You are on page 1of 1

20/7/2020 0 FOR APPROVAL APS SVK JTP

DATE REV. NO. DESCRIPTION Prepared Checked Approved


REVISIONS
PROJECT NAME :

DESIGN, ENGINEERING, BUILD AND COMMISSIONING OF 120 MLD CAPACITY


SEWAGE TREATMENT PLANT IN ZONE - II AT KODUNGAIYUR WITH SEQUENTIAL
BATCH REACTOR (SBR) WITH POWER GENERATION FROM BIO-GAS INCLUDING
OPERATION AND MAINTENANCE FOR TEN YEARS AT CHENNAI.
CLIENT :

CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD

CONTRACTOR: Eco Protection Engineers Private Limited


Plot No:943,54th street, TVS Colony,
Anna Nagar West Ext, Chennai

TITLE :
NAME SIGN DATE

PRED APS APS 20/7/20 Structural Design Calculation of Excess sludge sump,Dilution Water Sump
CHKD SVK SVK 20/7/20 and Supernatant Sump
APPD JTP JTP 20/7/20

SIZE REV.
DOC.No. 19-EPE-CMWSSB-STP-120MLD-ESDSS-SDC-12
A4 0

RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL CONSTRUCTION

You might also like