ID Task Task Name Duration

Start Finish
Qtr 1, 2021 Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022
#. Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
1 1 Team No.2 262 Thu Sat 262 days
days 4/22/21 1/8/22 4/22 1/8
2 2 Initial dossier, site surveying and 71 Thu Thu 71 days
mobilization days 4/22/21 7/1/21 4/22 7/1
3 3 L651 120 Sat Sat 120 days
days 6/5/21 10/2/21 6/5 10/2
4 3.1 Excavation 10 Sat Mon 10 days
days 6/5/21 6/14/21 6/5 6/14
5 3.2 Existing concrete removal 1 day Tue Tue 1 day
6/15/21 6/15/21 6/15 6/15
6 3.3 ROCKSHIELD Protect mesh 2 Wed Thu 2 days Team No.2
days 6/16/21 6/17/21 6/16 6/17
7 3.4 GEOTEXTILE TERRAM 2000 UV 8 Fri Fri 8 days
days 6/18/21 6/25/21 6/18 6/25
8 3.5 Gabion Boxes 13 Sat Thu 13 days
days 6/26/21 7/8/21 6/26 7/8
9 3.6 Reinforced Concrete material including 1 day Fri Fri 7/9/21 1 day
Form works with strength of (C25/30) and 7/9/21 7/9 7/9
streel grade to be R420.
10 3.7 Filling materials, Graded compacted soil, 7 Sat Fri 7 days
Granular Backfill, MAX particle size < 50mm days 7/10/21 7/16/21 7/10 7/16

11 3.8 RIP-RAP, D = 750mm. 38 Sat Mon 38 days


days 7/17/21 8/23/21 7/17 8/23
12 3.9 RIP-RAP, D = 900mm. 40 Tue Sat 40 days
days 8/24/21 10/2/21 8/24 10/2

Task Inactive Summary External Tasks


Split Manual Task External Milestone
Milestone Duration-only Deadline
Project: Rect. of 38 RoW Geo. Defects
Date: Wed 6/9/21 Summary Manual Summary Rollup Progress
Project Summary Manual Summary Manual Progress
Inactive Task Start-only
Inactive Milestone Finish-only

Page 1
ID Task Task Name Duration
Start Finish
Qtr 1, 2021 Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022
#. Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
13 4 L652 20 Sun Fri 20 days
days 10/3/21 10/22/21 10/3 10/22
14 4.1 Excavation 2 Sun Mon 2 days
days 10/3/21 10/4/21 10/3 10/4
15 4.2 Existing concrete removal 1 day Tue Tue 1 day
10/5/21 10/5/21 10/5 10/5
16 4.3 ROCKSHIELD Protect mesh 1 day Wed Wed 1 day
10/6/21 10/6/21 10/6 10/6
17 4.4 GEOTEXTILE TERRAM 2000 UV 1 day Thu Thu 1 day
10/7/21 10/7/21 10/7 10/7
18 4.5 Gabion Boxes 10 Fri Sun 10 days
days 10/8/21 10/17/21 10/8 10/17
19 4.6 Reinforced Concrete material including 1 day Mon Mon 1 day
Form works with strength of (C25/30) and 10/18/21 10/18/21 10/18 10/18
streel grade to be R420.
20 4.7 Filling materials, Graded compacted soil, 2 Tue Wed 2 days
Granular Backfill, MAX particle size < 50mm days 10/19/21 10/20/21 10/19 10/20

21 4.8 RIP-RAP, D = 750mm. 2 Thu Fri 2 days


days 10/21/21 10/22/21 10/21 10/22
22 5 L646 48 Sat Thu 48 days
days 10/23/21 12/9/21 10/23 12/9
23 5.1 Excavation 4 Sat Tue 4 days
days 10/23/21 10/26/21 10/23 10/26
24 5.2 Existing concrete removal 1 day Wed Wed 1 day
10/27/21 10/27/21 10/27 10/27

Task Inactive Summary External Tasks


Split Manual Task External Milestone
Milestone Duration-only Deadline
Project: Rect. of 38 RoW Geo. Defects
Date: Wed 6/9/21 Summary Manual Summary Rollup Progress
Project Summary Manual Summary Manual Progress
Inactive Task Start-only
Inactive Milestone Finish-only

Page 2
ID Task Task Name Duration
Start Finish
Qtr 1, 2021 Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022
#. Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
25 5.3 ROCKSHIELD Protect mesh 1 day Thu Thu 1 day
10/28/21 10/28/21 10/28 10/28
26 5.4 GEOTEXTILE TERRAM 2000 UV 3 Fri Sun 3 days
days 10/29/21 10/31/21 10/29 10/31
27 5.5 Gabion Boxes 5 Mon Fri 5 days
days 11/1/21 11/5/21 11/1 11/5
28 5.6 Reinforced Concrete material including 1 day Sat Sat 1 day
Form works with strength of (C25/30) and 11/6/21 11/6/21 11/6 11/6
streel grade to be R420.
29 5.7 Filling materials, Graded compacted soil, 3 Sun Tue 3 days
Granular Backfill, MAX particle size < 50mm days 11/7/21 11/9/21 11/7 11/9

30 5.8 1 RIP-RAP, D = 750mm. 26 Wed Sun 26 days


days 11/10/21 12/5/21 11/10 12/5
31 5.9 RIP-RAP, D = 900mm. 4 Mon Thu 4 days
days 12/6/21 12/9/21 12/6 12/9
32 6 L413 11 Fri Mon 11 days
days 12/10/21 12/20/21 12/10 12/20
33 6.1 ROCKSHIELD Protect mesh 1 day Fri Fri 1 day
12/10/21 12/10/21 12/10 12/10
34 6.2 GEOTEXTILE TERRAM 2000 UV 2 Sat Sun 2 days
days 12/11/21 12/12/21 12/11 12/12
35 6.3 Gabion Boxes 4 Mon Thu 4 days
days 12/13/21 12/16/21 12/13 12/16
36 6.4 Reinforced Concrete material including 1 day Fri Fri 1 day
Form works with strength of (C25/30) and 12/17/21 12/17/21 12/17 12/17
streel grade to be R420.

Task Inactive Summary External Tasks


Split Manual Task External Milestone
Milestone Duration-only Deadline
Project: Rect. of 38 RoW Geo. Defects
Date: Wed 6/9/21 Summary Manual Summary Rollup Progress
Project Summary Manual Summary Manual Progress
Inactive Task Start-only
Inactive Milestone Finish-only

Page 3
ID Task Task Name Duration
Start Finish
Qtr 1, 2021 Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022
#. Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
37 6.5 Filling materials, Graded compacted soil, 2 Sat Sun 2 days
Granular Backfill, MAX particle size < 50mm days 12/18/21 12/19/21 12/18 12/19

38 6.6 RIP-RAP, D = 600mm. 1 day Mon Mon 1 day


12/20/21 12/20/21 12/20 12/20
39 7 Final Dossier 30 Fri Sat 30 days
days 12/10/21 1/8/22 12/10 1/8

Task Inactive Summary External Tasks


Split Manual Task External Milestone
Milestone Duration-only Deadline
Project: Rect. of 38 RoW Geo. Defects
Date: Wed 6/9/21 Summary Manual Summary Rollup Progress
Project Summary Manual Summary Manual Progress
Inactive Task Start-only
Inactive Milestone Finish-only

Page 4