CALCULATIONS
DesignFOR
& Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description MGC FILE NO. BH-T2 Rev.D-1
VERTICAL CAPACITY OF PILES Cal By AKD DATE 9/3/2016 SHEET
Checked By MSP DATE 9/3/2016 OF
Sec. Reference
n
I
(
Q u = A p∗( 0. 5 DγN γ + Pd N q ) + ∑ KP di tan δA si +α CA S
i =1
) (As per IS2911 Part I/Sec 2)
1 2 3 4 5 6 7 8 9 10 11
End of Available
Pile Pile
Nearest Sand Sand Working Recommended
Critical Ground Pile Tip termination termination
Pier No. Influencing Layer / Clay layer Load Vertical Working
Borehole Level (m) Level (m) depth below depth below
Boreholes Layer Start below Pile Capacity (t) Load (t)
EGL, (m) COL, (m)
Level (m) Toe (m)
P 01 ABH-1 ABH-1
Borehole Investigation in Progress
P 02 ABH-1 ABH-1
P 03 ABH-1, BH-T2 BH-T2 + 4.46 - 27.04 31.50 29.00 -40.00 8.50 422
400.00
P 04 BH-T2 BH-T2 + 4.46 - 27.04 31.50 29.00 -40.00 8.50 422
P 07 BH-T1, ABH-2 -
P 10 ABH-3, BH-T3 BH-T3 + 3.30 - 27.20 30.50 28.00 -33.50 3.00 428
400.00
P 11 BH-T3 BH-T3 + 3.30 - 27.20 30.50 28.00 -33.50 3.00 428
P 15 ABH-4 ABH-4
P 16 ABH-4 ABH-4
P 17 ABH-5 ABH-5
Borehole Investigation in Progress
P 18 ABH-5, ABH-6 ABH-5
P 19 ABH-6 ABH-6
P 20 ABH-6, BH-T5 -
P 23 ABH-7 ABH-7
P 24 ABH-7 ABH-7
P 27 ABH-8 ABH-8
P 31 ABH-9 ABH-9
P 32 ABH-9 ABH-9
Borehole Investigation in Progress
P 33 ABH-10 ABH-10
P 34 ABH-10 ABH-10
Project RAIL VIKAS NIGAM LIMITED
1 2 3 4 5 6 7 8 9 10 11
End of Available
Pile Pile
Nearest Sand Sand Working Recommended
Critical Ground Pile Tip termination termination
Pier No. Influencing Layer / Clay layer Load Vertical Working
Borehole Level (m) Level (m) depth below depth below
Boreholes Layer Start below Pile Capacity (t) Load (t)
EGL, (m) COL, (m)
Level (m) Toe (m)
P 37 ABH-11 ABH-11
P 38 ABH-11 ABH-11
P 39 ABH-12 ABH-12
P 40 ABH-12 ABH-12
P 41 ABH-13 ABH-13
P 42 ABH-13 ABH-13
P 43 ABH-14 ABH-14
P 46 ABH-15 ABH-15
P 47 ABH-15 ABH-15
P 48 ABH-16 ABH-16
P 49 ABH-16 ABH-16
P 50 ABH-16 ABH-16
P 51 ABH-16, BH-C18 -
P 54 BH-C18, ABH-17 -
P 58 ABH-17, BH-C17 -
P 59 BH-C17 BH-C17 + 9.40 - 32.60 42.00 39.50 -46.50 4.50 411 400.00
P 60 BH-C17, ABH-18 -
Borehole Investigation in Progress
P 61 ABH-18 ABH-18
P 62 BH-C16 BH-C16 + 11.30 - 35.70 47.00 44.50 -50.10 3.10 435 400.00
P 63 BH-C16, ABH-19 -
P 64 ABH-19 ABH-19
P 65 ABH-19, ABH-20 -
P 68 ABH-21 ABH-21
P 70 BH-C15 BH-C15 + 11.80 - 34.70 46.50 44.00 -50.10 3.60 430 400.00
P 71 BH-C14, BH-C15 BH-C15 + 11.80 - 34.70 46.50 44.00 -50.10 3.60 430
P 74 ABH-22 ABH-22
Borehole Investigation in Progress
Project RAIL VIKAS NIGAM LIMITED
1 2 3 4 5 6 7 8 9 10 11
End of Available
Pile Pile
Nearest Sand Sand Working Recommended
