Professional Documents
Culture Documents
Set 02 TDL STR Tender Op4 v4.0 (Gđ1)
Set 02 TDL STR Tender Op4 v4.0 (Gđ1)
R
TE
N
DE
R
SET 02 : STRUCTURE
1. TAÁT CAÛ CAÙC BAÛN VEÕ ÑEÀU COÙ LIEÂN QUAN ÑEÁN BAÛN VEÕ KIEÁN TRUÙC VAØ ÑIEÄN. BAÁT KYØ SÖÏ KHOÂNG PHUØ 2. THEÙP TROØN SÖÛ DUÏNG LOAÏI VINAKYOEI HOAËC THEÙP COÙ CÖÔØNG ÑOÄ TÖÔNG ÑÖÔNG CHÆ ÑÒNH TRONG BAÛNG
HÔÏP NAØO CUÕNG PHAÛI THOÂNG BAÙO CHO KIEÁN TRUÙC SÖ HAY KYÕ SÖ ÑEÅ COÙ BIEÄN PHAÙP XÖÛ LYÙ. SAU. THEÙP LÖÔÙI HAØN SÖÛ DUÏNG LOAÏI THEÙP VRC HOAËC HLC HOAËC LOAÏI TÖÔNG ÑÖÔNG NEÁU COÙ: CHIEÀU DAØI NOÁI CHOÀNG VAØ CHIEÀU DAØI NEO COÁT THEÙP TRONG BEÂ TOÂNG
ALL DRAWINGS TO READ IN CONJUNCTION WITH THE ARCHITECT'S & M&E'S DRAWINGS. ALL STEEL BAR OR WELD MESH STEEL SHALL BE USED AS FOLLOWS THE TABLE (UNLESS OTHERWISE STATED) MINIMUM LAPS LENGTH & SPLICES LENGTH OF STEEL BAR IN R.C
ANY DISCREPANCIES MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT OR ENGINEERS.
2. TAÁT CAÛ ÑÔN VÒ CHIEÀU DAØI TRONG BAÛN VEÕ KEÁT CAÁU LAØ MIMETER (TRÖØ KHI COÙ CHÆ ÑÒNH KHAÙC) BEÂ TOÂNG CAÁP BEÂN B22.5 (MAÙC 300) / CONCRETE GRADE 30
BAÛNG YEÂU CAÀU MAÙC THEÙP TROØN VAØ THEÙP LÖÔÙI SÖÛ DUÏNG CHO CAÙC HAÏNG MUÏC TRONG COÂNG TRÌNH
ALL DIMENSION UNITS USED IN STRUCTURAL DRAWINGS ARE MILIMETER (UNLESS OTHERWISE STATED) TECHNICAL STANDARD OF STEEL BAR OR WELD MESH STEEL ĐƯỜNG KÍNH THÉP CHIEÀU DAØI NOÁI CHOÀNG COÁT THEÙP CHIEÀU DAØI NEO THEÙP TRONG BEÂ TOÂNG
DIAMETER OF REBAR LAPS LENGTH SPLICES LENGTH
3. TAÁT CAÛ CAO ÑOÄ DUØNG TRONG BAÛN VEÕ KEÁT CAÁU LAØ METER VAØ LAÁY THEO HEÄ CAO ÑOÄ TRONG BAÛN VEÕ THEÙP TROØN COÙ ÑÖÔØNG KÍNH (MPA) THEÙP LÖÔÙI HAØN (MPA)
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
(MM)
KIEÁN TRUÙC. CAO ÑOÄ QUOÁC GIA CUÛA MOÃI HAÏNG MUÏC XEM TRONG BAÛN VEÕ HAÏ TAÀNG KYÕ THUAÄT THE STEEL BAR WITH DIAMETER ARE (MPA) THE WELD MESH STEEL (MPA) TRONG VUØNG KEÙO TRONG VUØNG NEÙN TRONG VUØNG KEÙO TRONG VUØNG NEÙN THAM KHAÛO / FOR REFERENCE
TENSION AREA COMPRESSION AREA TENSION AREA COMPRESSION AREA
ALL LEVELS IN STRUCTURAL DRAWINGS ARE TO BE ARCHITECTURAL LEVELS (NOT BE NATIONAL LEVELS). THIEÁT KEÁ CÔ SÔÛ / BASIC DESIGN
Þ< 10 ( TYPE AI ) Þ >= 10 ( TYPE AIII ) VRC HOAËC HLC
10 300 250 300 200
THE EQUIVALENT NATIONAL LEVEL OF EACH BUILDING IS REFERED TO EXTERNAL-WORK DRAWINGS. XIN PHEÙP XAÂY DÖÏNG / FOR CONST. LICENSE
Rs (TÍNH TOAÙN) fy (G/H CHAÛY) Rs (TÍNH TOAÙN) fy (G/H CHAÛY) Rs (TÍNH TOAÙN) Fy (G/H CHAÛY) 12 450 350 400 250
4. NHAØ THAÀU PHAÛI XAÙC ÑÒNH TAÁT CAÛ CAÙC KÍCH THÖÔÙC TRÖÔÙC KHI TIEÁN HAØNH COÂNG VIEÄC VAØ KEÁT HÔÏP Rs (ALLOWABLE) fy (STRENGTH) Rs (ALLOWABLE) fy (STRENGTH) Rs (ALLOWABLE) Fy (STRENGTH) ÑAÁU THAÀU / FOR PROCUREMENT
14 500 400 450 300
KIEÅM TRA VÔÙI NHAØ THAÀU VEÀ VÒ TRÍ CUÛA TAÁT CAÛ CAÙC OÁNG ÑIEÄN, OÁNG CAÁP NÖÔÙC, OÁNG THOAÙT NÖÔÙC V...V, 210 245 365 390 430 490 BAÛN VEÕ THI COÂNG / FOR CONSTRUCTION
16 550 450 500 350
NHÖÕNG OÁNG MAØ SEÕ ÑÖÔÏC ÑOÅ BEÂ TOÂNG BAO BOÏC. 18 HOAØN COÂNG / AS - BUILT
650 550 550 400
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE COMMENCING WORK AND CHECK 20 700 600 600 400 CHÆNH SÖÛA / REVISION
WITH ELECTRICAL AND MECHANICAL CONTRACTORS FOR POSITIONS OF ALL CONDUITS, SLEEVES,
D. YÊU CẦU CẤU TẠO /STRUCTURE REQUIREMENTS
22 750 650 700 450
5
CHASES, ETC. WHICH HAVE TO BE CAST IN CONCRETE.
25 900 700 750 500
1. CHIEÀU DAØY LÔÙP BEÂ TOÂNG BAÛO VEÄ PHAÛI THEO BAÛNG SAU (TRÖØ KHI COÙ CHÆ ÑÒNH KHAÙC) 4
5. NHÖÕNG BAÛN VEÕ KHAI TRIEÅN THEÂM PHAÛI COÙ SÖÏ CHAÁP THUAÄN CUÛA KYÕ SÖ (ÑÔN VÒ THIEÁT KEÁ). 28 900 800 850 600
CONCRETE COVER SHALL BE USED AS FOLLOWS THE TABLE (UNLESS OTHERWISE STATED) 3
SHOP DRAWINGS ARE SUBJECT TO ENGINEER 'S APPROVAL. 30 1000 850 900 600
2
6. NHAØ THAÀU PHAÛI CUNG CAÁP ÑAÀY ÑUÛ DAØN GIAÙO, HEÄ GIAÈNG TRONG SUOÁT THÔØI GIAN THI COÂNG CHIEÀU DAØY NHOÛ NHAÁT CUÛA LÔÙP BEÂ TOÂNG BAÛO VEÄ TRONG CAÁU KIEÄN BEÂ TOÂNG COÁT THEÙP 32 1100 900 1000 700
MINIMUM CONCRETE COVER OF REINFORCED CONCRETE 1
ÑAÛM BAÛO CHÒU ÑÖÔÏC TAÛI TROÏNG TRONG LUÙC THI COÂNG VAØ TAÛI GIOÙ.
No. DATE DESCRIPTION CHECKER
THE CONTRACTOR IS TO PROVIDE ADEQUATE TEMPORARY SHORING AND BRACING DURING LOAÏI CAÁU KIEÄN SAØN DAÀM COÄT ÑAØ KIEÀNG TÖÔØNG MOÙNG
CONSTRUCTION TO TAKE CARE OF WIND LOAD AND CONSTRUCTION LOADS. TYPE OF STRUCTURE FLOOR SLAB BEAM COLUMN G.BEAM WALL FOUNDATION E. LANH TOÂ CÖÛA / LINTEL: CHUÛ ÑAÀU TÖ / EMPLOYER
7. TRÖØ KHI COÙ CHÆ ÑÒNH KHAÙC, KHOÂNG THÌ KHE NOÁI THI COÂNG CUÛA DAÀM VAØ SAØN ÔÛ VÒ TRÍ MOÄT PHAÀN TÖ NHÒP. KEÁT CAÁU BEÂN TREÂN
20 30 30 30 30 50
UNLESS OTHERWISE STATED OR SHOWN, POSITION OF CONSTRUCTION JOINTS TO BEAMS R.C ABOVE THE EARTH
AND SLABS SHALL BE AT QUARTER SPAN. THICK OF WALL = 100MM THICK OF WALL = 200MM
KEÁT CAÁU TIEÁP XUÙC VÔÙI ÑAÁT NHÒP LANH TOÂ
30 30 40 30 30 50
8. TÆ LEÄ BAÛN VEÕ CHÆ ÑUÙNG VÔÙI KHOÅ GIAÁY A1 R.C CONTACT WITH EARTH
SPAN OF LINTEL MAËT CAÉT THEÙP DOÏC THEÙP ÑAI MAËT CAÉT THEÙP DOÏC THEÙP ÑAI
THE DRAWING SCALE IS COMPATIBLE TO THE A1 SIZE
SECTION REBAR LINKS SECTION REBAR LINKS ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
9. KHOÂNG DUØNG THÖÔÙC ÑO KÍCH THÖÔÙC THÖÏC TEÁ TREÂN BAÛN VEÕ bxh (mm) (mm) (mm) bxh (mm) (mm) (mm)
floor Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
USING TAPE TO MEASURE THE REAL DIMENSION ON DRAWING IS NOT ALLOWABLE Lôùp 1 L< 2000 100x200 2Ø12 Ø6a150 200x200 4Ø12 Ø6a150
Lôùp 2
B. CÔ SÔÛ THIEÁT KEÁ / BASE DESIGN: 2000 < L< 3000 100x200 2Ø12 Ø6a150 200x200 4Ø12 Ø6a150
Lôùp 2
1. TCXDVN 5574-2018 VEÀ KEÁT CAÁU BTCT Lôùp 1
3000 < L< 4000 100x250 2Ø14 Ø6a150 200x250 4Ø14 Ø6a150 NHAØ THAÀU THI COÂNG / CONTRACTOR
TCXDVN 5574-2018 RC CODE
2. TCXDVN 5575-2012 VEÀ KEÁT CAÁU THEÙP
- e1 >= 50 mm 4000 < L< 5000 100x300 2Ø14 Ø6a150 200x300 4Ø14 Ø6a150
TCXDVN 5575-2012 STEEL CODE - 35 <= e2 <= 60 mm - 50 <= e1, e2 <= 400 mm floor
- e3 >= 40 mm
3. TCVN 10304-2014 MOÙNG COÏC - TIEÂU CHUAÅN THIEÁT KEÁ
TCVN 10304-2014 : PILE FOUNDATION - DESIGN STANDARD R.C Beam R.C Column
4. TCVN 2737-1995 TAÛI TROÏNG VAØ TAÙC ÑOÄNG 2. COÁT ÑAI TRONG COÄT LAØ Þ6, BÖÔÙC 100MM ÔÛ NHÖÕNG VÒ TRÍ NOÁI THEÙP, VAØ LAØ 200MM ÔÛ F. YEÂU CAÀU CHOÁNG THAÁM / WATERPROOFING :
TCVN 2737-1995 LOADING AND IMPACT
ÔÛ NHÖÕNG VÒ TRÍ KHAÙC. ( TRÖØ CAÙC CHÆ ÑÒNH COÙ TRONG BAÛN VEÕ)
4. BS 8110 KEÁT CAÁU BTCT -TIEÂU CHUAÅN THIEÁT KEÁ 1. TAÁT CAÛ CAÙC KEÁT CAÁU BEÅ NÖÔÙC, BEÅ TÖÏ HOAÏI, TAÀNG HAÀM VAØ CAÙC KHU VÖÏC VEÄ SINH TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
