togog apu PERLU 105+615 105+615 Area3 CREC PT. DYACONS PRIMA UTAMA
301 #38 Bridge 105+160 105+427 Selokan PERLU 104+150 104+150 Area3 CREC PT. DYACONS PRIMA UTAMA
302 #38 Bridge 105+160 105+427 Selokan PERLU 105+235 105+235 Area3 CREC PT. DYACONS PRIMA UTAMA
303 #39 Bridge 105+626 105+975 Selokan PERLU 105+685 105+685 Area3 CREC PT. DYACONS PRIMA UTAMA
304 #52 Subgrade 106+287 106+547 Jalan Desa bojong koneng PERLU 106+500 Area3 CREC PT. PT. PT. DYACONS PRIMA UTAMA/WBP 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-334
305 Jalan Desa bojong koneng PERLU 107+590 Area3 CREC PT RAHMANDHIKA
306 #52 Subgrade 106+287 106+547 Selokan PERLU 106+150 106+150 Area3 CREC PT. DYACONS PRIMA UTAMA
307 #52 Subgrade 106+287 106+547 Selokan PERLU 106+225 106+225 Area3 CREC PT. DYACONS PRIMA UTAMA
308 #12 Tunnel 107+070 108+300 Irigasi PERLU 107+590 107+590 Area3 CREC PT. DYACONS PRIMA UTAMA
309 #52 Subgrade 106+287 106+547 Selokan PERLU 106+040 106+040 Area3 CREC PT. DYACONS PRIMA UTAMA
310 #52 Subgrade 106+287 106+547 Selokan PERLU 105+900 105+900 Area3 CREC PT. DYACONS PRIMA UTAMA
311 #12 Tunnel 107+070 108+300 Gang PERLU 108+000 Area3 CREC PT ANDIKA PERSADA
312 #54 Sybgrade 108+300 109+182 Gang PERLU 108+425 108+425 Area3 CREC PT. DYACONS PRIMA UTAMA
313 Jalan PERLU 108+310 Area3 CREC PT RAHMANDHIKA
314 #54 Sybgrade 108+300 109+182 Gang PERLU 108+445 108+445 Area3 CREC PT. DYACONS PRIMA UTAMA
315 #54 Sybgrade 108+300 109+182 Gang PERLU 108+497 108+497 Area3 CREC PT. DYACONS PRIMA UTAMA
316 #54 Sybgrade 108+300 109+182 Jalan blok cihaliwung PERLU 108+530 108+530 Area3 CREC PT. DYACONS PRIMA UTAMA
317 #54 Sybgrade 108+300 109+182 Irigasi PERLU 108+152 Area3 CREC PT. DYACONS PRIMA UTAMA
318 #12 Tunnel 107+070 108+300 Irigasi PERLU/ sudah dibayar 108+240 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-002/252
319 #12 Tunnel 107+070 108+300 Relocation waterpipe temporary & pemanent PERLU 108+350 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 14-Jun-19 EC/HSRCC.CM/KCIC/VI/1548-2019 F01-471
320 #55 Subgrade 109+711 110+006 JALAN PERLU 110+000 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-335
321 #43 Bridge 110+009 113+387 Gang PERLU 110+360 110+360 Area3 CREC PT. DYACONS PRIMA UTAMA
322 #43 Bridge 110+009 113+387 Jalan babakan garut PERLU 110+400 110+400 Area3 CREC PT. DYACONS PRIMA UTAMA
323 #43 Bridge 110+009 113+387 MASJID PERLU 110+770 Area3 WIKA PT. DKR 1 1 1 1 1 27-Nov-18 EC/HSRCC.CM/KCIC/XI/987-2018 F01-057 Rev1
324 #43 Bridge 110+009 113+387 Selokan PERLU 110+300 110+300 Area3 CREC PT. DYACONS PRIMA UTAMA
325 #43 Bridge 110+009 113+387 Jalan kampung simpati PERLU 111+010 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-336
326 #43 Bridge 110+009 113+387 Gang PERLU 111+100 111+100 Area3 CREC PT. DYACONS PRIMA UTAMA
327 #43 Bridge 110+009 113+387 Gang PERLU 111+390 111+390 Area3 CREC PT. DYACONS PRIMA UTAMA
328 #43 Bridge 110+009 113+387 Jalan taman cilame indah PERLU 111+380 111+380 Area3 CREC PT. DYACONS PRIMA UTAMA
329 #43 Bridge 110+009 113+387 Jalan taman cilame indah PERLU 111+445 111+445 Area3 CREC PT. DYACONS PRIMA UTAMA
330 #43 Bridge 110+009 113+387 Jalan blok hegarmanah PERLU 111+560 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-337
331 #43 Bridge 110+009 113+387 Selokan PERLU 110+765 110+765 Area3 CREC PT. DYACONS PRIMA UTAMA
332 #43 Bridge 110+009 113+387 Selokan PERLU 111+385 111+385 Area3 CREC PT. DYACONS PRIMA UTAMA
333 #43 Bridge 110+009 113+387 Gang PERLU 112+325 112+325 Area3 CREC PT. DYACONS PRIMA UTAMA
334 #43 Bridge 110+009 113+387 Gang PERLU 112+420 112+420 Area3 CREC PT. DYACONS PRIMA UTAMA
335 #43 Bridge 110+009 113+387 Gang PERLU 112+480 112+480 Area3 CREC PT. DYACONS PRIMA UTAMA
336 #43 Bridge 110+009 113+387 Gang PERLU 112+560 Area3 CREC PT. DYACONS PRIMA UTAMA
VI WAKAF <5000 M2 -
VIII WAKAF LISAN 1
337 #6 Tunnel 88+900 93+340 Tanah dan Bangunan (Mushola) PERLU 91+440 91+440 Area3 WIKA PSBI/UGR 1 1 1 13-Feb-19 EC/HSRCC.CM/KCIC/II/1148-2019 F01-044
IX NON PEMERINTAH 6
338 #12 Tunnel 107+070 108+300 RELOCATION OF WATER SUPPLY PIPE (PMgS) PERLU 107+158 Area3 CREC PT. WBP / PT. ARME 1 1 1 1 1 30-Jan-19 EC/HSRCC.CM/KCIC/I/1114-2019 F01-184
339 #43 Bridge 110+009 113+387 SMP 1 Mekarsari PERLU 110+080 110+080 Area3 CREC PT. DYACONS PRIMA UTAMA
340 JALAN PERLU 110+800 Area3 CREC PT RAHMANDHIKA
341 Bangunan dan Tanah (Masjid) PERLU 110+770 110+770 Area3 CREC PT. DKR
342 #43 Bridge 110+009 113+387 Jalan pondok dustira indah PERLU 113+320 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-338
343 #43 Bridge 110+009 113+387 Jalan komp lembah teratai PERLU 113+350 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-003/253
TOTAL 124 27 27 27 2 2
7. KOTA CIMAHI
III PEMERINTAH KOTA/KABUPATEN 2
344 #13 Tunnel 113+440 114+525 Jalan Kel Cibeber PERLU 114 + 450 Area3 CREC PT. DYACONS PRIMA UTAMA 1 1 1 1-Mar-19 EC/HSRCC.CM/KCIC/II/1207-2019 F01-073/248
345 #44 Bridge 114+551 126+067 Jalan kel cibeber PERLU 114 + 561 Area4 CREC PT. DYACONS PRIMA UTAMA
V BELUM JELAS ALAS HAKNYA 6
346 #44 Bridge 114+551 126+067 Gang PERLU 114 + 636 Area4 CREC PT. INA HASTA MANDIRI
347 #44 Bridge 114+551 126+067 Gang PERLU 114 + 671 Area4 CREC PT. INA HASTA MANDIRI

348 #44 Bridge 114+551 126+067 Jalan BRIGIF PERLU 115+580 115+860 Area4 CREC PT. WBP / PT. ARME 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-411rev
349 #44 Bridge 114+551 126+067 Relocation of Ditch PERLU 115+700 115+900 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1 28-Nov-18 EC/HSRCC.CM/KCIC/XI/995-2018 F01-201

350 #44 Bridge 114+551 126+067 Jalan BRIGIF PERLU 115+920 116+060 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1 1 1
4-Mar-19 EC/HSRCC.CM/KCIC/III/1216-2019 F01-413
351 #44 Bridge 114+551 126+067 Gang PERLU 117 + 960 Area4 CREC PT. INA HASTA MANDIRI
IX NON PEMERINTAH 3
352 #44 Bridge 114+551 126+067 JALAN PERLU 116+600 116+810 Area4 CREC PT. WBP / CREC

353 #44 Bridge 114+551 126+067 Jalan Perumahan Pondok Mas PERLU 116 + 650 116+810 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1
4-Mar-19 EC/HSRCC.CM/KCIC/III/1216-2019 F01-415

354 #44 Bridge 114+551 126+067 Taman/RTH Perumahan Pondok Mas PERLU 116+720 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI

355 #44 Bridge 114+551 126+067 Building/Church Relocation - Pondok Mas PERLU 116+625 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI

TOTAL 11 5 5 5 1 1
Form Number

Start End
NO JENIS STRUKTUR DK STRUKTUR PRASARANA SARANA UTILITAS PERLU RELOKASI? AREA (Section) KONTRAKTOR SUBKONTRAKTOR Prelim Design Approval Pemilik Form 01 (basic Design) Nego Form 03 SPMK
Date Cover letter HSRCC

DK DK

8. KOTA BANDUNG
II PEMERINTAH PROVINSI -
III PEMERINTAH KOTA/KABUPATEN 8
356 #44 Bridge 114+551 126+067 TPS PERLU 134+750 134+760 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI

357 #46 Bridge 130+966 139+294 PSU Batununggal PERLU 131+320 131+510 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1
26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-254

358 #44 Bridge 114+551 126+067 Relocation of road and Ditch PERLU 126+350 126+726 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI
1 1 1 121 june 2019EC/HSRCC.CM/KCIC/VI/1571-2018 F01-472

359 #44 Bridge 114+551 126+067 Jalan Cirangrang PERLU 125+678 126+137 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1
26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-255
360 #44 Bridge 114+551 126+067 Kantor Rw PERLU 124+200 124+210 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1 30-Jan-19 EC/HSRCC.CM/KCIC/I/1115-2019 F01-325

361 #44 Bridge 114+551 126+067 Jalan cigondewah rahayu PERLU 123+350 123+400 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1
26-Feb-19 EC/HSRCC.CM/KCIC/II/1184-2019 F01-352
362 #44 Bridge 114+551 126+067 Pos Kamling PERLU 123+870 123+875 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1183-2019 F01-353
363 #44 Bridge 114+551 126+067 Taman PERLU 121+120 Area4 CREC PT. INA HASTA MANDIRI
V BELUM JELAS ALAS HAKNYA 6
364 #46 Bridge 130+966 139+294 Gang PERLU 134+680 134+682 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI
365 #46 Bridge 130+966 139+294 DRAINASE PERLU 134+000 Area4 WIKA PT. TRIJAYA INDOSARANA KARYA / PT SARANA NUSANTARA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1219-2019 F01-450
366 #46 Bridge 130+966 139+294 JEMBATAN ADHYAKSA PERLU 132+070 132+090 Area4 CREC PT. WBP 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-300
367 #46 Bridge 130+966 139+294 GATE AND SECURITY POS ADHYAKSA PERLU 132+240 132+245 Area4 CREC PT. WBP 1 1 1 30-Jan-19 EC/HSRCC.CM/KCIC/I/1115-2019 F01-200
368 #46 Bridge 130+966 139+294 Fasos/Fasum PERLU 132+950 132+960 Area4 CREC
PT WBP
369 #46 Bridge 130+966 139+294 Fasos/Fasum PERLU 132+970 132+980 Area4 CREC
PT WBP
VI WAKAF <5000 M2 6
370 #59 Subgrade 129+668 130+969 Mesjid Al-Huda PERLU 130+555 130+551 Area4 WIKA PT BUANA CAHAYA 1 1 1 1 1 31-Jul-18 EC/HSRCC.CM/KCIC/XI/946-2018 F01-067rev
371 Makam (deden nadzir) PERLU 130+613 Area4 WIKA PT BUANA CAHAYA 1 1 1 4-Mar-19 EC/HSRCC.CM/KCIC/III/1223-2019 F01-447
372 #59 Subgrade 129+668 130+969 Road Relocation PERLU 130+555 130+647 Area4 WIKA PT ANDIKA PERSADA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-225
373 #45 Bridge 126+805 129+668 Kantor Yayasan PERLU 127+390 Area4 WIKA PT. TRIJAYA INDOSARANA KARYA /PT ANDIKA 1 1 1 8-Aug-18 EC/HSRCC.CM/KCIC/V/689-2018 F01-070
374 #45 Bridge 126+805 129+668 Mushola PERLU 127+330 127+345 Area4 WIKA PT. TRIJAYA INDOSARANA KARYA / PT ANDIKA
375 #45 Bridge 126+805 129+668 Musholla Quba PERLU 127+020 Area4 WIKA PT BUANA CAHAYA 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/479-2018 F01-064 REV 1
VIII WAKAF LISAN 1
376 #45 Bridge 126+805 129+668 Relocation of School PERLU 127+062 Area4 WIKA PT BUANA CAHAYA 1 1 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/479-2018 F01-069 REV 1
IX NON PEMERINTAH 59

377 #46 Bridge 130+966 139+294 Jalan (PSU Perum Banyu Biru) PERLU 135+080 135+095 Area4 CREC PT. WBP

378 #46 Bridge 130+966 139+294 SPORT AREA PERLU 135+080 Area4 WIKA PSBI/UGR 1 1 1 7-Dec-18 EC/HSRCC.CM/KCIC/XII/476-2018 F01-240

379 #46 Bridge 130+966 139+294 Jalan (PSU Perum Oasis) PERLU 135+030 135+065 Area4 CREC PT. WBP

380 #46 Bridge 130+966 139+294 Taman (PSU Perum Banyu Biru) PERLU 135+003 Area4 CREC PT. WBP
135+010

381 #46 Bridge 130+966 139+294 Taman / Parkiran (PSU Perum Banyu Biru) PERLU 135+050 135+070 Area4 CREC PT. WBP

382 #46 Bridge 130+966 139+294 Sman 25 Bandung PERLU 135+230 Area4 WIKA PT. RAYI RAKA 1 1 1 1 1 31-Jul-18 EC/HSRCC.CM/KCIC/VI/667-2018 F01-010
383 #46 Bridge 130+966 139+294 Smpn 48 Bandung PERLU 135+340 135+380 Area4 WIKA PT. RAYI RAKA 1 1 1 1 1 31-Jul-18 EC/HSRCC.CM/KCIC/VI/667-2018 F01-009
384 #46 Bridge 130+966 139+294 Relocation of Pedestrian Bridge PERLU 135+428 Area4 WIKA PT. TRIJAYA INDOSARANA KARYA / PT PT SARANA NUSANTARA 1 1 1 28-May-19 EC/HSRCC.CM/KCIC/V/1524-2019 F01-128rev

385 #46 Bridge 130+966 139+294 Jln Adhiyaksa PERLU 132+000 132+220 Area4 CREC PT. WBP

386 #46 Bridge 130+966 139+294 Jalan (PSU Perum PU) PERLU 132+239 132+316 Area4 CREC PT. WBP 1 1 1 EC/HSRCC.CM/KCIC/II/1191-2019 F01-346
26-Feb-19
387 #46 Bridge 130+966 139+294 Jalan (PSU Perum PU) PERLU 131+986 132+220 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-299rev
388 #46 Bridge 130+966 139+294 Jalan (PSU PU) PERLU 132+400 132+425 Area4 CREC PT. WBP

389 #46 Bridge 130+966 139+294 Jalan (PSU PU) PERLU 132+450 132+455 Area4 CREC PT. WBP

390 #46 Bridge 130+966 139+294 Jalan (PSU Perum PU) PERLU 132+620 132+730 Area4 CREC PT. WBP

391 #46 Bridge 130+966 139+294 Jalan (PSU Perum PU) PERLU 132+660 132+665 Area4 CREC PT. WBP

392 #46 Bridge 130+966 139+294 Park Relocation (Kujangsari) PERLU 133+145 133+192 Area4 CREC PT. WBP 1 1 1
30-Jan-19 EC/HSRCC.CM/KCIC/I/1115-2019 F01-326
393 #46 Bridge 130+966 139+294 TAMAN/RTH Iperum Jakapurwa) PERLU 133+260 133+265 Area4 CREC PT. WBP 1 1 1
26-Feb-19 EC/HSRCC.CM/KCIC/II/1183-2019 F01-356
394 #45 Bridge 126+805 129+668 Puskesmas Pasawahan PERLU 129+000 Area4 CREC PT. WBP

395 #45 Bridge 126+805 129+668 RELOCATION OF ARTESIAN WALL PERLU 129+125 Area4 CREC PT. WBP 1 1 1
26-Feb-19 EC/HSRCC.CM/KCIC/II/1183-2019 F01-354
396 #45 Bridge 126+805 129+668 RELOCATION OF HEALTH CENTER PERLU 129+180 Area4 CREC PT. WBP 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1183-2019 F01-355
397 #45 Bridge 126+805 129+668 RELOCATION OF OFFICE HALL PERLU 129+455 Area4 CREC PT. WBP 1 1 1
26-Dec-18 EC/HSRCC.CM/KCIC/XII/1027-2018 F01-275
398 #45 Bridge 126+805 129+668 JALAN WATES RW03 PERLU 129+455 129+765 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-351rev
399 #45 Bridge 126+805 129+668 Jalan Perumahan (PT.DwiSaha Pradana) PERLU 127+715 128+091 Area4 CREC PT. WBP / CREC
400 #45 Bridge 126+805 129+668 Jalan (Perum Singgasana) PERLU 128+206 128+216 Area4 CREC PT. WBP / CREC
401 #45 Bridge 126+805 129+668 JALAN (Perum Mekarwangi) PERLU 128+175 128+300 Area4 CREC PT. WBP 1 1 1 8-Oct-18 EC/HSRCC.CM/KCIC/X/872-2018 F01-176
402 #45 Bridge 126+805 129+668 Taman (Perum Mekarwangi) PERLU 128+175 128+300 Area4 CREC PT. WBP 1 1 1 8-Oct-18 EC/HSRCC.CM/KCIC/X/872-2018 F01-177
403 #45 Bridge 126+805 129+668 RELOCATION OF OFFICE HALL PERLU 128+920 Area4 CREC PT. WBP 1 1 1
26-Dec-18 EC/HSRCC.CM/KCIC/XII/1027-2018 F01-274
404 #45 Bridge 126+805 129+668 JALAN WATES RW04 PERLU 128+920 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-348rev
405 #45 Bridge 126+805 129+668 Jalan (PT.DwiSaha Pradana) PERLU 127+980 128+180 Area4 CREC PT. WBP / CREC 1 1 1 8-Oct-18 EC/HSRCC.CM/KCIC/X/872-2018 F01-178
406 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 127+980 128+125 Area4 CREC PT. WBP 1 1 1 8-Oct-18 EC/HSRCC.CM/KCIC/X/872-2018 F01-179
407 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 127+552 127+767 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1192-2019 F01-272
408 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 127+766 127+820 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1192-2019 F01-271
409 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 127+822 127+830 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI
410 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 127+826 127+850 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI
411 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 127+850 127+880 Area4 CREC PT. WBP/PT. INA HASTA MANDIRI
412 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 127+980 128+184 Area4 CREC PT. WBP 1 1 1 27-Feb-19 EC/HSRCC.CM/KCIC/II/1192-2019 F01-273
413 #45 Bridge 126+805 129+668 Jalan (PT.DwiSaha Pradana) PERLU 127+980 128+180 Area4 CREC PT. WBP
414 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 128+093 128+135 Area4 CREC PT. WBP
415 #45 Bridge 126+805 129+668 Taman (PT.DwiSaha Pradana) PERLU 128+125 128+173 Area4 CREC PT. WBP 1 1 1 8-Oct-18 EC/HSRCC.CM/KCIC/X/872-2018 F01-180
Form Number

Start End
NO JENIS STRUKTUR DK STRUKTUR PRASARANA SARANA UTILITAS PERLU RELOKASI? AREA (Section) KONTRAKTOR SUBKONTRAKTOR Prelim Design Approval Pemilik Form 01 (basic Design) Nego Form 03 SPMK
Date Cover letter HSRCC

DK DK

416 #45 Bridge 126+805 129+668 Taman (Perum Mekarwangi) PERLU 128+305 128+486 Area4 CREC PT. WBP 1 1 1 8-Oct-18 EC/HSRCC.CM/KCIC/X/872-2018 F01-181
417 #45 Bridge 126+805 129+668 PDAM Artesian Relocation (Perum Mekarwangi) PERLU 128+350 128+380 Area4 CREC PT. WBP 1 1 1 30-Jan-19 EC/HSRCC.CM/KCIC/I/1115-2019 F01-301
418 #44 Bridge 114+551 126+067 Ruang Terbuka Hijau PERLU 124+210 124+213 Area4 CREC PT. WBP 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-345

419 #44 Bridge 114+551 126+067 Jalan Margasuka (Kopo Mas) PERLU 125+110 125+505 Area4 CREC PT. WBP

420 #44 Bridge 114+551 126+067 Tempat Pembuangan Sampah PERLU 123+060 123+063 Area4 CREC PT. WBP

421 #44 Bridge 114+551 126+067 Ruang Terbuka Hijau (TH I) PERLU 122+710 122+820 Area4 CREC PT. WBP 1 1 1 1 1 EC/HSRCC.CM/KCIC/XII/474-2018 F01-256
7-Dec-18
422 #44 Bridge 114+551 126+067 Ruang Terbuka Hijau (TH II) PERLU 122+850 123+100 Area4 CREC PT. WBP 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-277rev
423 #44 Bridge 114+551 126+067 Taman PERLU 122+679 Area4 CREC PT BUANA CAHAYA
424 #44 Bridge 114+551 126+067 Taman PERLU 122+710 Area4 CREC PT BUANA CAHAYA
425 #44 Bridge 114+551 126+067 Taman Bumi asri PERLU 120+930 121+050 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-188rev
426 #44 Bridge 114+551 126+067 Taman Bumi asri PERLU 121+290 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-189rev
427 #44 Bridge 114+551 126+067 Jalan marga asri PERLU 121+255 121+290 Area4 CREC PT. WBP 1 1 1 1 1 EC/HSRCC.CM/KCIC/XII/474-2018 F01-270
7-Dec-18
428 #44 Bridge 114+551 126+067 Jalan gempol sari PERLU 121+235 121+310 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-190rev
429 #44 Bridge 114+551 126+067 Jalan Gempolsari PERLU 121+050 121+235 Area4 CREC PT. WBP 1 1 1 1 1 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-191 rev
430 #44 Bridge 114+551 126+067 Jalan gempolsari PERLU 121+480 121+486 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-194rev
Pendopo Perumahan Bumiasri
431 #44 Bridge 114+551 126+067 regency PERLU 121+510 121+525 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-193rev
432 #44 Bridge 114+551 126+067 Jalan gempolsari PERLU 121+515 121+550 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-192rev
433 #44 Bridge 114+551 126+067 Lapangan bola PERLU 121+640 121+660 Area4 CREC 1 1 1 1 1
KCIC/PSBI UGR 25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-195rev
434 #44 Bridge 114+551 126+067 Jalan gempolsari PERLU 121+310 121+410 Area4 CREC PT. WBP 1 1 1 1 1
25-Jun-19 EC/HSRCC.CM/KCIC/VI/1576-2019 F01-197rev
435 #44 Bridge 114+551 126+067 Mesjid Al-Haq PERLU 121+255 121+290 Area4 CREC PT. WBP

TOTAL 80 52 52 52 19 19
9. KABUPATEN BANDUNG
I PEMERINTAH PUSAT 1
436 EMU Depot Subgrade 143+000 145+250 Sungai Cikeruh PERLU 144 +625 144 +900 Area4 CREC PT. INA HASTA MANDIRI
III PEMERINTAH KOTA/KABUPATEN 6
437 #46 Bridge 130+966 139+294 Jalan babakan GBI PERLU 135 +670 Area4 WIKA SECTION 4 WIKA 1 1 1 13-Feb-19 EC/HSRCC.CM/KCIC/II/1149-2019 F01-129 rev 1
438 #61 Subgrade 139+737 142+338 Sekolah dasar tirtayasa PERLU 141+060 Area4 CREC PT. INA HASTA MANDIRI
439 EMU Depot Subgrade 143+000 145+250 Jalan PERLU 144+625 Area4 CREC PT. INA HASTA MANDIRI
440 #46 Bridge 130+966 139+294 Jembatan Alam Raya PERLU 135+930 Area4 WIKA PT. TRIJAYA INDOSARANA KARYA / PT SARANA NUSANTARA 1 1 1 28-May-19 EC/HSRCC.CM/KCIC/V/1524-2019 F01-446rev
441 EMU Depot Subgrade 143+000 145+250 Jalan PERLU 144 +650 Area4 CREC PT. INA HASTA MANDIRI 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-343
442 #61 Subgrade 139+737 142+338 Jalan Kabupaten PERLU 139+750 Area4 CREC PT. WBP / CREC 1 1 1 26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-339
V BELUM JELAS ALAS HAKNYA 24
443 #46 Bridge 130+966 139+294 Saluran Air (selokan) PERLU 139 +284 139 +288 Area4 CREC PT. INA HASTA MANDIRI
444 #61 Subgrade 139+737 142+338 Saluran Air (selokan) PERLU 139 +450 139 +452 Area4 CREC PT. INA HASTA MANDIRI
445 #46 Bridge 130+966 139+294 Saluran Air (selokan) PERLU 138 +750 138 +753 Area4 CREC PT. INA HASTA MANDIRI
446 #60 Subgrade 139+294 139+672 Jalan PERLU 139 +476 Area4 WIKA PT. TRIJAYA INDOSARANA KARYA / PT SARANA NUSANTARA 1 1 1 4-Dec-18 EC/HSRCC.CM/KCIC/XII/465-2018 F01-226
447 #46 Bridge 130+966 139+294 Sungai Besar PERLU 130 +370 130 +680 Area4 CREC PT. INA HASTA MANDIRI
448 #61 Subgrade 139+737 142+338 Saluran Air (selokan) PERLU 140 +800 140 +976 Area4 CREC PT. INA HASTA MANDIRI

449 #61 Subgrade 139+737 142+338 Jalan Desa PERLU 140+210 141+382 Area4 CREC PT. WBP / CREC 1 1 1
26-Feb-19 EC/HSRCC.CM/KCIC/II/1191-2019 F01-340
450 Jalan Desa PERLU 141+010 Area4 CREC PT. INA HASTA MANDIRI
451 #61 Subgrade 139+737 142+338 Jalan Desa PERLU 140 +200 140 +350 Area4 CREC PT. WBP / CREC
452 #61 Subgrade 139+737 142+338 Saluran Air (selokan) PERLU 141 +010 141 +050 Area4 CREC PT. INA HASTA MANDIRI

