You are on page 1of 13

DATA INPUT SHEET Page 1 of 6

SITE SURVEY REPORT


Date of Survey 26/05/2016
Survey Engineer Jaswant
CW Engineer
Checked by: R. Quizon
Country Qatar
Client ooredoo
Type of Survey Documentation SITE SURVEY REPORT
Project 2G 3G & LTE Expansion Project
Site Status New
Revision Initial

Revision 0 Remarks Initial Date 26/05/2016 Name SA


Revision 1 Remarks Date Name
Revision 2 Remarks Date Name
Revision 3 Remarks Date Name
Revision 4 Remarks Date Name
Revision 5 Remarks Date Name

SURVEY PARTICIPANTS
Name Roderick Quizon Company Nokia Siemens Networks Contact N° +9745 5831788
Name Jaswant Company Zajel Contact N° 974 70472647
Name Company Contact N°
Name Company Contact N°
Name Company Contact N°
Name Company Contact N°

SITE INFORMATION
Site Name Abu-Faas-South
Site ID OD561
2G MSS MSKRC1
BSC / LAC KRCBSC3 / 9302
WBTS ID
3G MSS MSKRC1
RNC / LAC 77 / 7107
U900 Solution Shared
VFQ Site ID N/A
RF Configuration
GSM900 Configuration 2 2 2
DCS1800 Configuration 4 4 4
UMTS900 Configuration 1 1 1
UMTS2100 Configuration 3 3 3
Geographical Coordinates
Latitude 25.398655 N° Y
Longtitude 51.309318 E° X
Ground Level (ASL) 7 Meters

Key and Site Access Information Old Normal Key

____________________________ ____________________________
Siemens Representative Maxis Representative
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

Jaswant
SITE ID

Roderick Quizon
SITE NAME

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
PARTICIPANTS
NAME

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
DATE OF SURVEY

Customer:
:
:
:

OD561

Zajel
Qatar

COMPANY
26/05/2016

Nokia Siemens Networks


Abu-Faas-South
SITE SURVEY REPORT
2G 3G & LTE Expansion Project

SITE SURVEY REPORT


Contact

974 70472647
+97455831788

REV :
Initial
1
Page:
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

5.
4.
3.
2.
1.
0.
Rev.
Initial
Remarks
9
8
7
6
5
4
3
2
1

Date
26/05/2016

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
APPROVAL

SA
Name
Date

Checked:
Jaswant

R. Quizon
CW Engineer:
SITE INFORMATION

Survey Engineer:
PROPOSED LAYOUT
SITE PHOTOGRAPHS
CABLE LAYOUT DETAILS
GENERAL INFORMATION

26/05/2016
AC ELECTRICAL CONNECTIONS
ANTENNA MOUNTING AND LAYOUT

Site Name:
TRANSMISSION AND POWER SUPPLY EQUIPMENT
TABLE OF CONTENTS

Abu-Faas-South

SITE SURVEY REPORT


2G 3G & LTE Expansion Project
6
5
5
4
4
4
3

13
12
Page

REV :
SITE ID

Initial
Customer:

Site Status:
New
OD561

ooredoo

2
Page:
Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
1. GENERAL INFORMATION

Site Information
Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

Site Name : Abu-Faas-South


Site ID : OD561
2G MSS : MSKRC1
BSC / LAC : KRCBSC3 / 9302
Macro View (10km)
WBTS ID :
3G MSS : MSKRC1
RNC / LAC : 77 / 7107
U900 Solution : Shared
VFQ Site ID : N/A

SITE MAP

4 km View
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design.
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express

GSM 900 Config : 2 + 2 + 2 U900 Config : 1 + 1 + 1


DCS 1800 Config : 4 + 4 + 4 U2100 Config : 3 + 3 + 3
Geographical Coordinates (WGS 84 Format) (QNG Format)
Latitude o Y
: 25.39866 N
Longtitude o X
: 51.30932 E
Ground Level (ASL) : 7m
Key and Site Access Info : Old Normal Key

Rev. Remarks Date Name Date 26/05/2016 SITE ID


0. Initial 26/05/2016 SA Survey Engineer:
Jaswant
Site Name: Abu-Faas-South OD561
1.
CW Engineer:
Customer:
2.
3. Checked:
ooredoo
4.
R. Quizon
2G 3G & LTE Expansion Project Site Status:
5. New
REV : Page:
© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
SITE SURVEY REPORT Initial 3
2. SITE INFORMATION
2.1 Type of site:
Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
Green Field Mobile Shelter Rooftop Shelter Outdoor Cabinet Bldg Room
2.2 Type of Equipment:
FCOA FCIA Wall Mount Floor Mount + 2xDelta Cabinet
Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

2.3 Explain type of Tower:


4 Legged Tower Monopole Wall Mounted RoofTop Tower
Mast Roof Top Monopole Other: Mosque Minaret
2.3 Building or Tower height (ground level to top of structure): 30m
2.4 Crane required? (Yes or No):
Yes No If yes, What is the required crane load capacity? :
2.5 Permit Needed:
n/a OOREDOO ID Permit from OOREDOO Permit from bldg owner