THE HOOP-STEEL OF ALL COLUMN IS Þ6, THE SPACING OF WHICH IS 100 IN THE COLUMN LAPS, SPLICES
BS 8110 REINFORCE CONCRETE - DESIGN STANDARD PHAÛI SÖÏ DUÏNG CHAÁT CHOÁNG THAÁM BAÈNG SIKA LITE HOAËC LOAÏI COÙ TÍNH CHAÁT KYÕ THUAÄT TÖÔNG ÑÖÔNG
AND THE SPACING OF WHICH IN THE OTHER REGION IS 200. (UNLESS OTHERWISE STATED) ( TRÖØ CAÙC CHÆ ÑÒNH KHAÙC COÙ TRONG BAÛN VEÕ)
3. COÁT ÑAI TRONG DAÀM ÑÖÔÏC BOÁ TRÍ NHÖ SAU ( TRÖØ CAÙC CHÆ ÑÒNH KHAÙC COÙ TRONG BAÛN VEÕ): ALL CONCRETE STRUCTURE OF BASEMENT, WATER TANK AND TOILET MUST BE WATERPROOF BY SIKA LITE
THE HOOP-STEEL OF BEAM SHALL BE USED AS FOLLOWS ( UNLESS OTHERWISE STATED): (UNLESS OTHERWISE STATED)
2. TAÁT CAÛ KEÁT CAÁU CHÍNH NÔI MAØ TIEÁP XUÙC VÔÙI NÖÔÙC PHAÛI ÑÖÔÏC CHOÁNG THAÁM
ALL MAIN CONCRETE STRUCTURE WHERE ARE CONTACT WITH WATER OR SOLVEN MUST BE WATERPROOF
Þ6a100 Þ6a200 ØÞ6a100
C. VAÄT LIEÄU SÖÛ DUÏNG / MATERIAL SPECIFICATIONS: BY SIKA LITE (UNLESS OTHERWISE STATED)
GIAÙM ÑOÁC / DIRECTOR :
1. TAÁT CAÛ CAÙC KEÁT CAÁU BEÂ TOÂNG SÖÛ DUÏNG THEO CHÆ ÑÒNH TRONG BAÛN SAU
(TRÖØ CAÙC CHÆ ÑÒNH KHAÙC COÙ TRONG BAÛN VEÕ)
GOÁI TÖÏA NHÒP GOÁI TÖÏA
ALL REINFORCED CONCRETE SHALL BE USED AS FOLLOWS THE TABLE (UNLESS OTHERWISE STATED)
4. TAÁT CAÛ CAÙC KEÁT CAÁU TIEÁP XUÙC VÔÙI ÑAÁT ÑEÀ ÑAËC LEÂN LÔÙP BEÂ TOÂNG NGHEØO MAC 150 DAØY 50 MM CHUÛ NHIEÄM DÖÏ AÙN
PROJECT MANAGER
BAÛNG YEÂU CAÀU MAÙC BEÂ TOÂNG SÖÛ DUÏNG CHO CAÙC HAÏNG MUÏC TRONG COÂNG TRÌNH (TRÖØ CAÙC CHÆ ÑÒNH KHAÙC COÙ TRONG BAÛN VEÕ)
TECHNICAL STANDARD OF REINFORCED CONCRETE CHUÛ TRÌ
ALL THE REINFORECED CONCRETE CONTACT WITH EARTH MUST BE USED LEAN CONCRETE WITH PRINCIPAL DESIGN
NHOÙM 1 / GROUP 1 NHOÙM 2 / GROUP 2 BEÂ TOÂNG LOÙT ÑAÙ 1x2 THICKNESS 50 (UNLESS OTHERWISE STATED) THIEÁT KEÁ VAØ VEÕ
DESIGNED & DRAWN
CAÁP BEÀN B22.5 (MAÙC 300) CAÁP BEÀN B15 (MAÙC 200) CAÁP BEÀN B12.5 (MAÙC 150) 5. TAÁT CAÛ CAÙC ÑOAÏN NOÁI THEÙP TRONG NHÒP DAÀM KHOÂNG ÑÖÔÏC VÖÔÏT QUAÙ 50% LÖÔÏNG THEÙP CUÛA ÑOAÏN TECHNICAL MANAGER
B22.5 (GRADE 30) B15 (GRADE 20) B12.5 (GRADE 15) Q.L.K.T
DAÀM ÑOÙ.
Rb (Mpa) Rbt (Mpa) Rb (Mpa) Rbt (Mpa) Rb (Mpa) Rbt (Mpa) COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
ALL SPLICES BAR IN BEAMS AREN'T MORE THAN 50% OF BAR IN SAME SECTION
PROJECT : TAEKWANG DAKLAK FACTORY
13.0 1.0 9.0 0.75 7.0 0.66
6. CHIEÀU DAØI NHOÛ NHAÁT CUÛA ÑOAÏN THEÙP CHOÀNG LEÂN NHAU KHI NOÁI BUOÄC, ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
VAØ KHI NEO TRONG BEÂ TOÂNG THEO BAÛNG DÖÔÙI ÑAÂY (TRÖØ KHI COÙ CHÆ ÑÒNH KHAÙC) :
1.1. NHOÙM 1 : MOÙNG, COÄT, ÑAØ KIEÀNG, SAØN NEÀN, DAÀM SAØN, SAØN LAÀU, SAØN MAÙI, BEÅ NÖÔÙC NGAÀM
HAÏNG MUÏC / ITEM
MIN. LAPS AND SPLICES SHALL BE MAINTAINED (INCLUDING DOWELS EXTENSION AND EMBEDMEN),
1.2. NHOÙM 2 : LANH TOÂ, BOÅ TRUÏ, GIAÈNG TÖÔØNG
UNLESS OTHERWISE STATED TẤT CẢ HẠNG MỤC
TEÂN BAÛN VEÕ / DRAWING NAME
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
S-G-01 1:100 00
CB-01 CHI TIẾT DẦM -01 / DETAIL OF BEAM - 01 CB-05 CHI TIẾT DẦM -05 / DETAIL OF BEAM - 05 CB-09 CHI TIẾT DẦM -09 / DETAIL OF BEAM - 09
b Lo b b Lo b
Lo/4 2Lo/4 Lo/4 L'o/4 Lo/4 2Lo/4 Lo/4 L'o/4 Þ10 Loaïi
+ EL 50 + EL 50 Þ10 Loaïi
50 50 >35Þ >35Þ 50 50
50
50
>=35Þ
>=35Þ
25Þ
H
H
>40Þ
B
b
Only used top of CL
>=35Þ
>=35Þ
>=H >=H H >=H >=H H
Áp dụng đầu cột
50
50
50
L L D
1 2
B B
CB-02 CHI TIẾT DẦM -02 / DETAIL OF BEAM - 02 CB-06 CHI TIẾT DẦM -06 / DETAIL OF BEAM - 06 CB-10 CHI TIẾT DẦM -10 / DETAIL OF BEAM - 10 THIEÁT KEÁ CÔ SÔÛ / BASIC DESIGN
D
>=35Þ
350
35Þ
35Þ
35Þ
B
H
>40Þ
h
Only used top of CL
40Þ 4
>=35Þ
40Þ 40Þ
A A
Áp dụng đầu cột
L L 2
B 1
L Beà roäng coät Maët Caét A-A
No. DATE DESCRIPTION CHECKER
1 2 D Ñöôøng kính coát ñai
CHUÛ ÑAÀU TÖ / EMPLOYER
CB-03 CHI TIẾT DẦM -03 / DETAIL OF BEAM - 03 CB-07 CHI TIẾT DẦM -07 / DETAIL OF BEAM - 07 CB-11 CHI TIẾT DẦM -11 / DETAIL OF BEAM - 11
Khi B <= 350 söû duïng 1 Þ12
Khi 350 <B <= 500 söû duïng 2 Þ12
b Lo b Coát giaù gia cöôøng Khi 500 <B <= 650 söû duïng 3 Þ12
5 Ñai böôùc 50 ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Lo/4 2Lo/4 Lo/4 L'o/4
+ EL 50 50 50
>20Þ
Þ12 Loaïi Þ12 Loaïi Ñieän thoaïi: 061.3836421
Ngaøy / Date:
>=35Þ
B
H
A A
Daàm
25Þ
>=H >=H >=H Coät NHAØ THAÀU THI COÂNG / CONTRACTOR
- a = 45° khi H<60cm Daàm coâng son Coät
L
- a = 60° khi H>=60cm Daàm coâng son
1 2
Lieân keát vôùi daàm ñieån hình Maët caét A-A
CB-04 CHI TIẾT DẦM -04 / DETAIL OF BEAM - 04 CB-08 CHI TIẾT DẦM -08 / DETAIL OF BEAM - 08 CB-12 CHI TIẾT DẦM -12 / DETAIL OF BEAM - 12
Þ (1) a50 TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
>1.5H > 3Dmax > 3Dmax >1.5H
+ EL 50 50 + EL 50
2 25Þ
3H
35Þ
Þ12 Loaïi
Dmax
H
H
3H
1
Mieàn coù theå cho oáng xuyeân ñaø 40Þ hole 40Þ
B
L
25Þ 25Þ
CHI TIEÁT GIA CÖÔØNG B B
Daàm
25Þ
Coät GIAÙM ÑOÁC / DIRECTOR :
H (mm) GHI CHÚ / NOTES:
400 500 600 700 800 900 1000 1100
hole a. Bê tông mác <=300 / RC grade<=30 Daàm coâng son Daàm coâng son
+ EL + EL Coät
1 - Þ 10 >=35Þ
~ 50 Mieàn khoâng gia cöôøng theùp / Area do not strengthen b. Chỉ khoét lỗ tròn / Only used circle hole + EL1
2 - Þ 10 Lieân keát vôùi ñaàu cuoái daàm
~ 100 1 - Þ 10 1 - Þ 12 c. ĐK lỗ / Dia ( Ø ) : Ø <= H/4
2 - Þ 12 2 - Þ 12 Maët caét B-B
Khi B <= 350 söû duïng 1 Þ12 CHUÛ NHIEÄM DÖÏ AÙN
~ 150 1 - Þ 12 d/ Tỉ số: Lo/H >=6 PROJECT MANAGER
1 - Þ 12 2 - Þ 18 Khi 350 <B <= 500 söû duïng 2 Þ12
2 - Þ 16 + Thép số / Rebar no 01 : = 2 Khi 500 <B <= 650 söû duïng 3 Þ12 CHUÛ TRÌ
~ 200 PRINCIPAL DESIGN
+ Thép số / Rebar no 02 : = 4 35Þ
1 - Þ 12
~ 250 2 - Þ 20 Bố trí 2 lớp thép cho mỗi vị trí gia cố Chi tieát nuùt daàm lieân keát cao Chi tieát nuùt daàm lieân keát thaáp THIEÁT KEÁ VAØ VEÕ
Mieàn khoâng khoeùt loã / Area do not drill hole DESIGNED & DRAWN
~ 300 TECHNICAL MANAGER
Q.L.K.T
CB-13 CHI TIẾT DẦM -13 / DETAIL OF BEAM - 13 CB-14 CHI TIẾT DẦM -14 / DETAIL OF BEAM - 14 COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
PROJECT : TAEKWANG DAKLAK FACTORY
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
b Lo b b Lo b Lo b Lo b . LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
Lo/4 2Lo/4 Lo/4 Lo/4 2Lo/4 Lo/4 Lo/4 2Lo/4 Lo/4 Lo/4 2Lo/4 Lo/4
HAÏNG MUÏC / ITEM
Anchor length top of column
50 50 50 50 50 50 50 50 50
1-1 1-2 1-3 1-1 1-2 1-3 2-1 2-2 2-3 3-1 3-2 3-3 4-1 TẤT CẢ HẠNG MỤC
>25Ø >35Ø
>25Ø >35Ø
>25Ø >35Ø
>40Ø
>40Ø
>40Ø
h
1-1 1-2 1-3 1-1 1-2 1-3 2-1 2-2 2-3 3-1 3-2 3-3 4-1
b <0.15Lo >h >h <0.2Lo b b <0.15Lo >h >h <0.2Lo b <0.2Lo >h >h <0.2Lo b <0.2Lo >h >h <0.2Lo b
QUY ĐỊNH CHUNG - TỜ 2
L L L L .
