JOB TITLE / AIM: Jsa for screeding with mesh


JSA DATE: 14/12/2006 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER Ali Mosa SCRIBE: Abdullah
PARTICIPANTSMuneer Hussain , Rab Rakhio , Boxchall
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps: List the main sequential steps. Each step should accomplish a specific component of the task.

1. Mobilization of Equipment & Workers.


2.Placing of Mesh
3.Sreeding with crane using shoot and Bucket
4.Demobilization.

Alternatives Considered:

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of Equipment & Unauthorised Tools brought on to site. Ensure all tools shall be inspected & tagged prior
workers. starting the job.
Un inducted &Unskilled Persons All persons are skilled and trained for the job&
they are fully aware of all hazards.
Ensure that all personnel are fit for the job prior
starting the job.
All personnel must be Undergone fitness for work
Un fit workers for Job.
assessment thru Del Doctor.

JSA must be in place prior to start the work.


Ensure that all personnel take part in the toolbox
Workers starting the job without JSA meeting discussion& they are fully aware of Job
hazards.

Ensure all workers are using right teqnique for


Back Injury. manual handling.

2 Placing of mesh Unsecured parapet Wall / Slabs Ensure that the railings are in place and secured to
avoid the persons from falling from height and
while placing the mesh ply wood sheet are used
.No one shall be allowed to walk on the slabs. All
the work shall be done on the Ply wood sheet..

Hand gloves shall be worn at all the times .


Hand Injury
Proper Hauling of mesh shall be in place, get help
if required.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Tripping Hazard Ensure that Proper access shall be used while
placing the mesh .
Watch your steps.
Equipment failure Ensure that equipment shall not position in the
unstable condition and banks man should be
available at all times in the area
Ensure that equipment shall be used on daily basis
and checklist shall be maintained.
Establish a check point for QC inspection
Ensure that enough man power are present during
cement testing
Ensure enough ventilation and lighting are
Screeding with crane using shoot Equipment failure available in testing area
and Bucket Ensure that concrete debris are contained in one
area
Ensure that certified riggers for signalling the
Miscommunication
crane
Ensure that designated traffic man shall manage
the transit mixer movement and testing piece
sample preparation
No unauthorised person shall not allowed at the
testing area
Eye irritation/skin irritation Ensure workers are wearing hand gloves
Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
Ensure that equipment was inspected by equipment
supervisor & equipment inspection was in the
equipment
Personnel & equipment interface
Ensure that workers accessing the right walkway
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
and watch your steps.
Ensure that area was physically barricaded &
banks person was in place
Ensure that area for equipment & workers are
separated & vehicle access are identified

Same
Demobilization