3. ANTENNA MOUNTING AND LAYOUT


All mounting heights are from the ground level to the center of the antenna

ANTENNA INFORMATION Sector A Sector B Sector C

Antenna Height (m) (2G / 3G) 27.m 27.m 27.m


2G Antenna Model Number 5980300G 5980300G 5980300G
3G Antenna Model Number 5980300G 5980300G 5980300G
Azimuth (Magnetic Northº) 2G / 3G 60° 180° 300°
RF Band Compbiner Type / Model N/A N/A N/A

Electrical Tilt (GSM/DCS/WBTS/U900) 4° 3° 3° 4° 4° 3° 3° 4° 4° 3° 3° 4°


Antenna Mechanical Tilt 2° 2° 2°

4. CABLE LAYOUT DETAILS


4.1 RF Cable Details
Cable Cable Cable Cable Cable Cable
CABLE LAYOUT DETAILS
A+ A- B+ B- C+ C-
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design.
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express

Length of feeder cables needed ( 2G ) NA NA NA NA NA NA


Diameter of feeder cables to be used NA NA NA NA NA NA
Length of jumper cables in m (Antenna toTriplexer) NA NA NA NA NA NA
Length of jumper cables in m (MHA to Triplexer) NA NA NA NA NA NA
Length of jumper cables in m (GSM/DCS Ant to Combiner) NA NA NA NA NA NA
Length of jumper cables in m (WMHD to Antenna) NA NA NA NA NA NA
Length of jumper cables in m (GSM/DCS to Combiner) NA NA NA NA NA NA

4.2 IuB Cables, Power Cable and Grounding Cable Details

CABLE DESCRIPTION GSM900 DCS1800 WBTS

Length of Alarm cable in m 5m


Length of E1 cable in m (2G) UTP Cable (3G) 5m 5m 3m
2
Length of 25mm DC power cable in m (blue -) 6m 6m 6m
2
Length of 25mm DC power cable in m (black +) 6m 6m 6m
2
Length of 25mm grounding cable in m (yellow/green) 7m 7m 7m

Rev. Remarks Date Name Date 26/05/2016 SITE ID


0. Initial 26/05/2016 SA Survey Engineer:
Jaswant
Site Name: Abu-Faas-South OD561
1.
CW Engineer: Customer:
2.
3. Checked:
ooredoo
4.
R. Quizon
2G 3G & LTE Expansion Project Site Status:
5. New
REV : Page:
© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
SITE SURVEY REPORT (NODE B) 1 4
5. AC ELECTRICAL CONNECTIONS
5.1 Is the existing AC electrical power sufficient for the new equipment without modification?
yes no n/a
Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden

5.2 AC electrical power details:


Delta Rectifier
Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

AC Circuit Breakers 32A


AC Voltage 240Vac
AC Phase 3Ø
Length of AC Cable (m) 6m

6. TRANSMISSION AND POWER SUPPLY EQUIPMENT


6.1 Type of transmission equipment: To be advice
Fiber Multiplexer Microwave Radio DSL Modem
Supplier of transmission equipment: To be advice
Flexi Packet Huawei ODU Alcatel Huawei IND Other
s:
6.2 Details of DC power supply system:
Manufacturer Delta
DC Power Capacity 6.0 KW

6.3 Details of Battery Back-up:


Rectifer
Manufacturer North Star
Battery Capacity (Ah) 170Ah
No. of Banks (banks) 4

6.4 Cell Information


2G Cell Name Cell ID 3G Cell Name Cell ID
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design.
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express

ABUFAASSOUTH1G 46531 ABUFAASSOUTH1U 11531


ABUFAASSOUTH1D 46531 ABUFAASSOUTH2U 11532
ABUFAASSOUTH2G 46532 ABUFAASSOUTH3U 11533
ABUFAASSOUTH2D 46532 ABUFAASSOUTH4U 11534
ABUFAASSOUTH3G 46533 ABUFAASSOUTH5U 11535
ABUFAASSOUTH3G 46533 ABUFAASSOUTH6U 11536
ABUFAASSOUTH7U 11537
3G U900 Cell Name Cell ID
ABUFAASSOUTH8U 11538
ABUFAASSOUTH1W 16531
ABUFAASSOUTH9U 11539
ABUFAASSOUTH2W 16532
ABUFAASSOUTH3W 16533

6.5 E1 - needed
Number of E1 2 Required BW (Mbps) 42
Required Channel Capacity 400

Rev. Remarks Date Name Date 26/05/2016 SITE ID


0. Initial 26/05/2016 SA Survey Engineer:
Jaswant
Site Name: Abu-Faas-South OD561
1.
CW Engineer:
Customer:
2.
3. Checked:
ooredoo
4.
R. Quizon
2G 3G & LTE Expansion Project Site Status:
5. New
REV : Page:
© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
SITE SURVEY REPORT (BTS) Initial 5
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

