You are on page 1of 2

IRAQ GATES CONTRACTING CO.

Quality Observation Report

Observer’s Name Ahmed Jawad Position QA/QC


Report Number IGCC-ROO-WI-CP06-SOR-QC(1)- Impact Stop Work /
45 Continue
Date & Time 04-02-2021 Category Critical / Minor
Project Name or WO No. ROO Location/Site CP06
Observation Type? Negative Observation Positive Observation

Discipline? Mechanical PACO/Instrument

Rotating Construction

Civil & Structural Quality

Documentation HR & Admin


Other ( ____________________ )
Electrical

Characteristics? Tightness Preservation

Cleanliness Information Management


(Others: Welding, NDE,
Integrities Interface
Material, Traceability,
Operability & Maintainability Logistics
Testing, Coating & Painting,
HSE in transition Others
Dimensional, Workmanship,
Procedure, Documentation/ ____________________________
Workmanship
Records, Competency)
Short Description / Title: perfect installation for cable gland for small power socket Junction
box with tag (CP06-722-EJB1302) according to ROO specification .

Response or Action by Responsible Party (RP):

06-02-2021
Observation Close-Out
Open (as an Action Item)

Closed (Action Performed)

Cancelled (Responsible Person did not Agree)

Reference Drawing No.:


0187PF-S-WM-CP06-EL-DLS-1003-001

Form No.: IGCC-OPM-QUA-FMT-0044 Rev. 1 2019-Dec-23 1|Page 1


IRAQ GATES CONTRACTING CO.

Quality Observation Report

Reference Procedure/ Specification: 0187PF-S-DG-DG00-EL-SPC-0007-B01


Photos:

(Before) Insert Photo & Comment 1

(After) Insert Photo & Comment 1 Insert Photo & Comment 2

Accepted and closed


Observer or Accepted
BY IGCC Responsible ROO QA/QC Reviewed
By
Person

NAME

SIGN

POSITION

DATE

Form No.: IGCC-OPM-QUA-FMT-0044 Rev. 1 2019-Dec-23 2|Page 1