You are on page 1of 1

Operation Dept.

PSE SHIFT HANDOVER LOGBOOK


Doc No. KLIC-OPE-LGB02-01
Date: 04-Jan-21 Record time 08:00 - 16:00
Shift: 1 Name: Mr. Sengsouvanh
PSE-XPXN Status MW MVar PSE-XPXN Status MW MVar
Line 1 Energize De-Energize -83.39 38.76 Line 2 Energize De-Energize -83.35 38.51
PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar
Line 1 Energize De-Energize 83.40 -38.89 Line 2 Energize De-Energize 83.29 -38.77
CB 80112 CB 80122 CB 80132 CB 80312
Close Open Close Open Close Open Close Open

CB 80212 CB 80222 CB 80232 FUSE 603


Close Open Close Open Close Open Close Open

Service Voltage (kV) Current (A)


KW1A TR 21.3 0.80

Record Time Note


I. Transmission Line Status
08:00-16:00 Pakse Substation Energization Pakse-XPXN Line No.1
08:00-16:00 Pakse Substation Energization Pakse-XPXN Line No.2
08:00-16:00 Pakse Substation Energization Pakse-UB3 Line No.1
08:00-16:00 Pakse Substation Energization Pakse-UB3 Line No.2
II. Daily Activities
08:00 Receiving and Sending information to power house (call)
10:00 DCMS, Equipment Room Check (No problem)
11:40 DCMS, Equipment Room, Switch yard Check (No problem)
15:00 DCMS, Equipment Room Check (No problem)
230kV Main Bus 1 230kV Main Bus 2
𝑈𝑎𝑏 = 239.3 kV 𝑈𝑎𝑏 = 239.7 kV
𝑈𝑏𝑐 = 240.2 kV 𝑈𝑏𝑐 = 240.3 kV
𝑈𝑐𝑎 = 239.7 kV 𝑈𝑐𝑎 = 239.2 kV
F = 50.0 Hz F = 50.0 Hz

III. Switching Order Activities


Don't have
IV. Fault and Alarm Event Log
Don't have
V. Special Activities
Don't have
VI. Work Permit Activivties
Don't have
VII. Issue Trouble Memo
Don't have
VIII. Handover Activities
Observe Transmission line No. 1&2
Observe DCMS

Management Notification

Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….

Pakse Sub Operation Supervisor Signature: ………………………………