5.
4.
3.
2.
1.
0.
Rev.
Initial
Remarks
REMARKS:
REMARKS:
7.1 Site picture

Date
26/05/2016

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
SA
Name
7. SITE PHOTOGRAPHS

7.2 Equipment Room / Location

Date

Checked:
Jaswant

R. Quizon
CW Engineer:
Survey Engineer:
26/05/2016

Site Name:
Abu-Faas-South

SITE SURVEY REPORT


2G 3G & LTE Expansion Project

REV :
SITE ID

Initial
Customer:

Site Status:
New
OD561

ooredoo

6
Page:
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

5.
4.
3.
2.
1.
0.
Rev.
Initial
Remarks
REMARKS:

REMARKS:

Date
26/05/2016

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
SA
Name
Date

Checked:
Jaswant

R. Quizon
CW Engineer:
Survey Engineer:
7.4 Grounding bus bar and cable trays
7.3 Antenna system and antenna mounting pole

26/05/2016

Site Name:
Abu-Faas-South
Antenna Pole not yet installed

SITE SURVEY REPORT


2G 3G & LTE Expansion Project

REV :
SITE ID

Initial
Customer:

Site Status:
New
OD561

ooredoo

7
Page:
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

5.
4.
3.
2.
1.
0.
Rev.
Initial
Remarks
REMARKS:
REMARKS:

Date
26/05/2016
7.5 Existing equipment

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
New Installation

SA
Name
Date
7.6 Power Suppy and Equipment

Checked:
Jaswant

R. Quizon
CW Engineer:
Survey Engineer:
26/05/2016
N.A

Site Name:
Abu-Faas-South

SITE SURVEY REPORT


2G 3G & LTE Expansion Project

REV :
SITE ID

Initial
Customer:

Site Status:
New
OD561

ooredoo

8
Page:
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

5.
4.
3.
2.
1.
0.
Rev.
Initial
Remarks
REMARKS:
REMARKS:

7.8 DDF

Date
26/05/2016

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
Not yet installed

SA
Name
7.7 Transmission equipment

Date

Checked:
Jaswant

R. Quizon
CW Engineer:
Survey Engineer:
26/05/2016
N.A
N.A

Site Name:
OOREDOO transmission equipment not yet available

Abu-Faas-South

SITE SURVEY REPORT


2G 3G & LTE Expansion Project

REV :
SITE ID

Initial
Customer:

Site Status:
New
OD561

ooredoo

9
Page:
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

5.
4.
3.
2.
1.
0.
Rev.
Initial
Remarks
REMARKS:
7.9 Access to site

Date
26/05/2016

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
SA
Name
Date

Checked:
Jaswant

R. Quizon
CW Engineer:
Survey Engineer:
26/05/2016

Site Name:
Abu-Faas-South

SITE SURVEY REPORT


2G 3G & LTE Expansion Project

REV :
SITE ID

Initial
Customer:

Site Status:
New
OD561

ooredoo

10
Page:
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

5.
4.
3.
2.
1.
0.
Rev.
Initial
Remarks
REMARKS:
REMARKS:

Date
26/05/2016

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
SA
Name
Date
7.10 Panoramic view (0º to 90º)

Checked:
Jaswant

R. Quizon
CW Engineer:
7.11 Panoramic view (120º to 210º)

Survey Engineer:
26/05/2016
0 degrees, 30 degrees, 60 degrees, 90 degrees

Site Name:
120 degrees, 150 degrees, 180 degrees, 210 degrees

Abu-Faas-South

SITE SURVEY REPORT


2G 3G & LTE Expansion Project

REV :
SITE ID

Initial
Customer:

Site Status:
New
OD561

ooredoo

11
Page:
Copying this document, or making it available to other person, as well as the use or communication of its contents are prohibited without express Weitergabe sowie Vervielfältigung dieser Unterlage, Verwertung und Mitteilung ihres Inhalts is nicht gestattet, soweit nicht ausdrücklich zugestanden
authorization, on penalty of liability for damages. All right are reserved in the event of the grant of a patent or the registration of utility, model or design. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Recte für den Fall der Patentverleihung oder GM-eintragung vorbehalten.

5.
4.
3.
2.
1.
0.
Rev.
Initial
Remarks
REMARKS:

8. APPROVAL

Date
26/05/2016

© Nokia Siemens Networks GmbH & Co. KG. All rights reserved.
SA
Name
Nokia Siemens Networks' Sign Off
Nokia Siemens Networks Comments:

Date

Checked:
Jaswant

R. Quizon
CW Engineer:
7.12 Panoramic view (240º to 330º)

Survey Engineer:
Date

26/05/2016

Site Name:
240 degrees, 270 degrees, 300 degrees, 330 degrees

Qtel's Comments:

Abu-Faas-South
Qtel's Sign Off

SITE SURVEY REPORT


2G 3G & LTE Expansion Project
Date

REV :
SITE ID

Initial
Customer:

Site Status:
New
OD561

ooredoo

12
Page:

You might also like