453 #61 Subgrade 139+737 142+338 Building Relocation (SDN Tirtayasa-Cibiru Hilir) PERLU 141+042 141+090 Area4 CREC PT. WBP / CREC

454 #61 Subgrade 139+737 142+338 Saluran Air (Selokan) PERLU 141 +450 141 +460 Area4 CREC PT. INA HASTA MANDIRI
455 #61 Subgrade 139+737 142+338 Saluran Air (Selokan) PERLU 142 +300 142 +305 Area4 CREC PT. INA HASTA MANDIRI
456 #61 Subgrade 139+737 142+338 Saluran Air (Selokan) PERLU 142 +300 142 +305 Area4 CREC PT. INA HASTA MANDIRI
457 EMU Depot Subgrade 143+000 145+250 Saluran Air (Selokan) PERLU 143 +000 143 +005 Area4 CREC PT. INA HASTA MANDIRI
458 EMU Depot Subgrade 143+000 145+250 Saluran Air (selokan) PERLU 144 +000 Area4 CREC PT. INA HASTA MANDIRI
459 EMU Depot Subgrade 143+000 145+250 Saluran Air (selokan) PERLU 144 +750 Area4 CREC PT. INA HASTA MANDIRI

460 Jalan PERLU 144+000 144+120 Area4 CREC PT. WBP / CREC
EMU Depot Subgrade 143+000 145+250
461 EMU Depot Subgrade 143+000 145+250 Saluran Air (selokan) PERLU 144 +950 Area4 CREC PT. INA HASTA MANDIRI
462 EMU Depot Subgrade 143+000 145+250 Saluran air (Selokan) PERLU 145 +000 145 +005 Area4 CREC PT. INA HASTA MANDIRI
463 EMU Depot Subgrade 143+000 145+250 Saluran air (Selokan) PERLU 145 +205 145 +210 Area4 CREC PT. INA HASTA MANDIRI

464 Jalan PERLU 144+698 144+812 Area4 CREC PT. WBP / CREC
EMU Depot Subgrade 143+000 145+250
465 EMU Depot Subgrade 143+000 145+250 Saluran air (selokan) PERLU 145 +200 145 +250 Area4 CREC PT. INA HASTA MANDIRI
466 EMU Depot Subgrade 143+000 145+250 Saluran air (selokan) PERLU 145 +350 145 +400 Area4 CREC PT. INA HASTA MANDIRI
VI WAKAF <5000 M2 1
467 #46 Bridge 130+966 139+294 TPU PERLU 137 +643 137 +700 Area4 CREC PT. INA HASTA MANDIRI
Jumlah 32 6 6 6 - -
TOTAL KESELURUHAN 182 182 182 43 43
177
Summary Table of Relocation of "Fasos Fasum & Utilitas" based on application form

Status of form 01 application Status of negotiation/ form 03 (Approval/Process)


No. Description Utilitas Utilitas Remarks
Total Fasos/Fasum Utilitas Major Utilitas Minor Total Fasos/Fasum Utilitas Major Utilitas Minor
Jasamarga Jasamarga
A WIKA 68 53 11 2 2 13 11 2 -
- Area 1 27 15 9 2 1 2 1 1
- Area 2 20 19 - 1 3 3
- Area 3 9 8 1 3 3
- Area 4 12 11 1 5 4 1
B SINO 30 15 1 4 10 11 5 1 1 4
- Area 1 10 2 1 4 3 5 1 1 3
- Area 2 20 13 - 7 6 5 1
C CREC 53 30 6 1 16 21 18 - 1 2
- Area 3 27 5 5 1 16 3 1 2

- Area 4 26 25 1 18 18

D TOTAL 151 98 18 7 28 45 34 3 2 6

- Reported to KCIC (Proceed to Negotiation) 134 86 16 6 26 Belum di Nego : 151-45-17 = 89

- Returned to the Contractor (resubmit) 17 12 2 1 2

Notes:
- Quantity based on application number (form 01), Not total location 89
- Major Utility : SUTT, LRT, Pipa Pertamina and Cikunir Tol Gate
Daftar Rincian Subkontraktor Relokasi Fasos/fasum

Kontraktor Subkontraktor Jumlah Relokasi Submit form 01 to KCIC Sisa belum disubmit Keterangan

PT. KREASI MITRA/PT. AMB 8 1 7


PT. TRIJAYA INDOSARANA KARYA 47 22 25
PT. RAHMANDIKA 4 - 4
SINO
PT. PPU/PT. SJS 20 3 17
KCIC/PSBI UGR 2 2 -
PT. MBS 1 - 1
PT. Andika Persada 14 10 4
PT. Citra Kreasi/PT. BKB 28 23 5
PT. Karya Mandiri 2 2 -
PT. Rayi Raka 2 2 -
PT. Sarana Nusantara 26 14 12
PT. Buana Cahaya 4 4 -
PT. DKR 2 2 -
PT. Mitra Usaha 2 2 -
WIKA PT. PUTRA PANDAWA/PT.SJS 32 10 22
PT. Citra Kreasi/PT. Mitra Bangun Serasi (MBS) 9 3 6
PT. RAHMANDIKA 1 1 -
PT RIZKY INDERA CIPTA 2 1 1
WIKA Section 10 9 1
Sudah didesain sub CREC 2 1 1
PSBI/UGR 2 2 -
RW Setempat 2 2 -
PT. KREASI MITRA 17 - 17
PT. WBP/CREC 59 35 24
PT. INA HASTA MANDIRI 72 14 58
PT. DYACONS PRIMA UTAMA 60 14 46
PT. RAHMANDIKA 16 - 16
PT. ARME 2 2 -
CREC PSBI 3 1 2
PT. Andika Persada 11 1 10
PT. Buana Cahaya 2 - 2
PT. DKR 1 - 1
PT. MITRA USAHA 1 - 1
PT. KREASI MITRA 1 - 1
TOTAL 467 183 284

Remark : Jumlah Relokasi Fasos Fasum : 467 lokasi


Jumlah yang sudah disubmit form 01 ke KCIC : 183 lokasi
Sisa yang belum disubmit : 284 lokasi
Kepada Seluruh tim Subkontraktor, untuk segera menginformasikan status relokasi yang belum disubmit ke KCIC by HSRCC
Submit form 01 to Sisa belum Keterangn
Daftar Subkontraktor Jumlah Relokasi
KCIC disubmit Proses design Survey Koordinasi
PT. KREASI MITRA/PT. AMB 26 1 25
PT. TRIJAYA INDOSARANA KARYA 47 22 25
PT. RAHMANDIKA 21 1 20
PT. PPU/PT. SJS 52 13 39
PT. Andika Persada 25 11 14
PT. Citra Kreasi/PT. BKB 28 23 5
PT. Karya Mandiri 2 2 -
PT. Rayi Raka 2 2 -
PT. Sarana Nusantara 26 14 12
PT. Buana Cahaya 6 4 2
PT. DKR 3 2 1
PT. Mitra Usaha 3 2 1
PT. Citra Kreasi/PT. Mitra Bangun Serasi (MBS) 10 3 7
PT RIZKY INDERA CIPTA 2 1 1
PT. WBP 59 35 24
PT. INA HASTA MANDIRI 72 14 58
PT. DYACONS PRIMA UTAMA 60 14 46
PT. ARME 2 2 -
WIKA Section 10 9 1
KCIC/PSBI UGR 7 5 2
Sudah didesain sub CREC 2 1 1
RW Setempat 2 2 -
JUMLAH 467 183 284
Daftar List

Kontraktor
No. *Kolom Area Fasos Fasum
Patokan COUNTIF

1 CREC Area 4 Artesian Well Relocation


2 CREC Area 4 Tongding House Relocation
3 CREC Area 4 Telecom Relocation
4 CREC Area 4 Park Relocation
5 CREC Area 4 Park Relocation
6 CREC Area 4 Park Relocation
7 CREC Area 4 Telecom Tower Relocation
8 CREC Area 3 Pipeline Relocation
9 CREC Area 4 Relocation of bridge
10 CREC Area 3 Road Relocation
11 CREC Area 3 Road Relocation
12 CREC Area 3 Road Relocation
13 CREC Area 3 Road Relocation
14 CREC Area 3 Road Relocation
15 CREC Area 3 Road Relocation
16 CREC Area 3 Road Relocation
17 CREC Area 3 Road Relocation
18 CREC Area 3 Road Relocation
19 CREC Area 4 Road Relocation
20 CREC Area 4 Road Relocation
21 CREC Area 4 Road Relocation
22 CREC Area 4 Road & Ditch Relocation
23 CREC Area 4 Road Relocation
24 CREC Area 3 Road Relocation
25 CREC Area 3 Road Relocation
26 CREC Area 3 Road Relocation
27 CREC Area 3 Road Relocation
28 CREC Area 3 Road Relocation
29 CREC Area 3 Road Relocation
30 CREC Area 4 Road Relocation
31 CREC Area 4 Road Relocation
32 CREC Area 4 Com. Cable Iron Pole Relocation 1
33 CREC Area 4 Com. Cable Iron Pole Relocation
34 CREC Area 4 Com. Cable Iron Pole Relocation
35 CREC Area 4 Com. Cable Iron Pole Relocation 1
36 CREC Area 4 Com. Cable Iron Pole Relocation
37 CREC Area 4 Com. Cable Iron Pole Relocation 1
38 CREC Area 4 Com. Cable Iron Pole Relocation
39 CREC Area 4 Com. Cable Iron Pole Relocation
40 CREC Area 4 Com. Cable Iron Pole Relocation
41 CREC Area 4 Com. Cable Iron Pole Relocation 1
42 CREC Area 4 Com. Cable Iron Pole Relocation 2
43 CREC Area 4 Com. Cable Iron Pole Relocation 1
44 CREC Area 4 Com. Cable Iron Pole Relocation 2
45 CREC Area 4 Com. Cable Iron Pole Relocation 1
46 CREC Area 4 Com. Cable Iron Pole Relocation 2
47 CREC Area 4 Com. Cable Iron Pole Relocation
48 CREC Area 4 Com. Cable Iron Pole Relocation
49 CREC Area 4 Com. Cable Iron Pole Relocation
50 CREC Area 4 Com. Cable Iron Pole Relocation 2
51 CREC Area 4 Com. Cable Iron Pole Relocation
52 CREC Area 4 Com. Cable Iron Pole Relocation
53 CREC Area 4 Com. Cable Iron Pole Relocation 2
54 CREC Area 4 Com. Cable Iron Pole Relocation 3
55 CREC Area 4 Com. Cable Iron Pole Relocation 4
56 CREC Area 4 Com. Cable Iron Pole Relocation 5
57 CREC Area 4 Com. Cable Iron Pole Relocation
58 CREC Area 4 Com. Cable Iron Pole Relocation
59 CREC Area 4 Com. Cable Iron Pole Relocation
60 CREC Area 4 Com. Cable Iron Pole Relocation 2
61 CREC Area 4 Com. Cable Iron Pole Relocation 3
62 CREC Area 4 Com. Cable Iron Pole Relocation 4
63 CREC Area 4 Relocation of Office hall
64 CREC Area 3 Road Relocation
65 CREC Area 4 SUTM/SUTR Relocation
66 CREC Area 3 SUTM/SUTR Relocation
67 CREC Area 3 Relocation of Communication cable
68 CREC Area 3 SUTM/SUTR Relocation
69 CREC Area 3 Relocation of Communication cable
70 CREC Area 4 Relocation of telekom tower
71 CREC Area 4 Relocation of SUTM
72 CREC Area 4 水渠迁改Relocation
办公大厅迁改 of Ditch
73 CREC Area 4 Relocation
RW办公室迁改 of Office Hall
74 CREC Area 4 Relocation
自流井迁改of RW Office
75 CREC Area 4 Relocation of PDAM Artesian
76 CREC Area 4 Relocation of Gate and Security Pos
公园迁改
77 CREC Area 4 Relocation
通信光缆迁改 of Park
78 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
79 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
80 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
81 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
82 CREC Area 3 Relocation of Communication Cable
通信光缆迁改
83 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
84 CREC Area 3 Relocation of Communication Cable
通信光缆迁改
85 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
86 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
87 CREC Area 3 Relocation of Communication Cable
88 SINO Area 1 Ditch Reloc.
89 SINO Area 1 Relocation of Optical Fiber
90 SINO Area 1 Road Reloc.
91 SINO Area 1 Road Reloc.
92 SINO Area 1 Road Reloc.
93 SINO Area 1 Billboard Reloc.
94 SINO Area 1 Ditch Drainage Reloc.
95 SINO Area 1 Gas Reloc.
96 SINO Area 1 Water Pipe Reloc.
97 SINO Area 2 River Reloc.
98 SINO Area 2 Road Reloc.
99 SINO Area 2 Road Reloc.
100 SINO Area 2 Road Reloc.
101 SINO Area 1 Guardrail Reloc.
102 SINO Area 1 Signal Tower Reloc.
103 SINO Area 1 Street Light Reloc.
104 SINO Area 1 Relocation of Communication lines
105 SINO Area 1 Concrete Fence Reloc.
106 SINO Area 1 Tennis
道路改移 Court Reloc.
107 SINO Area 2 Relocated
河道改移 Road
108 SINO Area 1 Relocation of River
砍树申请
109 SINO Area 1 Relocation
JLJ办公室搬迁 of Tree Cutting
110 SINO Area 1 Relocation
路灯迁改 of JLJ Office
111 SINO Area 1 Relocation
视频监视系统迁改 of Street Lamps
112 SINO Area 1 Relocation of CCTV
光缆检查井迁改
113 SINO Area 1 Relocation
足球场改移of Telkom Manhole, Route Duct and FO
114 SINO Area 2 Relocated
坟墓迁改(2处) Football Field
115 SINO Area 2 Relocation of Tombs
116 WIKA Area 1 Sunter River Reloc.
117 WIKA Area 1 Public Funeral Nyi Kendil Reloc.
118 WIKA Area 4 Public
道路改移 Funeral Menger Reloc.
119 WIKA Area 2 Relocated
道路改移 Road
120 WIKA Area 2 Relocated
道路改移 Road
121 WIKA Area 2 Relocated
道路改移 Road
122 WIKA Area 2 Relocated
道路改移 Road
123 WIKA Area 2 Relocated
道路改移 Road
124 WIKA Area 2 Relocated Road
道路改移
125 WIKA Area 2 Relocated
道路改移 Road
126 WIKA Area 2 Relocated
道路改移 Road
127 WIKA Area 2 Relocated Road
道路改移
128 WIKA Area 2 Relocated
道路改移 Road
129 WIKA Area 2 Relocated Road
道路改移
130 WIKA Area 2 Relocated
道路改移 Road
131 WIKA Area 2 Relocated
道路改移 Road
132 WIKA Area 2 Relocated
道路改移 Road
133 WIKA Area 2 Relocated
道路改移 Road
134 WIKA Area 2 Relocated
道路改移 Road
135 WIKA Area 2 Relocated
道路改移-1 Road
136 WIKA Area 2 Relocated
道路改移-2 Road
137 WIKA Area 2 Relocated
道路改移 Road
138 WIKA Area 2 Relocated
道路改移 Road
139 WIKA Area 2 Relocated
道路改移 Road
140 WIKA Area 3 Relocated
道路改移 Road
141 WIKA Area 3 Relocated Road
道路改移
142 WIKA Area 3 Relocation
道路改移 of Road
143 WIKA Area 3 Relocation
道路改移 of Road
144 WIKA Area 3 Relocation
道路改移 of Road
145 WIKA Area 1 Relocated Road
道路改移
146 WIKA Area 1 Relocated Road
147 WIKA Area 4 Relocation
桥梁改移 of Pedestrian Bridge
148 WIKA Area 4 Relocation
清真寺迁改of Bridge
149 WIKA Area 3 Relocation of Musque
150 WIKA Area 4 公共运动场
151 WIKA Area 1 Relocation
光缆改移 of BTS
152 WIKA Area 1 Relocated optical fiber
153 WIKA Area 1 Relocated
道路改移 of Pump House
154 CREC Area 3 Relocation
电力线改移of Road
155 CREC Area 3 Relocation
电力线改移of SUTM
156 CREC Area 3 Relocation
380V 电力线改移 of SUTM
157 CREC Area 3 Relocated
电力线改移 380V Power Line
158 CREC Area 3 Relocation
20kV 电力线改移 of SUTM
159 CREC Area 3 Relocated
通信光缆迁改 20kV Power Line
160 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
161 CREC Area 3 Relocation
通信光缆迁改 of Communication Cable
162 CREC Area 3 Relocation of Communication Cable
163 WIKA Area 1 Relocation
光缆改移 of asset affected
164 WIKA Area 1 Relocated
道路改移 optical fiber
165 WIKA Area 1 Relocated
朝拜室迁改 Road
166 WIKA Area 1 Relocation
教育设施迁改 of Worship Place
167 WIKA Area 2 Relocation
朝拜室迁改of Education Facility
168 WIKA Area 2 Relocation of Worship Place
169 CREC Area 4 Relocation
水管迁改 of road and Ditch
170 CREC Area 3 Relocated water pipe
171 CREC Area 4 Relocation Road (Perum Mekarwangi)
172 CREC Area 4 Relocation Park (Perum Mekarwangi)
173 CREC Area 4 Relocation Road (Perum Singgasana Perdana)
174 CREC Area 4 Relocation Park (Perum Singgasana Perdana)
175 CREC Area 4 Relocation Park (Perum Singgasana Perdana)
176 CREC Area 4 Relocation Park (Perum Singgasana Perdana)
177 CREC Area 4 Relocation of Road

Keterangan

Membutuhkan Lahan Baru, Belum Negosiasi

Membutuhkan Lahan Baru, Sudah Negosiasi

Tidak Membutuhkan Lahan Baru, Belum Negosiasi


Daftar List revisi form 01 "returned by KCIC to HSRCC"

Application Number

Kategori Mileage
form Number

Fasos/fasum DK 129+125 - 129+365 F01-354


Fasos/fasum DK 123+870 - 123+875 F01-353
Utilitas DK 141+168 - 141+199 F01-342
Fasos/fasum DK 127+766 - 127+980 F01-271
Fasos/fasum Dk 127+552 - 127+980 F01-272
Fasos/fasum DK 127+980 - 128+184 F01-273
Utilitas DK 141+120 - 141+200 F01-341
Utilitas DK 99+959,7 F01-247
Fasos/fasum DK 132+070 - 132+090 F01-300
Fasos/fasum DK 99+940 - 100+180 F01-330
Fasos/fasum DK 104+480 F01-331
Fasos/fasum DK 104+500 - 104+640 F01-332
Fasos/fasum DK 105+380 - 105+450 F01-333
Fasos/fasum DK 106+500 - 106+560 F01-334
Fasos/fasum DK 110+000 - 110+400 F01-335
Fasos/fasum DK 111+010 - 111+050 F01-336
Fasos/fasum DK 111+560 - 111+580 F01-337
Fasos/fasum DK 113+320 - 113+380 F01-338
Fasos/fasum DK 139+750 - 139+887 F01-339
Fasos/fasum DK 140+803 - 141+293 F01-340
Fasos/fasum DK 144+650 - 145+650 F01-343
Fasos/fasum DK 124+210 - 124+213 F01-345
Fasos/fasum DK 132+239 - 132+316 F01-346
Fasos/fasum DK 103+550 - 103+600 F01-347
Fasos/fasum DK 93+550 - 93+800 F01-249
Fasos/fasum DK 94+880 - 95+100 F01-250
Fasos/fasum DK 99+450 - 99+610 F01-251
Fasos/fasum DK 108+240 - 108+310 F01-252
Fasos/fasum DK 113+350 - 113+450 F01-253
Fasos/fasum DK 131+320 - 131+510 F01-254
Fasos/fasum DK 125+678 - 126+137 F01-255
Utilitas DK 128+900 - 129+440 F01-365
Utilitas DK 125+900 - 126+125 F01-364
Utilitas DK 127+780 - 125+890 F01-363
Utilitas DK 125+675 F01-374
Utilitas DK 125+130 F01-361
Utilitas DK 117+388 F01-360
Utilitas DK 132+110 - 132+210 F01-388
Utilitas DK 132+021 - 132+240 F01-387
Utilitas DK 129+480 - 129+745 F01-386
Utilitas DK 129+450 F01-382
Utilitas DK 129+450 F01-383
Utilitas DK 132+216 - 132+240 F01-389
Utilitas DK 132+216 - 132+240 F01-390
Utilitas DK 132+240 F01-391
Utilitas DK 132+240 F01-392
Utilitas DK 123+387 F01-371
Utilitas DK 129+560 - 129+720 F01-366
Utilitas DK 132+030 F01-367
Utilitas DK 117+388 F01-368
Utilitas DK 125+523 F01-372
Utilitas DK 125+592 F01-373
Utilitas DK 125+675 F01-375
Utilitas DK 125+675 F01-376
Utilitas DK 125+675 F01-377
Utilitas DK 125+675 F01-362
Utilitas DK 125+900 - 125+910 F01-378
Utilitas DK 125+900 - 126+115 F01-379
Utilitas DK 127+156 - 127+258 F01-380
Utilitas DK 128+900 - 129+440 F01-381
Utilitas DK 129+450 F01-384
Utilitas DK 129+450 F01-385
Fasos/fasum DK 128+920 - 129+455 F01-274
Fasos/fasum DK 97+240 - 97+470 F01-448
Utilitas DK 140+816 - 141+288 F01-344
Utilitas DK 108+230 - 108+400 F01-264
Utilitas DK 103+035,52 F01-308
Utilitas DK 110+094 - 110+400 F01-262
Utilitas DK 103+887,92 F01-311
Utilitas DK 144+800 - 145+450 F01-350
Utilitas DK 144+800 - 145+440 F01-349
Fasos/fasum DK115+700~+900 F01-201
Fasos/fasum DK129+455~DK129+766 F01-275
Fasos/fasum DK124+200~DK124+210 F01-325
Fasos/fasum DK128+350~DK128+380 F01-301
Fasos/fasum DK132+240~DK132+245 F01-200
Fasos/fasum DK132+307~DK132+496 F01-326
Utilitas DK103+050 F01-309
Utilitas DK105+719 F01-312
Utilitas DK109+474.3 F01-313
Utilitas DK111+492 F01-314
Utilitas DK112+595 F01-315
Utilitas DK112+610 F01-316
Utilitas DK113+390 F01-317
Utilitas DK103+053.6 F01-318
Utilitas DK103+253 F01-319
Utilitas DK103+041 F01-321
Fasos/fasum DK 4+150 - 4+450 F01-425
Utilitas DK 4+150 - 4+450 F01-440
Fasos/fasum DK 14+199 F01-430
Fasos/fasum DK 9+150, 10, 14 & 32 F01-183
Fasos/fasum DK 32+595 - 33+270 F01-431
Utilitas JM DK 2 - 41 F01-420
Utilitas JM DK 2 - 41 F01-436
Utilitas DK 14+316, 24+244,7, DK 26, 30 F01-428
Utilitas JM DK 2 - 41 F01-438
Fasos/fasum DK 75+300 F01-423
Fasos/fasum DK 75+060 - 75+140 F01-099
Fasos/fasum DK 76+900 - 77+020 F01-105
Fasos/fasum DK 78+100 - 78+300 F01-106
Utilitas JM DK 2 - 41 F01-437
Utilitas DK 19+120 F01-429
Utilitas JM DK 2 - 41 F01-435
Utilitas JM DK 2 - 41 F01-434
Utilitas JM DK 4 - 35 F01-426
Fasos/fasum DK 11+710,23 F01-427
Fasos/fasum DK64+420~DK64+440(DK64+450) F01-074
Utilitas JM DK27+853~DK28+016 F01-462
Utilitas JM DK4~DK35 F01-453
Fasos/fasum DK9 F01-459
Utilitas JM DK27+870~DK28+295 F01-467
Utilitas JM KM28+000~KM31+000 F01-451
Utilitas DK30+631 F01-461
Fasos/fasum DK78+250 F01-112
Fasos/fasum DK78+400&DK78+800 F01-303
Fasos/fasum DK 01+960 - 02+610 F01-011
Fasos/fasum DK 01+343 F01-239
Fasos/fasum DK 130+613 F01-447
Fasos/fasum DK48+500 F01-455
Fasos/fasum DK49+450 F01-456
Fasos/fasum DK51+065 F01-457
Fasos/fasum DK52+500 F01-458
Fasos/fasum DK53+200 F01-265
Fasos/fasum DK54+050 F01-278
Fasos/fasum DK54+250 F01-279
Fasos/fasum DK54+640 F01-280
Fasos/fasum DK55+280 F01-281
Fasos/fasum DK56+190 F01-282
Fasos/fasum DK57+890 F01-283
Fasos/fasum DK59+300 F01-284
Fasos/fasum DK60+120 F01-285
Fasos/fasum DK60+740 F01-286
Fasos/fasum DK61+220 F01-287
Fasos/fasum DK67+720 F01-288
Fasos/fasum DK67+780 F01-289
Fasos/fasum DK70+850 F01-290
Fasos/fasum DK70+850 F01-291
Fasos/fasum DK70+970 F01-292
Fasos/fasum DK83+200 F01-293
Fasos/fasum DK85+450 F01-294
Fasos/fasum DK87+300 F01-295
Fasos/fasum DK100+250 F01-296
Fasos/fasum DK100+710 F01-297
Fasos/fasum DK101+390 F01-298
Fasos/fasum DK9+100~DK9+970 F01-328
Fasos/fasum DK17+600 F01-445
Fasos/fasum DK135+428 F01-128
Fasos/fasum DK135+930 F01-446
Fasos/fasum DK91+450 F01-044
Fasos/fasum DK135+080 F01-240
Utilitas DK19+100
KM4+050~KM37+000 F01-443
Utilitas JM DK3+050~DK36+000 F01-302
Fasos/fasum DK16+000 F01-449
Fasos/Fasum DK114+450 F01-248
Utilitas DK103+035.52&&DK103+039.5&DK103+039.8 F01-263
Utilitas DK105+451.1 F01-261
Utilitas DK105+720 F01-227
Utilitas DK111+357.9 F01-468
Utilitas DK112+610 F01-229
Utilitas DK93+600 F01-307
Utilitas DK93+605 F01-452
Utilitas DK103+260 F01-310
Utilitas 02+600 F01-324
Utilitas DK71+800 F01-465
Fasos/Fasum DK41+750 F01-470
Fasos/Fasum DK 41+750,00 F01-030
Fasos/Fasum DK 75+350,00 F01-039
Fasos/Fasum DK 75+350,00 F01-036
Fasos/Fasum DK126+350 - 126+726 F01-472
Fasos/Fasum DK108+350 F01-471
Fasos/Fasum DK 128+175-DK128+300 F01-177
Fasos/Fasum DK128+175-DK128+300 F01-176
Fasos/Fasum DK 127+980-DK128+180 F01-178
Fasos/Fasum DK 127+980-DK128+180 F01-179
Fasos/Fasum DK128+125-DK128+175 F01-180
Fasos/Fasum DK128+305-DK128+486 F01-181
Fasos/Fasum DK115 + 580 - DK 115 + 860 F01-411
Note *Kolom Status Saat ini Lahan
Patokan COUNTIF

returned by KCIC Masih di HSRCC 1


returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
canceled by TDM Tidak Perlu TDM
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
returned by KCIC Masih di HSRCC
UGR by PSBI UGR
UGR by PSBI UGR
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC (desain by CRDC) 1
returned by KCIC Masih di HSRCC 1
returned by KCIC Coordination with PSBI 1
returned by KCIC Proses Approval Design by PU 1
returned by KCIC Approval basic design by KCIC 1
returned by KCIC Approval basic design by KCIC 1
UGR by PSBI UGR
UGR by PSBI UGR
UGR by PSBI UGR
returned by KCIC Masih di HSRCC
returned by KCIC Masih proses revisi di Pemda 1
returned by KCIC Masih di HSRCC 1
Review by KCIC Masih di HSRCC 1
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC
Review by KCIC Masih di HSRCC 1
Review by KCIC Masih di HSRCC 1
Review by KCIC Masih di HSRCC 1
Review by KCIC Masih di HSRCC 1
Review by KCIC Masih di HSRCC 1
Review by KCIC Masih di HSRCC
UGR by PSBI UGR
canceled by TDM Tidak Perlu
canceled by TDM Tidak Perlu
UGR by PSBI UGR
UGR by PSBI UGR
UGR by PSBI UGR
canceled by TDM Tidak Perlu