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
S-G-02 1:100 00
CC-01 CHI TIẾT CỘT -01 / DETAIL OF COLUMN - 01 CC-02 CHI TIẾT CỘT -02 / DETAIL OF COLUMN - 02 CC-03 CHI TIẾT CỘT -03 / DETAIL OF COLUMN - 03
e
e
a=200
e e e
Ho
Ho/2 +15Þ
>=35Þ
>=35Þ
H
H
>=35Þ
>=35Þ
>=35Þ
>=35Þ
H
H
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
H
1- Tröôøng hôïp giaûm tieát dieän coù e/H<=1/6 2- Tröôøng hôïp giaûm tieát dieän coù e/H>1/6 >=250 THAM KHAÛO / FOR REFERENCE
CS-01 CHI TIẾT SÀN -01 / DETAIL OF RC SLAB - 01 CS-02 CHI TIẾT SÀN -02 / DETAIL OF RC SLAB - 02 CS-03 CHI TIẾT SÀN -03 / DETAIL OF RC SLAB - 03 XIN PHEÙP XAÂY DÖÏNG / FOR CONST. LICENSE
>=35Þ
h
AS - BUILT
Þ>=16, L=10Þ
HOAØN COÂNG /
1 Þ12
D
>=1.5H
>=35Þ
>=35Þ 1.5
1 Þ12 H
L=150 Þ10a200 2D CHÆNH SÖÛA / REVISION
L=150
Þ>=16, L=10Þ L=150 >35Þ >35Þ -Tröôøng hôïp/ CASE :
H
5
Fnx laø dieän tích theùp bò caét theo phöông x taïi vò trí khoeùt loã saøn Þ>=16, L=10Þ h < 0.5D
150
>=35Þ 4
Fnx
Þ>=16, L=10Þ
Fny laø dieän tích theùp bò caét theo phöông y taïi vò trí khoeùt loã saøn Töôøng BT
>=35Þ
>=35Þ 3
50 >=35Þ
L = 150
L=150
40
>=35Þ
2
Þ
Þ
10
L=
h
6,
1
40
D
=1
>=35Þ
Þ
Þ>
- Chi tieát neo theùp saøn taïi vò trí daàm. Saøn BT lieân tuïc >=35Þ No. DATE DESCRIPTION CHECKER
L=150
nhöng theùp saøn hai phía ñoái vôùi daàm khaùc nhau -Tröôøng hôïp :
Fny >=35Þ CHUÛ ÑAÀU TÖ / EMPLOYER
Þ>=16, L=10Þ
2D 0.5D<=h <= 2D
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ø6a500 300 300
Ñieän thoaïi: 061.3836421 ; Fax:
500
DẦM
50 BEAM NHAØ THAÀU THI COÂNG / CONTRACTOR
Hd
Ø6a500
500
CỘT
COLUMN TIE SPACING - a50
L/2 L/2
L=3B+2Hd
Goái keâ Þ10@1000 GIA CƯỜNG THÉP DẦM TẠI CỘT CẤY
KẾT NỐI GIỮA CỘT BÊ TÔNG VỚI TƯỜNG XÂY STEEL REINFORCEMENT FOR BEAM WITH COLUMN
1000 150 w 150 1000
JUNCTION OF RC COLUMN TO BLOCKWALL
h
Ø6a200 100
Ø6a200 CHUÛ NHIEÄM DÖÏ AÙN
PROJECT MANAGER
2Ø10 CHUÛ TRÌ
PRINCIPAL DESIGN
GIẰNG BTCT 2Ø12
100
LƯU Ý- NOTE: BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
S-G-03 1:100 00
- CÁC CHI TIẾT, GHI CHÚ TRONG BẢNG GHI CHÚ CHUNG CHỈ ÁP DỤNG ĐỐI VỚI NHỮNG CHI TIẾT CHƯA THỂ HIỆN ĐẦY ĐỦ TRÊN BẢN VẼ
TEÂN FILE / FILE NAME NGAØY / DATE
DETAILS, NOTE ON TABLE GENERAL NOTES ONLY APPLY FOR DETAILS NOT ENOUGH IN THE DRAWING 00-TDL-STR-GHI CHU CHUNG_V1.dwg 06.2021
GHI CHUÙ / NOTES:
1 - 1 (ĐỐI VỚI TƯỜNG 200mm ) 1 - 1 (ĐỐI VỚI TƯỜNG 100mm ) CHÆNH SÖÛA / REVISION
1-1 (FOR 250mm THK. WALL ) 1-1 (FOR 150mm THK. WALL ) 5
TƯỜNG XÂY
BRICK WALL
TƯỜNG XÂY 4
BRICK WALL
3
RC12 CHI TIẾT GIẰNG TƯỜNG - BỔ TRỤ / DETAIL OF BRACING BEAM - ATTACHED COLUMN
NHAØ THAÀU THI COÂNG / CONTRACTOR
CORNER DETAIL
OR TOP FREE NO.
TƯỜNG XÂY
BRICK WALL
GHI CHÚ
1-1 DESIGNED & DRAWN
TECHNICAL MANAGER
2T10 ( TRÊN & DƯỚI ) 2T10 ( TRÊN & DƯỚI ) Q.L.K.T
T1 - TƯỜNG DÀY 100mm
ĐAI R6 - 200 ĐAI R6 - 200
T1 - 100mm THICKWALL BRICK
2T12( T&B ) 2T12( T&B ) COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
ĐỐI VỚI TƯỜNG T2 /FOR TYPE 2) STIRRUP R6-200 STIRRUP R6-200
T2 - TƯỜNG DÀY 200mm PROJECT : TAEKWANG DAKLAK FACTORY
ĐỐI VỚI TƯỜNG T1 /FOR TYPE 1) T2 - 200mm THICKWALL BRICK
2-2 ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
S-G-04 1:100 00
h THE FABRICATING CONTRACTOR SHALL FABRICATE AND DELIVER TO THE JOB SITE ALL
STANDARD SEL.
No
CHỌN 02 THÉP I TỔ HỢP
tw STRUCTURAL STEEL ITEMS IN ACCORDANCE WITH THE DESIGN DRAWINGS AND 'AISC' MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
TÊN TIÊU CHUẨN TÁC DỤNG bf
Hàn liên tục SPECIFICATION AND CONSTRUCTION SPECIFICATION. WHENEVER A DIFFERENCE EXISTS EXISTS
I - BULT-UP tf THAM KHAÛO / FOR REFERENCE
TCVN 2737 : 1995 - LOADS AND AFFECT, DESIGN STANDARD BETWEEN THE DESIGN DRAWINGS AND THE SPECIFICATIONS, THE DRAWINGS SHALL GOVERN.
01 W.1000X10+F.300X12 THIEÁT KEÁ CÔ SÔÛ / BASIC DESIGN
TCVN 2737 : 1995 - TẢI TRỌNG VÀ TÁC ĐỘNG, TIÊU CHUẨN THIẾT KẾ - Liên kết cánh và bụng bằng đường hàn liên tục 4.3.2. BẤT CỨ LIÊN KẾT NÀO DÙNG 2 BULÔNG THÌ PHẢI DÙNG BULÔNG CÓ ĐƯỜNG KÍNH NHỎ NHẤT LÀ
- Web & flange conected by continuous welding line
16mm TRỪ PHI LIÊN KẾT ĐƯỢC CHỈ ĐỊNH RÕ TRONG BẢN VẼ XIN PHEÙP XAÂY DÖÏNG / FOR CONST. LICENSE
02 TCXD 229 : 1999 - GUIDANCE FOR DETERMENATION OF DYNAMIC COMPONENT OF WL.
ÑAÁU THAÀU / FOR PROCUREMENT
TCXD 229 : 1999 - CHỈ DẪN TÍNH TOÁN THÀNH PHẦN ĐỘNG CỦA TẢI TRỌNG GIÓ ANY TWO BOLT CONNECTIONS SHALL BE MADE BY USE OF 2M16 BOLTS MINIMUM UNLESS SHOWN
OTHERWISE ON THE DRAWINGS. BAÛN VEÕ THI COÂNG / FOR CONSTRUCTION
TCVN 5575 : 2012 - STEEL STRUCTURE - DESIGN STANDARD b
03 03 THÉP TẤM
a 4.3.3. TẤT CẢ CÁC BẢN MÃ VÀ SƯỜN GIA CƯỜNG KHÔNG NHỎ HƠN 10mm. TRỪ PHI ĐƯỢC CHỈ RÕ HOAØN COÂNG / AS - BUILT
TCVN 5575 : 2012 - KẾT CẤU THÉP, TIÊU CHUẨN THIẾT KẾ PLATE STEEL t
TRÊN BẢN VẼ
BS 5950 : 1-2000 -STEEL STRUCTURE - DESIGN STANDARD PL.200X300X10 CHÆNH SÖÛA / REVISION
04 ALL GUSSET PLATES AND STIFFENERS SHALL BE 10mm THICKNESS UNLESS NOTED OTHERWISE
BS 5950 : 1-2000 - KẾT CẤU THÉP- TIÊU CHUÂN THIẾT KẾ ON THE DRAWINGS. 5
B 4.3.8. ĐỐI VỚI CÁC CẤU KIỆN ĐƯỢC GHÉP TỪ 02 THÉP GÓC HAY THÉP CHỮ C THÌ KHOẢNG CÁCH GIỮA
XÀ GỒ THÉP HỘP, TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
D CÁC BULÔNG LIÊN KẾT HOẶC CÁC BẢN NỐI KHÔNG ĐƯỢC VƯỢT QUÁ 600MM TÍNH TỪ TÂM.
MẠ KẼM
3. KÍ HIỆU VÀ GHI CHÚ \ LEGEND AND NOTES 08 t
PURLIN BOX - SHAPE, DOUBLE ANGLE OR CHANNEL MEMBERS SHALL HAVE STITCH BOLTS & RINGFILLS OR WELDED FILLERS
3.1. CHỮ VIẾT TẮT SỬ DỤNG TRONG BẢN VẼ / ABBREVIATIONS ARE USED ON THE DRAWINGS GALVANIZED BOX-SHAPE NOT MORE THAN 600mm ON CENTERS.
