You are on page 1of 2

PERFORMANCE MONITORING AND COACHING FORM Appendix F

SIGNATURE
CRITICAL INCIDENCE
DATE OUTPUT IMPACT ON JOB/ACTION PLAN (RATER/RATE
DESCRIPTION
E)

About 25% of the total number As a result, the modules and outputs of
of students are unable to the students were late in being retrieved,
April 7, 2021 Releasing and Retrieval of Self-
retrieve their lost or stolen and this caused inconvenience for the
Learning Modules
modules. teacher/s, considering we have a very
difficult task ahead of us during this
There is a lag between when
epidemic. The teacher reminded the
their outputs are delivered to
students on a regular basis that they
their respective subject
needed to adhere to the schedule.
teachers.
As a result, the modules and outputs of
the students were late in being retrieved,
causing inconvenience for the teacher/s,
April 19, 2021 Releasing and Retrieval of Self- There are 30% of the total no. especially given the enormity of the task
Learning Modules of students enrolled who failed ahead of us during this epidemic. The
to claim/retrieve their modules. teacher repeatedly reminded the students
that they needed to stick to the schedule.
There is a delay on bringing
their outputs to their respective
subject teachers.
.
May 6, 2021 Submission of Sf2 for the Month SF2 is submitted on time. Routinely tracked attendance of students.
of April
ABRAHAM C. BOJOS  JUMAR C. CALES  ASER M. SAMSONA
RATEE RATER APPROVING AUTHORITY

You might also like