Professional Documents
Culture Documents
JSA For Screeding With Mesh
JSA For Screeding With Mesh
Alternatives Considered:
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of Equipment & Unauthorised Tools brought on to site. Ensure all tools shall be inspected & tagged prior
workers. starting the job.
Un inducted &Unskilled Persons All persons are skilled and trained for the job&
they are fully aware of all hazards.
Ensure that all personnel are fit for the job prior
starting the job.
All personnel must be Undergone fitness for work
Un fit workers for Job.
assessment thru Del Doctor.
2 Placing of mesh Unsecured parapet Wall / Slabs Ensure that the railings are in place and secured to
avoid the persons from falling from height and
while placing the mesh ply wood sheet are used
.No one shall be allowed to walk on the slabs. All
the work shall be done on the Ply wood sheet..
Same
Demobilization