*Hanya boleh diinput : 88


1. "returned by KCIC"
2. "review by KCIC"
3. "canceled by TDM"
Daftar List yang Butuh Lahan Saja

Kontraktor.
*Kolom
No. Area Jenis Relokasi Mileage
Patokan
COUNTIF
1 WIKA Area2 Jalan Kp Malangnengah 78+820
2 WIKA Area2 Bangunan 78+750
3 WIKA Area2 TANAH WARGA 82+277
4 WIKA Area3 Tanah 86+134
5 WIKA Area3 Tanah 86+134
6 WIKA Area3 Tanah 88+200
7 WIKA Area3 Tanah 88+700
8 WIKA Area2 Makam 67+100
9 WIKA Area2 Makam 70+100
10 WIKA Area2 Makam 71+200
11 WIKA Area3 RELOKASI MASJID (tanah sukaluyu) 91+450
12 WIKA Area3 TANAH DESA 100+275
13 WIKA Area3 TANAH PU 103+250
14 WIKA Area3 SPBE 103+100
15 SINO Area 1 TANAH MAKAM 13+347
16 SINO Area 1 Makam 31+050
17 SINO Area 1 Tanah kosong 31+100
18 SINO Area2 Tanah DINAS PERKEBUNAN 75+500
19 SINO Area2 Tanah 77+900
20 SINO Area2 Tanah Pemkab 67+750
21 SINO Area2 Tanah Desa 67+250
22 SINO Area2 TANAH DESA 67+100
23 SINO Area2 Tanah GG 69+830
24 SINO Area2 Tanah GG 69+860
25 SINO Area2 Tanah GG 69+880
26 SINO Area2 Tanah GG 69+900
27 SINO Area2 Tanah (makam) 78+860
28 CREC Area3 Tanah ISBI 106+150
29 CREC Area3 Tanah ISBI 106+170
30 CREC Area3 Tanah ISBI 106+200
31 CREC Area3 Tanah ISBI 106+270
32 CREC Area3 Tanah ISBI 106+280
33 CREC Area3 Tanah kp ciporang 88+775
34 CREC Area3 Tanah sirna sari 90+840
35 CREC Area3 Tanah sirna sari 90+900
36 CREC Area3 Tanah sirna sari 91+0,25
37 CREC Area3 Tanah sukaluyu 91+435
38 CREC Area3 Tanah Desa 93+300
39 CREC Area3 Tanah Desa 94+150
40 CREC Area3 Road Relocation (Tanah desa sumur bandung) 99+632
41 CREC Area3 Tanah Desa 100+050
42 CREC Area3 Makam 102+725
43 CREC Area3 Tanah Desa 102+285
44 CREC Area3 Makam 107+890
45 CREC Area3 Makam 107+817
46 CREC Area3 Tanah Kosong 108+550
47 CREC Area3 Tanah Fasum 100+820
48 CREC Area3 Tanah Fasum 110+800
49 CREC Area3 Tanah Fasum 110+850
50 CREC Area3 Tanah Fasos 111+775
51 CREC Area3 Tanah Fasum 111+790
52 CREC Area3 Tanah Fasum 111+810
53 CREC Area3 Tanah Fasum 111+850
54 CREC Area3 Tanah Fasum 111+925
55 CREC Area3 Tanah Fasum 111+960
56 CREC Area4 Tanah Kosong 120+122
Status

KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
PT ANDIKA PERSADA/WIKA/UGR
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
KCIC/PSBI
Daftar List yang dalam proses review KCIC

No. Kontraktor Area Jenis Relokasi Kategori Mileage


*Kolom Patokan COUNTIF 道路改移
1 WIKA Area 1 Relocated
道路改移 Road Fasos/Fasum DK19+500
2 WIKA Area 1 Relocated
道路改移 Road Fasos/Fasum DK41+850~DK42+000
3 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK50+693.11
4 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK53+639.80`
5 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK55+228
6 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK62+980
7 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK63+900
8 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK66+910
9 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK67+700
10 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK68+440
11 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK69+710
12 WIKA Area 2 Relocated
道路改移 Road Fasos/Fasum DK72+310
13 WIKA Area 2 Relocation
道路改移 of Road Fasos/Fasum DK81+000
14 WIKA Area 2 Relocation
道路改移 of Road Fasos/Fasum DK81+561
15 WIKA Area 2 Relocation
道路改移 of Road Fasos/Fasum DK81+900
16 WIKA Area 2 Relocation
道路改移 of Road Fasos/Fasum DK84+820
17 WIKA Area 3 Relocation
道路改移 of Road Fasos/Fasum DK95+068
18 WIKA Area 3 Relocation
道路改移 of Road Fasos/Fasum DK100+264
19 WIKA Area 3 Relocation
道路改移 of Road Fasos/Fasum DK100+939
20 WIKA Area 3 Relocation
道路改移 of Road Fasos/Fasum DK101+100
21 WIKA Area 4 Relocation
道路迁改 of Road Fasos/Fasum DK130+555
22 WIKA Area 4 Relocation
道路改移 of Road Fasos/Fasum DK135+670
23 WIKA Area 4 Relocation of Road Fasos/Fasum DK139+476
24 WIKA Area 1 Relocation Citizen Post RT 08 RW 12 Fasos/Fasum DK2+469
25 WIKA Area 1 Relocation Citizen Post RT 09 RW 12 Fasos/Fasum DK2+471
26 WIKA Area 1 迁改村公所
教育设施迁改 Fasos/Fasum DK16+900
27 WIKA Area 4 Relocation
光缆改移 of Education Facility Fasos/Fasum DK 127+390,00
28 WIKA Area 2 Relocated optical fiber Utilitas DK82+600
光纤迁改
29 CREC Area 4 Refairing Fiber Optic Backbone Highway Soroja Utilitas DK121+800
30 CREC Area 4 Relocation of SUTM Utilitas DK 141+130 - DK 141+900
31 CREC Area 4 Com. Cable Iron Pole Relocation Utilitas DK 121+300 - 121+550
32 CREC Area 4 Com. Cable Iron Pole Relocation Utilitas DK 121+002 - 131+246
33 SINO Area 1 Power Line & Underground Reloc. Utilitas DK 12+700&DK14+588~DK14+702
34 SINO Area 1 Relocated Power Line DK15+240-DK15+325
iew KCIC

Application Number Note


Status Saat ini Lahan
Cover Letter Form Number *Kolom Patokan COUNTIF
EC-465 F01-203 Review by KCIC 1
EC-1524 F01-469 Review by KCIC new application 1
EC-465 F01-204 Review by KCIC 1
EC-465 F01-205 Review by KCIC 1
EC-465 F01-206 Review by KCIC 1
EC-465 F01-207 Review by KCIC 1
EC-465 F01-208 Review by KCIC 1
EC-465 F01-209 Review by KCIC 1
EC-465 F01-210 Review by KCIC 1
EC-465 F01-211 Review by KCIC 1
EC-465 F01-212 Review by KCIC 1
EC-465 F01-213 Review by KCIC 1
EC-465 F01-214 Review by KCIC 1
EC-465 F01-215 Review by KCIC 1
EC-465 F01-216 Review by KCIC 1
EC-465 F01-217 Review by KCIC 1
EC-465 F01-218 Review by KCIC 1
EC-465 F01-220 Review by KCIC 1
EC-465 F01-221 Review by KCIC 1
EC-465 F01-222 Review by KCIC 1
EC-465 F01-225 Review by KCIC 1
EC-667/EC-1149 F01-129 Review by KCIC 1
EC-465 F01-226 Review by KCIC 1
EC-476 F01-244 Review by KCIC 1
EC-476 F01-246 Review by KCIC 1
EC-476 F01-245 Review by KCIC 1
EC-689 F01-070 Review by KCIC 1
EC-1448 F01-466 Review by KCIC
EC-1370 F01-464 Review by KCIC
EC-1636 F01-473 Review by KCIC new application
EC-1626 F01-370 Review by KCIC
EC-1627 F01-369 Review by KCIC
EC-1636 F01-439 Review by KCIC new application
EC-1636 F01-474 Review by KCIC new application

*Hanya boleh diinput "Review by KCIC" jika mau dihitung dalam summary
27
Daftar List S

No. Kontraktor Area Jenis Relokasi Kategori

1 WIKA Area 4 Relocation of Ditch Fasos/Fasum


2 WIKA Area 2 Relocation of Education Facility Fasos/Fasum
3 WIKA Area 1 Relocation of SUTM Utilitas
4 WIKA Area 1 Relocation Underground Cable Utilitas
5 WIKA Area 1 Relocation
朝拜室迁改of SKTT 150 KV GI Ganda Mekar Utilitas
6 WIKA Area 1 Relocation
道路改移 of Worship Place Fasos/Fasum
7 SINO Area 1 Relocated
道路改移(2处) Road Fasos/Fasum
8 SINO Area 1 Relocated
道路改移 Road Fasos/Fasum
9 SINO Area 2 Relocation
水渠迁改(2处) of Road Fasos/Fasum
10 SINO Area 2 Relocation of Bitch Fasos/Fasum
11 SINO Area 1 Concrete
坟墓迁改(2处) fence and Guardrail Utilitas JM
12 SINO Area 2 Relocation
供水管改移of Tombs Fasos/Fasum
13 SINO Area 2 Relocated
供水管改移 water supply pipe Fasos/Fasum
14 SINO Area 2 Relocated
光缆改移 water supply pipe Fasos/Fasum
15 SINO Area 1 Relocated
道路改移(2处) optical fiber Utilitas JM
16 SINO Area 1 Relocated
道路改移 Road Fasos/Fasum
17 CREC Area 4 Relocation
道路改移 of Road Fasos/Fasum
18 CREC Area 4 Relocation
房屋搬迁 of Road Fasos/Fasum
19 CREC Area 4 Relocation
公园迁改 of Health Center Fasos/Fasum
20 CREC Area 4 Relocation
管线迁改 of Park/RTH Fasos/Fasum
21 CREC Area 3 Pipeline
管线迁改 Relocation Utilitas
22 CREC Area 3 Pipeline
管线迁改 Relocation Utilitas
23 CREC Area 3 Pipeline
管线迁改 Relocation Utilitas
24 CREC Area 3 Pipeline
管线迁改 Relocation Utilitas
25 CREC Area 3 Pipeline
管线迁改 Relocation Utilitas
26 CREC Area 3 Pipeline
380V电力线改移Relocation Utilitas
27 SINO Area 2 Relocated
220V电力线改移 380V Power Line Utilitas
28 SINO Area 2 Relocated
电力线改移 220V Power Line Utilitas
29 SINO Area 2 Relocated
电力线迁改 Power Line Utilitas
30 SINO Area 2 Power
电力线改移Relocation
Line Utilitas
31 SINO Area 2 Relocated
水管迁改 Power Line Utilitas
32 SINO Area 2 Relocation of Water Pipe Fasos/Fasum

Keterangan

Membutuhkan Lahan Baru, Belum Negosiasi


Daftar List Sedang Proses Nego

Application Number
Mileage
Cover Letter Form Number
DK134+000~DK134+380 F01-450
DK 78+820 F01-040
DK17+600 F01-323
DK19+120 F01-196
DK26+000 F01-153
DK16+178 F01-018
DK14+300~DK14+700 EC-1203 F01-418
DK15+800&DK19+230 EC-1230 F01-424
DK78+250~DK79+022 EC-1203 F01-419
DK76+380~DK76+400 & DK76+560~DK76+562 EC-1188 F01-358
DK20+019-293 EC-988 F01-199
DK75+080-DK75+150 & DK78+610 EC-1242 F01-454
DK65+785 EC-1241 F01-079
DK65+977
KM15+350-KM17+000 EC-1241 F01-080
DK14+350~DK16+000 EC-944 F01-185
DK31+409~+488 & DK33+133~+453 EC-1203 F01-417
DK116+600~DK116+810 EC-1216 F01-415
DK123+350~DK123+400 EC-1184 F01-352
DK129+180~DK129+220 EC-1183 F01-355
DK133+260~DK133+265 EC-1183 F01-356
DK101+715 EC-1199 F01-231
DK103+885.6 EC-1199 F01-235
DK103+245 EC-1199 F01-232
DK105+177.8 EC-1199 F01-234
DK110+865~DK110+920 EC-1199 F01-236
DK111+000.6 EC-1199
EC-797 F01-233
DK64+286.2 EC-1502 F01-082
DK64+880 EC-797/EC-1502 F01-084
DK73+980 EC-797/EC-1502 F01-170
DK75+104 EC-797/EC-1502 F01-100
DK78+850 EC-797/EC-1502 F01-171
DK74+020 EC-1045 F01-202
Note Status Saat ini Lahan Status Lahan Status Relokasi

Ready for Negotiation 1


Ready for Negotiation On Process 1
Ready for Negotiation On Process
Ready for Negotiation On Process
Ready for Negotiation
Ready for Negotiation 1 Tersedia Selesai
Ready for Negotiation 1
Ready for Negotiation 1
Ready for Negotiation 1
Ready for Negotiation 1
Ready for Negotiation
Ready for Negotiation 1
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation On Process 1
Ready for Negotiation 1
Ready for Negotiation 1
Ready for Negotiation 1
Ready for Negotiation 1
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
Ready for Negotiation
13
Master Dokument Negotation Fasos Fasum & Utilities

Update : June 27th 2019 *Kolom Patokan COUNTIF *Kolom Patokan COUNTIF *Kolom Patokan COUNTIF *Kolom Patokan COUNTIF

Progress
NO Deskripsi Kategori Center mileage Tanggal Nego form 1 / Form 2 Form 3 Desain & BA Joint Survey BA Nego Area (Section) Kontraktor
Drawing

Position Date Status F03 Ketersediaan Lahan Status Lahan Data ke PSBI Status Relokasi Arsip

1 Relokasi Tiang Listrik Utilitas DK 2+540 4-Jul-18 F01-008 F03-001 Available Available 1 SINO CLOSED Tidak Perlu Selesai V
Available

2 Tower Relocation of SUTET/SUTT Utilias Major Area 1-3 5-Jul-18 F01-132 F03-002 Available Available Available 1-3 WIKA CLOSED Tidak Perlu V

3 Relocation School Fasos/Fasum DK 135+230 13-Aug-18 F01-010-REV1 F03-003 Available Available Available 4 WIKA CLOSED Perlu 26-Jun-19 V

4 Relocation School Fasos/Fasum DK 135+340 21-Aug-18 F01-009-REV1 F03-004 Available Available Available 4 WIKA CLOSED Perlu 26-Jun-19 V

5 Water Supply Pipe Sinohydro. Fasos/Fasum DK 75+200 22-Aug-18 F01-175 F03-012 Available na Process 2 SINO CLOSED Tidak Perlu - Selesai V

6 Water Supply Pipe Sinohydro. Fasos/Fasum DK 66+970 22-Aug-18 F01-096 F03-012 Available na Process 2 SINO CLOSED Tidak Perlu - Selesai V

7 Water Supply Pipe Sinohydro. Fasos/Fasum DK 65+970 22-Aug-18 F01-087 F03-012 Available na Process 2 SINO CLOSED Tidak Perlu - Selesai V

8 Water Supply Pipe Sinohydro. Fasos/Fasum DK 64+800 22-Aug-18 F01-173 F03-012 Available na Process 2 SINO CLOSED Tidak Perlu - Selesai V

9 Water Supply Pipe Sinohydro. Fasos/Fasum DK 64+955 22-Aug-18 F01-174 F03-012 Available na Process 2 SINO CLOSED Tidak Perlu - Selesai V

10 Water Supply Pipe Sinohydro. Utilitas DK 58+300 22-Aug-18 F01-172 F03-012 Available na Process 2 SINO CLOSED Tidak Perlu V

11 Relocation Mosque Cikaobandung Fasos/Fasum DK 67+000 23-Aug-18 F01-032-REV1 F03-006 Available Available Available 2 WIKA CLOSED Perlu Belum Dibebaskan 26-Jun-19 V

12 Relocation Mosque Sempur Fasos/Fasum DK 87+400 23-Aug-18 F01-042-REV1 F03-007 Available Available Available 3 WIKA CLOSED Perlu Tersedia 26-Jun-19 Selesai V

13 Relocation Mosque Cikaobandung Fasos/Fasum DK 68+550 23-Aug-18 F01-034-REV1 F03-008 Available Available Available 2 WIKA CLOSED Perlu Belum Dibebaskan 26-Jun-19 V

14 Relocation Mosque Sempur Fasos/Fasum DK 86+950 23-Aug-18 F01-041-REV1 F03-010 Available Available Available 3 WIKA CLOSED Perlu Tersedia 26-Jun-19 Selesai V

KM 127+750 TO 138+440 & KM


15 Relocation Pipe Pertamina. Utilias Major 23-Aug-18 F01-156 F03-011 Available Available Available 1 &2 WIKA CLOSED Tidak Perlu V
145+800 TO 147+850

16 Relocation of 20kV Line on utilitas DK 31 - DK 33 12-Dec-18 F01-169 F03-019 Available Available Available 1 SINO CLOSED Perlu 26-Jun-19 V

17 Relocation of Light Pole and Power utilitas JM DK 11 +930 -DK 12 +197 and DK 12-Dec-18 F01-187 F03-020 Available Available Available 1 SINO CLOSED Tidak Perlu 26-Jun-19 Selesai V
Cable at 15+195-DK 15 +851

18 Relocation of Ablution Masjid Baitul Fasos/Fasum DK 14 + 841 14-Dec-18 F01-016 REV1 F03-009 Available Available 1 WIKA CLOSED Perlu Tersedia 26-Jun-19 Selesai V
Hikmah

19 Relocation Masjid Cilame Fasos/Fasum DK 110 + 770 14-Dec-18 F01-057 REV1 F03-022 Available Available Available 3 WIKA CLOSED Perlu Belum Dibebaskan 26-Jun-19 V
(Perumahan Taman Bunga)

20 Relocation Masjid Al Huda Fasos/Fasum DK 130 + 555 14-Dec-18 F01-067 REV1 F03-005 Available n/a Available 4 WIKA CLOSED Perlu 26-Jun-19 V

21 Relocation Mosque Fasos/Fasum DK 83 + 515 9-Jan-19 F01-37 REV1 F03-023 Available n/a Process 2 WIKA CLOSED Perlu Belum Dibebaskan 26-Jun-19 V

22 Relocation Madrasah Quba Fasos/Fasum DK 127 + 062 9-Jan-19 F01-069 REV1 F03-024 Available n/a Process 4 WIKA CLOSED Perlu Belum Dibebaskan 26-Jun-19 V

23 Relocation Road (Bumi Asri- Kota Fasos/Fasum DK 121 +050 − DK 121 +235 28-Jan-19 F01-191 (dollar) Process Available Process Available 4 CREC Team Nego 27-Jan Form 01 is still USD., BA Perlu Belum Dibebaskan
Bandung) Joint Survey

Relocation Road (Bumi Asri- Kota Form 01 is still USD., BA


24 Fasos/Fasum DK 121+310 −DK 121+410 28-Jan-19 F01-190 (dollar) Process Available Process Available 4 CREC Team Nego 27-Jan Perlu Belum Dibebaskan
Bandung) DK 121 +310 and 121 +410 Joint Survey

Relocation Road (Bumi Asri- Kota Form 01 is still USD., BA


25 Bandung) Fasos/Fasum DK 121+235 − DK 121+310 28-Jan-19 F01-188 (dollar) Process Available Process Available 4 CREC Team Nego 27-Jan Joint Survey Perlu Belum Dibebaskan

26 Relocation Road (Bumi Asri- Kota Fasos/Fasum DK 121 +480 − DK 121+515 28-Jan-19 F01-194 (dollar) Process Available Process Available 4 CREC Team Nego 27-Jan Form 01 is still USD., BA Perlu Belum Dibebaskan
Bandung) Joint Survey

27 Relocation Road (Bumi Asri- Kota Fasos/Fasum DK 121 +515 and DK 121 +550 28-Jan-19 F01-192 (dollar) Process Available Process Process 4 CREC Team Nego 27-Jan Form 01 is still USD., BA Perlu Belum Dibebaskan
Bandung) Joint Survey

Relocation Road (Bumi Asri- Kota Form 01 is still USD., BA


28 Fasos/Fasum DK 120+930 − DK 121+050 28-Jan-19 F01-197 (dollar) Process Available Process Available 4 CREC Team Nego 27-Jan Perlu Belum Dibebaskan
Bandung) Joint Survey

29 Relocation Mosque Al HAQ Fasos/Fasum DK 121 +255 - DK 121+290 28-Jan-19 F01-270 F03-032 Available Process Available 4 CREC Team Nego 31-Jan CLOSED Perlu Belum Dibebaskan 26-Jun-19 V

30 Relocation of Fiber Opticin utilitas JM DK 114 +800 DK 116 +900 28-Jan-19 F01-257 F03-027 Available Process Available 4 CREC 16-May CLOSED Tidak Perlu Belum Dibebaskan V

31 Relocation Kabel Jaringan FO 24 Core utilitas DK 4+150 - DK 4+425 29-Jan-19 F01-320 F03-036 Available Available Available 1 SINO CLOSED Tidak Perlu V

Park Relocation (Taman Holis Indah


32 Fasos/Fasum DK 122 +650 - DK 128 +850 31-Jan-19 F01-256 F03-033 Available Process Available 4 CREC Team Nego 31-Jan CLOSED Perlu Belum Dibebaskan 26-Jun-19 V
I)

Park Relocation (Taman Holis Indah


33 II) Fasos/Fasum DK 122 +850 - DK 123 +100 31-Jan-19 F01-277 Process Available Process Process 4 CREC Team Nego 31-Jan PROSES F03 Perlu Belum Dibebaskan

34 Park Relocation Fasos/Fasum DK 121 +290 - DK 121 +330 31-Jan-19 F01-189 (dollar) Process Available Process Available 4 CREC Team Nego 31-Jan Form 01 is still USD., BA Perlu Belum Dibebaskan
Joint Survey
Progress
Desain &
NO Deskripsi Kategori Center mileage Tanggal Nego form 1 / Form 2 Form 3 BA Joint Survey BA Nego Area (Section) Kontraktor
Drawing

Position Date Status F03 Ketersediaan Lahan Status Lahan Data ke PSBI Status Relokasi Arsip

35 GAZEBO Relocation in Fasos/Fasum DK 121 +510 - DK 121 +525 31-Jan-19 F01-193 (dollar) Process Available Process Process 4 CREC Team Nego 31-Jan waiting for BA joint survey. Perlu Belum Dibebaskan

36 Sport Field Relocation in (Perum Fasos/Fasum DK 121 +640 − DK 121 +660 31-Jan-19 F01-195 (dollar) Process Available Process Available 4 CREC Team Nego 31-Jan Form 01 is still USD., BA Perlu Belum Dibebaskan
Bumi Asri) Joint Survey

37 Power Pole Relocation (Kota Baru utilitas DK 114 +613 - DK 114 +678 31-Jan-19 F01-258 F03-039 Available Process Available 4 CREC 16-May CLOSED Tidak Perlu Belum Dibebaskan V
Parahyangan)

Power Pole Relocation (Kota Baru


38 utilitas DK 115 +106 31-Jan-19 F01-276 F03-060 Available Process Process 4 CREC 16-May CLOSED Tidak Perlu Belum Dibebaskan V
Parahyangan) SUTM

39 Relocation Pipe DK 107 + 0.00 and Fasos/Fasum DK107+158 13-Feb-19 F01-184 Process Process Process 4 CREC Perlu Belum Dibebaskan
KM 107 +158

40 Relocation of Road Fasos/Fasum DK 115 +920 - DK 116 + 060 11-Mar-19 F01-413 F03-051 Available Process Available 4 CREC Team Nego 11-Mar BRIGIF AREA Perlu Belum Dibebaskan

41 Relocation of CCTV Utilitas JM DK 15+820 - DK 15+820 - DK 15 851 12-Mar-19 F01-198 F03-058 Available Available Available 1 SINO 22-Apr CLOSED Tidak Perlu Selesai V

Relocation of Electrical Network


42 Medium Voltage utilitas DK 82 + 600 13-Mar-19 F01-182 REV F03-040 Available n/a Available 2 WIKA 5-Apr CLOSED Tidak Perlu Selesai V

Medium Voltage Transmission


43 (STUM) Relocation utilitas DK 135 + 600 13-Mar-19 F01-444 F03-043 Available n/a Available 4 WIKA 5-Apr CLOSED Tidak Perlu Selesai V

44 Relocation of Electrical Network utilitas DK 67 + 750 13-Mar-19 F01-357 F03-041 Available n/a Available 2 WIKA 5-Apr CLOSED Tidak Perlu Selesai V
Medium Voltage

45 Medium Voltage Transmission utilitas DK 71 + 850 13-Mar-19 F01-442 F03-042 Available n/a Available 2 WIKA 5-Apr CLOSED Tidak Perlu Selesai V
(STUM) Relocation

46 SUTR (STUM) Relocation utilitas DK 100 + 101 13-Mar-19 F01-306 F03-045 Available n/a Available 3 WIKA 5-Apr CLOSED Tidak Perlu Selesai V

47 Medium Voltage Transmission utilitas DK 97+000 13-Mar-19 F01-441 F03-044 Available n/a Available 3 WIKA 5-Apr CLOSED Tidak Perlu Selesai V
(STUM) Relocation

waiting for F01 Rev and


48 Relocation of Road Fasos/Fasum DK 128+920 - DK 129+455 14-Mar-19 F01-348 Process Available Process Available 4 CREC Team Nego BA joint survey. Perlu Belum Dibebaskan

49 Relocation of Road (Kelurahan Fasos/Fasum DK 131+986 - DK 132+220 14-Mar-19 F01-299 Process Available Process Available 4 CREC Team Nego waiting for F01 Rev and Perlu Belum Dibebaskan
Kujangsari) BA joint survey.