Z275 (275 G/m²)
4.3.9. ĐỐI VỚI LIÊN KẾT CỦA DẦM CẦU TRỤC VÀ KẾT CẤU ĐỠ, BULÔNG ĐƯỢC SỬ DỤNG VỚI HAI ĐAI ỐC
SYMBOL SYMBOL VÀ VÒNG ĐỆM VÊNH PHẢI ĐƯỢC SỬ DỤNG , TRỪ CÁC CHỈ ĐỊNH KHÁC CÓ TRONG BẢN VẼ.
No No
KÍ HIỆU KÍ HIỆU FOR CONNECTIONS OF ALL CRANE GIRDERS AND THEIR SUPPORTS, F10T BOTLS WITH TWO NUTS
4. QUY ĐỊNH CHUNG ĐỐI VỚI KẾT CẤU THÉP/ STRUCTURAL STEEL WORK
BULÔNG NEO TƯỜNG GẠCH AND SPRING WASHERS ARE TO BE USED, UNLESS NOTED OTHERWISE.
01 AB 13 BW. GIAÙM ÑOÁC / DIRECTOR :
ANCHOR BOLT BRICK WALL 4.1. QUY ĐỊNH VỀ KÍCH THƯỚC VÀ CAO ĐỘ / VERIFICATION OF DIMENSIONS AND LEVELS
4.3.10. CÁC ĐƯỜNG HÀN ĐƯỢC THỰC HIỆN TRONG NHÀ MÁY TRỪ PHI CÓ CHỈ ĐỊNH KHÁC
- NHÀ THẦU PHẢI XÁC ĐỊNH TOÀN BỘ KÍCH THƯỚC VÀ CAO ĐỘ TẠI CÔNG TRƯỜNG VÀ CÙNG VỚI
BULÔNG LIÊN KẾT BÊ TÔNG CỐT THÉP ALL WELDS ARE SHOP FABRICATED UNLESS NOTED OTHERWISE.
02 M. 14 R.C TƯ VẤN GIẢI QUYẾT CÁC KÍCH THƯỚC KHÔNG NHẤT QUÁN TRƯỚC KHI BẮT ĐẦU CÔNG VIỆC.
CONNECTING BOLT REINFORCED CONCRETE
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LEVELS ON OR ENGINEER PRIOR TO 4.3.11. BULÔNG NEO PHẢI ĐƯỢC LẮP ĐẶT VỚI KÍCH THƯỚC VÀ ĐOẠN NHÔ RA TUÂN THEO ĐÚNG THIẾT
ĐƯỜNG KÍNH CAO ĐỘ KẾT CẤU COMMENCEMENT OF WORK. KẾ VỚI SAI LỆCH CHO PHÉP LÀ 5MM. REN CỦA BULÔNG PHẢI ĐƯỢC BẢO BỆ TRONG QUÁ TRÌNH THI CÔNG.
03 DIA. 15 IL. CHUÛ NHIEÄM DÖÏ AÙN
DIAMETER FLOOR LEVEL
- TẤT CẢ CÁC BẢN VẼ KẾT CẤU SẼ ĐƯỢC ĐỌC KẾT HỢP VỚI BẢN VẼ KIẾN TRÚC, ĐIỆN, NƯỚC, HẠ ANCHOR BOLTS MUST BE SET TO THE GIVEN DIMENSIONS & PROJECTION WITH MAXIMUM DEVIATION PROJECT MANAGER
TẦNG VÀ CÁC BẢN VẼ KHÁC CÓ LIÊN QUAN OF 5MM. ANCHOR BOLTS THREADS SHOULD BE PROTECTED DURING CONCRETE POORING. ALL CHUÛ TRÌ
BẢN THÉP CAO ĐỘ HOÀN THIỆN
04 PL. 16 FL. TEMPLATES SHOULD BE REMOVED. PRINCIPAL DESIGN
STEEL PLATE FINISH FLOOR LEVEL ALL OF STRUCTURE DRAWING WILL BE READ TOGETHER WITH ARCHITECTURE, MEP, CIVIL
DRAWINGS AND OTHER DRAWINGS WHICH HAVE REGARDING THIEÁT KEÁ VAØ VEÕ
4.3.12. VIỆC LẮP ĐẶT BULÔNG NEO VÀ CÁC CẤU KIỆN TƯƠNG TỰ PHẢI TUÂN THEO CÁC YÊU CẦU KỸ DESIGNED & DRAWN
TẤM THÉP MÓNG - TẤT CẢ CÁC CÁC KÍCH THƯỚC PHẢI ĐƯỢC ĐỌC VÀ KHÔNG ĐƯỢC ĐO TỶ LỆ. TẤT CẢ CÁC CAO ĐỘ
05 FB. 17 F. TECHNICAL MANAGER
FLAT BAR FOUNDATION THUẬT VỀ CÔNG TÁC THÉP NHƯ SAU:
TÍNH BẰNG MÉT, KÍCH THƯỚC ĐƯỢC ĐO BẰNG MILIMET NGOẠI TRỪ NHỮNG GHI CHÚ KHÁC Q.L.K.T
THE INSTALLATION OF ANCHOR BOLTS AND EMBEDDED ITEMS MUST BE DONE
TẤM THÉP CARO KHOẢNG BẰNG NHAU ALL OF DIMENSION MUST BE READ AND NONE SCALE. ALL OF ELEVATION IS METE. DIMENSION OF TO THE FOLLOWING MINIMUM ALLOWABLE TOLERANCES: COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
06 CHK. 18 EQ.
CHECKERED PLATE EQUAL PLAN IS MINIMETE U.O.S PROJECT : TAEKWANG DAKLAK FACTORY
+ 3mm TỪ TÂM ĐẾN TÂM CHO 2 BULÔNG BẤT KỲ NẰM CÙNG NHÓM BULÔNG
3mm CENTER TO CENTER OF ANY TWO BOLTS WITHIN ANCHOR BOLT GROUP. ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
SƯỜN GIA CƯỜNG TÂM ĐẾN TÂM 4.2. QUY ĐỊNH VỀ BẢN VẼ / VERIFICATION OF DRAWINGS
07 STIFF. 19 C/C. LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
STIFFENER CENTER TO CENTER + 6mm TỪ TÂM ĐẾN TÂM ĐỐI VỚI NHÓM BULÔNG KẾ BÊN
4.2.1. BẢN VẼ KẾT CẤU/ STRUCTURAL DRAWINGS
6mm CENTER TO CENTER OF ADJACENT ANCHOR BOLT GROUP. HAÏNG MUÏC / ITEM
BẢN VẼ THỂ HIỆN CÁC CHI TIẾT THI CÔNG CHUNG VÀ ĐIỂN HÌNH. TRONG TRƯỜNG HỢP CÁC CHI
BỀ DÀY THAY ĐỔI
08 THK.
THICKNESS
20 VAR.
VARIOUS
TIẾT KHÔNG ĐƯỢC THỂ HIỆN CỤ THỂ NHƯNG GIỐNG VỚI NHỮNG CHI TIẾT ĐÃ THỂ HIỆN TRƯỚC + CAO ĐỘ ĐỈNH BULÔNG: ±10mm TẤT CẢ HẠNG MỤC
ĐÓ THÌ NHÀ THẦU ĐƯỢC SỬ DỤNG KHI CÓ SỰ KIỂM TRA VÀ PHÊ DUYỆT CỦA TƯ VẤN.
BẢN VẼ TRƯỚC KHI BẮT ĐẦU THI CÔNG, NHÀ THẦU PHẢI KIỂM TRA TOÀN BỘ KÍCH THƯỚC VÀ CAO TRÌNH + TỐI ĐA LÀ 6MM CHO MỖI 30M DỌC THEO MỘT HÀNG CỘT CÓ NHIỀU NHÓM BULÔNG TEÂN BAÛN VEÕ / DRAWING NAME
09 DWG. 21
DRAWING TRONG BẢN VẼ. CÁC BẢN VẼ KHÔNG THỐNG NHẤT PHẢI ĐƯỢC THÔNG BÁO VỐI TƯ VẤN. NHƯNG KHÔNG ĐƯỢC VƯỢT QUÁ 25mm
MAXIMUM ACCUMULATION OF 6MM PER 30 METERS ALONG THE ESTABLISHED COLUMN
10 MAX.
GIÁ TRỊ LỚN NHẤT
22 DRAWING INDICATES GENERAL & TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE
LINES OF MULTIPLE ANCHOR BOLT GROUPS BUT NOT TO EXCEED A TOTAL OF 25MM.
QUY ĐỊNH CHUNG - TỜ 5
MAXIMUM
OF SIMILAR CHARACTER TO DETAILS SHOWN AND ALTHOUGH NOT SPECIFICALLY INDICATED,
+ 6mm TỪ TÂM CỦA BẤT KỲ NHÓM BULÔNG NÀO ĐẾN TRỤC CỘT ĐI QUA NHÓM BULÔNG ĐÓ
GIÁ TRỊ NHỎ NHẤT SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED SUBJECT TO REVIEW AND APPROVAL BY
11 MIN. 23 6MM FROM THE CENTER OF ANY ANCHOR BOLT GROUP TO THE ESTABLISHED COLUMN LINE
MINIMUM THE ENGINEER.PRIOR TO COMMENCEMENT OF WORKS, THE CONTRACTOR SHALL VERIFY ALL
THROUGH THAT GROUP.
DIMENSIONS AND LEVELS IN THE CONTRACT DRAWINGS. DISCREPANCIES IN DRAWINGS ARISING BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TIÊU CHUẨN + CÁC BULÔNG NEO PHẢI VUÔNG GÓC VỚI MẶT PHẲNG BẢN ĐẾ TRỪ PHI CÓ GHI CHÚ KHÁC
12 STD. 24 FROM SUCH VERIFICATION WORKS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCH./ENG.. S-G-05 1:100 00
STANDARD
ANCHOR BOLTS SHALL BE SET PERPENDICULAR TO THE THEORETICAL BEARING SURFACE, UNO.
TEÂN FILE / FILE NAME NGAØY / DATE
FL±0.000
D SIKA GROUT HOẶC TƯƠNG ĐƯƠNG
ĐAI ỐC NẮN
LEVELLING NUT
4 5 6
C1 W
S m t 6~9 10~16 - t 6~12 13~26 - t 12~30 - - MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
d1
b 1 2 - b 6 9 - b 2 - -
R
W
XIN PHEÙP XAÂY DÖÏNG / FOR CONST. LICENSE
C
ÑAÁU THAÀU / FOR PROCUREMENT
BULÔNG NEO MẠ KẼM ĐAI ỐC NUTS (TYP.) VÒNG ĐỆM WASHER (TYP.)
