This quality observation report documents the perfect installation of cable glands for a small power socket junction box according to project specifications. Photos show the installation before and after correction. The observation was made during an inspection and found the work to be in compliance with drawings and procedures. It was accepted and closed by the responsible project manager.
This quality observation report documents the perfect installation of cable glands for a small power socket junction box according to project specifications. Photos show the installation before and after correction. The observation was made during an inspection and found the work to be in compliance with drawings and procedures. It was accepted and closed by the responsible project manager.
This quality observation report documents the perfect installation of cable glands for a small power socket junction box according to project specifications. Photos show the installation before and after correction. The observation was made during an inspection and found the work to be in compliance with drawings and procedures. It was accepted and closed by the responsible project manager.
Report Number IGCC-ROO-WI-CP06-SOR-QC(1)- Impact Stop Work / 45 Continue Date & Time 04-02-2021 Category Critical / Minor Project Name or WO No. ROO Location/Site CP06 Observation Type? Negative Observation Positive Observation
Discipline? Mechanical PACO/Instrument
Rotating Construction
Civil & Structural Quality
Documentation HR & Admin
Other ( ____________________ ) Electrical
Characteristics? Tightness Preservation
Cleanliness Information Management
(Others: Welding, NDE, Integrities Interface Material, Traceability, Operability & Maintainability Logistics Testing, Coating & Painting, HSE in transition Others Dimensional, Workmanship, Procedure, Documentation/ ____________________________ Workmanship Records, Competency) Short Description / Title: perfect installation for cable gland for small power socket Junction box with tag (CP06-722-EJB1302) according to ROO specification .
Response or Action by Responsible Party (RP):
06-02-2021 Observation Close-Out Open (as an Action Item)
Closed (Action Performed)
Cancelled (Responsible Person did not Agree)
Reference Drawing No.:
0187PF-S-WM-CP06-EL-DLS-1003-001