50 Relocation of SUTM (PLN) utilitas DK 103 + 887.92 14-Mar-19 F01-259rev Process Available n/a Available 4 CREC Team Nego waiting for F01 Rev and Tidak Perlu Belum Dibebaskan
BA joint survey.

waiting for F01 Rev and


51 Relocation of SUTM/SUTR (PLN) utilitas DK 103+250.5 -DK 103+279.2 14-Mar-19 F01-260 Process Available n/a Available 4 CREC Team Nego BA joint survey. Tidak Perlu Belum Dibebaskan

52 Relocation of Road (Kelurahan Fasos/Fasum DK 129+455 - DK 129+765 14-Mar-19 F01-351 Process Available Available 4 CREC Team Nego 14-Mar Form 01 Perlu Belum Dibebaskan
Wates)

Telecommunication Tower
53 utilitas DK 2 + 800 15-Mar-19 F01-329 REV F03-059 Available Available Available 1 SINO 22-Apr CLOSED Tidak Perlu Selesai V
Relocation Halim (BTS)

54 Relocation of Power Line utilitas DK 4+170 - DK 4+425 29-Jan-19 F01-327 F03-046 Available Available Available 1 SINO 14-Jun Mr Xin Tidak Perlu

55 Relocation of street light Utilitas JM DK 20+000 12-Mar-19 F01-359 F03-048 Available Available Available 1 SINO Team Nego 14-Jun Mr Xin Tidak Perlu Selesai

56 Relocation of PDAM Rawa Lumbu Fasos/Fasum DK 14+000 5-Apr-19 F01-422 F03-055 Available Available Available 1 SINO Team Nego 11-Jun Mr Zhang Chao Perlu v

57 Relocation of PDAM Fasos/Fasum DK 35+600 5-Apr-19 F01-421 F03-056 Available Process Available 1 SINO Team Nego 11-Jun Mr Zhang Chao Perlu v

58 Relocation of Cikunir Toll Gate Utilias Major DK 8+915 26-Mar-19 F01-022 F03-057 Available Available Available 1 WIKA April CLOSED Tidak Perlu v

59 Relocation of Jakasetia Elementary Fasos/Fasum DK 9+620 10-Apr-19 FO1-024Rev F03-061 Available Available Available 1 WIKA Team Nego 11-Jun Mr Zhang Chao Perlu v
School, Jaka Sampurna, Bekasi

60 Relocation of SUTM/SUTR Jl Simpati utilitas DK 111+595 7-May-19 F01-268Rev F03-062 Available n/a Available 3 CREC Team Nego Tidak Perlu Belum Dibebaskan
Cileme

61 Relocation of SUTM/SUTR Taman utilitas DK 110+770 7-May-19 F01-267Rev F03-062 Available n/a Available 3 CREC Team Nego Tidak Perlu Belum Dibebaskan
Bunga Cileme

62 Relocation of SUTM/SUTR Cileme utilitas DK 111+020 7-May-19 F01-266Rev F03-062 Available n/a Available 3 CREC Team Nego Tidak Perlu Belum Dibebaskan
Utama
Relocation of SUTM/SUTR Lembah 13-Jun Mr Zhang Chao
63 utilitas DK 113+182 7-May-19 F01-463 F03-062 Available n/a Available 3 CREC Team Nego Tidak Perlu Belum Dibebaskan v
Teratai
64 Relocation of SUTM/SUTR Gunung utilitas DK 113+400 7-May-19 F01-460Rev F03-062 Available n/a Available 3 CREC Team Nego Tidak Perlu Belum Dibebaskan
Bohong
65 Relocation of SUTM/SUTR Cipatat utilitas DK 99+504.21 7-May-19 F01-230Rev F03-062 Available n/a Available 3 CREC Team Nego Tidak Perlu Belum Dibebaskan

66 Relocation of SUTM/SUTR Cikalong utilitas DK 93+600 7-May-19 F01-228Rev F03-062 Available n/a Available 3 CREC Team Nego Tidak Perlu Belum Dibebaskan Selesai
Progress v
Desain &
NO Deskripsi Kategori Center mileage Tanggal Nego form 1 / Form 2 Form 3 BA Joint Survey BA Nego Area (Section) Kontraktor
Drawing

Position Date Status F03 Ketersediaan Lahan Status Lahan Data ke PSBI Status Relokasi Arsip

67 Relocation of Mosque Cibaduyut Fasos/Fasum DK 127+020 13-May-19 F01-064Rev1 F03-063 Available n/a Available 3 WIKA Team Nego 13-Jun Tim Teknis Perlu Belum Dibebaskan

Relocation of Road (Anugrah Raya


68 Outlet Tunnel 1) Fasos/Fasum DK 4+170 - DK 4+425 20-May-19 F01-116Rev Process Available Available Available 2 SINO Sino F03 On process Perlu v

69 Relocation of Power Cable utilitas DK 30+621 - DK31+100 27-May-19 F01-433Rev Process Available Available Available 1 SINO Team Nego F03 On process Tidak Perlu

70 Relocation of Power Cable Cibatu, utilitas DK33+676 - DK34+360 27-May-19 F01-432Rev Process Available Available Available 1 SINO Team Nego F03 On process Tidak Perlu
Cikarang Pusat

71 房屋迁改 Fasos/Fasum 16+360 17-Jun-19 F01-269 Process 1 WIKA Team Nego Perlu
Relocation Citizen Post RT 10

72 Relocation of building and Trash Bin Fasos/Fasum DK16+000~DK16+085 17-Jun-19 F01-186 Process 1 WIKA Team Nego Perlu Tersedia Selesai

Relocation Concrete Pavement and


73 Drainage RT9&10 Fasos/Fasum DK16+000 17-Jun-19 F01-241 Process 1 WIKA Team Nego Perlu
迁改混凝土人行道及排水沟

Relocation Concrete Pavement and


74 Drainage RT1RW 15 Fasos/Fasum DK16+130 17-Jun-19 F01-242 Process 1 WIKA Team Nego Perlu
迁改混凝土人行道及排水沟

Relocation Concrete Pavement and


75 Drainage RT 3 RW 15 Fasos/Fasum DK16+200 17-Jun-19 F01-243 Process 1 WIKA Team Nego Perlu
迁改混凝土人行道及排水沟

76 水管迁改 Utilitas DK 102+150 19-Jun-19 F01-322 Process Available n/a Available 3 CREC Team Nego F03 On process Tidak Perlu Belum Dibebaskan
Relocation of Water Pipe

Relocation of Road DK 93 +550 - DK 93 + 800 11-Mar-19 F01-249 Available Process Available 4 CREC tidak perlu by TDM

SUTR (STUM) Relocation (Cikuda) DK 103 +006 - DK 103+067 14-Mar-19 Belum ajukan F01 Available Available Available 4 CREC Team Nego Form 01

SUTR (STUM) Relocation (Neglasari


DK 103 + 897- DK 103 + 887 14-Mar-19 Belum ajukan F01 Available Available Available 4 CREC Team Nego Form 01
Cikamuning)
Tahapan Bidang Perlu Relokasi
PSBI, KCIC, PEMILIK Tim Pengawasan (Pemda,
PSBI, HSRCC HSRCC PSBI PSBI Surveyor Indonesia* KJPP* KCIC/ PSBI* Notaris* KCIC* Pemilik dan PSBI BPN
Kanwil Agama, KCIC, PSBI)

Bentuk Relokasi Lahan Pengganti Infrastruktur / Bangunan


NO PRASARANA SARANA UTILITAS Kelurahan/Desa (Tanah, Infrastruktur, Tanah dan Ketersediaan Lahan Keterangan
Infrastruktur) BA Survey dan Surat
Survey Tim Penelitian Approval Pernyataan Survey dan Negosiasi Cek Berkas BAST (Berita Acara
(Pemeriksaan) Prelin Design/ Peta Bidang SI Survei KJPP Valuasi KJPP kepada pemilik Pelepasan Hak Pembayaran Proses Relokasi Sertifikasi
(pemilik) Pemilik Lahan Pengukuran SI Kepemilikan Serah Terima)
Gambar Awal Basic Design DED Pengganti lahan
(Petunjuk)

1 2 3 21 22 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
1. JAKARTA TIMUR
II PEMERINTAH PROVINSI 1 1 1 - - - 1 1 1 1 1 1 - - - - - - 1
1 PEMAKAMAN UMUM NYI KENDIL Cipinang Melayu Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 Tersedia sdh diukur si, tinggal nunggu kjpp turun untuk survey
V BELUM JELAS ALAS HAKNYA 4 4 4 - - 3 4 - - - - - - - - - - - 1

2 LAPANGAN BASKET DAN TAMAN Cipinang Melayu Infrastruktur 1 1 Rencana relokasi ke lahan temporary yg sudah dibebaskan,yg sekarang dipakai buat konstruksi
1 1 Tersedia tunnel 1, dan akan direlokasi setelah konstruksi selesai
3 SEKRETARIAT DAN TAMAN RT 07/05 Cipinang Melayu Tanah dan Infrastruktur 1 1 1 1 1 sudah direlokasi sementara ke lahan dan bangunan yang sudah dibebaskan
4 SEKRETARIAT RT.09 DAN RT.08 /012 (DI DNP TERTULIS KANTOR RW) Cipinang Melayu Tanah dan Infrastruktur 1 1 1 1 1 sudah direlokasi sementara ke lahan dan bangunan yang sudah dibebaskan
5 Gapura rt.09/012 Cipinang Melayu Infrastruktur 1 1 1 1 1 Sudah direlokasi oleh kontraktor (Sinohidro)
TOTAL - 5 5 5 - - 3 5 1 1 1 1 1 - - - - - - 2
2. KOTA BEKASI
I. PEMERINTAH PUSAT 3 3 3 - - - - - - - - - - - - - - - 3
6 RAMP OFF PINTU TOL PONDOK GEDE TIMUR 2 Jatibening Infrastruktur 1 1 1 Tersedia
7 RAMP OFF TOL BEKASI BARAT Pekayonjaya Infrastruktur 1 1 1 Tersedia
8 TEMPAT PEMBAKARAN SAMPAH Pengasinan Tanah dan Infrastruktur 1 1 1 Tersedia
III PEMERINTAH KOTA/KABUPATEN 12 12 12 2 1 1 9 1 - 1 1 1 - - - 1 - - 8
9 JALAN ANUGRAH RAYA Jaticempaka Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 1 Tersedia
10 JEMBATAN CURUG Jaticempaka Tanah dan Infrastruktur 1 1 1
11 TUGU BATAS Jatibening Baru Infrastruktur 1 1 1 1 Diganti bangunannya saja
12 SALURAN AIR Jatibening Baru Infrastruktur 1 1 1 1 Tersedia
13 JALAN CIKUNIR RAYA Jakamulya Tanah dan Infrastruktur 1 1 1 1 Tersedia
14 JALAN KOMPLEK PERUM PELANGI Jakamulya Tanah dan Infrastruktur 1 1 1 1 Tersedia
15 SALURAN JALAN CIKUNIR Jakamulya Infrastruktur 1 1 1 1 Tersedia
16 SD NEGERI 7 JAKASETIA Jakasetia Infrastruktur 1 1 1 1 Diganti bangunannya saja
17 JALAN TEUKU UMAR Sepanjang jaya Infrastruktur 1 1 1 1
18 POS SKRETARIAT RW 10 Pos yandu, PAUD Sepanjang jaya Infrastruktur 1 1 1 1 Tersedia
19 POS RT 5/10 SEPANJANG JAYA Sepanjang jaya Infrastruktur 1 1 1 1 Tersedia
20 TEMPAT WUDLU MASJID BAITUL HIKMAH RW Pengasinan Infrastruktur 1 1 1 1 1 Tersedia Sudah Dibangun KCIC
VI BELUM JELAS ALAS HAKNYA - 2 2 2 - - - 2 - - - - - - - - - - - 2
21 POS SATPAM Jaticempaka Infrastruktur 1 1 1 1 Tersedia
22 JALAN PEMUKIMAN RT 06 RW 02 Jaticempaka Tanah dan Infrastruktur 1 1 1 1 Tersedia
IX NON PEMERINTAH - 22 22 22 - - - 16 1 - - - - - - - - - - 17
23 JALAN KOMPLEK VILLA JATIBENING TOL/ JALAN GARUDA Jatibening Tanah dan Infrastruktur 1 1 1
24 TAMAN VILLA JATIBENING TOL Jatibening Tanah dan Infrastruktur 1 1 1
25 POS KEAMANAN LINGKUNGAN Jatibening Infrastruktur 1 1 1 1 Tersedia
26 TEMPAT PENAMPUNGAN SAMPAH Jatibening Infrastruktur 1 1 1 1 Tersedia
27 LAPANGAN TENIS I Jatibening Tanah dan Infrastruktur 1 1 1
28 LAPANG TENIS II Jatibening Tanah dan Infrastruktur 1 1 1
29 KOLAM PENAMPUNGAN AIR Jatibening Infrastruktur 1 1 1
30 TAMAN GREEN LEAF Jatibening Tanah dan Infrastruktur 1 1 1 1 Tersedia
31 TEMBOK KOMPLEK PELANGI Jakamulya Infrastruktur 1 1 1 1 Tersedia
32 JALAN LAPANG PELANGI Jakamulya Tanah dan Infrastruktur 1 1 1 1 Tersedia
33 SELOKAN Jakamulya Infrastruktur 1 1 1 1 Tersedia
34 JALAN PELANGI Jakamulya Tanah dan Infrastruktur 1 1 1 1 Tersedia
35 JALAN PELANGI II Jakamulya Tanah dan Infrastruktur 1 1 1 1 Tersedia
36 JALAN PELANGI Jakamulya Tanah dan Infrastruktur 1 1 1 1 Tersedia
37 JL. GALAKSI RAYA Jakasetia Tanah dan Infrastruktur 1 1 1 1 Tersedia
38 JALAN PERUMAHAN GALAKSI Jakasetia Tanah dan Infrastruktur 1 1 1 1 Tersedia
39 JALAN PERUMAHAN ARJUNA Jakasetia Tanah dan Infrastruktur 1 1 1 1 Tersedia
40 TEMPAT PEMBAKARAN SAMPAH VJS Jakasetia Infrastruktur 1 1 1 1 Tersedia
41 SALURAN JALAN CITRA Jakasetia Infrastruktur 1 1 1 1 Tersedia
42 LAPANGAN TENIS GRIYA METROPOLITAN Pekayonjaya Tanah dan Infrastruktur 1 1 1 1 Tersedia
43 POS RT SEPANJANG JAYA Sepanjangjaya Infrastruktur 1 1 1 1 Tersedia
44 POS SATPAM GRIYA MITRA ASRI Pengasinan Infrastruktur 1 1 1 1 Tersedia
TOTAL - 39 39 39 2 1 1 27 2 - 1 1 1 - - - 1 - - 30
3. KABUPATEN BEKASI
III PEMERINTAH KOTA/KABUPATEN - 11 11 11 2 - - 10 - - - - - - - - - - - 10
45 Jalan Jatimulya Jatimulya Tanah dan Infrastruktur 1 1 1 - - 1 - - - - - - - - - - Tersedia
46 Saluran Air Jatimulya Infrastruktur 1 1 1 1 Tersedia
47 Jalan Kavling Jatimulya Infrastruktur 1 1 1 1 Tersedia
48 Jalan Kavling Jatimulya Infrastruktur 1 1 1 1 - - - - - - - - - - Tersedia
49 TPA ZIYADATURRAHMAN Jatimulya Infrastruktur 1 1 1 1 - - - - - - - - - - Tersedia Sudah Direlokasi oleh Wika
50 Jalan Kavling Jatimulya Infrastruktur 1 1 1 1 - - - - - - - - - - Tersedia
51 Jalan Kavling Jatimulya Jatimulya Tanah dan Infrastruktur 1 1 1 1 - - - - - - - - - - Tersedia
52 Gedung serbaguna Jatimulya Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
53 Sarana Olah Raga Terapi Jatimulya Infrastruktur 1 1 1 1 - - - - - - - Tersedia
54 Jalan Jatimulya Jatimulya Tanah dan Infrastruktur 1 1 1 1 - - - - - - - Tersedia
55 Jalan Jatimulya (toyogiri) Jatimulya Tanah dan Infrastruktur 1 1 1 1 - - - - - - -
V BELUM JELAS ALAS HAKNYA - 3 3 3 - - - 3 - - - - - - - - - - - 2
56 Jalan Desa lambangsari Lambangsari Tanah dan Infrastruktur 1 1 1 1 Sudah Direlokasi oleh Wika
57 Jalan Jayamukti Jayamukti Tanah dan Infrastruktur 1 1 1 1 Tersedia
58 Jalan Cibatu Cibatu Tanah dan Infrastruktur 1 1 1 1 Tersedia
VI WAKAF <5000 M2 - 2 2 2 - - - 2 2 2 2 2 2 - - - - - - 2
59 makam Pasirsari Tanah 1 1 1 1 1 1 1 1 1 Tersedia
60 tanah kosong Pasirsari Tanah 1 1 1 1 1 1 1 1 1 Tersedia
TOTAL - 16 16 16 2 - - 15 2 2 2 2 2 - - - - - - 14
4. KABUPATEN KARAWANG
V BELUM JELAS ALAS HAKNYA - 2 2 2 - - - - - - - - - - - - - - - 2
61 Jalan Kec Teluk Jambe Wanasari infrastruktur 1 1 1 Tersedia Di dalam Boundary
62 Jalan Desa Wanakerta Wanakerta Infrastruktur 1 1 1 Tersedia Di dalam Boundary
IX NON PEMERINTAH - 1 1 1 - - - 1 1 - - - - - - - - - - 1
63 Masjid Wanasari Infrastruktur 1 1 1 1 1 Tersedia
TOTAL - 3 3 3 - - - 1 1 - - - - - - - - - - 3
5. KABUPATEN PURWAKARTA
II PEMERINTAH PROVINSI - 3 3 - - - - - - - - - - - - - - - - -
64 Tanah Cibinong Tanah 1 1 - - - - - - - - - -
65 Tanah Malangnengah Tanah 1 1 - - - - - - - - - -
66 Lapangan Bola Malangnengah Tanah dan Infrastruktur 1 1 - - - - - - - - - - - -
III PEMERINTAH KOTA/KABUPATEN - 11 11 8 - - - 11 11 11 - - - - - - - - - 11
67 Jalan Raya Baru Cikaobandung Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
68 Mushola Cikaobandung Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
69 Tanah Cikaobandung Tanah 1 1 1 1 1 1 Tersedia
70 Jalan Kp Neglasari Jatiluhur Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
71 Jalan Kp Neglasari Jatiluhur Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
72 Jalan Kp Cilegong Cilegong Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
73 Jalan Kp Tegal Nangklak Bunder Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
74 Jalan Kp Cidadapan Anjun Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
75 Jalan Kp Buluh Nagrak Tanah dan Infrastruktur 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
76 Jalan Kp Cihuni Sempur Tanah dan Infrastruktur 1 1 - - 1 1 1 - - - - - - - - Tersedia
77 Jalan Raya Militer Depok Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
IV TANAH KAS DESA - 75 75 75 - - - 75 75 75 - - - - - - - - - 75
78 Jalan Desa Kp Cikaobandung Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
79 Gang Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
80 Tanah Desa Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
81 Saluran Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
82 Gang Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
83 Gang Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
84 Jalan Desa Kp Cilalawak Cikaobandung Tanah dan Infrastruktur 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
85 Saluran Air Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
86 Saluran Air Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
87 Saluran Air Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
88 Saluran Air Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
89 Saluran Air Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
90 Saluran Air Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
91 Jalan Desa Kp Cilalawak Cikaobandung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
92 Tanah Desa Cikaobandung Tanah 1 1 1 1 1 1 - Tersedia
93 Saluran Jatiluhur Tanah 1 1 1 - - 1 1 1 - - Tersedia
94 Saluran Jatiluhur Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
95 Tanah GG Jatiluhur Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
96 Tanah GG Jatiluhur Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
97 Tanah GG Jatiluhur Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
98 Tanah GG Jatiluhur Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
99 Gang Cilegong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
100 Jalan Desa Cilegong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
101 Saluran Cilegong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
102 Gang Cilegong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
103 Gang Kembangkuning Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
104 Gang Kembangkuning Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
105 Selokan Kembangkuning Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
106 Gang Kembangkuning Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
107 Selokan Kembangkuning Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
108 Saluran Bunder Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
109 Saluran Bunder Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
110 Gang Bunder Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
111 Jalan Desa Tegal Nangklak Bunder Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
112 Jalan Kp Pasir Ipis Mekargalih Tanah dan Infrastruktur 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
113 Jalan Kp Pasir Ipis Mekargalih Tanah dan Infrastruktur 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
114 Jalan Kp Pasir Ipis Mekargalih Tanah dan Infrastruktur 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
115 Jalan Kp Mekarsari Cibinong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
116 Tanah & Bangunan (Madrasah, MCK, Mesjid) Cibinong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
117 Jalan Kp Mekarsari Cibinong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
118 Jalan Kp Mekarsari Cibinong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
119 gang Cibinong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
120 gang Cibinong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
121 Saluran Cibinong Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
122 Saluran Malangnengah Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
123 Jalan Kp Malangnengah Malangnengah Infrastruktur 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
124 Bangunan Malangnengah Tanah dan Infrastruktur 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
125 Tanah (makam) Malangnengah Tanah 1 1 1 1 1 1 - - - - - - - - Tersedia
126 Saluran Malangnengah Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
127 Gang Cilalawi Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
128 Selokan Cilalawi Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
129 Saluran Liunggunung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
130 Saluran Liunggunung Tanah 1 1 1 - - 1 1 1 - - - - - - - Tersedia
131 Saluran Liunggunung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
132 Saluran Liunggunung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
133 Saluran Liunggunung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
134 Gang Liunggunung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
135 Saluran Liunggunung Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
136 Selokan Anjun Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
137 Jalan Kp Gunung Anjun Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
138 Selokan Babakansari Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
139 Gang Babakansari Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
140 Selokan Babakansari Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
141 Selokan Babakansari Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
142 Selokan Babakansari Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
143 Selokan Palinggihan Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
144 Jalan Kp Pangkalan Palinggihan Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
145 Selokan Palinggihan Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
146 Saluran Nagrak Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
147 Tanah Sempur Tanah 1 1 1 1 1 1 - - - - - - - - Tersedia
148 Tanah Sempur Tanah 1 1 1 1 1 1 - - - - - - - - Tersedia
149 Gang Cibogohilir Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
150 Jalan Kp Babakan Calibur Depok Tanah 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
151 Tanah Depok Tanah 1 1 1 1 1 1 - - - - - - - - Tersedia
152 Tanah Depok Tanah 1 1 1 1 1 1 - - - - - - - - Tersedia
VI WAKAF <5000 M2 - 4 4 - - - - 4 4 4 - - - - - - - - - 4
153 Bangunan dan Tanah (Mesjid) Cikaobandung Tanah dan Infrastruktur 1 1 - - 1 1 1 - - - - - - - - Tersedia
154 Makam Cikaobandung Tanah 1 1 1 1 1 - Tersedia
155 Makam Jatiluhur Tanah 1 1 1 1 1 - - - - - - - - Tersedia
156 Mushola Palinggihan Tanah dan Infrastruktur 1 1 - - 1 1 1 - - - - - - - - Tersedia
VII WAKAF >5000 M2 - 1 1 - - - - 1 1 1 - - - - - - - - - 1
157 Makam Cilegong Tanah 1 1 1 1 1 - - - - - - - - Tersedia
VIII WAKAF LISAN - 1 1 1 - - - 1 1 1 - - - - - - - - - 1
158 Mushola Cikaobandung Tanah dan Infrastruktur 1 1 1 - - 1 1 1 - - - - - - - - Tersedia
TOTAL - 95 95 84 - - - 92 92 92 - - - - - - - - - 92
6. KABUPATEN BANDUNG BARAT
I PEMERINTAH PUSAT - 5 5 5 - - - 5 5 5 - - - - - - - - - 5
159 Tanah ISBI Bojongkoneng Tanah 1 1 1 1 1 1 Tersedia
160 Tanah ISBI Bojongkoneng Tanah 1 1 1 1 1 1 Tersedia
161 Tanah ISBI Bojongkoneng Tanah 1 1 1 1 1 1 Tersedia
162 Tanah ISBI Bojongkoneng Tanah 1 1 1 1 1 1 Tersedia
163 Tanah ISBI Bojongkoneng Tanah 1 1 1 1 1 1 Tersedia
III PEMERINTAH KOTA/KABUPATEN - 2 2 2 - - - - - - - - - - - - - - - -
164 Rumah Pemotongan Hewan (RPH) Cempakamekar Tanah dan Infrastruktur 1 1 1
165 Rumah Pemotongan Hewan (RPH) Cempakamekar Tanah dan Infrastruktur 1 1 1
IV TANAH KAS DESA - - - - - - - 48 - - - - - - - - - - - -
166 Jalan kp ciporang Puteran Tanah
167 Jalan kp hegarmanah Puteran Tanah
168 Jalan sirna sari Puteran Tanah
169 Jalan sukaluyu Puteran Tanah
170 Jalan sukaluyu Puteran Tanah
171 Tanah kp ciporang Puteran Tanah 1
172 Tanah sirna sari Puteran Tanah 1
173 Tanah sirna sari Puteran Tanah 1
174 Tanah sirna sari Puteran Tanah 1
175 Tanah sukaluyu Puteran Tanah 1
176 Tanah sukaluyu Puteran Tanah 1
177 Saluran Air (Selokan) Puteran Tanah 1
178 Saluran Air (Selokan) Puteran Tanah 1
179 Saluran Air (Selokan) Puteran Tanah 1
180 Saluran Air (Selokan) Puteran Tanah 1
181 Saluran Air (Selokan) Puteran Tanah 1
182 Saluran Air (Selokan) Puteran Tanah 1
183 Saluran Air (Selokan) Puteran Tanah 1
184 Saluran Air (Selokan) Puteran Tanah 1
185 Saluran Air (Selokan) Puteran Tanah 1
186 Saluran Air (Selokan) Puteran Tanah 1
187 Jalan pangkalan Cikalong Tanah
188 Jalan sumumput Cikalong Tanah
189 Jalan sumumput Cikalong Tanah
190 Saluran Air (Selokan) Cikalong Tanah
191 Saluran Air (Selokan) Cikalong Tanah
192 Saluran Air (Selokan) Cikalong Tanah
193 Jalan Desa Rende Tanah 1
194 Gang Rende Tanah 1
195 Jalan dangdeur Rende Tanah 1
196 Jalan cigeblig Rende Tanah 1
197 Tanah Desa Rende Tanah 1
198 Tanah Desa Rende Tanah 1
199 Saluran Air (Selokan) Rende Tanah 1
200 Saluran Air (Selokan) Rende Tanah 1
201 Saluran Air (Sungai) Rende Tanah 1
202 Saluran Air (Selokan) Rende Tanah 1
203 Saluran Air (Selokan) Rende Tanah 1
204 Saluran Air (Selokan) Rende Tanah 1
205 Saluran Air (Selokan) Rende Tanah 1
206 Saluran Air (Selokan) Rende Tanah 1
207 Saluran Air (Selokan) Rende Tanah 1
208 Saluran Air (Selokan) Rende Tanah 1
209 Jalan cikuda Mandalasari Tanah
210 Jalan cikuda Mandalasari Tanah
211 Jalan ciasri Mandalasari Tanah
212 Selokan Mandalasari Tanah
213 Jalan Desa sumur bandung Sumurbandung Tanah
214 Jalan Desa sumur bandung Sumurbandung Tanah
215 Jalan Desa sumur bandung Sumurbandung Tanah
216 Tanah Desa sumur bandung Sumurbandung Tanah 1
217 Tanah Desa Nyalindung Tanah 1
218 Jalan Desa nyalindung Nyalindung Tanah
219 Jalan Desa nyalindung Nyalindung Tanah
220 Jalan Desa nyalindung Nyalindung Tanah
221 Jalan Desa nyalindung Nyalindung Tanah
222 Jalan Nyalindung Tanah
223 Selokan/ Sawah Desa Nyalindung Tanah 1
224 Selokan Nyalindung Tanah 1
225 Selokan Nyalindung Tanah 1
226 Selokan Nyalindung Tanah 1
227 Selokan Nyalindung Tanah 1
228 Jalan desa cempaka mekar Cempakamekar Tanah
229 Jalan desa cempaka mekar Cempakamekar Tanah
230 Jalan desa cempaka mekar Cempakamekar Tanah
231 Jalan desa cempaka mekar Cempakamekar Tanah
232 Gang Cempakamekar Tanah
233 Jalan desa cempaka mekar Cempakamekar Tanah
234 Jalan desa cempaka mekar Cempakamekar Tanah
235 Makam Cempakamekar Tanah
236 Tanah Desa Cempakamekar Tanah
237 Jalan desa togog apu Togog Apu Tanah 1
238 Gang Togog Apu Tanah 1
239 Gang Togog Apu Tanah 1
240 Jalan desa togog apu Togog Apu Tanah 1
241 Jalan desa togog apu Togog Apu Tanah
242 Jalan desa togog apu Togog Apu Tanah 1
243 Jalan desa togog apu Togog Apu Tanah
244 Jalan desa togog apu Togog Apu Tanah
245 Jalan desa togog apu Togog Apu Tanah 1
246 Selokan Togog Apu Tanah 1
247 Selokan Togog Apu Tanah 1
248 Selokan Togog Apu Tanah 1
249 Jalan Desa bojong koneng Bojongkoneng Tanah
250 Jalan Desa bojong koneng Bojongkoneng Tanah
251 Selokan Bojongkoneng Tanah
252 Selokan Bojongkoneng Tanah
253 Irigasi Bojongkoneng Tanah
254 Selokan Bojongkoneng Tanah
255 Selokan Bojongkoneng Tanah
256 Gang Sukatani Tanah
257 Gang Sukatani Tanah
258 Jalan Sukatani Tanah
259 Gang Sukatani Tanah
260 Gang Sukatani Tanah
261 Jalan blok cihaliwung Sukatani Tanah
262 Selokan Sukatani Tanah
263 Gang Mekarsari Tanah
264 Jalan babakan garut Mekarsari Tanah
265 Selokan Mekarsari Tanah
266 Jalan kampung simpati Cilame Tanah
267 Gang Cilame Tanah
268 Gang Cilame Tanah
269 Jalan taman cilame indah Cilame Tanah
270 Jalan taman cilame indah Cilame Tanah
271 Jalan blok hegarmanah Cilame Tanah
272 Selokan Cilame Tanah
273 Selokan Cilame Tanah
274 Gang Gadobangkong Tanah
275 Gang Gadobangkong Tanah
276 Gang Gadobangkong Tanah
277 Gang Gadobangkong Tanah
VI WAKAF <5000 M2 - 2 2 2 - - - 2 2 2 - - - - - - - - - 2
278 Makam Sukatani Tanah 1 1 1 1 1 1 Tersedia
279 Tanah Kosong Kertamulya Tanah 1 1 1 1 1 1 Tersedia
VIII WAKAF LISAN - 1 1 1 - - - 1 1 1 - - - - - - - - - 1
280 Mushola Puteran Tanah dan Infrastruktur 1 1 1 1 1 1 - - Tersedia
IX NON PEMERINTAH - 13 13 1 - - - 2 2 2 - - - - - - - - - 2
281 SPBE Cempakamekar Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
282 Pipa Air Bersih Sukatani Tanah dan Infrastruktur 1 1
283 SMP 1 Mekarsari Mekarsari Tanah dan Infrastruktur 1 1
284 Tanah Fasum Cilame Tanah 1 1
285 Tanah Fasos Cilame Tanah 1 1
286 Tanah Fasum Cilame Tanah 1 1
287 Tanah Fasum Cilame Tanah 1 1
288 Tanah Fasum Cilame Tanah 1 1
289 Tanah Fasum Cilame Tanah 1 1
290 Tanah Fasum Cilame Tanah 1 1
291 Bangunan dan Tanah (Masjid) Cilame Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
292 Jalan pondok dustira indah Gadobangkong Tanah dan Infrastruktur 1 1
293 Jalan komp lembah teratai Gadobangkong Tanah dan Infrastruktur 1 1
TOTAL - 23 23 11 - - - 58 10 10 - - - - - - - - - 10
7. KOTA CIMAHI
III PEMERINTAH KOTA/KABUPATEN - 2 2 2 2 2 2 2 2 2 2 - - - - - - - - 2
294 Jalan Kel Cibeber Cibeber Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 1 Tersedia
295 Jalan kel cibeber Cibeber Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 1 Tersedia
V BELUM JELAS ALAS HAKNYA - 3 3 3 3 3 3 3 3 3 3 - - - - - - - - 3
296 Gang Cibeber Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 1 Tersedia
297 Gang Cibeber Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 1 Tersedia
298 Gang Utama Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 1 Tersedia
IX NON PEMERINTAH - 1 1 1 1 1 1 1 1 1 1 - - - - - - - - 1
299 Jalan perumahan pondok mas Leuwigajah Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 1 Tersedia
TOTAL - 6 6 6 6 6 6 6 6 6 6 - - - - - - - - 6
8. KOTA BANDUNG
III PEMERINTAH KOTA/KABUPATEN - 7 7 7 4 2 - - - - - - - - - - - - - 6
300 TPS Mekarjaya Infrastruktur 1 1 1 1
301 PSU Batununggal Mengger Tanah dan Infrastruktur 1 1 1 1 Tersedia
302 Jalan cirangrang Cirangrang Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
303 Jalan Cirangrang Cirangrang Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
304 Kantor Rw Margasuka Infrastruktur 1 1 1 Tersedia Menggunakan tanah sisa
305 Pos Kamling Cigondewah RahayuTanah dan Infrastruktur 1 1 1 Tersedia Menggunakan tanah sisa
306 Taman Gempolsari Tanah 1 1 1 Tersedia Menggunakan tanah sisa
V BELUM JELAS ALAS HAKNYA 1 1 1 1 - - - - - - - - - - - - - - - -
307 Fasos/Fasum Kujangsari Tanah 1 1 1
VI WAKAF <5000 M2 - 5 5 5 4 - 5 5 5 5 5 - - - - - - - - 5
308 Mesjid Al-Huda Mengger Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 Tersedia
309 Makam (deden nadzir) Mengger Tanah 1 1 1 1 1 1 1 1 Tersedia
310 Kantor Yayasan Cibaduyut Wetan Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 Tersedia
311 Mushola Cibaduyut Wetan Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 Tersedia
312 Musholla Quba Cibaduyut Kidul Tanah dan Infrastruktur 1 1 1 1 1 1 1 1 1 Tersedia
VIII WAKAF LISAN - 1 1 1 - - - 1 1 1 1 - - - - - - - - -
313 Madrasah Quba Cibaduyut Kidul Tanah dan Infrastruktur 1 1 1 1 1 1 1
IX NON PEMERINTAH - 48 48 48 37 11 3 28 26 - 7 - - - - - 2 - - 44
314 Jalan (PSU Perum Banyu Biru) Mekarjaya Tanah dan Infrastruktur 1 1 1 Tersedia
315 Jalan (PSU Perum Oasis) Mekarjaya Tanah dan Infrastruktur 1 1 1 Tersedia
316 Taman (PSU Perum Banyu Biru) Mekarjaya Tanah 1 1 1 Tersedia
317 Taman / Parkiran (PSU Perum Banyu Biru) Mekarjaya Tanah 1 1 1 Tersedia
318 Sman 25 Bandung Mekarjaya Infrastruktur 1 1 1 1 1 1 1
319 Smpn 48 Bandung Mekarjaya Infrastruktur 1 1 1 1 1 1 1
320 Jln Adhiyaksa Kujangsari Infrastruktur 1 1 1 1 1
321 JL. Komplek Koperpu Kujangsari Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
322 Jalan (PSU Perum PU) Kujangsari Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
323 Jalan (PSU Perum PU) Kujangsari Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
324 Jalan (PSU PU) Kujangsari Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
325 Jalan (PSU PU) Kujangsari Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
326 Jalan (PSU Perum PU) Kujangsari Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
327 Jalan (PSU Perum PU) Kujangsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
328 Tanah Perum PU Kujangsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
329 Ruang Terbuka Hijau Kujangsari Tanah 1 1 1 Tersedia
330 Puskesmas Pasawahan Wates Infrastruktur 1 1 1 1 Tersedia Progres persetujuan BA pemkot
331 Jalan Perumahan (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia Update PBT baru
332 Jalan (Perum Singgasana) Cibaduyut Wetan Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia konfirmasi lokasi fisik berada di perum mekarwangi
333 Taman (Perum Mekarwangi) Cibaduyut Wetan Tanah 1 1 1 1 1 1 1 Tersedia
334 Jalan (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
335 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
336 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
337 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
338 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
339 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
340 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
341 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
342 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
343 Taman (PT.DwiSaha Pradana) Cibaduyut Wetan Tanah 1 1 1 1 1 1 Tersedia
344 RTH Perum Mekarwangi Cibaduyut Wetan Tanah 1 1 1 1 1 1 1 Tersedia
345 Ruang Terbuka Hijau Margasuka Tanah 1 1 1 1 Tersedia
346 Jalan margasuka Margasuka Tanah dan Infrastruktur 1 1 1 1 Tersedia
347 Tempat Pembuangan Sampah Cigondewah RahayuTanah 1 1 1 1 1 1 1 Tersedia
348 Ruang Terbuka Hijau Cigondewah RahayuTanah 1 1 1 1 1 1 Tersedia
349 Ruang Terbuka Hijau Cigondewah RahayuTanah 1 1 1 1 1 1 Tersedia
350 Taman Cigondewah Kidul Tanah 1 1 1 1 1 1 Tersedia
351 Taman Cigondewah Kidul Tanah 1 1 1 1 1 1 Tersedia
352 Jalan Bumi Asri Gempolsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
353 Taman Bumi asri Gempolsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
354 Jalan marga asri Gempolsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia Pengukuran PT SI tersedia, namun harus pembebasan lahan tanah sisa yang tidak dibebaskan KCIC
355 Jalan gempol sari Gempolsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
356 Jalan gempolsari Gempolsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
357 Pendopo Perumahan Bumiasri Gempolsari Tanah dan Infrastruktur 1 1 1
regency
358 Jalan gempolsari Gempolsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
359 Lapangan Gempolsari Tanah 1 1 1 1 1 Tersedia
360 Jalan gempolsari Gempolsari Tanah dan Infrastruktur 1 1 1 1 1 Tersedia
361 Mesjid Al-Haq Gempolsari Tanah dan Infrastruktur 1 1 1 1 1 1 Tersedia
TOTAL 1 62 62 62 45 13 8 34 32 6 13 - - - - - 2 - - 55
9. KABUPATEN BANDUNG
I PEMERINTAH PUSAT - 1 1 1 - - - - - - - - - - - - - - - -
362 Sungai Cikeruh Cileunyi Wetan Infrastruktur 1 1 1
III PEMERINTAH KOTA/KABUPATEN - 4 4 4 - - - 2 - - - - - - - - - - - 1
363 Jalan babakan GBI Buah Batu Tanah dan Infrastruktur 1 1 1 1 masalah dengan
* Sudah ada subkon
3 opsi lahan pengganti, meminta harga lebih dari KJPP
364 Sekolah Dasar Tirtayasa Cibiru Hilir Tanah dan Infrastruktur 1 1 1 - 1 Tersedia * Menunggu BA relokasi dari tim pemkab (belum tanda tangan asda)
365 Jalan Cileunyi Wetan Tanah dan Infrastruktur 1 1 1
366 Jalan Kabupaten Rancaekek Kulon Tanah dan Infrastruktur 1 1 1
V BELUM JELAS ALAS HAKNYA - 22 22 22 - - - - - - - - - - - - - - - -
367 Saluran Air (selokan) Tegalluar Infrastruktur 1 1 1
368 Saluran Air (selokan) Tegalluar Infrastruktur 1 1 1
369 Saluran Air (selokan) Tegalluar Infrastruktur 1 1 1
370 Jalan Tegalluar Infrastruktur 1 1 1
371 Sungai Besar Tegalluar Infrastruktur 1 1 1
372 Saluran Air (selokan) Cibiru Hilir Infrastruktur 1 1 1
373 Jalan Desa Cibiru Hilir Tanah dan Infrastruktur 1 1 1
374 Jalan Desa Cibiru Hilir Tanah dan Infrastruktur 1 1 1
375 Jalan Desa Cibiru Hilir Tanah dan Infrastruktur 1 1 1
376 Saluran Air (selokan) Cibiru Hilir Infrastruktur 1 1 1
377 Posyandu Cibiru Hilir Infrastruktur 1 1 1
378 Saluran Air (Selokan) Cimekar Infrastruktur 1 1 1
379 Saluran Air (Selokan) Cimekar Infrastruktur 1 1 1
380 Saluran Air (Selokan) Cileunyi Kulon Infrastruktur 1 1 1
381 Saluran Air (Selokan) Cileunyi Kulon Infrastruktur 1 1 1
382 Saluran Air (selokan) Cileunyi Wetan Infrastruktur 1 1 1
383 Jalan Cileunyi Wetan Tanah dan Infrastruktur 1 1 1
384 Saluran air (Selokan) Rancaekek Kulon Infrastruktur 1 1 1
385 Saluran air (Selokan) Rancaekek Kulon Infrastruktur 1 1 1
386 Jalan Rancaekek Kulon Tanah dan Infrastruktur 1 1 1
387 Saluran air (selokan) Rancaekek Wetan Infrastruktur 1 1 1
388 Saluran air (selokan) Rancaekek Wetan Infrastruktur 1 1 1
VI WAKAF <5000 M2 1 1 1 - - - 1 1 1 1 1 - - - - - - - 1
389 TPU Tegalluar Tanah 1 1 1 1 1 1 1 1 Tersedia
TOTAL - 28 28 28 - - - 3 1 1 1 1 - - - - - - - 2
Jumlah 277 277 254 55 20 18 241 147 118 24 5 4 - - - 3 - - 214