ANCHOR BOLTS GALVANIZED BAÛN VEÕ THI COÂNG / FOR CONSTRUCTION
KÍCH THƯỚC BULÔNG NEO / DIMENSIONAL ANCHOR BOLT HOAØN COÂNG / AS - BUILT
M30 3.50 6.15 900 170 160 150 75 100 50 1114 No. DATE DESCRIPTION CHECKER
M36 4.00 10.04 1000 210 192 200 125 100 60 1263 CHUÛ ÑAÀU TÖ / EMPLOYER
10 11 12
KÍCH THƯỚC VÒNG ĐỆM VÀ ĐAI ỐC / / DIMENSIONAL WASHER AND NUTS
t 12~40 - - t 6~10 11~17 18~30 t 12~40 - -
b 2 - - b 1 2 3 b 2 - -
ĐƯỜNG KÍNH
VÒNG ĐỆM / WASHER ĐAI ỐC / NUT GHI CHÚ
DANH NGHĨA hf min 1 2 2
NOMINAL t W d1 s m NOTES
DIAMETER (mm) (mm) (mm) (mm) (mm)
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
M16 9 60 18 24 13 Ñieän thoaïi: 061.3836421 ; Fax:
M24 16 70 26 36 19
M30 16 70 33 46 24 13 14 15
M36 19 80 39 55 29 t 12~40 - - t - - - t - - -
b 45° - - b - - - b - - - NHAØ THAÀU THI COÂNG / CONTRACTOR
6. ĐẶC TRƯNG BULÔNG CƯỜNG ĐỘ CAO / PROPERTIES - HIGH STRENGTH BOLT
H F
G
E
R
L=LT
E F G H R 7.3. CHIỀU CAO ĐƯỜNG HÀN THÉP I TỔ HỢP/ WELD HIGHT OF I - BULT-UP TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
BULÔNG Đ.KÍNH C.R. CẠNH C.R. GÓC C.H. ĐẦU BÁN KÍNH CHIỀU DÀI BULÔNG
THÂN LỤC GIÁC LỤC GIÁC BULÔNG VÁT
BOLT BODY WIDTH ACROSS WIDTH ACROSS HEIGHT RADIUS OF BOLT LENGTH "L"AND LEGEND & SIZE WELDING H1 LEGEND & SIZE WELDING H2
tw tw
DIA. FLATS CORNERS FILLET KÍ HIỆU & CHIÊU CAO ĐƯỜNG HÀN H1 KÍ HIỆU & CHIÊU CAO ĐƯỜNG HÀN H2
Đ. KÍNH BƯỚC
MAX. MAX. MIN. MAX. MIN. MAX. MIN. MAX. MIN. L = LT L = LT 4
3
4
4
REN
4 5
M12 1.75 12.00 19.00 18.67 - 21.10 7.68 7.32 - 0.23 35 55 5 5 H2 tw
4.5 5.5
M16 2.00 16.70 27.00 26.16 31.18 29.56 10.75 9.25 - 0.53 50 70 6 6
5.5 8
M20 2.50 20.84 34.00 33.00 39.26 37.29 13.40 11.60 - 0.53 60 80 8 H1 8 GIAÙM ÑOÁC / DIRECTOR :
6 8
M24 3.00 24.84 41.00 40.00 47.34 45.20 15.90 14.10 - 0.79 70 90 10 10
7.5 8.5
M27 3.00 27.84 46.00 45.00 53.12 50.85 17.90 16.10 - 1.57 90 100 12 12
9 10
M30 3.50 30.84 50.00 49.00 57.74 55.37 19.75 17.65 - 1.57 100 120 14 14 tf
S-G-06 1:100 00
F6 F6 F6 F6 F6 F6 F6 F6
F5 F5 F5 F5
H
F3 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1
F4 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
F4 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
F4 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 2
B 1
A
F5 F5 F5 F5 F5 F5 F5 F5
F6 F6 F6 F6 F6 F6 F6 F6
F5 F5 F5 F5 F5 F5 F5 F5
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MẶT BẰNG MÓNG TL: 1/ 250
F6 F6 F6 F6 F6 F6
F5 F5 F5 F5
H
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F3
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F4
TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
G
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F4
F
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F4 LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
A
F5 F5 F5 F5 F5 F5 F5 F5
MẶT BẰNG MÓNG
F6 F6 F6 F6 F6 F6 F6 F6
F5 F5 F5 F5 F5 F5 F5 F5
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-FA2-01 1:250 00
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
TEÂN FILE / FILE NAME NGAØY / DATE
C5 C6 C6 C6 C6 C5 C5 C5
H C6 C6 C6 C6
C2 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
C4 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3
G
C4 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3
F
2
C4 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3
B 1
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
C5 C5 C5 C6 C6 C6 C6 C6 C5 C5 C5 C5 C5 C5
C5 C5 C5
C6 C6 C6 C6
H
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C2
C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C4
G TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C4
F
C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C4
E
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C4
B HAÏNG MUÏC / ITEM
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-FA2-02 1:250 00
F5 1200 1200 200 200 Ø12a200 Ø12a200 01 -2.600 ÑAÁU THAÀU / FOR PROCUREMENT
2
GHI CHÚ: L >= B 1
* CAO ĐỘ ±0.000 TƯƠNG ỨNG VỚI CAO ĐỘ BẢN VẼ KIẾN TRÚC.
No. DATE DESCRIPTION CHECKER
* CAO ĐỘ ĐÁY MÓNG ĐƯỢC XÁC ĐỊNH THEO MẶT BẰNG NỀN ĐẤT HIỆN TRẠNG
CHUÛ ÑAÀU TÖ / EMPLOYER
* BÊ TÔNG LÓT ĐÁ 1X2, DÀY 50MM
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
CỘT BTCT DỪNG TẠI +0.900 CỘT BTCT DỪNG TẠI +0.900 CỘT BTCT DỪNG TẠI +0.900
G G
TỪ TRỆT (+0.000) ... ... ...
ĐẾN B B
H A H A
+0.900; ĐẾN MÁI
...
1 24 2 3
1 24
2 ... 23 GIAÙM ÑOÁC / DIRECTOR :
1 24 ... ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
2 ... 23 1 24 2 --- 24
HAÏNG MUÏC / ITEM
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-FA2-03 1:250 00
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B3 G.B3
NỀN N2 NỀN N2
G.B1 TẢI TRỌNG : 0.2 TẤN/M² G.B1 TẢI TRỌNG : 0.2 TẤN/M²
H
I.J
2 1 2
G.B2
S.J
G
S.J
F
CN.J
CN.J
CN.J
CN.J
2
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
I.J
1
S.J
B No. DATE DESCRIPTION CHECKER
A G.B1 G.B1
1 1
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MẶT BẰNG ĐÀ KIỀNG & SÀN NỀN TL: 1/ B
NHAØ THAÀU THI COÂNG / CONTRACTOR
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B4
G.B3
NỀN N2
G.B1 TẢI TRỌNG : 0.2 TẤN/M² G.B1
H
I.J
1 2
G.B2
TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
S.J
G
S.J
F
GIAÙM ÑOÁC / DIRECTOR :
E
NỀN N1 1 CHUÛ NHIEÄM DÖÏ AÙN
TẢI TRỌNG : 1.5 TẤN/M² PROJECT MANAGER
CHUÛ TRÌ
S.J PRINCIPAL DESIGN
D THIEÁT KEÁ VAØ VEÕ
DESIGNED & DRAWN
TECHNICAL MANAGER
Q.L.K.T
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
CN.J
CN.J
CN.J
CN.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
S.J
HAÏNG MUÏC / ITEM
S.J
B XƯỞNG SẢN XUẤT
TEÂN BAÛN VEÕ / DRAWING NAME
G.B2
MB & CHI TIẾT ĐÀ KIỀNG & SÀN NỀN
G.B1 G.B1 A
1
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-FA2-04 1:250 00
HOÀN THIỆN THEO CHỈ ĐỊNH BVKT HOÀN THIỆN THEO CHỈ ĐỊNH BVKT
Grid line/ Trục ALL Grid line/ Trục ALL BTCT ĐÁ 1x2, DÀY 200 BTCT ĐÁ 1x2, DÀY 100
MÀNG CHỐNG THẤM PVC DÀY 0.2MM MÀNG CHỐNG THẤM PVC DÀY 0.2MM
BEAM / DẦM +0.000 BEAM / DẦM
+0.000 LỚP ĐÁ 0x4, DÀY 200, ĐẦM CHẶT K=0.95 LỚP ĐÁ 0x4, DÀY 200, ĐẦM CHẶT K=0.95
G.B1 G.B3 ĐẤT NỀN HIỆN HỮU ĐẦM CHẶT ĐẤT NỀN HIỆN HỮU ĐẦM CHẶT
S.J
BAÛN VEÕ THI COÂNG / FOR CONSTRUCTION
CỘT BTCT
HOAØN COÂNG / AS - BUILT
J
S.
S.
BÊN NGOÀI BÊN TRONG NỀN N1 NỀN N2
S.J
J
I.J CHÆNH SÖÛA / REVISION
TƯỜNG GẠCH XÂY TƯỜNG GẠCH XÂY
TRÁM KHE BẰNG SEALANT 5*15 TRÁM KHE BẰNG SEALANT 5*15 TRÁM KHE BẰNG SEALANT 5*15 5
S.J S.J
S.
CHÈN KHE BẰNG MÚT XỐP CHÈN KHE BẰNG MÚT XỐP CHÈN KHE BẰNG MÚT XỐP
S.
I.J
I.J
J
Sealant WxH=5x15 4
I.J
CHÈN SEALANT W*H=5*15 Ø20a500, L=600 +0.000 +0.000
3
+0.000
I.J I.J I.J 2
J
S.
S.