Critical Ground Pile Tip termination termination
Pier No. Influencing Layer / Clay layer Load Vertical Working
Borehole Level (m) Level (m) depth below depth below
Boreholes Layer Start below Pile Capacity (t) Load (t)
EGL, (m) COL, (m)
Level (m) Toe (m)
1 2 3 4 5 6 7 8 9 10 11
End of Available
Pile Pile
Nearest Sand Sand Working Recommended
Critical Ground Pile Tip termination termination
Pier No. Influencing Layer / Clay layer Load Vertical Working
Borehole Level (m) Level (m) depth below depth below
Boreholes Layer Start below Pile Capacity (t) Load (t)
EGL, (m) COL, (m)
Level (m) Toe (m)
P 78 BH-C12 BH-C12 + 9.00 - 30.50 39.50 37.00 -42.00 2.50 416 400.00
P 79 BH-C10 BH-C10
Bridge
P 80 BH-C10 BH-C10
P 81 BH-C9 BH-C9
Bridge
P 82 BH-C9 BH-C9
P 83 BH-C6 BH-C6
Bridge
P 84 BH-C6 BH-C6
P 85 BH-C4, BH-C5 BH-C4 + 5.00 - 25.00 30.00 27.50 -33.50 3.50 436
400.00
P 86 BH-C4 BH-C4 + 5.00 - 25.00 30.00 27.50 -33.50 3.50 436
P 94 BH-C19, BH-C2 BH-C19 + 4.60 - 25.40 30.00 27.50 -33.00 3.00 443 400.00
P 95 BH-C2 BH-C2 + 5.50 - 24.50 30.00 27.50 -33.00 3.00 457 400.00
P 96 BH-C1, BH-C2 BH-C1 + 4.60 - 24.40 29.00 26.50 -35.50 6.50 410
P 98 BH-C1 BH-C1 + 4.60 - 24.40 29.00 26.50 -35.50 6.50 410 400.00
P 100 BH-20, BH-C1 BH-C1 + 4.60 - 24.40 29.00 26.50 -35.50 6.50 410
1 2 3 4 5 6 7 8 9 10 11
End of Available
Pile Pile
Nearest Sand Sand Working Recommended
Critical Ground Pile Tip termination termination
Pier No. Influencing Layer / Clay layer Load Vertical Working
Borehole Level (m) Level (m) depth below depth below
Boreholes Layer Start below Pile Capacity (t) Load (t)
EGL, (m) COL, (m)
Level (m) Toe (m)
PROJECT RAIL VIKAS NIGAM LIMITED
CALCULATIONS
DesignFOR
& Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description MGC FILE NO. BH-T1 Rev.D-1
VERTICAL CAPACITY OF PILES Cal By AKD DATE 9/3/2016 SHEET
Checked By MSP DATE 9/3/2016 OF
Sec. Reference
n
I
(
Q u = A p∗( 0. 5 DγN γ + Pd N q ) + ∑ KP di tan δA si +α CA S
i =1
) (As per IS2911 Part I/Sec 2)
0.75 BH-C1
Fill Materials
2.50
6.00
10.50
15.00
25.50
Pile
Toe Level Medium dense / dense yellowish grey
26.50m silty fine sand with occasional traces of
kankars.
33.00
Project #REF!
L1
=
=
569.72 cm
0 cm
hence linear interpretation has been done
L1 = 0.00
R
For Free Head Piles Lf = 1.6 From Fig. 2 of
R Appendix-C of IS:2911
(Part-1 / Sec-2)
Hence, Length of Fixity for a free head pile Lf = 911.56 cm
12 EI
ANNEXURE - 1
SOIL REPORT -
BORE HOLE DAT
ANNEXURE - 4
TEST PILE DESIGN
ANNEXURE - 2
GEOTECH PROFILE
OF BORELOGS
ANNEXURE - 5
GA & RC DRAWING OF TEST PILE
CAPACITY CALCULATIONS
ANNEXURE - 3
TYPICAL LOAD ON PILE CALCULATION