Ket * Konfirmasi data dari KCIC


Progres pelaksanaan Fasos Fasum Bidang Perlu Relokasi
Status pertanggal 20 Juni 2019
Data Fasos Fasum Perlu Relokasi

Bidang tanah Gedung/ Infrastruktur


Jumlah
No Kota/Kabupaten Fasos Fasum
BA Survey dan Surat Pernyataan BAST (Berita
Survey Penelitian Prelim Design/ Gambar Basic DED Approval Pemilik Lahan Survey dan Peta Bidang Survei KJPP Valuasi KJPP Negosiasi kepada pemilik Cek Berkas Pelepasan Pembayaran Proses Relokasi Acara Serah Sertifikasi
Tim Awal (Petunjuk) Design (pemilik) Pengukuran SI SI lahan Kepemilikan Hak
(Pemeriksaan) Pengganti Terima)

1 Jakarta Timur 5 5 5 5 5 - - 3 5 1 1 1 1 1 - - - - - -
2 Kota Bekasi 39 39 39 39 39 2 1 1 27 2 - 1 1 1 - - - 1 - -
3 Kabupaten Bekasi 16 16 16 16 16 2 - - 15 2 2 2 2 2 - - - - - -
4 Kabupaten Karawang 3 3 3 3 3 - - - 1 1 - - - - - - - - - -
5 Kabupaten Purwakarta 95 95 95 95 84 - - - 92 92 92 - - - - - - - - -
6 Kabupaten Bandung Barat 135 135 23 23 11 - - - 58 10 10 - - - - - - - - -
7 Kota Cimahi 6 6 6 6 6 6 6 6 6 6 6 6 - - - - - - - -
8 Kota Bandung 62 62 62 62 62 45 13 8 34 32 6 13 - - - - - 2 - -
9 Kabupaten Bandung 28 28 28 28 28 - - - 3 1 1 1 1 - - - - - - -
TOTAL 389 389 277 277 254 55 20 18 241 147 118 24 5 4 - - - 3 - -
Progres pertahapan 71% 71% 65% 14% 5% 5% 62% 38% 30% 6% 1% 1% 0% 0% 0% 1% 0% 0%
Belum Berproses 29% 29% 35% 86% 95% 95% 38% 62% 70% 94% 99% 99% 100% 100% 100% 99% 100% 100%

PROGRES RELOKASI
100%

90%

29% 29%
80%
35% 38%

70%
62%
70%
60%

86%
95% 95% 94%
50% 99% 99% 100% 100% 100% 99% 100% 100%

40%

71% 71%
65% 62%
30%

20%
38%
30%
10%
14%
5% 5% 6% 0% 0% 0% 0% 0%
0% 1% 1% 1%
) k) ) SI SI k i ) i
Ti
m an ju i gn ED ilik an
ti
KJ
PP JP
P
a n an Ha ar
a n a s a as
y ksa un es D m g g ra
n
a ng i i K h
la ilik n y l ok rim ti fik
e i t D e n u d e s m a a e e r
rv er e sic l(
p
Pe uk Bi rv a ilik pe
s b
sR
T
Se
Su (P ng Su lu pa em ra
h
P em al Ba o va a n e eta Va pe m
s Ke ele P o se
S e
( Aw pr La
h n
P P a ka P Pr ra
an ar Ap ik da ad er ca
liti b il y e p B A
ne am m rv
e
si
k
Ce
k
ita
Pe /G Pe Su ia er
an n a n s ( B
yd sig at
a go ST
ve De ny Ne BA
r e r
Su el
im
tP
BA Pr u ra
S
Progres pelaksanaan Fasos Fasum Bidang Perlu Relokasi
Status pertanggal 25 Juni 2019
Data Fasos Fasum Perlu Relokasi

Jumlah
No Kota/Kabupaten Fasos Fasum

I. Fasos Fasum Terkena Trase (Melalui UU No 2)


1 Jakarta Timur 5 5
Tanah -
Infrastruktur 2
Tanah dan Infrastruktur 3
2 Kota Bekasi 39 39
Tanah -
Infrastruktur 20
Tanah dan Infrastruktur 19
3 Kabupaten Bekasi 16 16
Tanah 2
Infrastruktur 6
Tanah dan Infrastruktur 8
4 Kabupaten Karawang 3 3
Tanah -
Infrastruktur 3
Tanah dan Infrastruktur -
5 Kabupaten Purwakarta 95 95
Tanah 75
Infrastruktur 1
Tanah dan Infrastruktur 19
6 Kabupaten Bandung Barat 135 135
Tanah 126
Infrastruktur -
Tanah dan Infrastruktur 9
7 Kota Cimahi 6 6
Tanah -
Infrastruktur -
Tanah dan Infrastruktur 6
8 Kota Bandung 62 62
Tanah 24
Infrastruktur 6
Tanah dan Infrastruktur 32
9 Kabupaten Bandung 28 28
Tanah 1
Infrastruktur 18
Tanah dan Infrastruktur 9
TOTAL 389 389
Tanah 228
Infrastruktur 56
Tanah dan Infrastruktur 105
Progres pertahapan
Belum Berproses
II. Fasos Fasum Tidak Terkena Trase (Terdampak)
1 Jakarta Timur
Tanah
Infrastruktur
Tanah dan Infrastruktur
2 Kota Bekasi
Tanah
Infrastruktur
Tanah dan Infrastruktur
3 Kabupaten Bekasi
Tanah
Infrastruktur
Tanah dan Infrastruktur
4 Kabupaten Karawang
Tanah
Infrastruktur
Tanah dan Infrastruktur
5 Kabupaten Purwakarta
Tanah
Infrastruktur
Tanah dan Infrastruktur
6 Kabupaten Bandung Barat
Tanah
Infrastruktur
Tanah dan Infrastruktur
7 Kota Cimahi
Tanah
Infrastruktur
Tanah dan Infrastruktur
8 Kota Bandung
Tanah
Infrastruktur
Tanah dan Infrastruktur
9 Kabupaten Bandung
Tanah -
Infrastruktur 0
Tanah dan Infrastruktur 0
TOTAL - -
Tanah -
Infrastruktur -
Tanah dan Infrastruktur -
Progres pertahapan
Belum Berproses

PROGRES RELOKASI
100%

90%

29%29%
80%
35% 38%

70%
62%
70%
60%

86%
95%95% 94%
50% 99%99%
100%
100% 99%
100% 100%
100%
40%

71%71%
65% 62%
30%
100%
100%
100% 100%
100%
40%

71%71%
65% 62%
30%

20%
38%
30%
10%
14%
5% 5% 6%
0% 1% 1% 0% 0% 0% 1% 0% 0%
Tanah Infrastruktur
NO PRASARANA SARANA UTILITAS Bidang PBT DNP