J
1
S.J
CỘT BTCT ĐÀ KIỀNG BTCT
CHUÛ ÑAÀU TÖ / EMPLOYER
KHE CẮT CHỐNG NỨT (S.J) TL: 1/ 25 KHE NỐI CN.J TL: 1/ 25 KHE CẮT I.J TL: 1/ 25 MẶT CẮT 2-2 TL: 1/ 25 CT CẮT KHE QUA CỘT GIỮA TL: 1/ 25 CT CẮT KHE QUA CỘT BIÊN TL: 1/ 25
MẶT CẮT 1-1 SC: 1/ 25
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-FA2-04a 1:250 00
DG1
H
BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1
DG1
BT1
BT1
BT1
4
BT1
3
2
B
1
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
DG1
H
BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1
DG1
BT1
TỪ TRỆT (+0.000)
G ĐẾN TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
+0.900
BT1
BT1
Grid line/ Trục ALL CHUÛ NHIEÄM DÖÏ AÙN
PROJECT MANAGER
BEAM / DẦM
D CHUÛ TRÌ
PRINCIPAL DESIGN
DG1 +0.900 THIEÁT KEÁ VAØ VEÕ
BT1 DESIGNED & DRAWN
TECHNICAL MANAGER
Q.L.K.T
C COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
PROJECT : TAEKWANG DAKLAK FACTORY
BT1 ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
DG1
BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1 BT1
DG1
A MB & CHI TIẾT ĐÀ KIỀNG & SÀN NỀN
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-FA2-04 1:250 00
F4 F4 F4
C5 C4 C5 C5 C5
7
7
F3 F3 F3 F3 F3 F3 C2 C2 C2 C2 C2 C2
F4
C4
F2 F1 F1 F1 F1 F2
6 C1 C3 C1 C1 C3 C1
6
F2 F1 F1 F1 F1 F2
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
5 C1 C3 C1 C1 C3 C1
5 THAM KHAÛO / FOR REFERENCE
F1 F1 F1 F1 4
F2 F2
3
3 C1 C3 C1 C1 C3 C1
3 2
2 C1 C3 C1 C1 C3 C1
2
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
F3 F3 F3 F3 F3 F3
Ñieän thoaïi: 061.3836421 ; Fax:
A B C D E F
A B C D E F
MẶT BẰNG MÓNG TL: 1/ 150
MẶT BẰNG CỘT TL: 1/ 150
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
CỐT ĐAI Ø8a(100-200) Ø6a(100-200) Ø6a150 LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
TỪ LẦU (+3.600)
ĐẾN CỐT DỌC 10Ø18 8Ø16 4Ø16 MÓNG ĐIỂN HÌNH MẶT CẮT 1-1 HAÏNG MUÏC / ITEM
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TÊN CỘT CỘT C1 CỘT C2 CỘT C3 CỘT C4 CỘT C5
TDL-STR-CA-01 1:100 00
06-TDL-STR-CANTEEN_V2.0.dwg 06.2021
GHI CHUÙ / NOTES:
G.B5
G.B6
G.B8
G.B6
7 G.B7a G.B1 G.B1
G.B2
G.B4
G.B4
G.B2
G.B2
G.B2
G.B2
G.B3 G.B3
G.B2
G.B1
G.B3 G.B3
G.B3 G.B3 G.B3
6 G.B1 G.B1
G.B7
G.B4
G.B2
G.B2
G.B2
G.B2
G.B2
G.B1 G.B1
5
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
THAM KHAÛO / FOR REFERENCE
G.B2
G.B1 G.B1 ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Grid line/ Trục ALL Grid line/ Trục ALL Grid line/ Trục ALL Grid line/ Trục ALL Grid line/ Trục ALL
BEAM / DẦM BEAM / DẦM BEAM / DẦM BEAM / DẦM BEAM / DẦM TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
-0.050 -0.050 -0.250 -0.050 -0.050
Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1 Section / Mặt cắt 1-1 Section / Mặt cắt 1-1
Notes / Ghi chú Notes / Ghi chú Notes / Ghi chú Notes / Ghi chú Notes / Ghi chú
ĐẤT NỀN HIỆN HỮU ĐẦM CHẶT TƯỜNG GẠCH XÂY COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
PROJECT : TAEKWANG DAKLAK FACTORY
TRÁM KHE BẰNG SEALANT 5*15
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
1 LỚP DƯỚI - THÉP LƯỚI HÀN CHÈN KHE BẰNG MÚT XỐP
Ø8a200*Ø8a200 +0.000 LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
+0.000
Stirrup / Cốt đai Ø6a150
HAÏNG MUÏC / ITEM
Section / Mặt cắt 1-1
Notes / Ghi chú CANTEEN
TEÂN BAÛN VEÕ / DRAWING NAME
CHI TIẾT SÀN NỀN TL: 1/ 25 MẶT CẮT 1-1 TL: 1/ 25 MẶT BẰNG ĐÀ KIỀNG
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-CA-02 1:100 00
06-TDL-STR-CANTEEN_V2.0.dwg 06.2021
GHI CHUÙ / NOTES:
7
L.B1 L.B1
7
3
L.B4
L.B4
L.B4
L.B4
L.B4
L.B2
L.B2
L.B2
L.B2
L.B2
L.B2
Ø10a120 Ø10a120
L.B1 L.B1
6
5
6
Ø10a120
L.B1 L.B1
5
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
5
5 THAM KHAÛO / FOR REFERENCE
Ø10a150
Ø10a120
L.B1 L.B1 ÑAÁU THAÀU / FOR PROCUREMENT
4 BAÛN VEÕ THI COÂNG / FOR CONSTRUCTION
2
5
4 HOAØN COÂNG / AS - BUILT
Ø10a120
L.B1 L.B1 4
3 1 Ø10a150
3
5
3 2
Ø10a120
L.B1 L.B1 CHUÛ ÑAÀU TÖ / EMPLOYER
2
5
2
L.B2
L.B4
L.B2
L.B4
L.B2
L.B4
L.B2
L.B4
L.B2
L.B4
L.B2
Ø10a120
L.B1 L.B1 ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
3
1
BEAM / DẦM
Grid line/ Trục ALL Grid line/ Trục ALL
+3.950
L.B1 BEAM / DẦM
+3.950
BEAM / DẦM
+3.950
BEAM / DẦM ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
+3.950
L.B2 HAÏNG MUÏC / ITEM
CANTEEN
TEÂN BAÛN VEÕ / DRAWING NAME
06-TDL-STR-CANTEEN_V2.0.dwg 06.2021
GHI CHUÙ / NOTES:
R.B1 R.B1
7 7
R.B2
R.B2
R.B2
R.B2
TY GIẰNG Ø12
KHUNG SF1
6 6
CÁP Ø20
2C 200*2.0
2C 200*2.0
2C 200*2.0
2C 200*2.0
2C 200*2.0
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
5 5 KHUNG SF1 THAM KHAÛO / FOR REFERENCE
3
3 3 KHUNG SF1 2
1
CÁP Ø20 No. DATE DESCRIPTION CHECKER
2C 200*2.0
2C 200*2.0
2C 200*2.0
2C 200*2.0
2C 200*2.0
CHUÛ ÑAÀU TÖ / EMPLOYER
XÀ GỒ Z200*65*20*1.5@1200
2 2 KHUNG SF1
R.B2
R.B2
R.B2
R.B2
TY GIẰNG Ø12
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
R.B1 R.B1 Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
1 1
A B C D E F A B C D E F
MẶT BẰNG GIẰNG MÁI TL: 1/ 150 MẶT BẰNG KHUNG KÈO MÁI TL: 1/ 150
+10.017 +10.017
.164*8 W.284*6 + F
W.284*6 + F .164*8
GIAÙM ÑOÁC / DIRECTOR :
W.284*6 + F.164*8
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
CANTEEN
+0.000 +0.000
TEÂN BAÛN VEÕ / DRAWING NAME
A B C C B A
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-CA-04 1:100 00
KHUNG THÉP SF1 TL: 1/ 75
TEÂN FILE / FILE NAME NGAØY / DATE
06-TDL-STR-CANTEEN_V2.0.dwg 06.2021
GHI CHUÙ / NOTES:
6 G.B1 G.B1
6 6
C1 C1 C1
F1 F2 F1
G.B3
G.B3 G.B3
F3 F3
C2 C2
G.B3
5 G.B3
5 5
G.B3 G.B3
G.B2
ÑAÁU THAÀU / FOR PROCUREMENT
3
G.B3 G.B3
2
G.B2
G.B2
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
G.B3
Ñieän thoaïi: 061.3836421 ; Fax:
A B C A B C A B C
MẶT BẰNG MÓNG TL: 1/ 100 MẶT BẰNG CỘT TL: 1/ 100 MẶT BẰNG ĐÀ KIỀNG TL: 1/ 100
BẢNG THỐNG KÊ MÓNG CHI TIẾT MÓNG ĐIỂN HÌNH Grid line/ Trục ALL Grid line/ Trục ALL
Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1
F2 2000 1600 200 300 Ø12a100 Ø12a200 01 -1.500 CHUÛ NHIEÄM DÖÏ AÙN
Notes / Ghi chú Notes / Ghi chú PROJECT MANAGER
TỪ MÓNG
CỐT ĐAI Ø6a150 Ø6a150
MÓNG ĐIỂN HÌNH MẶT CẮT 1-1 Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100 NHÀ RÁC
ĐẾN CỐT DỌC 6Ø16 10Ø16 Section / Mặt cắt 1-1 1-2 1-3 TEÂN BAÛN VEÕ / DRAWING NAME
CHI TIẾT SÀN NỀN TL: 1/ 25
TRỆT (+0.000) GHI CHÚ: L >= B Notes / Ghi chú
TIẾT DIỆN 200*300 300*400
* CAO ĐỘ ±0.000 TƯƠNG ỨNG VỚI CAO ĐỘ BẢN VẼ KIẾN TRÚC. MẶT BẰNG & CHI TIẾT MÓNG, CỘT
* CAO ĐỘ ĐÁY MÓNG ĐƯỢC XÁC ĐỊNH THEO MẶT BẰNG NỀN ĐẤT HIỆN TRẠNG
TÊN CỘT CỘT C1 CỘT C2 * BÊ TÔNG LÓT ĐÁ 1X2, DÀY 50MM
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-RMCC-01 1:100 00
07 -TDL-STR-RMCC_V1.0.dwg 06.2021
GHI CHUÙ / NOTES:
R.B1
6
KHUNG SF1
5
R.B2
XIN PHEÙP XAÂY DÖÏNG / FOR CONST. LICENSE
Grid line/ Trục ALL
XÀ GỒ THÉP ÑAÁU THAÀU / FOR PROCUREMENT
C125*50*15*1.5@1000 BEAM / DẦM +4.500 BAÛN VEÕ THI COÂNG / FOR CONSTRUCTION
R.B2
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
1
R.B1
A B C
W.(238-
45 0)*4 + F
+5.950 .150*6
.150*6 W.(388-
)* 4 + F 238)*4 +
238 F.150*6
W.(388-
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
+0.000
HAÏNG MUÏC / ITEM
NHÀ RÁC
TEÂN BAÛN VEÕ / DRAWING NAME
A B C
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-RMCC-02 1:100 00
07 -TDL-STR-RMCC_V1.0.dwg 06.2021
GHI CHUÙ / NOTES:
F2 F2 F2 F2 F2 F2 F2 F2
F1 F1
F2 F2 F2 F2 F2 F2 F2 F2
F1 F1
1
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
THAM KHAÛO / FOR REFERENCE
4
2
C1 C2 C2 C2 C2 C2 C2 C2 C2 C1 3
C1 C2 C2 C2 C2 C2 C2 C2 C2 C1 ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
1 Ñieän thoaïi: 061.3836421 ; Fax:
A B C D E F G H I J
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
CỐT ĐAI Ø6a150 Ø6a150 MẶT BẰNG & CHI TIẾT MÓNG, CỘT
TỪ MÓNG GHI CHÚ: L >= B
ĐẾN CỐT DỌC 4Ø16 4Ø16 * CAO ĐỘ ±0.000 TƯƠNG ỨNG VỚI CAO ĐỘ BẢN VẼ KIẾN TRÚC.
* CAO ĐỘ ĐÁY MÓNG ĐƯỢC XÁC ĐỊNH THEO MẶT BẰNG NỀN ĐẤT HIỆN TRẠNG
TRỆT (+0.000)
TIẾT DIỆN 200*200 200*200 * BÊ TÔNG LÓT ĐÁ 1X2, DÀY 50MM
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-EL-01 1:100 00
TÊN CỘT CỘT C1 CỘT C2
TEÂN FILE / FILE NAME NGAØY / DATE
G.B2
G.B2
G.B2
G.B2
G.B2
G.B2
1 G.B1 G.B1 G.B1
R.B2
R.B2
R.B2
R.B2
R.B2
R.B2
R.B2
R.B2
R.B2
CHUÛ ÑAÀU TÖ / EMPLOYER
W100
W100
W100
W100
W100
W100
W100
W100
GIAÙM ÑOÁC / DIRECTOR :
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
W100 : TƯỜNG HỒI XÂY GẠCH DÀY 100MM
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
ALL Grid line/ Trục ALL Grid line/ Trục ALL HAÏNG MUÏC / ITEM
Grid line/ Trục HOÀN THIỆN THEO CHỈ ĐỊNH BVKT
G.B1 LỚP ĐÁ 0x4, DÀY 200, ĐẦM CHẶT K=0.95 R.B1 R.Bm TEÂN BAÛN VEÕ / DRAWING NAME
Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100 Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100 Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100 BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1 1-2 1-3 TDL-STR-EL-02 1:100 00
Notes / Ghi chú CHI TIẾT SÀN NỀN TL: 1/ 25 Notes / Ghi chú Notes / Ghi chú TEÂN FILE / FILE NAME NGAØY / DATE
F1 F1
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
C
F1 F1
F1 F1
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
B
1
D
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 No. DATE DESCRIPTION CHECKER
C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2
C
C3 C3
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
B
BN1 BN1
D
BN1
BN1
F3 F3 CHUÛ NHIEÄM DÖÏ AÙN
PROJECT MANAGER
CHUÛ TRÌ
PRINCIPAL DESIGN
C I.J
THIEÁT KEÁ VAØ VEÕ
DESIGNED & DRAWN
TECHNICAL MANAGER
F5 F5 Q.L.K.T
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
I.J PROJECT : TAEKWANG DAKLAK FACTORY
B ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
BN1
BN1
HAÏNG MUÏC / ITEM
F4 F4
NHÀ XE 01
BN1 BN1
A TEÂN BAÛN VEÕ / DRAWING NAME
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-BP-01 1:150 00
MẶT BẰNG ĐÀ KIỀNG TL: 1/ 150 TEÂN FILE / FILE NAME NGAØY / DATE
1
CỐT ĐAI Ø6a150 Ø6a150 Ø6a150
No. DATE DESCRIPTION CHECKER
Grid line/ Trục ALL ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
HOÀN THIỆN THEO CHỈ ĐỊNH BVKT
Ñieän thoaïi: 061.3836421 ; Fax:
S.J
BEAM / DẦM BÊ TÔNG LÓT ĐÁ 1x2, DÀY 100
Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
+0.000 MÀNG CHỐNG THẤM PVC DÀY 0.2MM
S.