Luas (m2) Status Kepemilikan Luas (m2) Status Kepemilikan

1 2 7 8 9 10 11 12 13
1. JAKARTA TIMUR
V BELUM JELAS ALAS HAKNYA 49 49 49 1,730 - - -
1 JALAN LINGKUNGAN 1 FASOS FASUM 5 FASOS FASUM 5 477 Belum Jelas Alas Haknya - non pemerintah
2 JALAN/GANG 1 16A 16A 12 Belum Jelas Alas Haknya - non pemerintah
3 JALAN/GANG 1 17A.1 17A 19 Belum Jelas Alas Haknya - non pemerintah
4 JALAN/GANG 1 20A 20A 10 Belum Jelas Alas Haknya - non pemerintah
5 JALAN/GANG 1 22A 22A 2 Belum Jelas Alas Haknya - non pemerintah
6 JALAN/GANG 1 26A 26A 12 Belum Jelas Alas Haknya - non pemerintah
7 JALAN/GANG 1 55A 55A 13 Belum Jelas Alas Haknya - non pemerintah
8 JALAN/GANG 1 56A 56A 5 Belum Jelas Alas Haknya - non pemerintah
9 JALAN/GANG 1 95A 95A 8 Belum Jelas Alas Haknya - non pemerintah
10 JALAN/GANG 1 98A 98A 8 Belum Jelas Alas Haknya - non pemerintah
11 JALAN/GANG 1 101A 101A 24 Belum Jelas Alas Haknya - non pemerintah
12 JALAN/GANG 1 103A 103A 5 Belum Jelas Alas Haknya - non pemerintah
13 JALAN/GANG 1 104A 104A 15 Belum Jelas Alas Haknya - non pemerintah
14 JALAN/GANG 1 105A 105A 3 Belum Jelas Alas Haknya - non pemerintah
15 JALAN/GANG 1 110A 110A 12 Belum Jelas Alas Haknya - non pemerintah
16 JALAN/GANG 1 111A 111A 10 Belum Jelas Alas Haknya - non pemerintah
17 JALAN/GANG 1 9A 9A 10 Belum Jelas Alas Haknya - non pemerintah
18 JALAN/GANG 1 28A 28A 8 Belum Jelas Alas Haknya - non pemerintah
19 JALAN/GANG 1 30A 30A 18 Belum Jelas Alas Haknya - non pemerintah
20 JALAN/GANG 1 35A 35A 5 Belum Jelas Alas Haknya - non pemerintah
21 JALAN/GANG 1 40A 40A 16 Belum Jelas Alas Haknya - non pemerintah
22 JALAN/GANG 1 85A 85A 15 Belum Jelas Alas Haknya - non pemerintah
23 JALAN/GANG 1 154A 154A 13 Belum Jelas Alas Haknya - non pemerintah
24 JALAN/GANG 1 108A 108A 31 Belum Jelas Alas Haknya - non pemerintah
25 JALAN/GANG 1 123A 123A 37 Belum Jelas Alas Haknya - non pemerintah
26 JALAN/GANG 1 128A 128A 10 Belum Jelas Alas Haknya - non pemerintah
27 JALAN/GANG 1 130A 130A 9 Belum Jelas Alas Haknya - non pemerintah
28 JALAN/GANG 1 131A 131A 43 Belum Jelas Alas Haknya - non pemerintah
29 JALAN/GANG 1 132A 132A 5 Belum Jelas Alas Haknya - non pemerintah
30 JALAN/GANG 1 147A 147A 28 Belum Jelas Alas Haknya - non pemerintah
31 JALAN/GANG 1 147B 147B 40 Belum Jelas Alas Haknya - non pemerintah
32 JALAN/GANG 1 150A 150A 4 Belum Jelas Alas Haknya - non pemerintah
33 JALAN/GANG 1 159A 159A 10 Belum Jelas Alas Haknya - non pemerintah
34 JALAN/GANG 1 230 230 415 Belum Jelas Alas Haknya - non pemerintah
35 JALAN/GANG 1 231 231 37 Belum Jelas Alas Haknya - non pemerintah
36 JALAN/GANG 1 232 232 41 Belum Jelas Alas Haknya - non pemerintah
37 JALAN/GANG 1 234 234 37 Belum Jelas Alas Haknya - non pemerintah
38 JALAN/GANG 1 235 235 24 Belum Jelas Alas Haknya - non pemerintah
39 JALAN/GANG 1 237 237 9 Belum Jelas Alas Haknya - non pemerintah
40 JALAN/GANG 1 11A 11A 2 Belum Jelas Alas Haknya - non pemerintah
41 JALAN/GANG 1 12A 12A 9 Belum Jelas Alas Haknya - non pemerintah
42 JALAN/GANG 1 46A 46A 27 Belum Jelas Alas Haknya - non pemerintah
43 JALAN/GANG 1 46B 46B 8 Belum Jelas Alas Haknya - non pemerintah
44 JALAN/GANG 1 76A 76A 22 Belum Jelas Alas Haknya - non pemerintah
45 JALAN/GANG 1 108A 108A 46 Belum Jelas Alas Haknya - non pemerintah
46 JALAN/GANG 1 108B 108B 25 Belum Jelas Alas Haknya - non pemerintah
47 JALAN/GANG 1 109A 109A 13 Belum Jelas Alas Haknya - non pemerintah
48 JALAN/GANG 1 109B 109B 19 Belum Jelas Alas Haknya - non pemerintah
49 JALAN/GANG 1 109C 109C 59 Belum Jelas Alas Haknya - non pemerintah
TOTAL 49 49 49 1,730 - - -
2. KOTA BEKASI
I PEMERINTAH PUSAT 2 1 - 3,579 - - -
50 SUNGAI BEKASI BARU 1 2 1,729 Pemerintah Pusat Pemerintah Pusat
51 JALAN JEMBATAN RAYA CUT MUTIA 1 1,850 Pemerintah Pusat Pemerintah Pusat
II PEMERINTAH PROVINSI 1 - - 300 - - -
52 JEMBATAN RAYA RA KARTINI 1 300 Pemerintah Provinsi Pemerintah Provinsi
III PEMERINTAH KOTA/KABUPATEN 21 6 2 6,048 - - -
53 Jembatan Kodam 1 2 159 Pemerintah kota Pemerintah kota
54 JEMBATAN JATIBENING BARU 1 255 Pemerintah kota Pemerintah kota
55 JEMBATAN CAMAN 1 245 Pemerintah kota Pemerintah kota
56 JEMBATAN CAMAN RAYA 1 275 Pemerintah kota Pemerintah kota
57 JEMBATAN SERSAN MARJUKI 1 168 Pemerintah Kota Pemerintah Kota
58 JEMBATAN KEMALA LAGOON 1 119 Pemerintah Kota Pemerintah Kota
59 SALURAN DEKAT LAPANGAN TENIS 1 3 14 Pemerintah Kota Pemerintah Kota
60 JL. JEMBATAN AHMAD YANI 1 408 Pemerintah Kota Pemerintah Kota
61 JALAN PEMUKIMAN 1 487 Pemerintah Kota Pemerintah Kota
62 TAMAN VILLA MEUTIA KIRANA 1 44 44 545 Pemerintah Kota Pemerintah Kota
63 TAMAN VILLA MEUTIA KIRANA 1 45 45 73 Pemerintah Kota Pemerintah Kota
64 JALAN PERMUKIMAN 1/1 1 250 Pemerintah Kota Pemerintah Kota
65 JALAN LOSARI 1 384 Pemerintah Kota Pemerintah Kota
66 JEMBATAN JALAN LOSARI 1 236 Pemerintah Kota Pemerintah Kota
67 TAMAN BUMI BEKASI BARU 1 250 Pemerintah Kota Pemerintah Kota
68 JALAN PERMUKIMAN RT 05-01/ RW 1 675 Pemerintah Kota Non Pemerintah
69 JALAN RAYA PENGASINAN 1 687 Pemerintah Kota Pemerintah Kota
70 TAMAN JALAN RAYA PENGASINAN 1 58 Pemerintah Kota Pemerintah Kota
71 JEMBATAN JALAN RAYA PENGASINAN 1 7 113 Pemerintah Kota Pemerintah Kota
72 JEMB ATAN JLN.MULYADI JOYOMARTONO 1 180 Pemerintah Kota Pemerintah Kota
73 KALI PENGASINAN 1 1 467 Pemerintah Kota Pemerintah Kota
V BELUM JELAS ALAS HAKNYA 11 10 1 922 - - -
74 SALURAN 1 3 92 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
75 JALAN PEMUKIMAN RT 01 RW 02 1 5 59 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
76 JL. ANUGRAH I 1 9 30 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
77 JL. ANUGRAH II 1 10 43 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
78 JL. ANUGRAH III 1 11 24 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
79 JL. TASKA 1 12 35 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
80 JL. TABANAS 1 13 39 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
81 JL. WADAS RAYA 1 14 63 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
82 JEMBATAN CEMERLANG 1 2 167 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
83 SUNGAI 1 120 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
84 PENGAIRAN 1 52 52 250 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
IX NON PEMERINTAH 11 3 3 2,801 - - -
85 JALAN GARUDA 1 1 3 - 24 non pemerintah non pemerintah
86 JALAN JEMBATAN GALAKSI RAYA 1 750 non pemerintah non pemerintah
87 JALAN PERUMAHAN ARJUNA 1 1 120 non pemerintah non pemerintah
88 JALAN PERUMAHAN ARJUNA 2 1 120 non pemerintah non pemerintah
89 JALAN PERUMAHAN ARJUNA 3 1 120 non pemerintah non pemerintah
90 JALAN PERUMAHAN ARJUNA 4 1 120 non pemerintah non pemerintah
91 JALAN PERUMAHAN ARJUNA 5 1 120 non pemerintah non pemerintah
92 JALAN PERUMAHAN VJS 1 100 non pemerintah non pemerintah
93 TAMAN VILLA MEUTIA KIRANA 1 43 43 839 Non Pemerintah Non Pemerintah
94 JALAN KOMPLEK PERUMAHAN 1 1 1 473 Non Pemerintah Non Pemerintah
95 POS RT PERUM PONDOK HIJAU 1 15 Non Pemerintah Non Pemerintah
TOTAL 46 20 6 13,650 - - -
3. KABUPATEN BEKASI
III PEMERINTAH KOTA/KABUPATEN 9 9 9 960 - - -
96 Saluran Air 1 15 15 45 Pemerintah Kabupaten - Pemerintah Kabupaten
97 Saluran Air 1 24a 24a 40 Pemerintah Kabupaten - Pemerintah Kabupaten
98 Jalan jatimulya 1 49 49 77 Pemerintah Kabupaten - Pemerintah Kabupaten
99 Saluran Air 1 75 75 30 Pemerintah Kabupaten - Pemerintah Kabupaten
100 Jalan Jatimulya 1 113 113 19 Pemerintah Kabupaten - Pemerintah Kabupaten
101 Jalan Kp Buaran 1 10A 10A 307 pemerintah kabupaten - pemerintah kabupaten
102 Jalan Kp Buaran 1 72A 72A 101 pemerintah kabupaten - pemerintah kabupaten
103 Sungai 1 1 1 278 Pemerintah Kabupaten - Pemerintah Kabupaten
104 Saluran Air 1 59 59 63 Pemerintah Kabupaten - Pemerintah Kabupaten
V BELUM JELAS ALAS HAKNYA 18 18 18 2,751 - - -
105 Jalan Kp Kalijambe 1 2A 2A 35 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
106 Gang 1 4A 4A 37 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
107 Gang 1 28 28 79 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
108 Jalan Kp Buaran 1 40A 40A 22 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
109 Jalan Kp Buaran 1 46A 46A 38 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
110 Gang 1 49A 49A 10 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
111 Gang 1 51A 51A 11 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
112 Jalan Cibuntu 1 9 9 81 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
113 Saluran Air 1 15 15 134 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
114 Jalan Cibuntu 1 22 22 226 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
115 Jalan gandasari 1 7 7 335 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
116 Sungai 1 1 1 325 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
117 Sungai 1 14 14 302 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
118 Sungai 1 1 1 146 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
119 Sungai 1 14 14 465 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
120 Jalan pasir sari 1 43 43 128 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
121 Sungai 1 71 71 373 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
122 Jalan Pasirtanjung 1 9 9 4 Belum Jelas Alas Haknya Belum Jelas Alas Haknya
TOTAL 27 27 27 3,711 - - -
4. KABUPATEN KARAWANG
III PEMERINTAH KOTA/KABUPATEN 1 1 1 405 - - -
123 Jalan tegalega 1 26 26 405 pemerintah kabupaten - pemerintah kabupaten
V BELUM JELAS ALAS HAKNYA 24 24 24 6,588 - 371 -
124 Saluran Air 1 8 8 130 Belum Jelas Alas Haknya - belum jelas alas haknya
125 Saluran Air 1 17 17 171 Belum Jelas Alas Haknya - belum jelas alas haknya
126 Saluran Irigrasi 1 28 28 92 Belum Jelas Alas Haknya - belum jelas alas haknya
127 Saluran Air 1 62 62 53 Belum Jelas Alas Haknya - belum jelas alas haknya
128 Saluran Irigrasi 1 64 64 54 Belum Jelas Alas Haknya - belum jelas alas haknya
129 Saluran Irigasi 1 69 69 192 Belum Jelas Alas Haknya - belum jelas alas haknya
130 Selokan 1 79A 79A 124 Belum Jelas Alas Haknya - belum jelas alas haknya
131 Selokan 1 47 47 278 Belum Jelas Alas Haknya - belum jelas alas haknya
132 Jalan mulyasejati 1 8B 8B 129 belum jelas alas haknya - belum jelas alas haknya
133 Sungai 1 11 11 65 belum jelas alas haknya - belum jelas alas haknya
134 Sungai 1 12A 12A 107 belum jelas alas haknya - belum jelas alas haknya
135 Jalan mulyasejati 1 21 21 133 belum jelas alas haknya - belum jelas alas haknya
136 Jalan mulyasejati 1 24 24 49 belum jelas alas haknya - belum jelas alas haknya
137 Jalan mulyasejati 1 34 34 89 belum jelas alas haknya - belum jelas alas haknya
138 Jalan mulyasejati 1 36 36 70 belum jelas alas haknya - belum jelas alas haknya
139 Jalan mulyasejati 1 37 37 385 belum jelas alas haknya - belum jelas alas haknya
140 Jalan mulyasejati 1 38A 38A 1,167 belum jelas alas haknya - belum jelas alas haknya
141 Jalan mulyasejati 1 44 44 2,483 belum jelas alas haknya - belum jelas alas haknya
142 Sungai 1 61A 61A 89 belum jelas alas haknya - belum jelas alas haknya
143 Sungai 1 24A 24A 154 belum jelas alas haknya 154 belum jelas alas haknya
144 Sungai 1 10 10 75 belum jelas alas haknya 75 belum jelas alas haknya
145 Jalan tegalega 1 54 54 142 belum jelas alas haknya 142 belum jelas alas haknya
146 Jalan tegalega 1 52 52 84 belum jelas alas haknya - belum jelas alas haknya
147 Jalan tegalega 1 16 16 273 belum jelas alas haknya - belum jelas alas haknya
IX NON PEMERINTAH 4 4 4 3,207 - 1,954 -
148 Masjid 1 74 74 225 non pemerintah 225 belum jelas alas haknya
149 Kawasan Jalan 1 22 22 970 Non Pemerintah - Non Pemerintah
150 Jalan Konsorsium Trans Heksa 1 69 69 1,729 Non Pemerintah 1,729 Non Pemerintah
151 Sungai 1 75 75 283 Non Pemerintah - Non Pemerintah
TOTAL 29 29 29 10,200 - 2,325 -
5. KABUPATEN PURWAKARTA
II PEMERINTAH PROVINSI 1 1 1 363 - 363 -
152 Jalan Raya Pramuka 1 12 12 363 Pemerintah Provinsi 363 Pemerintah Provinsi
III PEMERINTAH KOTA/KABUPATEN 4 4 4 723 - 723 -
153 Jalan Kp Hanura 1 34 34 143 Pemerintah Kabupaten 143 Pemerintah Kabupaten
154 Jalan Kp Cilayung 1 5 5 171 Pemerintah Kabupaten 171 Pemerintah Kabupaten
155 Jalan Raya Plered 1 1 1 278 Pemerintah Kabupaten 278 Pemerintah Kabupaten
156 Selokan 1 2 2 131 Pemerintah Kabupaten 131 Pemerintah Kabupaten
TOTAL 5 5 5 1,086 - 1,086 -
6. KABUPATEN BANDUNG BARAT
II PEMERINTAH PROVINSI 1 1 1 241 - - -
157 Tanah PU 1 59 59 241 Pemerintah Provinsi - Pemerintah Provinsi
IX NON PEMERINTAH 8 8 8 2,035 - - -
158 Jalan komp taman bunga cilame 1 20 20 1,236 Non Pemerintah - Non Pemerintah
159 Gang 1 177 177 31 Non Pemerintah - Non Pemerintah
160 Jalan 1 166 166 305 Non Pemerintah - Non Pemerintah
161 Jalan komp lembah teratai 1 71 71 64 Non Pemerintah - Non pemerintah
162 Jalan komp lembah teratai 1 78 78 51 Non Pemerintah - Non pemerintah
163 Jalan komp lembah teratai 1 88 88 140 Non Pemerintah - Non pemerintah
164 Jalan komp lembah teratai 1 96 96 143 Non Pemerintah - Non pemerintah
165 Selokan 1 64 64 65 Non Pemerintah - Non pemerintah
TOTAL 9 9 9 2,276 - - -
7. KOTA CIMAHI
III PEMERINTAH KOTA/KABUPATEN 11 11 11 1,180 - 1,180 -
166 Selokan 1 A7 A7 76 Pemerintah Kota 76 Pemerintah Kota
167 Selokan 1 A8 A8 32 Pemerintah Kota 32 Pemerintah Kota
168 Jalan Ibu Ganirah 1 A3 A3 165 Pemerintah Kota 165 Pemerintah Kota
169 Selokan 1 A1 A1 196 Pemerintah Kota 196 Pemerintah Kota
170 Gang 1 A2 A2 91 Pemerintah Kota 91 Pemerintah Kota
171 Gang 1 A3 A3 21 Pemerintah Kota 21 Pemerintah Kota
172 Selokan 1 A4 A4 38 Pemerintah Kota 38 Pemerintah Kota
173 Tanah PU/Jasamarga 1 A2 A2 143 Pemerintah Kota 143 Pemerintah Kota
174 Jalan Raya mahar martanegara 1 A4 A4 232 Pemerintah Kota 232 Pemerintah Kota
175 Jalan pahlawan dede 1 A3 A3 94 Pemerintah Kota 94 Pemerintah Kota
176 Jalan 1 A1 A1 92 Pemerintah Kota 92 Pemerintah Kota
V BELUM JELAS ALAS HAKNYA 12 12 12 1,200 - 1,200 -
177 Gang 1 A2 A2 48 Belum Jelas Alas Haknya 48 Pemerintah Kota
178 Gang 1 A5 A5 47 Belum Jelas Alas Haknya 47 Pemerintah Kota
179 Gang 1 A6 A6 8 Belum Jelas Alas Haknya 8 Pemerintah Kota
180 Gang 1 A2 A2 7 Belum Jelas Alas Haknya 7 Pemerintah Kota
181 Gang 1 A4 A4 6 Belum Jelas Alas Haknya 6 Pemerintah Kota
182 Gang 1 A6 A6 282 Belum Jelas Alas Haknya 282 Pemerintah Kota
183 Gang 1 A8 A8 70 Belum Jelas Alas Haknya 70 Pemerintah Kota
184 Jalan kp lembur sawah 1 A1 A1 199 Belum Jelas Alas Haknya 199 Pemerintah Kota
185 Jalan kp lembur sawah 1 A2 A2 416 Belum Jelas Alas Haknya 416 Pemerintah Kota
186 Gang 1 A5 A5 41 Belum Jelas Alas Haknya 41 Pemerintah Kota
187 Selokan 1 A1 A1 60 Belum Jelas Alas Haknya 60 Pemerintah Kota
188 Selokan 1 A1 A1 16 Belum Jelas Alas Haknya 16 Pemerintah Kota
IX NON PEMERINTAH 2 2 2 13 - 13 -
189 Selokan 1 A1 A1 3 Non Pemerintah 3 Pemerintah Kota
190 Selokan 1 A2 A2 10 Non Pemerintah 10 Pemerintah Kota
TOTAL 25 25 25 2,393 - 2,393 -
8. KOTA BANDUNG
II PEMERINTAH PROVINSI 3 3 3 764 - - -
191 jalan raya buah batu 1 17 17 318 Pemerintah Provinsi - Pemerintah Provinsi
192 jalan raya moh toha 1 112 112 203 Pemerintah Provinsi - Pemerintah Provinsi
193 Jalan Raya Kopo 1 59 59 243 Pemerintah Provinsi - Pemerintah Provinsi
III PEMERINTAH KOTA/KABUPATEN 80 80 80 17,967 - - -
194 selokan 1 28 28 81 Pemerintah Kota - Pemerintah Kota
195 Jalan cijawura 1 6 6 318 Pemerintah Kota - Pemerintah Kota
196 Selokan 1 14 14 263 Pemerintah Kota - Pemerintah Kota
197 selokan 1 15 15 1,278 Pemerintah Kota - Pemerintah Kota
198 Selokan 1 9 9 23 Pemerintah Kota - Pemerintah Kota

199 Selokan 1 21 21 190 Pemerintah Kota - Pemerintah Kota

200 Tanah pu 1 22 22 238 Pemerintah Kota - Pemerintah Kota


201 Selokan 1 24 24 24 Pemerintah Kota - Pemerintah Kota

202 Selokan 1 73 73 921 Pemerintah Kota - Pemerintah Kota

203 selokan 1 65 65 164 Pemerintah Kota - Pemerintah Kota

204 Tanah kosong (Ada sutet) 1 35 35 941 Pemerintah Kota -

205 Jalan terusan logam 1 39 39 96 pemerintah kota - pemerintah kota

206 Selokan 1 47 47 164 pemerintah kota - Pemerintah Kota

207 saluran air 1 51 51 3 Pemerintah Kota - Pemerintah Kota

208 Selokan 1 53 53 15 Pemerintah Kota - Pemerintah Kota

209 saluran air 1 62 62 4 Pemerintah Kota - Pemerintah Kota

210 jalan 1 57 57 62 Pemerintah Kota - Pemerintah Kota


211 Jalan 1 6 6 359 Pemerintah Kota - Pemerintah Kota
212 selokan 1 51 51 73 Pemerintah Kota - Pemerintah Kota
213 Jalan 1 60 60 70 Pemerintah Kota - Pemerintah Kota
214 Jalan 1 73 73 9 Pemerintah Kota - Pemerintah Kota
215 selokan 1 107 107 131 Pemerintah Kota - Pemerintah Kota
216 Selokan 1 118 118 59 Pemerintah Kota - Pemerintah Kota
217 Gang 1 120 120 1 Pemerintah Kota - Pemerintah Kota
218 selokan 1 126 126 5 Pemerintah Kota - Pemerintah Kota
219 selokan 1 130 130 9 Pemerintah Kota - Pemerintah Kota
220 Selokan 1 168 168 19 Pemerintah Kota - Pemerintah Kota
221 selokan 1 180 180 11 Pemerintah Kota - Pemerintah Kota
222 selokan 1 8 8 64 Pemerintah Kota - Pemerintah Kota
223 Tanah Pu 1 24 24 13 Pemerintah Kota - Pemerintah Kota
224 Tanah Pu 1 25 25 95 Pemerintah Kota - Pemerintah Kota
225 Tanah Pu 1 26 26 82 Pemerintah Kota - Pemerintah Kota
226 Tanah Pu 1 27 27 46 Pemerintah Kota - Pemerintah Kota
227 Tanah Pu 1 28 28 114 Pemerintah Kota - Pemerintah Kota
228 Tanah Pu 1 29 29 5 Pemerintah Kota - Pemerintah Kota
229 Tanah Kosong 1 1 1 388 Pemerintah Kota -
230 selokan 1 35 35 3 Pemerintah Kota - Pemerintah Kota
231 Selokan 1 44 44 175 Pemerintah Kota - Pemerintah Kota
232 Selokan 1 59 59 36 Pemerintah Kota - Pemerintah Kota
233 selokan 1 17 17 12 Pemerintah Kota - Pemerintah Kota
234 Jalan Ciparay Tengah 1 77 77 262 Pemerintah Kota - Pemerintah Kota
235 Jalan cibaduyut 1 88 88 397 Pemerintah Kota - Pemerintah Kota
236 Jalan Raya Cibaduyut 1 90 90 269 pemerintah kota - Pemerintah Kota
237 Selokan 1 6 6 61 Pemerintah Kota - Pemerintah Kota
238 Selokan 1 18 18 172 Pemerintah Kota - Pemerintah Kota
239 Selokan 1 27 27 202 Pemerintah Kota - Pemerintah Kota
240 Gang 1 30 30 16 Pemerintah Kota - Pemerintah Kota
241 Jalan margasuka 1 33 33 118 Pemerintah Kota - Pemerintah Kota
242 Selokan 1 35 35 35 Pemerintah Kota - Pemerintah Kota
243 Selokan 1 35 35 47 Pemerintah Kota - Pemerintah Kota
244 Selokan 1 43 43 98 Pemerintah Kota - Pemerintah Kota
245 Selokan 1 47 47 53 Pemerintah Kota - Pemerintah Kota
246 Jalan margasuka 1 48 48 118 Pemerintah Kota - Pemerintah Kota
247 Selokan 1 53 53 57 Pemerintah Kota - Pemerintah Kota
248 Selokan 1 58 58 46 Pemerintah Kota - Pemerintah Kota
249 Selokan 1 75 75 148 Pemerintah Kota - Pemerintah Kota
250 Jalan cigondewah rahayu 1 27 27 31 Pemerintah Kota - Pemerintah Kota
251 selokan 1 37 37 30 Pemerintah Kota - Pemerintah Kota
252 Jalan cigondewah rahayu 1 69 69 211 Pemerintah Kota - Pemerintah Kota
253 saluran air 1 79 79 347 Pemerintah Kota - Pemerintah Kota
254 Jalan Raya Cibolerang 1 90 90 164 pemerintah kota - pemerintah kota
255 saluran air 1 145 145 172 Pemerintah Kota - Pemerintah Kota
256 Selokan 1 7 7 55 Pemerintah Kota - Pemerintah Kota
257 Selokan 1 9 9 43 Pemerintah Kota Pemerintah Kota
258 Tanah Kosong 1 4 4 311 Pemerintah Kota -
259 Tanah Kosong 1 5 5 300 Pemerintah Kota -
260 Tanah Kosong 1 6 6 861 Pemerintah Kota -
261 Tanah Kosong 1 7 7 674 Pemerintah Kota -
262 Selokan 1 8 8 99 Pemerintah Kota - Pemerintah Kota
263 Tanah Kosong 1 9 9 187 Pemerintah Kota -
264 Tanah Kosong 1 10 10 1,427 Pemerintah Kota -
265 Tanah Kosong 1 11 11 1,117 Pemerintah Kota -
266 Selokan 1 12 12 67 Pemerintah Kota - Pemerintah Kota
267 Tanah Kosong 1 14 14 345 Pemerintah Kota -
268 Selokan 1 15 15 701 Pemerintah Kota - Pemerintah Kota
269 Jalan Batu Rengat 1 18 18 125 pemerintah kota - Pemerintah Kota
270 Tanah PU 1 29 29 1,090 Pemerintah Kota - Pemerintah Kota
271 Jalan Raya Reungas 1 30 30 114 Pemerintah Kota - Pemerintah Kota
272 jalan gempolsari 1 35 35 165 Pemerintah Kota - Pemerintah Kota
273 Jalan gempolsari 1 87 87 668 Pemerintah Kota - Pemerintah Kota
V BELUM JELAS ALAS HAKNYA 49 49 49 2,990 - - -
274 Gang 1 15 15 83 Belum Jelas alas haknya - Belum Jelas Alas Haknya

275 Gang 1 20 20 19 Belum Jelas alas haknya - Belum Jelas Alas Haknya

276 Jalan/Gang 1 31 31 446 Belum Jelas alas haknya - Belum Jelas Alas Haknya
277 Gang 1 8 8 35 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
278 Gang 1 14 14 46 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
279 Gang 1 29 29 45 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
280 selokan 1 36 36 23 Belum Jelas Alas Haknya - Pemerintah Kota
281 gang 1 42 42 53 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
282 gang 1 71 71 45 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
283 Gang 1 75 75 63 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
284 Gang 1 87 87 28 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
285 Gang 1 92 92 5 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
286 Gang 1 98 98 18 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
287 Gang 1 104 104 51 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
288 Gang 1 105 105 23 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
289 Gang 1 133 133 12 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
290 Gang 1 141 141 20 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
291 Gang 1 153 153 62 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
292 Gang 1 162 162 2 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
293 Gang 1 170 170 27 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
294 Gang 1 174 174 5 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
295 Gang 1 178 178 10 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
296 Gang 1 186 186 20 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
297 gang 1 190 190 11 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
298 Gang 1 20 20 16 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
299 Gang 1 23 23 51 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
300 Gang 1 40 40 56 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
301 Gang 1 42 42 9 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
302 Gang 1 65 65 102 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
303 Gang 1 70 70 130 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
304 Gang 1 19 19 10 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
305 Gang 1 23 23 24 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
306 Gang 1 35 35 47 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
307 Gang 1 45 45 1 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
308 Gang 1 47 47 4 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
309 Gang 1 49 49 4 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
310 Gang 1 59 59 5 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
311 Gang 1 69 69 140 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
312 Gang 1 17 17 120 Belum jelas alas haknya - Belum Jelas Alas Haknya
313 Gang 1 25 25 22 Belum jelas alas haknya - Belum Jelas Alas Haknya
314 Gang 1 60 60 22 Belum jelas alas haknya - Belum Jelas Alas Haknya
315 Gang 1 63 63 41 Belum jelas alas haknya - Belum Jelas Alas Haknya
316 Gang 1 72 72 33 Belum jelas alas haknya - Belum Jelas Alas Haknya
317 Gang 1 77 77 93 Belum jelas alas haknya - Belum Jelas Alas Haknya
318 Gang 1 48 48 300 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
319 gang 1 96 96 130 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
320 Gang 1 108 108 241 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
321 gang 1 119 119 106 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
322 gang 1 132 132 131 Belum Jelas Alas Haknya - Belum Jelas Alas Haknya
IX NON PEMERINTAH 13 13 13 2,445 - - -
323 Lapangan Warga 1 3 3 43 Non Pemerintah - Non Pemerintah
324 Saluran Air 1 6 6 152 Non Pemerintah - Non Pemerintah
325 Saluran Air (PSU Perum Banyu Biru) 1 21 21 36 Non Pemerintah - Non Pemerintah
326 PSU Perum Banyu Biru 1 20 20 210 Non Pemerintah - Non Pemerintah
327 Ruang Terbuka Hijau 1 49 49 2 Non Pemerintah - Non Pemerintah