S.
J
ĐẤT NỀN HIỆN HỮU ĐẦM CHẶT I.J STEEL DECKING 0.75mm THK. Ø8a200 Ø8a200
120
SHEAR STUD Ø10a500
CHÈN SEALANT W*H=5*15
+0.000 +0.000
I.J I.J NHAØ THAÀU THI COÂNG / CONTRACTOR
H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1
D
V.SB2
V.SB2
V.SB2
V.SB2
H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
CHUÛ NHIEÄM DÖÏ AÙN
H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2
PROJECT MANAGER
H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 CHUÛ TRÌ
C PRINCIPAL DESIGN
H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 THIEÁT KEÁ VAØ VEÕ
DESIGNED & DRAWN
H.SB2 H.SB2 H.SB2 H.SB2
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
TECHNICAL MANAGER
H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 Q.L.K.T
H.SB2 H.SB2 H.SB2 H.SB2
COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1
B PROJECT : TAEKWANG DAKLAK FACTORY
H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
V.SB1
H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 H.SB2 HAÏNG MUÏC / ITEM
V.SB2
V.SB2
NHÀ XE 01
A H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1 H.SB1
TEÂN BAÛN VEÕ / DRAWING NAME
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-BP-02 1:150 00
MẶT BẰNG DẦM SÀN LẦU TL: 1/ 150 TEÂN FILE / FILE NAME NGAØY / DATE
D SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1
T1 T1 T1 T1 T1 T1
SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1
C
T1 T1 T1 T1 T1 T1
SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1
B
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
SF1
T1 T1 T1 T1 T1 T1
SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
A THAM KHAÛO / FOR REFERENCE
2
D 1
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
Ñieän thoaïi: 061.3836421 ; Fax:
B Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
MB XÀ GỒ MÁI TL: 1/ 150
SC1.2
SC1.2
SC1.2
PROJECT MANAGER
SC1.2
V.SB1 W.284*5 + F.184*8 MÁC THÉP SS400 CHUÛ TRÌ
PRINCIPAL DESIGN
V.SB2 W.190*5 + F.150*5 MÁC THÉP SS400 +2.500 THIEÁT KEÁ VAØ VEÕ
DESIGNED & DRAWN
SB1 Ø90*4 MÁC THÉP SS400 TECHNICAL MANAGER
Q.L.K.T
SC1.1
SC1.1
T1 GIẰNG TĂNG ĐƠ Ø16 MÁC THÉP Q345b
COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
SC2
SC2
T2 TI GIẰNG XÀ GỒ Ø10 MÁC THÉP SS400 PROJECT : TAEKWANG DAKLAK FACTORY
+0.000 ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
XÀ GỒ MÁI C125*50*15*1.2@1000 MÁC THÉP SS400 LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
NHÀ XE 01
TEÂN BAÛN VEÕ / DRAWING NAME
A B C D
KHUNG SF1 TL: 1/ 75 MẶT BẰNG & CHI TIẾT SÀN NỀN
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-BP-03 1:150 00
F1 F1
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
C
F1 F1
F1 F1
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
B
1
D
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 No. DATE DESCRIPTION CHECKER
C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2
C
C3 C3
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
B
BN1 BN1
D
BN1
BN1
F3 F3 CHUÛ NHIEÄM DÖÏ AÙN
PROJECT MANAGER
CHUÛ TRÌ
PRINCIPAL DESIGN
C I.J
THIEÁT KEÁ VAØ VEÕ
DESIGNED & DRAWN
TECHNICAL MANAGER
F5 F5 Q.L.K.T
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
I.J
COÂNG TRÌNH : NHAØ MAÙY SAÛN XUAÁT GIAØY TAEKWANG DAKLAK
I.J PROJECT : TAEKWANG DAKLAK FACTORY
B ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
BN1
BN1
HAÏNG MUÏC / ITEM
F4 F4
NHÀ XE 01
BN1 BN1
A TEÂN BAÛN VEÕ / DRAWING NAME
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-BP-01 1:150 00
MẶT BẰNG ĐÀ KIỀNG TL: 1/ 150 TEÂN FILE / FILE NAME NGAØY / DATE
1
CỐT ĐAI Ø6a150 Ø6a150 Ø6a150
No. DATE DESCRIPTION CHECKER
Grid line/ Trục ALL ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
HOÀN THIỆN THEO CHỈ ĐỊNH BVKT
Ñieän thoaïi: 061.3836421 ; Fax:
S.J
BEAM / DẦM BÊ TÔNG LÓT ĐÁ 1x2, DÀY 100
Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
+0.000 MÀNG CHỐNG THẤM PVC DÀY 0.2MM
S.
S.
J
ĐẤT NỀN HIỆN HỮU ĐẦM CHẶT I.J
CHÈN SEALANT W*H=5*15
+0.000 +0.000
I.J I.J NHAØ THAÀU THI COÂNG / CONTRACTOR
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
NHÀ XE 01
TEÂN BAÛN VEÕ / DRAWING NAME
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-BP-02 1:150 00
GM1
GM1
GM1
GM1
GM1
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
B F3 3600 1800 200 300 Ø12a150 Ø12a150 01 -2.000 THAM KHAÛO / FOR REFERENCE
F2 F2 F2 F2 F1 BEAM / DẦM
F1 CHÆNH SÖÛA / REVISION
A GM1 5
4
-2.000 MÓNG ĐIỂN HÌNH MẶT CẮT 1-1
3
F4 F4 2
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
C C CỐT DỌC 8Ø16
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-DOM-01 1:100 00
11-TDL-STR-DORMITORY_V2.0.dwg 06.2021
GHI CHUÙ / NOTES:
G.B1 G.B1
D Grid line/ Trục ALL Grid line/ Trục ALL Grid line/ Trục ALL
G.B2
G.B2
G.B2
G.B2
G.B4
G.B2
G.B3
G.B1
Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100 Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100 Stirrup / Cốt đai Ø6a150
C G.B1 G.B1
Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1
G.B2
G.B2
G.B2
G.B2
G.B2
THAM KHAÛO / FOR REFERENCE
D BÊ TÔNG LÓT ĐÁ 1x2, DÀY 100
Ø10a150
Ø10a150
MÀNG CHỐNG THẤM PVC DÀY 0.2MM THIEÁT KEÁ CÔ SÔÛ / BASIC DESIGN
LỚP ĐÁ 0x4, DÀY 200, ĐẦM CHẶT K=0.95
XIN PHEÙP XAÂY DÖÏNG / FOR CONST. LICENSE
1
ĐẤT NỀN HIỆN HỮU ĐẦM CHẶT
ÑAÁU THAÀU / FOR PROCUREMENT
G.B1
CHÆNH SÖÛA / REVISION
5
1
4
Ø10a150
Ø10a150
Ø10a150
CHI TIẾT NỀN TL: 1/ 25 3
1 2 3 4 4 5 B 2
1
MẶT BẰNG ĐÀ KIỀNG TL: 1/ 100
No. DATE DESCRIPTION CHECKER
1
Ø10a150
D
A ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
1
Ñieän thoaïi: 061.3836421 ; Fax:
Ø10a150
Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
1 Ø8a100 Ø8a100 1 Grid line/ Trục ALL
1 2 3 4 4 5 1.B1
NHAØ THAÀU THI COÂNG / CONTRACTOR
B
Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100
Ø8a150
Ø8a150
1.B2
1.B2
1.B2
1.B2
1.B2
1
C 1.B1 1.B1
1
MB THÉP LỚP DƯỚI SÀN LẦU TL: 1/ 100 1.B1 1.B1 Notes / Ghi chú CHUÛ TRÌ
PRINCIPAL DESIGN
TOÀN BỘ SÀN DÀY 120MM THIEÁT KEÁ VAØ VEÕ
DESIGNED & DRAWN
ALL
1.B2
1.B2
1.B2
1.B2
1.B2
1.B2
Grid line/ Trục
TECHNICAL MANAGER
BEAM / DẦM +3.550 Q.L.K.T
A ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
1.B1
1.B4
1.B4
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-DOM-02 1:100 00
11-TDL-STR-DORMITORY_V2.0.dwg 06.2021
GHI CHUÙ / NOTES:
R.Bm R.Bm
D
Ø10a150
D
R.B1 R.B1
1
1 Ø8a100
1
R.B1 R.B1 THAM KHAÛO / FOR REFERENCE
Ø10a150
C
THIEÁT KEÁ CÔ SÔÛ / BASIC DESIGN
B XIN PHEÙP XAÂY DÖÏNG / FOR CONST. LICENSE
B FOR PROCUREMENT
R.B1 R.B1 ÑAÁU THAÀU /
Ø8a150
R.B2
R.B2
R.B2
R.B2
R.B2
R.B2
R.m
R.m
5
1
Ø10a150
4
3
R.B1 R.B1 A
2
A
1
1 2 3 4 4 5
1 2 3 4 4 5
MB THÉP SÀN ÁP MÁI TL: 1/ 100
MB DẦM SÀN ÁP MÁI TL: 1/ 100 TOÀN BỘ SÀN ÁP MÁI DÀY 120MM & LẬT BẰNG VỚI ĐÁY CỦA DẦM
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
TOÀN BỘ SÀN ÁP MÁI DÀY 120MM & LẬT BẰNG VỚI ĐÁY CỦA DẦM
Ñieän thoaïi: 061.3836421 ; Fax:
XÀ GỒ [] 50*100*2.0@800
Grid line/ Trục ALL Grid line/ Trục ALL NHAØ THAÀU THI COÂNG / CONTRACTOR
R.B1 R.Bm
Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100 Stirrup / Cốt đai Ø6a100 Ø6a200 Ø6a100
Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1 1-2 1-3
C
Notes / Ghi chú Notes / Ghi chú
B
Grid line/ Trục ALL
GIAÙM ÑOÁC / DIRECTOR :
BEAM / DẦM +7.700
W100
W100
W100
W100
W100
W100
R.B2
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
1 2 3 4 4 5 LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-DOM-03 1:100 00
11-TDL-STR-DORMITORY_V2.0.dwg 06.2021
GHI CHUÙ / NOTES:
DW1
+0.000
Ø12a150
Ø12a150
1
1
CHI TIẾT BẢN NẮP TL: 1/ 25
1 Ø12a150
1 Ø12a150
NỀN HOÀN THIỆN (XEM CHỈ ĐỊNH BVKT)
BÊ TÔNG CỐT THÉP ĐÁ 1x2, DÀY 300MM
BÊ TÔNG LÓT ĐÁ 1x2, D50
ĐẤT NỀN HIỆN HỮU ĐẦM CHẶT
MB BẢN ĐÁY TL: 1/ 100 CHI TIẾT BẢN ĐÁY TL: 1/ 25 VÁCH W1 TL: 1/ 25 VÁCH W2 TL: 1/ 25 HOAØN COÂNG / AS - BUILT
4
C1 C1 C1 C1
3
C2
TỪ ĐÁY BỂ TỪ NẮP BỂ 2
VÁCH W1
DE5 DE7
ĐẾN ĐẾN 1
DE5 DE6
C2 NẮP BỂ MÁI No. DATE DESCRIPTION CHECKER
C2
C1 CỐT DỌC 4Ø20 8Ø20 CỐT DỌC 4Ø16
C1 C1 C1 C1 C1 C1 C1
CỐT ĐAI Ø6a150 Ø6a150 CỐT ĐAI Ø6a150
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
TÊN CỘT C1 C2 TÊN CỘT C3 Ñieän thoaïi: 061.3836421 ; Fax:
VÁCH W1
VÁCH W2
VÁCH W1
Pheâ duyeät bôûi / Approved by: Ngaøy / Date:
DE5
DE5
C1 C1 C1 C1
Grid line/ Trục ALL Grid line/ Trục ALL
VÁCH W1
BEAM / DẦM BEAM / DẦM
+0.000 +0.000
NHAØ THAÀU THI COÂNG / CONTRACTOR
1.B1 1.B2
DE1 Stirrup / Cốt đai Ø8a100 Ø8a200 Ø8a100 Stirrup / Cốt đai Ø8a150
DE4 DE4 DE4 DE4
TÖ VAÁN THIEÁT KEÁ / DESIGN CONSULTANCY
Section / Mặt cắt 1-1 1-2 1-3 Section / Mặt cắt 1-1
DW1
DE1 DE2 DE2 Notes / Ghi chú Notes / Ghi chú
B2
B2
Ø10a150
Ø10a150
B2
Ø10a150
Ø10a150
DW1
DW1
B1
B1
B1
1
1
W
GIAÙM ÑOÁC / DIRECTOR :
1
1
B1 B1 B1
W
C3 C3
DE4
1 Ø10a150 W W W
1 Ø10a150
1 Ø10a150 W W
1 Ø10a150 Daàm
150 CHUÛ NHIEÄM DÖÏ AÙN
VAÙCH BEÅ BTCT PROJECT MANAGER
DW1
Ø10a150
Ø10a150
CHUÛ TRÌ
CHI TIẾT DE1 TL: 1/ 25 CHI TIẾT DE2 TL: 1/ 25
CHI TIẾT DE4 TL: 1/ 25
PRINCIPAL DESIGN
1
1
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
MB NẮP BỂ TL: 1/ 100 THÉP BẢN ĐÁY LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
3Ø16
+3.000 W W W W W TEÂN BAÛN VEÕ / DRAWING NAME
R.B1 +0.000
R.B2
R.B2
W
R.B2
3Ø16 3Ø16
3Ø16
R.B1 BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
Stirrup / Cốt đai Ø8a100 Ø8a200 Ø8a100
TDL-STR-RMCC-01 1:100 00
Section / Mặt cắt 1-1 1-2 1-3
CHI TIẾT DE5 TL: 1/ 25 CHI TIẾT DE6 TL: 1/ 25 CHI TIẾT DE7 TEÂN FILE / FILE NAME NGAØY / DATE
Notes / Ghi chú MẶT BẰNG MÁI TL: 1/ 100
TL: 1/ 25
12 14-TDL-STR-WT_V1.0.dwg 06.2021
GHI CHUÙ / NOTES:
B
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
THAM KHAÛO / FOR REFERENCE
CỔNG B
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
Ñieän thoaïi: 061.3836421 ; Fax:
A
NHAØ THAÀU THI COÂNG / CONTRACTOR
ÑÒA ÑIEÅM : KCN HÒA PHÚ, TP. BUÔN MA THUỘT, TỈNH ĐẮK LẮK
LOCATION : HOA PHU IP, BUON MA THUOT CITY, DAK LAK PROVINCE
BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
TDL-STR-FE-01 1:100 00
TDL-STR-HR-CC_V3.0.dwg 06.2021
GHI CHUÙ / NOTES:
GHI CHUÙ 1:
GHI CHUÙ 2 (VEÀ NGUYEÂN TAÉC BOÁ TRÍ BOÅ TRUÏ TÖÔØNG RAØ0):
- Ghi chuù naøy aùp duïng cho haïng muïc: Töôøng raøo - Ghi chuù naøy trình baøy nguyeân taéc boá trí caùc caáu kieän Töôøng raøo doïc theo chu vi ñöôïc xaùc ñònh ñeå thi coâng haïng muïc Töôøng raøo
- Toïa ñoä caùc ñieåm moác cuûa ranh ñaát (phaàn ñöôïc xaùc ñònh xaây töôøng raøo) xem ôû baûn veõ Kieán truùc. (tam goïi laø Ñöôøng Chu vi);
- Taát caû caùc kích thöôùc ñöôïc ñoïc baèng Milimet (mm), Cao ñoä ñoïc baèng Met (m); - Ñònh vò caùc coät truï raøo (bao goàm moùng cuûa noù) treân maët baèng toång theå tuaân theo baûn veõ Kieán truùc. Tröôøng hôïp Kieán truùc khoâng
- Cao ñoä ghi trong baûn veõ laø cao ñoä laáy theo Kieán truùc; chæ roõ thì vieäc boá trí tuaân theo thöù töï öu tieân sau:
- Taát caû caùc baûn veõ phaûi ñöôïc ñoïc cuøng vôùi baûn veõ Kieán truùc vaø baûn veõ caùc heä thoáng kyõ thuaät lieân quan. Nhaø thaàu seõ kieåm 1. Öu tieân ñònh vò caùc Haïng muïc Coång (bao goàm caùc caáu kieän cuûa noù), töø ñoù boá trí caùc coät raøo (bao goàm moùng cuûa noù) ñi veà phía 2
TỪ MÓNG
tra caùc baûn veõ, kieåm tra cao ñoä, kích thöôùc vaø caùc thoâng soá coù lieân quan trong coâng trình, neáu phaùt hieän söï sai khaùc hoaëc beân moãi Coång; ĐẾN
khoâng phuø hôïp phaûi baùo ngay cho ñôn vò thieát keá ñeå ñieàu chænh; 2. Öu tieân ñònh vò coät töôøng raøo taïi caùc goùc giao giöõa 2 ñoaïn thaúng cuûa Ñöôøng Chu vi theo caùc chæ daãn ñaõ ñöôïc trình baøy ôû baûn veõ
- Keát caáu Beâ toâng Coát theùp (BTCT) laø daïng keát caáu chòu löïc chính, vôùi caùc thoâng soá vaät lieäu nhö sau: "MB BOÁ TRÍ KEÁT CAÁU ÑOAÏN TÖÔØNG RAØO TAÏI ÑOAÏN GIAO TAÏO GOÙC TÖØ 45° ÑEÁN NHOÛ HÔN 90°" vaø "MB BOÁ TRÍ KEÁT CAÁU ÑOAÏN ĐỈNH RÀO
+ Beâ toâng: Xem GHI CHUÙ CHUNG TÖÔØNG RAØO TAÏI ÑOAÏN GIAO TAÏO GOÙC TÖØ 90° TRÔÛ LEÂN", ;
+ Söû duïng phuï gia choáng thaám cho beâ toâng laø moät ñeà nghò chung cho taát caû caùc caáu kieän BTCT tieáp xuùc vôùi nöôùc, ñaát aåm 3. Caùc ñoaïn Töôøng raøo coøn laïi thì caùc coät töôøng raøo neân ñöôïc chia ñeàu nhöng khoaûng caùch giöõa 2 coät (Nhòp) khoâng ñöôïc vöôït quaù
hay naèm döôùi maët ñaát. Thi coâng theo chæ daãn cuûa NSX phuï gia vaø keát hôïp vôùi caùc bieän phaùp choáng thaám khaùc theo chæ daãn 4m, neáu trong ñoaïn thaúng treân ñöôøng chu vi coù nhieàu Boå truï vaø vieäc chia ñeàu khoâng thuaän tieän thì öu tieân laøm caùc ñoaïn raøo coù Nhòp
cuûa baûn veõ Kieán Truùc; 4m sao cho ñoái xöùng tính töø giöõa moãi ñoaïn vaø 2 nhòp coøn laïi cuõng boá trí ñoái xöùng töông öùng vôùi moãi ñoaïn thaúng ñoù.
+ Coát theùp: Xem GHI CHUÙ CHUNG; CỐT DỌC 4Ø12
- Lôùp beâ toâng baûo veä ñoái vôùi:
+ Baûn BTCT (Bao goàm Saøn vaø Vaùch) laø 15mm;
+ DAÀM, COÄT laø 20mm (coäng theâm 5mm neáu tieáp xuùc vôùi ñaát hoaëc naèm döôùi maët ñaát);
GHI CHUÙ 3: CỐT ĐAI Ø6a150
+ MOÙNG laø 35mm;
- Chieàu daøi noái buoäc khoâng nhoû hôn 250mm vaø khoâng nhoû hôn 40d (Vôùi d laø ñöôøng kính thanh theùp); - Caùc goùc giao töø 175° ñeán 185° thì xem nhö laø ñöôøng thaúng vaø boá trí nhö ñoaïn töôøng ñieån hình;
- AÙp duïng caùc tieâu chuaån chuû yeáu sau cho coâng taùc thi coâng vaø nghieäm thu: - Khi goùc giao töø 185° trôû leân thì boá trí moät boå truï taïi goùc vaø khoaûng caùch caùc boå truï cuõng nhö caáu
+ TCVN 4453:1995 "Keát caáu BT vaø BTCT toaøn khoái - Quy phaïm Thi coâng vaø Nghieäm thu"; taïo moùng nhö ñoaïn töôøng ñieån hình; TÊN CỘT CỘT RÀO CR1
+ TCVN 9345:2012 "Keát caáu BT vaø BTCT - Höôùng daãn kyõ thuaät phoøng choáng nöùt döôùi taùc ñoäng cuûa khi haäu noùng aåm";
MUÏC ÑÍCH PHAÙT HAØNH / ISSUED FOR
THAM KHAÛO / FOR REFERENCE
TRỤ RÀO
MÓNG GIỮA
PHÍA NGOÀI RANH
MÓNG GIỮA
PHÍA NGOÀI RANH
2
ĐẤT SAN LẤP
ĐÀ KIỀNG DK1 1
MÓNG GIỮA MÓNG GIỮA MÓNG BIÊN MÓNG BIÊN MÓNG GIỮA
No. DATE DESCRIPTION CHECKER
TƯỜNG RÀO
RANH ĐẤT
CHUÛ ÑAÀU TÖ / EMPLOYER
RANH ĐẤT
MAËT ÑÖÙNG KEÁT CAÁU ÑOAÏN TÖÔØNG RAØO ÑIEÅN HÌNH TL: 1/50
MB KẾT CẤU ĐOẠN TƯỜNG RÀO TẠI ĐOẠN GIAO MB KẾT CẤU ĐOẠN TƯỜNG RÀO TẠI ĐOẠN GIAO
TẠO GÓC TỪ 450ĐẾN NHỎ HƠN 900 TẠO GÓC TỪ 900ĐẾN NHỎ HƠN 1750
ĐỊA CHỈ: KCN BIÊN HÒA II, TP. BIÊN HÒA, TỈNH ĐỒNG NAI
TÁCH KHE
RANH ĐẤT TƯỜNG RÀO CỘT RÀO CR1 PHÍA NGOÀI RANH CỘT RÀO CR1 Ñieän thoaïi: 061.3836421 ; Fax:
MAËT BAÈNG KEÁT CAÁU ÑOAÏN TÖÔØNG RAØO ÑIEÅN HÌNH TL: 1/50
+0.000
+0.000 +0.000
3 3
1 1 2 2
CHUÛ NHIEÄM DÖÏ AÙN
PROJECT MANAGER
CHUÛ TRÌ
PRINCIPAL DESIGN
THIEÁT KEÁ VAØ VEÕ
DESIGNED & DRAWN
TECHNICAL MANAGER
Q.L.K.T
TL: 1/25
4
2 2
CHI TIẾT KẾT CẤU
1/4Lo tại gối 1/2Lo tại nhịp
CÁCH KHOẢNG 40 MÉT TÁCH KHE
50
11 ính)
(ta
ïm
t
ĐÀ KIỀNG DK1
TL: 1/25 BAÛN VEÕ SOÁ / DRAWING No TYÛ LEÄ / SCALE SÖÛA LAÀN / REV No
4
1
TDL-STR-FE-01 1:100 00