328 Taman/ RTH 1 55 55 7 Non Pemerintah - Non Pemerintah


329 selokan 1 3 3 230 Non Pemerintah - Non Pemerintah
330 selokan 1 24 24 784 Non Pemerintah - Non Pemerintah
331 Gang 1 48 48 90 Non pemerintah - Non pemerintah
332 Gang 1 58 58 26 Non pemerintah - Non pemerintah
333 Jalan gempolsari 1 98 98 829 Non Pemerintah - Non pemerintah
334 selokan 1 115 115 3 Non pemerintah - Non pemerintah
335 selokan 1 134 134 33 Non pemerintah - Non pemerintah
TOTAL 145 145 145 24,166 - - -
9. KABUPATEN BANDUNG
- - - - - - -
JUMLAH 335 309 295 59,212 - 5,804 -
Surat Keluar
Nilai Valuasi
NPW (Nilai Penggantian
Wajar) Sudah
Nomor Surat
TANAH INFRASTRUKTUR bersurat

14 15 16 17 18

1,440,830,524 - 1,440,830,524 49 49
- - - 1 DU.PP.01.01.206.2019
125,029,968 - 125,029,968 1 DU.PP.01.01.206.2019
67,691,733 - 67,691,733 1 DU.PP.01.01.206.2019
135,383,465 - 135,383,465 1 DU.PP.01.01.206.2019
27,076,693 - 27,076,693 1 DU.PP.01.01.206.2019
112,815,906 - 112,815,906 1 DU.PP.01.01.206.2019
122,217,232 - 122,217,232 1 DU.PP.01.01.206.2019
47,006,628 - 47,006,628 1 DU.PP.01.01.206.2019
75,210,604 - 75,210,604 1 DU.PP.01.01.206.2019
75,210,604 - 75,210,604 1 DU.PP.01.01.206.2019
225,631,812 - 225,631,812 1 DU.PP.01.01.206.2019
47,006,628 - 47,006,628 1 DU.PP.01.01.206.2019
141,019,883 - 141,019,883 1 DU.PP.01.01.206.2019
28,203,977 - 28,203,977 1 DU.PP.01.01.206.2019
112,815,906 - 112,815,906 1 DU.PP.01.01.206.2019
94,013,255 - 94,013,255 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
3,543,842 - 3,543,842 1 DU.PP.01.01.206.2019
952,388 - 952,388 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
- - - 1 DU.PP.01.01.206.2019
1,440,830,524 - 1,440,830,524 49 49

- - - - -

- - -
- - - - -
- - -
- - - 13 13
- - -
- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019
- - -
- - - 1 DU.PP.01.01.199.2019

- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019

- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019
- - - 1 DU.PP.01.01.199.2019

- - - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - 13 13

3,106,606,000 - 3,106,606,000 9 9
208,440,000 - 208,440,000 1 DU.PP.01.01.200.2019
184,937,000 - 184,937,000 1 DU.PP.01.01.200.2019
329,841,000 - 329,841,000 1 DU.PP.01.01.200.2019
116,313,000 - 116,313,000 1 DU.PP.01.01.200.2019
79,065,000 - 79,065,000 1 DU.PP.01.01.200.2019
958,990,000 - 958,990,000 1 DU.PP.01.01.200.2019
347,048,000 - 347,048,000 1 DU.PP.01.01.200.2019
719,027,000 - 719,027,000 1 DU.PP.01.01.200.2019
162,945,000 - 162,945,000 1 DU.PP.01.01.200.2019
9,706,745,000 - 9,706,745,000 18 18
109,332,000 - 109,332,000 1 DU.PP.01.01.200.2019
115,579,000 - 115,579,000 1 DU.PP.01.01.200.2019
271,454,000 - 271,454,000 1 DU.PP.01.01.200.2019
75,595,000 - 75,595,000 1 DU.PP.01.01.200.2019
130,573,000 - 130,573,000 1 DU.PP.01.01.200.2019
34,362,000 - 34,362,000 1 DU.PP.01.01.200.2019
37,798,000 - 37,798,000 1 DU.PP.01.01.200.2019
230,603,000 - 230,603,000 1 DU.PP.01.01.200.2019
340,994,000 - 340,994,000 1 DU.PP.01.01.200.2019
648,935,000 - 648,935,000 1 DU.PP.01.01.200.2019
963,405,000 - 963,405,000 1 DU.PP.01.01.200.2019
1,247,796,000 - 1,247,796,000 1 DU.PP.01.01.200.2019
1,159,272,000 - 1,159,272,000 1 DU.PP.01.01.200.2019
548,682,000 - 548,682,000 1 DU.PP.01.01.200.2019
1,747,512,000 - 1,747,512,000 1 DU.PP.01.01.200.2019
460,111,000 - 460,111,000 1 DU.PP.01.01.200.2019
1,556,655,000 - 1,556,655,000 1 DU.PP.01.01.200.2019
28,087,000 - 28,087,000 1 DU.PP.01.01.200.2019
12,813,351,000 - 12,813,351,000 27 27

- - - 1 1
1 DU.PP.01.01.201.2019
- - - 24 24
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
1 DU.PP.01.01.201.2019
- - - - -

- - - 25 25

- - - 1 1
1 DU.PP.01.01.198.2019
- - - 4 4
1 DU.PP.01.01.202.2019
1 DU.PP.01.01.202.2019
1 DU.PP.01.01.202.2019
1 DU.PP.01.01.202.2019
- - - 5 5

- - - 1 1
1 DU.PP.01.01.203.2019
- - - - -
- - - 1 1

6,193,823,000 - 6,193,823,000 11 11
207,138,000 - 207,138,000 1 DU.PP01.01.204.2019
87,215,000 - 87,215,000 1 DU.PP01.01.204.2019
810,931,000 - 810,931,000 1 DU.PP01.01.204.2019
432,316,000 - 432,316,000 1 DU.PP01.01.204.2019
251,885,000 - 251,885,000 1 DU.PP01.01.204.2019
58,128,000 - 58,128,000 1 DU.PP01.01.204.2019
83,817,000 - 83,817,000 1 DU.PP01.01.204.2019
1,244,231,000 - 1,244,231,000 1 DU.PP01.01.204.2019
2,123,311,000 - 2,123,311,000 1 DU.PP01.01.204.2019
338,415,000 - 338,415,000 1 DU.PP01.01.204.2019
556,436,000 - 556,436,000 1 DU.PP01.01.204.2019
4,952,795,000 - 4,952,795,000 12 12
130,824,000 - 130,824,000 1 DU.PP01.01.204.2019
128,099,000 - 128,099,000 1 DU.PP01.01.204.2019
21,803,000 - 21,803,000 1 DU.PP01.01.204.2019
19,078,000 - 19,078,000 1 DU.PP01.01.204.2019
22,610,000 - 22,610,000 1 DU.PP01.01.204.2019
1,373,399,000 - 1,373,399,000 1 DU.PP01.01.204.2019
340,915,000 - 340,915,000 1 DU.PP01.01.204.2019
787,969,000 - 787,969,000 1 DU.PP01.01.204.2019
1,874,488,000 - 1,874,488,000 1 DU.PP01.01.204.2019
157,255,000 - 157,255,000 1 DU.PP01.01.204.2019
72,366,000 - 72,366,000 1 DU.PP01.01.204.2019
23,989,000 - 23,989,000 1 DU.PP01.01.204.2019
97,203,000 - 97,203,000 - -
22,432,000 22,432,000
74,771,000 74,771,000
11,243,821,000 - 11,243,821,000 23 23

8,345,226,000 - 8,345,226,000 3 3

2,759,516,000 - 2,759,516,000 1 DU.PP.01.01.198.2019


2,084,789,000 - 2,084,789,000 1 DU.PP.01.01.198.2019
3,500,921,000 - 3,500,921,000 1 DU.PP.01.01.198.2019
93,916,041,000 - 93,916,041,000 77 77
237,145,000 - 237,145,000 1 DU.PP.01.01.205.2019
921,167,000 - 921,167,000 1 DU.PP.01.01.205.2019
574,644,000 - 574,644,000 1 DU.PP.01.01.205.2019
2,702,601,000 - 2,702,601,000 1 DU.PP.01.01.205.2019
118,240,000 - 118,240,000 1 DU.PP.01.01.205.2019
976,758,000 - 976,758,000 1 DU.PP.01.01.205.2019
2,817,276,000 - 2,817,276,000 1 DU.PP.01.01.205.2019
122,153,000 - 122,153,000 1 DU.PP.01.01.205.2019
9,516,684,000 - 9,516,684,000 1 DU.PP.01.01.205.2019

998,319,000 - 998,319,000 1 DU.PP.01.01.205.2019

6,042,456,000 - 6,042,456,000 1 DU.PP.01.01.205.2019

694,780,000 - 694,780,000 1 DU.PP.01.01.198.2019

1,019,378,000 - 1,019,378,000 1 DU.PP.01.01.205.2019

20,275,000 - 20,275,000 1 DU.PP.01.01.205.2019

426,487,000 - 426,487,000 1 DU.PP.01.01.205.2019

26,215,000 - 26,215,000 1 DU.PP.01.01.205.2019

426,487,000 - 426,487,000 1 DU.PP.01.01.205.2019


1,793,881,000 - 1,793,881,000 1 DU.PP.01.01.205.2019
354,471,000 - 354,471,000 1 DU.PP.01.01.205.2019
373,894,000 - 373,894,000 1 DU.PP.01.01.205.2019
43,702,000 - 43,702,000 1 DU.PP.01.01.205.2019
635,043,000 - 635,043,000 1 DU.PP.01.01.205.2019
286,012,000 - 286,012,000 1 DU.PP.01.01.205.2019
4,899,000 - 4,899,000 1 DU.PP.01.01.205.2019
24,341,000 - 24,341,000 1 DU.PP.01.01.205.2019
43,814,000 - 43,814,000 1 DU.PP.01.01.205.2019
89,443,000 - 89,443,000 1 DU.PP.01.01.205.2019
53,414,000 - 53,414,000 1 DU.PP.01.01.205.2019
298,006,000 - 298,006,000 1 DU.PP.01.01.205.2019
377,070,000 - 377,070,000 1 DU.PP.01.01.205.2019
454,016,000 - 454,016,000 1 DU.PP.01.01.205.2019
403,381,000 - 403,381,000 1 DU.PP.01.01.205.2019
529,583,000 - 529,583,000 1 DU.PP.01.01.205.2019
549,597,000 - 549,597,000 1 DU.PP.01.01.205.2019
179,808,000 - 179,808,000 1 DU.PP.01.01.205.2019
4,891,224,000 - 4,891,224,000
24,015,000 - 24,015,000 1 DU.PP.01.01.205.2019
1,474,545,000 - 1,474,545,000 1 DU.PP.01.01.205.2019
384,225,000 - 384,225,000 1 DU.PP.01.01.205.2019
69,562,000 - 69,562,000 1 DU.PP.01.01.205.2019
1,822,504,000 - 1,822,504,000 1 DU.PP.01.01.205.2019
4,904,587,000 - 4,904,587,000 1 DU.PP.01.01.205.2019
3,323,259,000 - 3,323,259,000 1 DU.PP.01.01.198.2019
480,652,000 - 480,652,000 1 DU.PP.01.01.205.2019
1,073,310,000 - 1,073,310,000 1 DU.PP.01.01.205.2019
744,323,000 - 744,323,000 1 DU.PP.01.01.205.2019
- - - 1 DU.PP.01.01.205.2019
655,494,000 - 655,494,000 1 DU.PP.01.01.205.2019
539,098,000 - 539,098,000 1 DU.PP.01.01.205.2019
283,090,000 - 283,090,000 1 DU.PP.01.01.205.2019
516,116,000 - 516,116,000 1 DU.PP.01.01.205.2019
272,091,000 - 272,091,000 1 DU.PP.01.01.205.2019
1,153,958,000 - 1,153,958,000 1 DU.PP.01.01.205.2019
625,196,000 - 625,196,000 1 DU.PP.01.01.205.2019
660,224,000 - 660,224,000 1 DU.PP.01.01.205.2019
726,912,000 - 726,912,000 1 DU.PP.01.01.205.2019
194,061,000 - 194,061,000 1 DU.PP.01.01.205.2019
151,211,000 - 151,211,000 1 DU.PP.01.01.205.2019
1,195,380,000 - 1,195,380,000
1,965,861,000 - 1,965,861,000 1 DU.PP.01.01.205.2019
929,111,000 - 929,111,000 1 DU.PP.01.01.198.2019
902,135,000 - 902,135,000 1 DU.PP.01.01.205.2019
265,399,000 - 265,399,000 1 DU.PP.01.01.205.2019
207,494,000 - 207,494,000 1 DU.PP.01.01.205.2019
1,238,915,000 - 1,238,915,000 1 DU.PP.01.01.205.2019
1,098,632,000 - 1,098,632,000 1 DU.PP.01.01.205.2019
3,153,072,000 - 3,153,072,000 1 DU.PP.01.01.205.2019
2,468,258,000 - 2,468,258,000 1 DU.PP.01.01.205.2019
362,549,000 - 362,549,000 1 DU.PP.01.01.205.2019
684,814,000 - 684,814,000 1 DU.PP.01.01.205.2019
5,121,306,000 - 5,121,306,000 1 DU.PP.01.01.205.2019
4,090,570,000 - 4,090,570,000 1 DU.PP.01.01.205.2019
245,361,000 - 245,361,000 1 DU.PP.01.01.205.2019
1,289,210,000 - 1,289,210,000 1 DU.PP.01.01.205.2019
2,619,526,000 - 2,619,526,000 1 DU.PP.01.01.205.2019
537,171,000 - 537,171,000 1 DU.PP.01.01.198.2019
2,493,046,000 - 2,493,046,000
484,681,000 - 484,681,000 1 DU.PP.01.01.198.2019
71,288,000 - 71,288,000 1 DU.PP.01.01.205.2019
3,387,165,000 - 3,387,165,000 1 DU.PP.01.01.205.2019
16,560,481,000 - 16,560,481,000 49 49
430,935,000 - 430,935,000 1 DU.PP.01.01.205.2019
97,737,000 - 97,737,000 1 DU.PP.01.01.205.2019
2,315,625,000 - 2,315,625,000 1 DU.PP.01.01.205.2019
169,952,000 - 169,952,000 1 DU.PP.01.01.205.2019
223,366,000 - 223,366,000 1 DU.PP.01.01.205.2019
218,510,000 - 218,510,000 1 DU.PP.01.01.205.2019
111,683,000 - 111,683,000 1 DU.PP.01.01.205.2019
283,091,000 - 283,091,000 1 DU.PP.01.01.205.2019
216,208,000 - 216,208,000 1 DU.PP.01.01.205.2019
305,914,000 - 305,914,000 1 DU.PP.01.01.205.2019
135,962,000 - 135,962,000 1 DU.PP.01.01.205.2019
26,464,000 - 26,464,000 1 DU.PP.01.01.205.2019
87,404,000 - 87,404,000 1 DU.PP.01.01.205.2019
274,631,000 - 274,631,000 1 DU.PP.01.01.205.2019
111,209,000 - 111,209,000 1 DU.PP.01.01.205.2019
58,786,000 - 58,786,000 1 DU.PP.01.01.205.2019
97,977,000 - 97,977,000 1 DU.PP.01.01.205.2019
303,727,000 - 303,727,000 1 DU.PP.01.01.205.2019
9,456,000 - 9,456,000 1 DU.PP.01.01.205.2019
132,268,000 - 132,268,000 1 DU.PP.01.01.205.2019
23,794,000 - 23,794,000 1 DU.PP.01.01.205.2019
49,960,000 - 49,960,000 1 DU.PP.01.01.205.2019
95,173,000 - 95,173,000 1 DU.PP.01.01.205.2019
52,346,000 - 52,346,000 1 DU.PP.01.01.205.2019
78,545,000 - 78,545,000 1 DU.PP.01.01.205.2019
250,883,000 - 250,883,000 1 DU.PP.01.01.205.2019
448,262,000 - 448,262,000 1 DU.PP.01.01.205.2019
72,043,000 - 72,043,000 1 DU.PP.01.01.205.2019
957,712,000 - 957,712,000 1 DU.PP.01.01.205.2019
1,220,614,000 - 1,220,614,000 1 DU.PP.01.01.205.2019
57,968,000 - 57,968,000 1 DU.PP.01.01.205.2019
139,123,000 - 139,123,000 1 DU.PP.01.01.205.2019
272,448,000 - 272,448,000 1 DU.PP.01.01.205.2019
5,797,000 - 5,797,000 1 DU.PP.01.01.205.2019
23,118,000 - 23,118,000 1 DU.PP.01.01.205.2019
23,118,000 - 23,118,000 1 DU.PP.01.01.205.2019
28,984,000 - 28,984,000 1 DU.PP.01.01.205.2019
811,548,000 - 811,548,000 1 DU.PP.01.01.205.2019
595,035,000 - 595,035,000 1 DU.PP.01.01.205.2019
108,808,000 - 108,808,000 1 DU.PP.01.01.205.2019
119,298,000 - 119,298,000 1 DU.PP.01.01.205.2019
224,992,000 - 224,992,000 1 DU.PP.01.01.205.2019
163,006,000 - 163,006,000 1 DU.PP.01.01.205.2019
489,626,000 - 489,626,000 1 DU.PP.01.01.205.2019
1,512,105,000 - 1,512,105,000 1 DU.PP.01.01.205.2019
655,246,000 - 655,246,000 1 DU.PP.01.01.205.2019
1,275,461,000 - 1,275,461,000 1 DU.PP.01.01.205.2019
534,277,000 - 534,277,000 1 DU.PP.01.01.205.2019
660,286,000 - 660,286,000 1 DU.PP.01.01.205.2019
12,893,216,000 - 12,893,216,000 - -
128,489,000 - 128,489,000
449,528,000 - 449,528,000
193,241,000 - 193,241,000
1,107,017,000 - 1,107,017,000

12,225,000 - 12,225,000

48,077,000 - 48,077,000
1,159,281,000 - 1,159,281,000
4,907,845,000 - 4,907,845,000
369,377,000 - 369,377,000
106,709,000 - 106,709,000
4,203,532,000 - 4,203,532,000
15,212,000 - 15,212,000
192,683,000 - 192,683,000
131,714,964,000 - 131,714,964,000 129 129

- - - - -
157,212,966,524 - 157,212,966,524 272 272
Sudah bersurat dengan status kepemilikan tanah belum jelas alas haknya, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota
Surat Keluar Surat Balasan

Draft Surat Sudah dibalas

19 20

-
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_206_WALIKOTA JAKARTA TIMUR_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-

..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_199_WALIKOTA BEKASI_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

-
-

-
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_200_BUPATI BEKASI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-

-
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_201_BUPATI KARAWANG_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-

-
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_202_BUPATI PURWAKARTA_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_202_BUPATI PURWAKARTA_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_202_BUPATI PURWAKARTA_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_202_BUPATI PURWAKARTA_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-

-
..\..\..\11. SURAT FASOS FASUM\SURAT\2019\Januari\20190103_203_BUPATI BANDUNG BARAT_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-
-

-
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_204_WALIKOTA CIMAHI_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_198_GUBERNUR JAWA BARAT_PERMOHONAN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF

../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
../../../11. SURAT FASOS FASUM/SURAT/2019/Januari/20190103_205_WALIKOTA BANDUNG_PERMOHONAN IZIN PENGGUNAAN LAHAN UNTUK PROYEK KCJB.PDF
-
-

-
-
Surat Balasan

Keterangan
Nomor Surat Draft Surat

21 22 23

- -
- -

- -
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
- -
Bidang baru keluar di peta bidang BPN
- -
Bidang baru keluar di peta bidang BPN

Bidang baru keluar di peta bidang BPN

Bidang baru keluar di peta bidang BPN


Bidang baru keluar di peta bidang BPN

Bidang baru keluar di peta bidang BPN

Bidang baru keluar di peta bidang BPN


Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
- -
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
Bidang baru keluar di peta bidang BPN
- -

- -

- -

- -

- -

- -

- -
- -

- -

- -

- -

- -

- -

- -
- -

- -
Sudah bersurat dengan status kepemilikan tanah belum jelas alas haknya, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota
Sudah bersurat dengan status kepemilikan tanah belum jelas alas haknya, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota

Sudah bersurat dengan status kepemilikan tanah belum jelas alas haknya, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota
Sudah bersurat dengan status kepemilikan tanah belum jelas alas haknya, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota
Sudah bersurat dengan status kepemilikan tanah belum jelas alas haknya, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota
Sudah bersurat dengan status kepemilikan tanah belum jelas alas haknya, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota

- -

- -

- -

- -

- -
Sudah bersurat dengan status kepemilikan tanah pemerintah provinsi, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota

Semula bidang perlu relokasi, berubah menjadi tidak perlu relokasi

Sudah bersurat dengan status kepemilikan tanah pemerintah provinsi, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota
Semula bidang perlu relokasi, berubah menjadi tidak perlu relokasi

Sudah bersurat dengan status kepemilikan tanah pemerintah provinsi, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota

Sudah bersurat dengan status kepemilikan tanah pemerintah provinsi, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota
Semula bidang perlu relokasi, berubah menjadi tidak perlu relokasi
Sudah bersurat dengan status kepemilikan tanah pemerintah provinsi, harus bersurat ulang setelah ada perubahan kepemilikan menjadi pemerintah kota

- -
- -
- -

- -
- -
di pemerintah kota
di pemerintah kota

di pemerintah kota
di pemerintah kota
di pemerintah kota
di pemerintah kota
emerintah kota

emerintah kota
emerintah kota

emerintah kota

emerintah kota
Progres pelaksanaan Fasos Fasum Bidang Tidak Perl
Status pertanggal 20 Juni 2019
TIDAK PERLU RELOKASI

Jumlah Fasos
NO Kota/Kabupaten
Fasum Sudah Bersurat

1 Jakarta Timur 49 49
2 Kota Bekasi 46 13
3 Kabupaten Bekasi 27 27
4 Kabupaten Karawang 29 25
5 Kabupaten Purwakarta 5 5
6 Kabupaten Bandung Barat 9 1
7 Kota Cimahi 25 23
8 Kota Bandung 145 129
9 Kabupaten Bandung - -
TOTAL 335 272
Progres pertahapan 81%
Belum Berproses 19%

PROGRES TIDAK PERLU RELOKASI

100%

90% 19%
90% 19%

80%

70%

60%

50% 100%

40% 81%

30%

20%

10%

0%
0%
Sudah Bersurat Surat Balasan
0%
0%
Sudah Bersurat Surat Balasan
idang Tidak Perlu Relokasi

IDAK PERLU RELOKASI

Surat Balasan

-
-
-
-
-
-
-
-
-
-
0%
100%

I
100%

0%
Surat Balasan
0%
Surat Balasan
Summary Table of Relocation of Public Facilities

TOTAL CREC SINO WIKA


No. Type Form-03 Under Form-03 Under Form-03 Under
Plan Form 1 Negotiation Plan Form 1 Negotiation Plan Form 1 Negotiation Plan Form 1 Negotiation
(Approval) Construction (Approval) Construction (Approval) Construction
1 Relocation of Road & Bridge 39 2 - - 13 2 - - 13 - - - 56 13 -

2 Relocated Channel 6 - - - 2 - - - 2 - - - 39 2 -

3 Relocation of Public Utilities 44 10 6 6 12 4 - - 10 - - - 48 22 6

4 Relocation of Power Line 30 6 6 - 6 - - - 22 6 6 - 2 2 -

5 Relocation of Underground Pipeline 15 - - 1 2 - - - 11 - - - 2 2 -

6 Relocation of Communication Cable 6 - - - 1 - - - 3 - - - 2 2 -

7 Relocation of SUTT 2 1 1 1 1 - - - - - - - - 2 1 1

8 Relocation of Toll Gate 3 4 - - 1 - - - - 1 - - - 3 3 -

9 Relocation of LRT Crossing 1 1 - - 1 - - - - - - - - 1 1 -

10 Relocation of BTS 9 - - - - - - - - - - - - 9 - -

Total 438 146 19 13 10 137 36 6 - - 137 62 6 6 - 164 48 7

TOTAL FORM 01 146


TOTAL FORM 02 19
TOTAL FORM 03 13
UNDER CONSTRUCTION 10

Notes:
- Relocation of Road including Roads and Bridge relocations, etc.
- Relocation of Channel including River relocation and etc.
- Relocation of Public Utilities including Highway Facilities (billboards, signage, lights)
- Relocation of Power Line including All Power Line relocation work
- Relocation of Underground Pipeline including the Relocation of Underground Power Lines, Communication Cables, Oil and Gas Pipelines, etc.
- Relocation of Communication Cable including the Relocation of Underground Power Lines, Communication Cables, Oil and Gas Pipelines, etc.
WIKA
Form-03 Under Remarks
(Approval) Construction
- -

- -

6 6

- -

- 1

- -

1 1

- 1

- 1

- -

7 10
Detail Table of Relocation of Public Facilities & Utilities

Work Name Owner Milleage/Location (DK) Relocation Area Contractor Process (Attached) Clarification/ Negotiation

Work Area Form 01 Negotiation Form 03 (Approval) Notes Offering Negotiation

Relocation of Road & Bridge

Road Relocation (Perum Mekarwangi) Developer DK128+175~DK128+300 Area 4 CREC ✔ ✔ ✔ Rp1,054,146,000.00 Rp635,532,000.00

Road Relocation (Perum Singgasana Pradana) Developer DK127+980~DK128+180 Area 4 CREC ✔ ✔ ✔ Rp3,730,800,000.00 Rp2,024,322,000.00

Road Relocation (Perum Bumi Asri) Developer DK 121+235 - DK 121+310 407.4 m2 Area 4 CREC ✔ ✔ ✔ $ 168,076.00

Road Relocation (Perum Bumi Asri) Developer DK 121+310 - DK 121+410 391 m2 Area 4 CREC ✔ ✔ ✔ $ 209,266.00

Road Relocation (Perum Bumi Asri) Developer DK 121+050 - DK 121+235 968 m2 Area 4 CREC ✔ ✔ ✔ $ 274,019.00

Regency road relocation (Perum Bumi Asri) Developer DK 121+515 - DK 121+550 143.4 m2 Area 4 CREC ✔ ✔ ✔ $ 70,444.00

Road Relocation (Perum Bumi Asri) Developer DK 121+480 - DK 121+515 69 m2 Area 4 CREC ✔ ✔ ✔ $ 28,051.00

Road Relocation (Perum Bumi Asri) Developer DK 120+930 - DK 121+050 1058 m2 Area 4 CREC ✔ ✔ ✔ $ 275,238.00

Road Relocation PT Jasa Marga DK99+450 2000 m2 Area 3 CREC ✔ ✖ ✖


Road Relocation PT Jasa Marga DK108+300 500 m2 Area 3 CREC ✔ ✖ ✖
Road Relocation PT Jasa Marga DK113+390 1000 m2 Area 3 CREC ✔ ✖ ✖
Road Relocation Cibeber Cimahi Selatan DK114+450 1000 m2 Area 4 CREC ✔ ✖ ✖ $ 9,523,156,806.00

Road Relocation PT Jasa Marga DK115+590, DK116+020 2952 m2 Area 4 CREC ✔ ✖ ✖


Relocation of Pedestrian Bridge PT Jasa Marga DK135+428 Area 4 WIKA ✔ ✖ ✖
Road Relocation Komplek. Alam Raya DK135+670 2406 m2 Area 4 WIKA ✔ ✖ ✖
Road Relocation Dinas Bina Marga Kota Bekasi DK4+170 - DK4+450 Area 1 SINO ✔ ✖ ✖
Road Relocation Jasa Marga DK9+140 - DK10+040 Area 1 SINO ✔ ✖ ✖
Road Relocation Dinas Bina Marga Kota Bekasi DK33+441 Area 1 SINO ✔ ✖ ✖
Road Relocation Tegalega DK64+420 - DK64+440 Area 2 SINO ✔ ✖ ✖
Road Relocation Tegalega DK64+980 - DK65+070 Area 2 SINO ✔ ✖ ✖
Road Relocation Tegalega DK66+890 - DK66+910 Area 2 SINO ✔ ✖ ✖
Road Relocation Cikao Bandung DK66+910 - DK67+030 Area 2 SINO ✔ ✖ ✖
Relocated Mud Road Makarkalih Jatiluhur Purwakarta DK75+050 Area 2 SINO ✔ ✖ ✖
Relocated Crushed Stone Road Makarkalih Jatiluhur Purwakarta DK75+060 - DK75+110 Area 2 SINO ✔ ✖ ✖
Relocated Asphalt Concrete Pavement Cibinong Jatiluhur Purwakarta DK75+450 Area 2 SINO ✔ ✖ ✖
Relocated Crushed Stone Road Cibinong Jatiluhur Purwakarta DK76+895 Area 2 SINO ✔ ✖ ✖
Road Relocation Cibinong Jatiluhur Purwakarta DK78+090 - DK78+300 Area 2 SINO ✔ ✖ ✖
Relocated Crushed Stone Road Cibinong Jatiluhur Purwakarta DK78+270 Area 2 SINO ✔ ✖ ✖
Road Relocation Village DK 63+900 3059 m2 Area 2 WIKA ✔ ✖ ✖ Siap Nego harga Rp5,526,670,955.00

Road Relocation Village DK 139+476 555 m2 Area 4 WIKA ✔ ✖ ✖ Siap Nego harga Rp1,924,076,421.00

Road Relocation Village DK 130+555 470 m2 Area 4 WIKA ✔ ✖ ✖ Siap Nego harga Rp1,138,565,414.61
Detail Table of Relocation of Public Facilities & Utilities

Work Name Owner Milleage/Location (DK) Relocation Area Contractor Process (Attached) Clarification/ Negotiation

Work Area Form 01 Negotiation Form 03 (Approval) Notes Offering Negotiation

Road Relocation Village DK 127+250 237 m2 Area 4 WIKA ✔ ✖ ✖ Siap Nego harga Rp1,233,175,528.27

Road Relocation Village DK 126+960 867 m2 Area 4 WIKA ✔ ✖ ✖ Siap Nego harga Rp3,338,988,586.94

Road Relocation Village DK 68+440 1340 m2 Area 2 WIKA ✔ ✖ ✖ Siap Nego harga Rp1,971,599,715.69

Road Relocation Liunggunung Village DK 81+561 404.25 m2 Area 2 WIKA ✔ ✖ ✖ Siap Nego harga Rp1,285,142,450.95

Road Relocation Liunggunung Village DK 81+900 447 m2 Area 2 WIKA ✔ ✖ ✖ Siap Nego harga Rp1,126,067,010.28

Road Relocation Village DK 84+820 524 m2 Area 2 WIKA ✔ ✖ ✖ Siap Nego harga Rp3,820,249,157.74

Road Relocation (3,5 m) Civilian in Jasamarga Road DK 19+500 1041.88 m2 Area 1 WIKA ✔ ✖ ✖ form 1 submit KCIC Rp1,761,048,108.94

Road Relocation Village DK 50+693 1041.88 m2 Area 2 WIKA ✔ ✖ ✖ form 1 submit KCIC Rp4,086,502,355.07

Road Relocation of Cikunir Raya & Galaxy raya Ministry of Public work DK 9+100 - 9+970 9274.16 m2 Area 1 WIKA ✔ ✖ ✖ form 1 submit KCIC Rp8,747,447,654.59

Amount Fasos Fasum

Relocated Channel

Relocated channel PT Jasa Marga DK115+770 - DK115+880 800 m2 Area 4 CREC ✔ ✖ ✖


Relocation of Drainage BBWS DK135+350 Area 4 WIKA ✔ ✖ ✖
Relocation of river BBWS DK 2+080,00 Area 1 WIKA ✔ ✖ ✖
Relocated Flood protection embankment BBWS,PJT DK66+900 Area 2 SINO ✔ ✖ ✖
Relocated Gully Malangnengah Purwakarta DK78+280 Area 2 SINO ✔ ✖ ✖
Relocation of Ditch Brigif DK115+700 - DK115+900 1052 m2 Area 4 CREC ✔ ✖ ✖ Siap Nego harga Rp4,442,979,375.00

Relocation of Public Utilities

Relocation of Mosque (tempat wudhu) Masjid Baitul Hikmah Perum Taman Bekasi Asri DK 14+841 Area 1 WIKA ✔ ✔ ✔ Rp483,059,324.00

Relocation of Mosque, (Cikao Bandung) Alm.Eman Yunus, AHLI WARIS: H.Tatang Abidin DK 67+000 Area 2 WIKA ✔ ✔ ✔ Rp986,700,000.00 Rp716,704,000.00

Relocation of Mosque, (Cikao Bandung) Bp Dayat DK 68+550 Area 2 WIKA ✔ ✔ ✔ Rp573,198,000.00 Rp434,767,000.00

Relocation of Mosque (Sempur) Desa Sempur DK 86+950 Area 3 WIKA ✔ ✔ ✔ Rp759,947,000.00 Rp556,230,000.00

Relocation of Mosque (Sempur) Desa Depok DK 87+400 Area 3 WIKA ✔ ✔ ✔ Rp1,386,347,000.00 Rp1,136,575,000.00

Relocation of School (SMAN 25 Bandung) SMAN 25 BANDUNG (Kemendikbud Pemprov) DK 135+230 Area 4 WIKA ✔ ✔ ✔ Rp4,095,766,000.00 Rp3,181,272,000.00

Relocation of School (Kantin sekolah) SMPN 48 BANDUNG (Kemendikbud Pemprov) DK 135+340 Area 4 WIKA ✔ ✔ ✔ Rp1,007,379,000.00 Rp837,580,000.00

Park Relocation (Perum Singgasana Pradana) Developer DK127+980~DK128+180 Area 4 CREC ✔ ✔ ✔ Rp1,190,653,000.00 Rp493,894,000.00

Park Relocation (Perum Singgasana Pradana) Developer DK128+125~DK128+175 Area 4 CREC ✔ ✔ ✔ Rp489,838,000.00 Rp219,677,000.00

Park Relocation (Perum Mekarwangi) Developer DK128+175~DK128+300 Area 4 CREC ✔ ✔ ✔ Rp1,912,198,000.00 Rp589,761,000.00

Park Relocation (Perum Singgasana Pradana) Developer DK128+305~DK128+486 Area 4 CREC ✔ ✔ ✔ Rp1,134,736,000.00 Rp467,526,000.00

Park Relocation (Perum Bumi Asri) Developer DK 121+290 - DK 121+338 475 m2 Area 4 CREC ✔ ✔ ✔ Siap Nego harga $ 18,717.00

Gazebo Relocation (Perum Bumi Asri)) Developer DK 121+510 - DK 121+525 171 m2 Area 4 CREC ✔ ✔ ✔ Siap Nego harga $ 47,792.00

Sport field relocation (Perum Bumi Asri)) Developer DK 121+640 - DK 121+660 447 m2 Area 4 CREC ✔ ✔ ✔ Siap Nego harga $ 17,096.00

Relocation of Mosque DK 91+450 Area 3 WIKA ✔ ✖ ✖


Relocation of Mosque Mushola Cibaduyut Kidul DK 127+020 38 m2 Area 3 WIKA ✔ ✖ ✖ Siap Nego harga Rp281,753,252.33

Relocated Graves Village Group DK114+500 500 m2 Area 4 CREC ✔ ✖ ✖


Relocatied Trees PT Jasa Marga DK121+700 - DK122+100 4000 m2 Area 4 CREC ✔ ✖ ✖
Relocatied Trees PT Jasa Marga DK124+860 - DK125+120 5200 m2 Area 4 CREC ✔ ✖ ✖
Detail Table of Relocation of Public Facilities & Utilities

Work Name Owner Milleage/Location (DK) Relocation Area Contractor Process (Attached) Clarification/ Negotiation

Work Area Form 01 Negotiation Form 03 (Approval) Notes Offering Negotiation

Relocation of Mosque Mesjid Al huda DK 130+555 114 m2 Area 4 WIKA ✔ ✔ ✔ Rp999,328,305.38

Relocation of Mosque (Wanasari) Village Wanasari DK 41+750 373 m2 Area 2 WIKA ✔ ✖ ✖ Rp986,719,600.00

Relocation of Mosque Cilame (Perumahan Taman Bunga) DK 110+770,00 192 M2 Area 3 WIKA ✔ ✔ ✔ Rp1,237,074,499.49

Relocation of School Madrasah Quba DK 127+062,00 45 m2 Area 4 WIKA ✔ ✔ ✔ Rp335,465,726.87

Relocation of Yayasan Nurul Iman H.Abdul Hamid DK 127+390,00 2747 m2 Area 4 WIKA ✔ ✖ ✖ Rp16,182,655,011.41

Relocation of School (SD Jakasetia) Pemkot Bekasi DK 9+620,00 Area 1 WIKA ✔ ✖ ✖ Revision form 1 Rp5,937,652,985.54

Relocation of public facilities building and Trash Bin Pemkot Bekasi DK16+085/DK16+100 Area 1 WIKA ✔ ✖ ✖ Rp171,842,728.00

Relocation of Mosque Ziyadaturahman Komplek Jatimulya DK 16+178,00 280 m2 Area 1 WIKA ✔ ✖ ✖ Submit revisi form 1 Rp1,482,043,861.41

Relocation of Mosque in Islamic School facility Cibinong Islamic School DK 75+350,00 Area 2 WIKA ✔ ✖ ✖ Revision form 1

Relocation of Islamic School facility Cibinong Islamic School DK 75+350,00 Area 2 WIKA ✔ ✖ ✖ Revision form 1

Relocation of SDN 1 Malangnengah Dinas Pendidikan Kabupaten Purwakarta DK 78+820,00 Area 2 WIKA ✔ ✖ ✖ Revision form 1

Relocation of Mosque Desa Nagrak DK 83+515,00 75 m2 Area 2 WIKA ✔ ✔ ✔ Rp568,524,897.85

Masjid Al Abror (outlet) Yayasan Hajran Jamilan DK4+150 Area 1 SINO ✔ ✖ ✖


Relocation Office PT Jasa Marga DK9+000 Area 1 SINO ✔ ✖ ✖
Relocation Tennis Court - DK11+720 Area 1 SINO ✔ ✖ ✖
Relocation of CCTV Jasa Marga DK 15+820 - DK 15+851 620 m2 Area 1 SINO ✔ ✖ ✖ Siap Nego harga Rp30,340,145.00

Relocation of Concrete fence and Guardrail PT Jasa Marga DK20+019 - 20+293 54800 m2 Area 1 SINO ✔ ✖ ✖ Siap Nego harga Rp51,140,980.00

Cable-stayed Bridge Coordination PT Jasa Marga DK20+150 Area 1 SINO ✔ ✖ ✖


Relocated mosque Cikao Bandung DK66+970 Area 2 SINO ✔ ✖ ✖
Relocated Villager's House Cibinong Jatiluhur Purwakarta DK75+420 Area 2 SINO ✔ ✖ ✖
Relocated Villager's House Malangnengah Purwakarta DK78+150 Area 2 SINO ✔ ✖ ✖
Relocated Football Field Malangnengah Purwakarta DK78+250 Area 2 SINO ✔ ✖ ✖
Relocation of Park (Taman Holis Indah I) Developer DK 122+650 - 122+850 3718.19 m2 Area 4 CREC ✔ ✔ ✔ Siap Nego harga Rp2,421,840,000.00

Relocation of Park (Taman Holis Indah II) Developer DK 122+850 - 123+100 3718.19 m2 Area 4 CREC ✔ ✔ ✔ Siap Nego harga Rp2,421,840,000.00

Relocation Citizen Post RT 10 Civilian DK 16+360 108.7 m2 Area 1 WIKA ✔ ✖ ✖ form 1 submit KCIC Rp255,849,000.00

Relocation of Mosque (Perum Bumi Asri) Developer DK 121+255 - 121+290 273.6 m2 Area 4 CREC ✔ ✔ ✔ Rp2,299,273,120.79

Relocation of Power Line

Relocation of 20kV Power Line PT PLN DK31+924~DK33+676 35040 m2 Area 1 SINO ✔ ✔ ✔ Rp5,600,950,000.00

Power relocation PT PLN Purwakarta DK64+286.2 Area 2 SINO ✔ ✖ ✖ Rp61,613,764.94

Power relocation PT PLN Purwakarta DK64+880 Area 2 SINO ✔ ✖ ✖ Rp53,090,831.38

Power relocation PT PLN Purwakarta DK73+980 Area 2 SINO ✔ ✖ ✖ Rp187,366,364.25

Power relocation PT PLN Purwakarta DK75+104 Area 2 SINO ✔ ✖ ✖ Rp342,152,333.79

Power relocation PT PLN Purwakarta DK78+850 Area 2 SINO ✔ ✖ ✖ Rp153,436,527.49

Relocation of SKTT 150 KV GI Ganda Mekar PT PLN (Persero) DK26+000 1212 m' Area 2 WIKA ✔ ✖ ✖ Rp72,733,723,520.00
Detail Table of Relocation of Public Facilities & Utilities

Work Name Owner Milleage/Location (DK) Relocation Area Contractor Process (Attached) Clarification/ Negotiation

Work Area Form 01 Negotiation Form 03 (Approval) Notes Offering Negotiation

DK11+930-DK12+197,
Relocation of light pole and Power cable PT Jasa Marga
DK15+197-DK15+851
18460 m2 Area 2 SINO ✔ ✔ ✔ Rp151,734,968.00

Relocation of Electrical Network PT PLN (Persero) DK82+600 Area 2 WIKA ✔ ✖ ✖

Relocation Power Tower PT PLN (Persero) DK27+370 Area 1 SINO ✔ ✖ ✖

Relocated 220V Power Line Local Residents DK64+335 Area 2 SINO ✔ ✖ ✖

Relocated 220V Power Line Local Residents DK64+860 Area 2 SINO ✔ ✖ ✖

Relocated 150kV Power Line PLN DK65+450 Area 2 SINO ✔ ✖ ✖

Relocated 20kV Power Line PLN DK65+532.4 Area 2 SINO ✔ ✖ ✖

Relocated 10kV Power Line Kapok Farm DK65+770.to.DK65+790 Area 2 SINO ✔ ✖ ✖

Relocated 10kV Power Line Kapok Farm DK65+770.to.DK65+790 Area 2 SINO ✔ ✖ ✖

Relocated 75kV Power Line PJT2 DK66+040.5 Area 2 SINO ✔ ✖ ✖

Relocated 220V Power Line Local Residents DK66+990 Area 2 SINO ✔ ✖ ✖

Relocated 220V Power Line PT PLN (Persero) DK74+010 Area 2 SINO ✔ ✖ ✖

Relocated 220V Power Line PT PLN (Persero) DK75+000.to.DK75+080 Area 2 SINO ✔ ✖ ✖

Relocated 380V Power Line PT PLN (Persero) DK77+838 Area 2 SINO ✔ ✖ ✖

Relocated 380V Power Line PT PLN (Persero) DK78+097 Area 2 SINO ✔ ✖ ✖

Relocated 220V Power Line PT PLN (Persero) DK78+100.to.DK78+200 Area 2 SINO ✔ ✖ ✖

Relocated Power Line PT PLN (Persero) DK2+450 Area 1 SINO ✔ ✔ ✔

SUTM 20KV Relocation PT PLN (Persero) DK 93+600 115 m Area 3 CREC ✔ ✖ ✖ form 1 submit KCIC Rp165,173,048.00

SUTM 380V Relocation PT PLN (Persero) DK 105+720 53 m Area 3 CREC ✔ ✖ ✖ form 1 submit KCIC Rp372,273,413.00

SUTM 20KV Relocation (Gadobangkong) PT PLN (Persero) DK 112+601 106 m Area 3 CREC ✔ ✖ ✖ form 1 submit KCIC Rp217,996,265.00

SUTM 380V Relocation (Cipatat) PT PLN (Persero) DK 99+504.2 149 m Area 3 CREC ✔ ✖ ✖ form 1 submit KCIC Rp177,799,175.00

Relocation of Power Pole PT PLN (Persero) DK 114+613 - DK 114+678 Area 4 CREC ✔ ✔ ✔ Siap Nego harga Rp2,804,793.00

Relocation of Power Pole PT PLN (Persero) DK 115+106 Area 4 CREC ✔ ✔ ✔ Siap Nego harga Rp122,249,877.75

Tunnel outlet power 380v facilities relocation PT PLN (Persero) DK 4+170 - 4+425 Area 1 SINO ✔ ✔ ✔

Relocation of Underground Pipeline

Relocation of Water Supply Pipe DK 58+300 Area 2 SINO ✔ ✔ ✔ Rp321,469,000.00 Rp193,886,000.00

Relocation of Water Supply Pipe DK 64+800 Area 2 SINO ✔ ✔ ✔

Relocation of Water Supply Pipe DK 64+955 Area 2 SINO ✔ ✔ ✔

Relocation of Water Supply Pipe DK 65+575 Area 2 SINO ✔ ✔ ✔


Detail Table of Relocation of Public Facilities & Utilities

Work Name Owner Milleage/Location (DK) Relocation Area Contractor Process (Attached) Clarification/ Negotiation

Work Area Form 01 Negotiation Form 03 (Approval) Notes Offering Negotiation

Relocation of Water Supply Pipe DK 66+970 Area 2 SINO ✔ ✔ ✔

Relocation of Water Supply Pipe DK 75+200 Area 2 SINO ✔ ✔ ✔

Relocated water pipe BUMD PT Perdana Multiguna Sarana DK107+000 120m Area 3 CREC ✔ ✖ ✖ Rp314,058,800.00

Relocation of Oil Pipe PT Pertamina DK121+950 - DK122+100 3000 m2 Area 4 CREC ✔ ✖ ✖


Relocation of undergorund cable TM asset PLN PT PLN Prima Bekasi DK19+120 68 m' Area 1 WIKA ✔ ✖ ✖ Rp1,848,874,000.00
DK 127+750 - 138+440 ,
Relocation of Pertamina Pipe PT. Pertamina
145+800 - 147+850
12740 m Area 4 WIKA ✔ ✔ ✔
Relocation Underground Cabl PT PLN (Persero) DK26+747~DK27 Area 1 SINO ✔ ✖ ✖
Relocated water supply pipe PT SOUTH PACIFIC VISCOSE DK65+775.8 Area 2 SINO ✔ ✖ ✖
Relocated water supply pipe PT SOUTH PACIFIC VISCOSE DK65+777 Area 2 SINO ✔ ✖ ✖
Relocated water supply pipe PT PUPUK KUJANG DK65+952 Area 2 SINO ✔ ✖ ✖
Relocated water supply pipe Cikao Bandung DK66+890 Area 2 SINO ✔ ✖ ✖

Relocation of Communication Cable

Relocation of Kabel FO Korlantas Korlantas DAK10+000 Area 1 WIKA ✔ ✖ ✖


Relocation of Kabel FO Jasamarga Jasa Marga DAK10+000 Area 1 WIKA ✔ ✖ ✖
Relocated optical fiber Jasa Marga KM15+350-KM17+000 33000 m2 Area 1 SINO ✔ ✖ ✖ Rp354,838,000.00

Relocated communication cable 1 TELKOM DK65+000 Area 2 SINO ✔ ✖ ✖


Relocated cimmunication cable 4 TELKOM DK66+986 Area 2 SINO ✔ ✖ ✖
Relocation of Fiber Optic Jasa Marga Cab. Purbaleunyi DK 114+800 - 116+900 Area 4 CREC ✔ ✔ ✔ Rp171,297,844.00

Optical fiber relocation DK 4+170 - 4+425 Area 1 SINO ✔ ✔ ✔

Relocation of SUTT

Tower Relocation of SUTET/SUTT PT PLN (Persero) 32 Location Area 1-3 WIKA ✔ ✔ ✔ Rp456,183,857,761.65 Rp424,726,894,256.00

Relocation of Toll Gate

Relocation of Pondok Gede Tol Gate PT Jasa Marga DK 7+366,00 Area 1 WIKA ✔ ✖ ✖
Relocation of Cikunir Tol Gate PT Jasa Marga DK 8+915,00 Area 1 WIKA ✔ ✖ ✖
Relocation of Bekasi Barat Tol Gate PT Jasa Marga DK 12+355,00 Area 1 WIKA ✔ ✖ ✖
Relocated Toll Gate PT Jasa Marga DK8+871 Area 1 SINO ✔ ✖ ✖
Relocation of LRT Crossing

Relocation of LRT crossing Adhi Karya DK2+600-DK3+100 Area 1 WIKA ✔ ✖ ✖

Total
Clarification/ Negotiation

Approval date
Clarification/ Negotiation

Approval date

August-18

August-18

August-18

August-18

August-18

August-18
Clarification/ Negotiation

Approval date
Clarification/ Negotiation

Approval date

October-18
Clarification/ Negotiation

Approval date

July-18
HASIL PENGECEKAN LAPANGAN UNTUK FASOS FASUM DAN UTILITAS
UPDATE tanggal 02 Januari 2019

%
Progress
thd : Kontraktor
Area 1 Area 2 Area 3 Area 4 Jumlah
JumlahWIKA
Koordinator The Pek Siang Tri Kuswandi Indra Yulianto Rully Tedjasukmana F01
Wilayah JKT, BKS (Kot&Kab) KRW, PWK PWK, KBB CMH, BDG (Kot&Kab)
FASOS FASUM 279
sudah di cek 49 66 7 9 210 100.0%
KCIC PSBI Lahan Saja 1 12 20 0 32 15.2%

sudah di cek dan perlu relokasi 59 77 32 78 178 84.8%


sudah di cek, perlu Relok dan ada BA dari pemilik 59 77 32 78 178 84.8%
###
Form 01 26 20 8 38 181 86.2%
Form 02 1 2 4 22 44 21.0%
Final Negosiasi 1 2 4 22 44 21.0%
Sudah Proses Relokasi 1 2 3 2 8 3.8%
Selesai Di relokasi 1 0 2 0 3 1.4%

UTILITAS 4
sudah di cek, perlu Relok dan ada BA dari pemilik 2 5 0 0 4 100%
Form 01 3 0 0 4 4 100%
Form 02 3 0 0 4 2 50%
Final Negosiasi 3 0 0 4 2 50.0%
Sudah Proses Relokasi 3 0 0 4 4 100.0%
Selesai Di relokasi 3 0 0 0 0 0.0%
TOTAL

Plan Ongoing Completed


List of Utilities and Public Utilities
Last Month Up to This Month Last Month Up to This Month
NO List Catt TTk Krit
BIDANG LUAS (m) BIDANG % BIDANG % BIDANG % BIDANG %

1. Tempat Ibadah 25 5,177 16 64.00% 16 64.00% - 0.00% - 0.00% DK 87+400 Kp Babakan, DK 86+950 Pasirsalam WIKA
2. Makam  17 8,110 1 5.88% 3 17.65% - 0.00% - 0.00% Tanah Kas & PU Surat ke PSBI no 1262/DIR/KCIC/11.18 ttg Proses relokasi 30 ttk tanah desa/Lap/PU
3. Tempat Pendidikan 14 39,141 8 57.14% 8 57.14% - 0.00% 3 21.43% Tmp Pnddkn 1.Kantin SMAN 25/SMPN 48 (data PSBI) tanah milik JASAMARGA
4. Balai Warga  14 2,202 2 14.29% 10 71.43% - 0.00% - 0.00% 2.Gudang SMAN 25/SMPN 48 (data PSBI) tanah milik JASAMARGA
5. Tanah Kas Desa 28 4,105 31 110.71% 28 100.00% - 0.00% - 0.00% 3.Toilet SMAN 25/SMPN 48 (data PSBI) tanah milik JASAMARGA
6. Jalan/ Gang 115 135,149 15 13.04% 79 68.70% - 0.00% - 0.00% Balai Warga Dongting house dk 76+895
7. Selokan/ Saluran air/Irigasi 47 20,955 1 2.13% 46 97.87% - 0.00% - 0.00% Jalan/Gang Relokasi jalan dk 33+441 Jln Anugerah Raya road relocation (outlet) dk 2+670
8. Tanah PU  2 143 2 100.00% 2 100.00% - 0.00% - 0.00% Jalan Desa dk 66+372 Jalan akses masyarakat dk 107+070
9. Lapangan 3 731 1 33.33% 3 100.00% - 0.00% - 0.00% Jalan Desa dk 97+320 Jalan Umum dk 135+284
10. Taman 13 14,974 5 38.46% 13 100.00% - 0.00% - 0.00% Jalan Desa dk 107+070 Jalan Komplek Kopo Mas (data PSBI)
11. TPS 1 377 1 100.00% 1 100.00% - 0.00% - 0.00% Seloka/Sal Air/Irig Selokan DK 88+900
Sub Total Fasos Fasum 279 231,064 83 209 - 3 Selokan dk 107+070
Fasos Fasum Lahan Saja 32 32 32 - -
TOTAL HSRCC 247 51 177 - 3